REMOVAL OF PHREATIC WATER EXCESS OF THE BASEMENT CONSTRUCTIONS LOCATED ON SLOPING LANDS



Similar documents
COMPULSORY HOME INSURANCE: A WAY TO DIMINISH NEGATIVE IMPACT OF NATURAL DISASTERS

LANDSCAPING AQUA SPORT. Rainwater treatment using filter substrate channel. DIBt approval applied for

How To Know If A Refrigeration System Is Efficient

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Session 7: Retrofitted Edge Drains 7.1

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

September September Consulting Structural and Civil Engineers. 100 St John Street London EC1M 4EH. akt-uk.com

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

SECTION STORM DRAINAGE TABLE OF CONTENTS

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

R E S I D E N T I A L H O U S I N G

ASPECTS REGARDING THE PROMOTION OF WINE PRODUCTS THROUGH ONLINE MARKETING, WITH CASE STUDY COMPANY COTNARI S.A.

The Ultimate Guide To Protecting Your House From Water In The Basement

Storm Drain Inlet Protection

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Geotechnical Building Works (GBW) Submission Requirements

Town of Beaumont. Lot Grading Guidelines

Site Grading and Drainage to Achieve High-Performance Basements

Foundation Drainage. Gable Roof Runoff. Hip roof Runoff. By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

Quick Guide to Application for Clearance for Drainage Works for issuance of Certificate of Statutory Completion (CSC) Minor Project

The Most Advanced Name in Drainage Systems. Geotextile Products

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

opti-drän system Keeps your basement and building dry

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Storm Drain Inlet Protection for Construction Sites (1060)

VALUE CREATION - AS A VALUATION METHOD OF A LISTED COMPANY

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Type of Sewer Systems. Solomon Seyoum

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Uniclass L L2123 EPIC J3413. CI/SfB (52.5) Heavy duty channel drainage system ACO S Range

THE ULTRASONIC TOMOGRAPHY TESTS OF CONCRETE IN FOUNDATION SLAB

piles of debris that accumulate after a rain such as leaves, trash, twigs, etc., water stains on fences and buildings, or salts extruded on bricks,

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Property Care White Papers. Site Drainage: Monitor and Maintain

Section 402. STORM SEWERS

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Crawlspaces. Bowling Green, KY Stormwater Best Management Practices July No Symbol. Symbol. Immediate and Long Term Problems

Storm Drain Inlet Protection for Construction Sites (1060)

SOAK UP YOUR STORMWATER

Section 2100-Trenching and Tunneling

Performance of Edge Drains in Concrete Pavements in California

How To Use A Hydraway System

SANITARY SEWER BACKUP. Causes & Prevention

SECTION EARTH MOVING

CHAPTER 11 STORM DRAINAGE

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

What Causes Foundation Leaking?

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

How to Build a Rain Garden at Your Home

BASEMENT FLOODING. Prevention Guide for. Homeowners

NJ Interception Drainage

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Permeable Pavement Treatment Capacity

PREVENTATIVE MEASURES TO BE TAKEN BY THE OWNER FOR BASEMENT FLOODING OF A RESIDENCE

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS. Attention

EXPERIMENTAL EVALUATION OF THE BIOLOGICAL CLOGGING OF DRAINAGE GEOCOMPOSITE AT THE BOTOM OF LANDFILL

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

CHAPTER 4 STORM DRAINAGE SYSTEMS

Downspout to storm sewer. Leaky laterals

CHAPTER 11 STORM DRAINAGE

Waterproofing membranes are a critical component

Storm Drainage Systems

When considering Roof drainage design the following should be taken into account:

OSU Extension FACT SHEET

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

Protect your home from basement flooding

SUMP PUMP DISCHARGES INFORMATIONAL PACKET

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

City of Shelbyville Site Inspection Checklist

Storm Drain Inlet Protection

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

LUCRĂRI ŞTIINŢIFICE, SERIA I, VOL. XIV (3) USE OF ACCOUNTING INFORMATION IN EUROPEAN PROJECTS

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

Gettysburg Adams Chamber of Commerce Storm Water Management

TECHNICAL SPECIFICATION GUIDE

Track Drainage Inspection and Maintenance

Transcription:

Lucrări ştiinţifice - vol. 54, Nr. 2/2011, seria Agronomie REMOVAL OF PHREATIC WATER EXCESS OF THE BASEMENT CONSTRUCTIONS LOCATED ON SLOPING LANDS Oprea RADU 1 E-mail: opricaradu@yahoo.com Abstract In order to insure a high stability and a normal exploitation of a building, both the land and the foundation must fulfill certain conditions, that is the foundation has to be strong and dry. The underground waters are mostly guilty for the problems and damages caused to the civil and industrial constructions, both in the construction s execution phase and during their utilization and exploitation. In this paper, we present a method for removing water excess deriving from the underground water, but also of the rain water coming from the roof of the building and from the sidewalks. By executing an appropriate drainage for the basement constructions, we insure water removal, the hydrostatic pressure exercised on the walls is reduced, the formation of mildew and dampness is avoided, which allows an appropriate use of the basement spaces. Key words: excessive humidity, building drainage, drainage tube, filtering prism, geotextile Water infiltration into the basement walls of buildings is a permanent issue to be solved by architects and designers. If the water is not removed from the base of foundations critical problems cam appear in the rooms placed at ground level, the infiltrations affecting also the resistance walls of the building (Radulescu et al., 2010). Moreover water accumulation around the buildings makes the soil heavier to the detriment of walls that have sometimes to bear a double pressure compared to the normal situations (Alexandrescu, I., 2010). Such kind of issues emerges due to a lack of measures of water elimination, to improper drains or due to wrong methods of sealing the walls to water infiltration. MATERIAL AND METHOD The surveys were performed to a building with basement (fig. 1) located in Horodniceni commune, Suceava county. The construction is placed on a land with an average 22% slope, a slope affected by an excess of humidity coming out from heavy rainfalls and from a 1-2 meter depth ground water table. In order to carry out the perimetral drainage of the building it was adapted a method derived from the elimination of water excess of the farm fields made up of absorbing drainages and of filtering material columns. In case of the underground drainage associated with land modeling in ridge bands from the farm fields, the literature in the field recommends for improving the collecting conditions of absorbing drainages placed under ditches to erect columns of filtering materials from the drainage level to ditch level. The insertion of filtering columns, in the case of farm fields allows the increase of column size and reduction of collection-discharge network. An economic solution of modeling system of the land in band ridges consists of carrying out water collection from ditches with collecting drainages, placed perpendicular on bands at large distances (about 75 m), the discharge of each ditch into the collecting drainage being made through a prism of granular filtering material. The prism erected at the level of drainage until the land surface makes the hydraulic connection ditchdrain, this being protected by clogging up with a geotextile layer (Barbu Floru, 1986). RESULTS AND DISCUSSIONS Figure 1 Placement of building In order to eliminate the excess of water and to provide the usage of construction basement in good conditions, it was executed in the first stage a 1 University of Agricultural Sciences and Veterinary Medicine, Iaşi 169

Universitatea de Ştiinţe Agricole şi Medicină Veterinară Iaşi perimetral drainage to the building placed at the level of foundation base (fig. 2). The perimetral drainage consisted in execution of a ditch at the level of foundation base at a 1.20 m distance to the basement walls so that the draining tube to be laid down vertically on the pavement side (fig. 3). Figure 2 Perimetral drainage of the building wrapped with geotextile material for preventing its clogging (fig. 4). Figure 4 Draining tube Figure 3 Drainage at the level of foundation base of the building The 0.40 m wide ditch was executed in uphill at the level of foundation base and downhill at a depth higher than the foundation base, providing a longitudinal slope of about 2% for the water flow collected by the draining tube. Corrugated PVC draining tubes were used with a diameter of 110 mm, provided with 2 mm wide transversal slots, the slot surface is of 20 mm 2 and with a number of 40 slots on linear meter that was The filtering material of ballast was placed on the draining tube in a 0.80 m thick layer and with a width of 0.40 m. In order to maintain the width of the filtering material layer, the ballast was placed at the same time with the earth between the basement walls and filtering layer. In order to facilitate the access of rainwater and also the water coming from the pavements towards the draining tube, columns of filtering materials were executed with a diameter of 0.30 m, spaced at 3 m, also of ballast, from the level of filtering layer to the land surface (fig. 5). The columns were obtained by using bottomless tubes and drums that were filled with ballast and together with the filling of spaces between them with earth, the tubes and drums were erecting, so making filtering columns. 170

Lucrări ştiinţifice - vol. 54, Nr. 2/2011, seria Agronomie Figure 5 Building drainage with filtering prism While in constructions placed on lands without excess of humidity of ground water nature, the perimetral drainage evacuates water only during the rainfall periods (Radu O., 2011), in the studied case, the absorbing drainages operate also during the draught periods, evacuating water, in lower flows, in the control manhole (fig. 6). The presence of water supply from ground water table can be noticed also in figure 7, where Figure 6 Water discharge by perimetral drainage from the left side bank of access way into the basement the water flows permanently. In order to avoid an eventual later wetting of the basement and in order to reduce the hydrostatic pressure exercised by the impregnated soil with Figure 7 Water from ground water table water on walls, the perimetral drainage was completed with an agricultural drainage (fig. 8). 171

Universitatea de Ştiinţe Agricole şi Medicină Veterinară Iaşi Figure 8 Perimetral drainage of the building associated with agricultural drainage The agricultural drainage consists of 3 absorbing drains with the length of 23 m, the distance between them being of 10 m, placed uphill the construction (fig. 9). In absorbing drainages, corrugated PVC draining tube was used with a diameter of 110 mm, wrapped with geotextile material, laid down at a depth of 1.40-1.60 m in order to intercept the ground table and as a filtering material, ballast was used in a 0.60-0.80 m thick layer and with a width of 0.40 m. 172

Lucrări ştiinţifice - vol. 54, Nr. 2/2011, seria Agronomie Figure 9 Agricultural drainage The water collected by these drainages is overflowed in a control manhole through an absorbing drainage placed on highest slope line. The connection between the three absorbing drainages with the absorbing-collecting drain was carried out through some PVC connections in a 45 angle (fig. 10). By making the agricultural drainage, the water flow of ground table to the building was interrupted, what it may be concluded also from the fact that the perimetral drainage of the building Figure 10 Connection of absorbing drainages does not evacuate water in periods without rainfall, but the agricultural drainage is operating, evacuating water to the second control manhole also during these periods (fig. 11). 173

Universitatea de Ştiinţe Agricole şi Medicină Veterinară Iaşi The ground water flow interruption by walls, providing an increased stability and a normal operation of the construction execution of agricultural drainage determines the decrease of hydrostatic pressure on basement. Since the slope on which the building is located is affected by the excess of humidity, the water collected by the perimetral drainage as well as by the agricultural one is discharged at about 200 m in the Bradatel creek. Figure 11 Control manhole CONCLUSIONS At constructions located on lands with excess of humidity coming from ground water supply, it is also necessary, besides a perimetral drainage, an agricultural drainage of the surrounding surfaces in order to reduce the hydrostatic pressure on basement walls. The execution of a proper drainage to buildings with basement avoids water infiltration in the walls, formation of dampness and mildew, providing a corresponding operation of basement spaces. BIBLIOGRAPHY Alexandrescu, I., 2010 Contribuţii la studiul acţiunii solicitărilor dinamice asupra fundaţiilor şi a terenului de fundare. Editura Politehnica, Timişoara. Barbu, Fl., 1986 Procedeu de evacuare a apelor de suprafaţă de pe terenurile cu pante mici şi permeabilitate redusă. Lucrările Simpozionului Ameliorarea solurilor slab permeabile cu exces de umiditate de suprafaţă, Satu Mare-Bihor, Publicaţiile S.N.R.S.S., 1988, nr. 24, p. 75-93, Bucureşti. Radu, O., 2011 Adjusting agricultural drainage to buildings. Lucrări Ştiinţifice, seria Horticultură, U.Ş.A.M.V. Iaşi, vol. 53, Editura Ion Ionescu de la Brad Iaşi, ISSN 1454-7376. Rădulescu, N., Popa, H., Muntean, A., 2010 Fundaţii de adâncime. Modelarea analitică a interacţiunii fundaţie teren. Editura Matrix Rom, Bucureşti. 174