Construction Work in Progress: An Effective Financial Tool to Lower the Cost of Electricity



Similar documents
What is Cost of Service Regulation? Basic Issues in Rate Proceedings. Basic COS Component: Operating Expenses

Wisconsin Energy Corporation Plan

Group Exercise I: Calculating the Revenue Requirement

UNITED STATES SECURITIES AND EXCHANGE COMMISSION. Washington, D. C FORM 8-K CURRENT REPORT

Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles

Many directors of public enterprises

REBUTTAL TESTIMONY OF JASON P. NIELSEN

Introduction to Regulatory Accounting

RATE OF RETURN: REGULATION

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C FORM 10-Q

SUPPLEMENTAL INVESTOR INFORMATION. Fourth Quarter 2012

ON- BILL ENERGY EFFICIENCY FINANCE PROGRAMS

Fuel and purchased power expenses decreased primarily due to:

First Quarter 2014 Earnings Conference Call. New Nuclear Presentation Section. April 24, 2014 First Quarter 2014 Earnings Conference Call 1

Public Service Company of North Carolina, Incorporated Condensed Consolidated Balance Sheets (Unaudited)

Debt Policy. I. Purpose of the Debt Policy

DEBT MANAGEMENT POLICY

PROCUREMENT GUIDE: CHP FINANCING

OPPORTUNITY STATEMENT:

NORTHWESTERN ENERGY REPORTS THIRD QUARTER 2015 FINANCIAL RESULTS

rising Electricity Costs:

The Nature of Accounting Systems

The Outlook for Nuclear Energy In a Competitive Electricity Business

Using the FRR to rate Project Business Success

CHAPTER 26. SUBSTANTIVE RULES APPLICABLE TO TELECOMMUNICATIONS SERVICE PROVIDERS.

2012 Survey of Credit Underwriting Practices

ESTIMPA - The Working Capital Reserve

Guide to Financial Statements Study Guide

APPENDIX VIII FORMULA FOR CALCULATING ANNUAL BASE TRANSMISSION REVENUE REQUIREMENTS UNDER SDG&E S TRANSMISSION OWNER TARIFF

2015 ANNUAL OPERATING AND FINANCIAL PLAN

Department of Legislative Services

City Planning - Council's Improvement Strategy

Ipx!up!hfu!uif Dsfeju!zpv!Eftfswf

The Clean Energy Loan Guarantee Program s Credit Subsidy Fee: A Review of a Recent Paper by the Center for American Progress

The Basic Framework of Budgeting

Plan and Track Your Finances

AFM 391 Case Concepts

Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario

Chapter 12 Special Industries: Banks, Utilities, Oil and Gas, Transportation, Insurance, Real Estate Companies

Financial Projections. Making sense of the money

How To Calculate Per Book Return On Equity

Financing New Nuclear Generation. John E. Parsons, MIT July 9, 2009 EPRG / CEEPR / GDF Suez European Electricity Workshop

Table of Contents. Need For and Alternatives To Chapter 11 Financial Evaluation of Development Plans

How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015

Tax Credits, Tax Equity and Alternatives To Spur Clean Energy Financing

DG NORTHERN UTILITIES, INC. Inventory Financing Vehicle. Order Approving the Use of the Money Pool Agreement to Finance Fuel Inventory

Great Plains Energy. Third Quarter 2009 Earnings Presentation. October 30, 2009

STATEMENT OF CASH FLOWS AND WORKING CAPITAL ANALYSIS

Getting More from APPA s Annual Report on Financial and Operating Ratios

Debt Reduction Plan 2005 Debt Reduction and the Offshore Offset Agreement

CH 23 STATEMENT OF CASH FLOWS SELF-STUDY QUESTIONS

Economics of Traditional Planning Methods

Smart Meter Cost Recovery

BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF DELAWARE ) ) ) DIRECT TESTIMONY OF ON BEHALF OF COMMISSION STAFF

Wind Energy Incentives in the USA

Renewable Energy Market Conditions and the 1705 Loan Guarantee Program

CC.2.1.HS.F.5 -- Essential Choose a level of accuracy appropriate to limitations on measurement when reporting quantities Essential. them.

Renewable Energy Finance, Market & Policy Overview

The Economics of Nuclear Power: Is New Nuclear Competitive?

FORM 10-Q. El Paso Pipeline Partners, L.P. - EPB. Filed: August 10, 2009 (period: June 30, 2009)

TECO Energy Edison Electric Institute Financial Conference

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 10-Q (Mark One)

Accounting for the Business- Type Activities of State and Local Governments

Key cost factors include: Year: Engineering News Record Construction Cost Index: AACE Cost Estimate Classification: 4.

MAKING SOLAR ENERGY COST-EFFECTIVE TODAY IS A SNAP

The Risks of Building New Nuclear Power Plants

MARCH 2010 BEST PRACTICES FOR ENERGY RETROFIT PROGRAM DESIGN CASE STUDY: LONG ISLAND GREEN HOMES

Review of the Approach to Capital Investments

Accounting for Long-term Assets,

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

NWN OPUC Advice No / UG (UM 1635 / UG 221)

Preparing Agricultural Financial Statements

WATER UTILITY REFERENCE MANUAL

Financing Solar Energy for Affordable Housing Projects. May 2009

Allowed Return on Equity - Focus on Effective Regulation

Cost of Service Ratemaking

The Insider s Guide to Leasing

DANIEL J. LAWTON LAWTON CONSULTING B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY

El Paso Electric Company Investor Meetings October 2015

Brookfield financial Review q2 2010

RATE BASE, RATE-OF-RETURN REGULATION OVERVIEW

2013 Survey of Credit Underwriting Practices

ČEZ, a. s. BALANCE SHEET in accordance with IFRS as of March 31, 2015 in CZK Millions

The Kansai Electric Power Company, Incorporated and Subsidiaries

Understanding Financial Statements. For Your Business

Forward-Looking Statement Disclosure

Entergy Mississippi's receivables from or (payables to) the money pool were as follows:

Chapter 3 Unit 1. IET Engineering Economics. Learning Objectives Chapter 3. Learning Objectives Unit 1

Public Policy and Innovation: Partnering with Capital Markets through Securitization. Antonio Baldaque da Silva November 2007

2011 Legislative Agenda

Unlimited deposit insurance is unnecessary

NYISO MARKETS CREDIT ISSUES AND WORKING CAPITAL REQUIREMENTS

New York Power Authority Finance Committee Meeting Debt Management Plan Update. December 17, 2013

Spectra Energy Reports Fourth Quarter and Year-End 2007 Results

SMR Financing and Economics. The Nuclear Option: Is Small Scale Nuclear Energy an Option for Alaska?

Texas Electricity Basics

Please NOTE This example report is for a manufacturing company; however, we can address a similar report for any industry sector.

ČEZ, a. s. BALANCE SHEET in accordance with IFRS as of June 30, 2014 in CZK Millions

DEBT MANAGEMENT POLICY ANNUAL UPDATE HUMBOLDT COUNTY, NEVADA

Financial Performance and Financial Statement Projections

Transcription:

February 2012 Construction Work in Progress: An Effective Financial Tool to Lower the Cost of Electricity Executive Summary New nuclear power plants are large, capital-intensive projects. They provide major long-term benefits, however stable, competitive electricity prices and reliable, carbon-free power. These benefits lead many utilities and state regulators to favor new nuclear reactor construction as a strategic resource when planning to meet future electricity demand. To assist regulated utilities with the financing for these large projects and to provide the lowest cost to consumers, many states have policies in place to lower the cost of financing and expedite regulatory reviews. For regulated utilities, the most effective tool to lower the cost 1 of these large infrastructure projects is for state regulators to permit the collection of interest costs and return on equity during construction. Similar rate treatment is allowed by the Federal Energy Regulatory Commission (FERC) to encourage the construction of new transmission lines. This mechanism is also known as Construction Work in Progress, or CWIP. The cost savings from CWIP, which will be passed on to consumers, can amount to billions of dollars over the life of a project. 1201 F Street NW Suite 1100 Washington DC 20004 www.nei.org 1 For a more thorough discussion of the costs of new nuclear generating capacity, see NEI s white paper, The Cost of New Generating Capacity in Perspective.

What is Construction Work in Progress? 2 The term Construction Work in Progress (CWIP) is borrowed from an accounting definition that refers to a line item on a utility s balance sheet to reflect construction work that is not yet complete. When used to describe a financing incentive, CWIP is when a state allows or directs a utility to collect from customers the carrying costs of a project during construction. The carrying costs include interest costs on the money used for construction expenses and a return on equity employed during construction. Collection of carrying costs during construction significantly reduces the allowance for funds used during construction (AFUDC) when the completed project is added to the customer rate base. If these carrying costs were not recovered during construction, they would be capitalized, rolled into total project cost, and recovered when the facility goes into commercial operation. CWIP is one of the tools state regulators and FERC can use to support capitalintensive projects such as new base load generation or new transmission lines or upgrades. Table 1. Impact of CWIP on Levelized Busbar Cost of Electricity Technology Project Structure (Nuclear Energy Institute Financial Model) Rate Base No CWIP 50/50 Nuclear EPC Cost ($/kwe) $4,500 Rate base CWIP 50/50 Total Cost ($/kwe) $9,375 $7,392 Fuel Cost ($/MWh) $7.50 O&M Cost ($/MWh) $9.50 Capacity (MWe) 1,400 Capacity Factor 90% Levelized Busbar (2011 $/MWh) $104.0 $85.7 The Benefits of Construction Work in Progress By paying carrying costs as they are incurred, the utilities and their customers benefit from: Reduced financing costs since carrying costs are not accumulated and capitalized over the life of the asset. This avoids having to pay interest on interest when the carrying costs are rolled into total project cost. Reduced rate shock for consumers by minimizing financing costs and gradually introducing small rate increases during construction. Improved utility cash flows through inclusion of carrying costs in the rate base as they are incurred. Improved cash flows support stronger financial ratings which result in lower interest costs for the project and all other utility investments over the long term. Notes: Cases assume 48-month construction, 6-month start-up, owner s A simple financial analysis illustrates cost of $420 million plus 10% contingency, 6.0% interest rate on commercial debt, 12% return on equity. the power of CWIP to lower the levelized busbar cost of electricity (see Table 1). These results were generated using the Nuclear Energy Institute (NEI) financial model 2 and do not repre- 2 The NEI Financial Model is a detailed financial pro-forma model used to estimate total project, first year and levelized busbar costs for new generating capacity built in either utility-regulated rate base or private sector project finance environments. The model was constructed and tested by NEI staff in consultation with financial, utility, and other industry experts.

3 sent a specific project. For example, owners costs, specific technology cost and output, project structure, and financing costs will all vary based on the project specifics. Examples of CWIP Legislation On April 21, 2009, Senate Bill 31, the Georgia Nuclear Energy Financing Act, was signed into law. This law allows Georgia Power to include approved carrying costs in the rate base during construction of two additional reactors at the Vogtle site. The company has calculated a savings of over $300 million in interest on interest. By paying the interest during the construction period, rather allowing these charges to accumulate for gradual repayment during the project s amortization period, the in-service cost of Vogtle Units 3 and 4 will be reduced by nearly $2 billion. Similarly in South Carolina, the Base Load Review Act enacted in May 2007 allows the state Public Service Commission to grant a project development order for nuclear generation facilities. The project development order permits the utility to collect carrying costs through annual rate requests. For SCANA, the owner of 55 percent of the V.C. Summer site in Jenkins, South Carolina, the Financing New Generating Capacity Under Rate-of-Return Regulation Many states regulate the generation, transmission, and distribution of electricity. In these states, public utility commissions (PUCs) control electricity prices by regulating a utility s allowed costs and rate of return on investment. Electricity rates are determined such that utilities can recover their investments and operating costs and provide a reasonable return on equity to their investors. Rate-of-return regulation can be summarized using the following equations: (rate of return) x (rate base) = (utility s return) (electricity price) x (electricity sold) 1 = (rate base) 2 + (utility s return) + (operating costs) The rate base is a measure of the value of the utility s prudent capital investments. The utility s allowed return to its investors is equal to the rate of return set by the PUC times the utility s rate base. The utility will charge an electricity price that generates revenues to cover the rate base (its investments), its allowed return, and its operating costs. When an electric company builds a new power plant, large upfront investment is required. In most regulated states, utilities recover the interest on the debt and the return on equity associated with this upfront investment through rates. The interest cost and equity return or carrying costs can be capitalized, added to the rate base, and recovered in rates when the plant goes into operation and is deemed used and useful. These accumulated costs are called allowance for funds used during construction or AFUDC. Before capital investment and operating costs can be passed on to electric customers through rates, the PUC must determine that they were prudently incurred. PUCs review the costs being added to the rate base during rate cases and during periodic prudence reviews. A PUC can disallow the recovery of costs that are deemed extravagant or imprudent. 1 For simplicity, utility revenue is expressed as a single electricity price times the quantity of electricity generated. In reality, electricity prices differ by class (residential, industrial, commercial) and sometimes include pass-throughs for items such as fuel and public benefits. 2 Investments for a new power plant are capitalized over the expected life of the plant. The depreciable portion of the rate base is recovered through rates each year.

CWIP policy will result in savings of $1 billion in capitalized interest costs through the construction cycle alone for its portion of Units 2 and 3. 4 Florida s Senate Bill 888 (enacted in June 2006) and its implementing Public Service Commission (PSC) regulation (Docket 060508-EL), adopted in February 2007, permits utilities to recover the carrying costs of construction in rates after the PSC has issued a determination of need order for the proposed plant. Progress Energy received a determination of need order for a proposed two-unit site in Levy County in July 2008. Progress Energy credits Florida s CWIP policy for an estimated $13 billion savings to consumers over the life of the proposed Levy County units. The new units also provide a conservatively estimated annual fuel cost savings of $1 billion. Central Maine Power received approval from the Maine Public Utilities Commission in May 2010 for its proposed Maine Power Reliability Program (MPRP), a project to invest $1.4 billion in the bulk transmission system in the region. FERC authorized CWIP for 100 percent of the prudently incurred expenses. The October 20, 2008, FERC order (125 FERC 61,079) explains the Commission s rationale for awarding the CWIP incentive: Consistent with Order No. 679, we find that authorizing 100 percent of CWIP will enhance Central Maine s cash flow, reduce interest expense, assist Central Maine with financing, and improve the coverage ratios used by rating agencies to determine Central Maine s credit quality by replacing non-cash AFUDC with cash earnings. This, in turn, will reduce the risk of a down grade in Central Maine s debt ratings. Considering the relative size of Central Maine s $1.4 billion investment in the Project, we find that authorization of the CWIP incentive is appropriate. We also find that allowing Central Maine to recover 100 percent of CWIP in its rate base will result in better rate stability for customers. As we have explained in prior orders, when certain large-scale transmission projects come on line, there is a risk that consumers may experience rate shock if CWIP is not permitted in rate base. By allowing CWIP in rate base, the rate impact of the Project can be spread over the entire construction period and will help consumers avoid a return on and of capitalized AFUDC. In addition to CWIP, state legislation to promote new power plant construction, like the FERC orders for new transmission lines, frequently provides other incentives such as annual prudency reviews for construction costs, inclusion of project development costs in annual rate reviews, and recovery of prudently incurred costs if the project is cancelled. All of these measures aid companies in securing financing for new reactors at favorable rates since the overall project risk is reduced. Why CWIP Is Good Public Policy Access to utility service is considered a basic necessity in modern societies. The costs of service are spread evenly in electricity rates based on usage, with the cost of infrastructure borne by all consumers in a service territory regardless of the precise costs and requirements to service locations that may be more complex or remote than others. Like roads and schools, electricity is a benefit to society as a whole, so the costs of providing that infrastructure are shared. America s electric power industry faces a formidable and unprecedented investment challenge. Approximately $1.5-2.0 trillion in new investment will be required by 2030 for new generating capacity, new transmission and distribution, efficiency pro-

5 grams, and environmental controls on operating plants. This is larger than the book value of the entire U.S. electricity supply system and does not include the potential costs of controls on carbon. CWIP can reduce the impact of large cost increases that occur when new electricity generating units or transmission lines are placed on line and lower electricity rates for years to come. CWIP is being used to finance expansion of transmission lines to allow increased use of renewable energy and to modernize the transmission infrastructure. Also, by improving utility cash flows, CWIP helps lower interest rates for all utility investment. Lower interest rates will further reduce the impact on electricity bills. The benefits of new nuclear power plants extend beyond carbon-free power. New plant construction creates up to 3,500 construction jobs at peak and 400-700 permanent high-paying jobs associated with plant operation. Studies of operating units show that the average nuclear plant generates approximately $430 million in sales of goods and services (economic output) in the local community and nearly $40 million in total labor income each year. This results in average annual state and local tax payments of $20 million and federal taxes of $75 million.