CURRICULUM VITAE 1. Family name: ZANÓN 2. First names: Pablo 3. Date of birth: 29/05/1963 4. Nationality: Spanish 5. Civil status: Married 6. Education: Institution (Date from - Date to) Degree(s) or Diploma(s) obtained: Polytechnic University of Catalonia (Barcelona, ) (1982-1988) M.Sc. Civil Engineering Degree 7. Language skills: Indicate competence on a scale of 1 to 5 (5 - excellent; 1 - basic) Language Reading Spoken Writing English 5 4 4 French 2 1 1 Italian 3 2 1 Spanish 5 5 5 8. Other skills: Windows & Office environment, 10. Present position: Freelancer and Senior Consultant. 11. Years within the firm: From November 2002 12. Key qualifications: A senior manager with proven leadership skills and 23 years of relevant professional experience. Highways is his main knowledge area, in all its aspects: Manager of the Project, Site Construction Engineer, Client Representative and and Road Operation Manager in more of 100 km of PPP Toll Highways in (Marbella). Has managed PPP projects in of more than 660 Millions of Euros (1.998-2.002), The Málaga-Estepona toll Highway was a single construction contract of more than 420 million of Euros in 1.998 year. 13. Contact details: pizanon@gmail.com ; +34 606.31.62.67
14. Professional experience Date from - Date to Location Company& reference person (name & contact details) Position Description Construction of 1200 m of a urban Highway inside Barcelona for the Olympics games of 1.992. The government was represented by two different offices, The town hall and the regional government. The investment was 26,75 Millions of Euros. Site Construction Manager 1.998 1.992 Barcelona, Dragados y Construcciones S A Alfonso Lorente García Site Construction Engineer Site Construction Manager 1.998 1.992 Barcelona, Dragados y Construcciones S A Alfonso Lorente García Site Construction Manager Construction of four underground galleries crossing the above highway for urban infrastructure The investment was 5 million Euros
Site Construction Manager Undergrounding a railway and a railway station in the middle of Tarrasa The investment was over the 24 millions of Euros It was a site work of 5.000 ml of diaphragm wall excavation covered by prefabricated beams and concrete slabs. 1.998 1.992 Barcelona, Dragados y Construcciones S A Alfonso Lorente García Site Construction Manager Detailed design of the highway: Autovía del Noroeste. N - VI de Madrid a La Coruña. P.K. 473 al 494. Tramo: Villartelín - Nadela. Clave: T2-LU-2930 y 12-LU-2930. 1.993 1.994 La Coruña, Urbaconsult José Alba García
Detailed design of the highway: Autovía Bailén - Motril. Carretera N-323 de Bailén a Motril. Tramo: Alhendín - Dúrcal. Clave: T2-GR-2830 y 12-GR-2830. 1.996 1.997 Granada, Urbaconsult José Alba García 2001 Detailed design of the As Built highway: Toll highway of Málaga Estepona. 2002 Detailed design of the widening to three lanes of the toll higway in Marbella.
Project Expert Project Expert Detailed design of the toll highway: 1.992 1.998 Málaga, Urbaconsult José Alba García Layout Design, design specifications, and safety barriers Autopista de la Costa del Sol, Tramo Málaga Estepona. We worked for the Private Partnership Cintra (The company that after became ). 2001 Detailed design of slope repairs. Proyecto Complementario Reparación de desmonte entre p. k. 7+190 y p.k. 7+420 del margen derecho de la Autopista del tramo Málaga Estepona Proyecto Complementario Reparación de desprendimiento en el p.k. 22+120 del tramo A del margen derecho de la Autopista 2006-2011 Málaga, Freelancer and Senior Consultant Detailed design : Project of several Infrastructure works for a street in Estepona, Mijas, Fuengirola, Vélez Málaga, Alcaucón and Málaga(Málaga) Detailed design : 2008 Fuengirola Freelancer and Senior Consultant Project of a Skate Plaza in Fuengirola. http://www.360cities.net/image/spain-malaga-fuengirola-roller-skating-rink- 1?utm_campaign=clickback&utm_medium=embedded_hotspot&utm_source= embed#0.00,0.00,70.0 Since 2.007 Ministerio Luis C Tobaruela Due Diligence and construction monitoring Manager Due Diligence and construction monitoring Under growing the highway in the coast, in San Pedro de Alcántara, in, a site work of more than 80 million of Euros for a 6 km long highway, with a cut and cover tunnel of 1000 meters.
Client representative Site in the PPP Toll Highway of Marbella. (1.998 2.002) He was the client representative engineer and project manager in the Málaga Estepona highway, a PPP toll highway in Costa del Sol, with an investment of more than 420 millions of Euros in a single building contract for 83 km long. 1.998-2.002 in the PPP Toll Highway of Marbella. (1.998 2.002) Road Operation Manager in the PPP Toll Highway of Marbella. (1.999 2.002 When it finished Pablo is the road operation manager while is the client representative engineer in the PPP Estepona-Guadiaro toll highway That is another toll highway of 22,3 km long, and we had to build the road lane duplication of the coast (with 13 roundabouts) that was the competition of the toll highway. The investment of this second highway was over the 240 millions of euro.