Our projects ORYX GTL

Similar documents
The Canada GTL Project

Worldwide Engineering centers in the Middle East

Case study: Velocys partnership with Waste Management, Ventech Engineers LLC and NRG Energy

Michael Williams Gasification Technologies Council, 28 th October Smaller scale Fischer-Tropsch enables biomass-to-liquids

Application of Synthetic Diesel Fuels

Our business approach Technip PMC

Thermochemical Upgrading Workshop Coal to Liquids (F-T) Via Gasification

Engineering and technologies Floating LNG

Our business approach Technip PMC

Refining of Crude Oil - Process

UOP Gas Processing. Realizing the Value of Your Natural Gas and Synthesis Gas Resources

CONGRESSMAN DON YOUNG LEADS FACT FINDING TRIP TO SOUTH AFRICA TO VIEW MOSSGAS GTL PLANT

BorsodChem MCHZ, Czech Republic. 6,000 Nm 3 /h HTCR Topsøe Hydrogen Plant A Case Story: 18 Months from Engineering to Operation

From solid fuels to substitute natural gas (SNG) using TREMP

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Best Practices and Approaches to Supply Chain Management

UOP Career Development. Career development program for mechanical and civil engineers

GAS TO LIQUIDS (GTL)

Unconventional Gas Monetisation: GTL - an attractive option?

Concepts in Syngas Manufacture

BP Texas City Refinery

Refinery Equipment of Texas. Mini - Refinery Feasibility Overview

Our business approach Risk Management

20,000 Barrel Per Day Crude Oil Refinery

Suncor Denver Refinery Overview

Velocys and TOYO Engineering. An integrated approach to the implementation of GTL

Process Heater Burners, Flare Systems, Thermal Oxidizers and Catalyst Systems. Combustion Technology

Coal Gasification & Fischer-Tropsch

Facilities Asiaflex Products

Company Profile. Sterling Industries PLC Sterling House Brunel Road Aylesbury Buckinghamshire HP19 8SS United Kingdom

Main areas of services are:

Gasförmige und flüssige synthetische Energieträger aus Biomasse Stand der Entwicklungen an der TU Wien. Hermann HOFBAUER, TU Wien

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

FLEXICOKING technology for upgrading heavy oil and utilization of by-products

TABLE OF CONTENT

Energieffektivitet og bærekraft ved 2. generasjons biodrivstoff. Teknisk Direktør Gjermund Røkke

Transformational gas solution for the upstream industry. Iain Baxter Director of Business Development

SYNTHETIC FUELS: Driving Towards Sustainable Mobility A PUBLICATION BY ASFE ALLIANCE FOR SYNTHETIC FUELS IN EUROPE

Viresco Energy s Advanced Gasification Technology

Haldor Topsøe Catalysing Your Business

Press Kit. The Maire Tecnimont Group pag. 3. History pag. 6. Business Structure pag. 9. R & D: Maire Tecnimont Innovation Centre pag.

ASimple Guide to Oil Refining

SULFUR RECOVERY UNIT. Thermal Oxidizer

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

Effect of GTL Diesel Fuels on Emissions and Engine Performance

SOCAR TURKEY AEGEAN REFINERY

Proud to be here, since 1853

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

The Use of Exhaust Gas Recirculation (EGR) Systems in Stationary Natural Gas Engines. The Engine Manufacturers Association August 2004

AREVA: supply chain network principles and company s vision

London Underground Environment Strategy

Facilities Flexibras Tubos Flexíveis Ltda

Jeff McDaniel GTL Technology Forum, Houston, July 29-30th Why smaller scale GTL still makes sense in a low-oil price world

Pulp & Paper Mills Value and Sustainability

Natural Gas. Natural Gas... p. 57 to 59. fin-house f Training... p. 61

AM Cost Effective Solutions for Reduction of Benzene in Gasoline

Olefins from Syngas Potential for bio-based applications Dr. Thomas Wurzel, Lurgi GmbH. New Biofuels rd-24th June 2010, Berlin, Germany

Ultra Coolant. The Best Performance. The Best Cost. The Best Coolant.

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Upgrading of Heavy Oils with FLEXICOKING. ExxonMobil Research & Engineering Company Tim Hilbert

Engineering g Procurement. 02-Feb-2015

CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER

WISI - ABB Water Industrial Sector Initiative Introducing ABB Water for Process Industry. ABB Group July 29, 2009 Slide 1

TGE TECH. Waste and Green Energy Management For a best future TEL HAY JUNE 2008

Reliability Modeling Software Defined

Latest developments in ammonia production technology

Roy Lipski SMi Gas to Liquids North America, March Smaller scale GTL Projects, partnerships and opportunities

Study Plan. MASTER IN (Energy Management) (Thesis Track)

How To Make A Mine Guard Fosil Process

Guidelines for Preparing for a Temporary Steam Plant

Fujitsu Group s Environmental Management: Outline of Environmental Protection Program (Stage IV)

Biomass-to-Fuel-Cell Power For Renewable Distributed Power Generation

HOW DOES A NUCLEAR POWER PLANT WORK?

Clean Energy Systems, Inc.

Biofuels and Renewable Energy

UNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA DIPARTIMENTO INGEGNERIA CHIMICA MATERIALI AMBIENTE

IMPLEMENTING ISO 14001:

97 MW of Cat coal seam methane power in New South Wales, Australia

GE Oil & Gas. Air Cooled Heat Exchangers. Robust and reliable for all loads and applications

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

Dual Fuel Medium Speed Product. Presenter Name Date

Hythane Company LLC. Hythane Tomorrow s low cost, low emission fuel today

Neville Hargreaves SMi Gas-to-Liquids, October Smaller scale GTL The new paradigm in the age of gas

Monitoring Air Emissions on Ships. Restricted Siemens AG 2014 All rights reserved.

INDUSTRIAL SITE SERVICES. sharing responsibility

Hydrogen Production via Steam Reforming with CO 2 Capture

Main Automation Contractor (MAC) Targets Long-Term Control System Access

Help Shape the Future of Energy as an Engineer at Chevron

Michael Williams AFPM International Lubricants & Waxes Conf., November 13, Smaller scale GTL: a local wax supply solution

ABOUT US PAUL SPENCE CHIEF EXECUTIVE OFFICER

The. Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes.

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

TODAY S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES

Worldwide Technip in Norway

Last update: January 2009 Doc.: 08A05203_e

Transcription:

Our projects ORYX GTL How Technip delivered Middle East s first GTL plant

A large-scale second-generation GTL plant ORYX GTL complex North Field The ORYX GTL complex has positioned Qatar as the leading producer of synthetic petroleum products made from natural gas. The plant converts gas from the North Field into high value, low-sulphur environmentally friendly diesel, naphtha, and LPG. Saudi Arabia Doha Qatar In March 2003, the ORYX GTL project was launched at Ras Laffan to build a world-class first-of-a-kind GTL plant based on the Sasol Slurry Phase Distillate TM (SPD TM ) technology. The ORYX GTL plant includes: 3 core technology units: Synthesis-gas production (Haldor Topsoe) Fischer-Tropsch (FT) synthesis (Sasol) Product work-up (Chevron) Ancillary process units: Air separation Hydrogen production Heavy ends recovery Reaction water treatment LPG clean-up The complex also includes the full production and distribution of utilities (water, steam, power), thorough effluent treatment to match the high environmental standards of Qatar, product storage and ship loading facilities. The first GTL plant in Qatar Client: ORYX GTL Ltd. (JV 51% Qatar Petroleum 49% Sasol Synfuels International) EPC Contractor: Technip Lumpsum turnkey contract awarded in March 2003 Conversion of natural gas into liquid hydrocarbon products (34,000 bpsd of GTL Diesel, Naphtha and LPG) Utility systems started up in December 2005 Process unit commissioning from August 2006 On-spec GTL products to storage in January 2007 The ORYX GTL Project was implemented in two phases -the EPC project and technological improvement following startup-, and was managed by our Rome office, one of Technip s main operating centres. GTL is a new way of bringing natural gas energy to the market, enabling gas-rich countries to strategically diversify their gas monetisation options. GTL products from ORYX have superior environmental characteristics, producing ultra-low emissions during combustion compared to conventional products from oil refineries. The high quality gas-derived products are easily sold on an almost unlimited market.

ORYX GTL plant: project scope Rising EPC costs and resource shortages in construction, logistics and procurement were the real challenges in implementing the ORYX GTL project, a large and technically complex project. The EPC lumpsum contract was awarded at the end of 2002 and came into force in March 2003. Technip s contract scope included: engineering, procurement and supply of equipment and materials, construction, commissioning, start-up, initial operation and performance testing of this grassroots GTL plant. Engineering activities specifically focused on safety, constructability, operability and environmental impacts. ORYX GTL plant block flow diagram Process Units Utilities/Offsites Ancillary Process Units Construction also included the lifting of two 2,000-tonne reactors Air Air Separation External Recycle Fuel Gas Heavy Ends Recovery Natural Gas Hydrogen Production Natural Gas Oxygen HP Steam Syngas Production Syngas MP Steam F-T Synthesis Liquid Products Reaction Water Product Work-up LPG Naphtha Diesel The high level of integration of process and utilities posed many challenges to both plant efficiency and on-stream time. Plant Condensates Steam, BFW, Power To Users Utilities BFW Effluent Treatment Plant Effluents Treated Water Oxygenates To match this challenge, Technip carried out a significant amount of dynamic simulation validated by the stability of plant controls and their ability to manage any plant upset smoothly and safely. Technip successfully completed this large project by leveraging its 50-year experience in hydrocarbon processing project execution. The number of process units in a GTL plant, the complexity of operating sequences linking those units, and the limited intermediate storage buffer volume led to a need for careful definition of the start-up sequence and fine-tuning of the various conditions to guarantee the safe and successful ramp up of the entire plant. New process steps were introduced to reduce catalyst fines in the wax and to improve the operation of the reaction water treatment units.

The site team Nearly 30,000,000 construction manhours were spent on site. At peak, some 4,500 people were working, representing more than 15 nationalities. 1,500,000 manhours were spent by Technip on construction management and supervision. The project s main challenges For plant handover purposes and to manage the interface between construction and commissioning, the plant was divided into 229 systems, each having the following certified steps: Construction Completion (CC) Ready for Commissioning (RFC) Ready for Operation (RFO) The industry s leading vendors and erection contractors were engaged considering the size of the main equipment (diameters up to 10 m, lengths up to 60 m, weights up to 2,000 tonnes), and piping and the complexity of the plant s civil structures. Piping pre-fabrication was extensively used and exceeded 4,500 tonnes. Extensive use was made of reinforced pre-fabricated concrete structures, as more cost-effective given the type of resources available locally. A significant amount of instrumentation was installed to guarantee proper plant performance. The overall number of control and safety valves approached 1,500 units. Technip designed the DCS, MMS and SIS systems to meet the highest safety standards as well as the highest on-stream factor. The large amount of cooling needed and the absence of available cooling water led to many air coolers. The procurement of this equipment was a critical step in the project execution, as it saturated the supply capacity of air-fin exchanger manufacturers worldwide. The main quantities reveal the large size of the ORYX GTL plant: Plant area 72 hectares Equipment 1,650 pieces Concrete 63,000 m 3 Steel structures 8,000 tonnes Piping 12,800 tonnes Equipment 26,000 tonnes Instrument cables 1,200 km Electrical cables 500 km ORYX GTL

Major success factors Involvement of Technip's construction and commissioning experts in plant design from day one. Careful planning of each phase of the project, with a particular focus on start-up which was under Technip's complete care and responsibility. The existence of a proactive and fair dialogue between the Owner, Licensor and Contractor. Home office Project Team organised as a task force. Use of highly experienced staff and specialised vendors. Quick release of purchase orders for the Fischer-Tropsch reactors and other long-lead items. Direct management of plant finishing works and punch-list clearance by Technip's construction teams (direct hire). Prompt personnel recruitment for plant start-up and operation ensuring proper training, both at site and at similar industrial plants. Strong support from Sasol for expertise in plant operations. Excellence Award 2010 - Project rewarded by IPMA (*) for the mega sized-project category. (*) International Project Management Association

HSE performance More than 9 million manhours without LTI HEADQUARTERS Technip 89 avenue de la Grande Armée 75773 Paris Cedex 16 France Phone: +33 (0)1 47 78 24 00 LNG / GTL Business Unit Philip HAGYARD Phone: +33 (0)1 47 78 27 17 E-mail: phagyard@technip.com Roberto di CINTIO Phone: +39 06 65 98 30 58 E-mail: rdicintio@technip.com Technip Italy SpA Viale Castello della Magliana Rome Italy Phone: +39 06 65 981 Fax: +39 06 655 1402 www.technip.com A complete HSE program was set up, including: Procedures Permit to work (PTW), with certified personnel Lock out Tag out (LOTO) procedure Training Site HSE induction Distribution of a safety booklet to each member of the workforce Confined space entry Working at heights Commissioning Pre-start-up safety training, including Quantitative Risk Assessment per unit Sustainable Development initiatives Environment Development of pollution control policy including: Low NOx and SOx emissions with continuous monitoring and control Closed drain systems to prevent soil contamination Waste water treatment unit to upgrade reaction water up to irrigation water quality (irrigation of 2 hectares of land newly planted with trees), cooling water quality and demineralised water quality Waste management, recycling of wood, metals, and plastic Employment of local workforce Wherever possible, use was made of local skills for example in workshops, and for maintenance and transportation activities. Traditions The work was carried out in the respect of local traditions and holidays. This document is the property of Technip and is not intended to be a binding contractual document. Any information contained herein shall not result in any binding obligation on the part of Technip, or any of its affiliates, and is provided for information purposes only. Technip - Group Communications - September 2011 - Photo credits: Technip