Guide Specifications Fiberglass Doors & Frames Section 08220

Similar documents
Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

HMMA 810 HOLLOW METAL DOORS HOLLOW METAL MANUAL -87 NAAMM STANDARD FOURTH EDITION METAL DOORS & FRAMES NAAMM 2 NAAMM 2 METAL DOORS & FRAMES

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

CLEAR-DIVISIONS CENTERFOLD

CLEAR-DIVISIONS VARIOFOLD

ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2

Technical Data Honeycomb Door Leaf

C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

City of San Diego, CWP Guidelines

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION SERIES 1500 VINYL PATIO DOORS

Subject: DKS Steel Door and Frames Systems, Inc., ITS / Warnock Hersey Procedural Specification, Certification, and Inspection.

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

MEANS OF EXIT / ESCAPE / EGRESS SELF INSPECTION CHECKLIST

Sun Windows General Information Sun New Construction Window Installation Instructions

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

Architectural Casework Description of Work

n Three 4 x 4 butt hinges per door - prevents wracking and assures smooth positive operation n Heavy duty 16 gauge steel frame

CLEAR-DIVISIONS APERTO

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

SECTION PREFORMED METAL STANDING SEAM ROOFING

PART 1 GENERAL 1.1 SECTION INCLUDES

SECTION 6. Glass Storefront Doors:

SECTION STANDING SEAM METAL ROOFING

DOORS HOLLOW METAL MANUAL NAAMM STANDARD NAAMM HMMA METAL DOORS & FRAMES METAL. A Division of

quality door and window systems for metal buildings

Core and Frame Details

Wood Sound Retardant Door Hardware Information Bulletin

Fire-Rated Doors and Hardware. A Guide to Field Inspection

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

Protecting Your Home From Hurricane Wind Damage

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU # ).

Phoenix-3W Series One-Way Security Revolving Doors

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

RadianceRail Installation Guide

Fabcograte FRP Grating. Tolerances: ±1/16. Tolerances: ±1/16. THICKNESS BAR SPACING PANEL SIZE (FT.) WT (LBS) 1" 1.5" x 1.

SECTION ACOUSTICAL WALL TREATMENT. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

Product Guide Specification

Active and Passive Sash Replacement

Basic Fire Door Requirements

How to secure your property after a disaster

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

SECTION METAL WALL PANELS

DENVER MODEL 30 X 30 SPECIFICATIONS

Toll Free:

Stainless Steel Continuous Hinges

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

Protecting Your Home from Wind Damage

Calvert USA, Inc. Attic Stairs

Sash Replacement Guide

Doors and frames. Technical data manual 2015 rev. 8/17/15

SECTION STANDING SEAM METAL ROOF

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

March 14, Installation of Bay, Bow and Garden Windows

DESIGN CLARIFICATION (DC)

Window Installation Instructions

Andersen Electric Window Opener for Andersen Awning and Roof Windows

CONCEALED BEARING HINGES. StANLEy ARCHItECtuRAL HARDwARE

Packaged Terminal Air Conditioner Wall Sleeve Installation


Best Barns USA Assembly Book

AZEK Rail Install Guide

Premier & Deluxe 3-Season Room Sliding Glass Door

SECTION ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

HARDWARE LOCATIONS FOR HOLLOW METAL DOORS AND FRAMES

CHAPTER 7: Building Systems ROOFING SYSTEMS

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

White Paper FIRE DOOR INSPECTIONS, REPAIRS AND LABELING

Automatic Door Selection Guide

Preformed Metal Roofing and Siding

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS WINDOWS

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

2. Division 05 Structural Steel Framing for steel framework requirements

DE Frame with C Series Sidelight

SECTION GUARDA SECURITY WINDOW SCREENS

2.02. Specifications. General. Products. Execution. Offset Pivots P-694 Top and Bottom Pivots

AZEK Rail Install Guide

COLORADO MODEL. 35 x 65 SPECIFICATIONS

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

All-Season Sunroom Sliding Glass Door Installation Instructions

glass & Glazing Products

COMMERCIAL BUILDING APPLICATIONS

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

Transcription:

1.0 General 1.1 Scope A. Standards for manufacturing, machining, finishing and installation of fiberglass doors unless more specifically described under other section(s). 1.2 Related work in other sections A. Section 06200: Carpentry B. Section 06420: Architectural Paneling C. Section 08700: Finish Hardware D. Section 08800: Glass and Glazing E. Section 09900: Painting 1.3 Quality Assurances A. Provide doors meeting or exceeding the minimum standards as set forth by the following organizations unless standards are modified or exceeded by this specification: 1. Composite Fabricators Association (CFA) 2. Composites Institute 3. National Accreditation & Management Institute, Inc. (NAMI) B. All doors shall be the products of the same manufacturer to insure uniformity of quality and appearance throughout the project. C. The top of each door shall bear a quality assurance label from the manufacturer indicating the door handing and order number. D. The door manufacturer shall provide a Certification of Compliance with this specification signed by an authorized company representative to the architect or owner at their discretion. 1.4 Submittals A. Shop Drawings Submit schedules and elevations indicating door sizes, construction, swing, undercut and applicable hardware locations. 1

B. Product Information Submit manufacturer's product description showing compliance with specifications, finishing instructions, installation instructions, and any general recommendations the manufacturer may have for the care and maintenance of each door type. 1.5 Coordination Contractor shall be responsible for coordination and acquiring of all necessary information from hardware manufacturers. Door supplier shall be responsible for coordinating all necessary information received by contractor from hardware manufacturers, to facilitate door preparation for hardware installation. Contractor shall provide door supplier with two copies of hardware schedule and all necessary hardware templates. All of the above information shall be in possession of door supplier 120 days prior to desired delivery date of doors. 1.6 Delivery, Storage and Handling A. No doors shall be delivered to the building until weatherproof storage space is available. Stack doors flat and off the floor. Protect doors from damage at all times. B. Factory finished doors shall be individually wrapped in plastic bags to protect the finish from damage by contact with other doors. C. Do not walk or place other material on top of stacked doors. Do not drag doors across one another. D. Installer shall use all means necessary to protect doors from damage prior to, during and after installation. All damaged doors shall be repaired or replaced by contractor at no cost to owner. E. Doors may be palletized at the factory in stacks of no more than 30 doors per pallet. All doors and frames will be fully crated with plywood protection all sides of the pallet. 1.7 Warranty A. All work in this Section shall be warranted (from the date of shipment) against defect in materials including the following: 1. Delamination in any degree. 2. Warp or twist of 1/4" or more in any 3'0" x 7'0" door. 3. Telegraphing of any core assembly through face to cause surface variation of 1/100" or more in a 3" span. 2

4. Any defect that may, in any way, impair or affect performance of the door for the purpose of which it is intended. B. Warranty Period: doors and frames are guaranteed for the life of the product against corrosion induced failure and for a period of ten (10) calendar years after the date of purchase against defects. C. Doors must be stored, finished, hung and maintained per manufacturer's recommendations set forth in their warranty coverage. 2.0 Product 2.1 Manufacturers Listed manufacturers are believed to conform to the criteria stated for material quality standards, function and appearance. Manufacturers are still subject to meeting the requirements of this specification. Non-conforming substitutions shall not be accepted. A. Oregon Door product line B. Oshkosh Door Company Cor-Guard product line C. Corrim 2.2 Materials and Components A. FRP Door Cores: Select from below options FRP-S (Polystyrene minimum 2 lb density) FRP-E (Structural Composite Lumber core) FRP-H (Hurricane approved polystyrene core) FRP-F (45-90 min fire rated core) B. Stiles and Rails: Stiles and rails shall be constructed of solid polymers securely bonded to the core material and then abrasively planed as a unit to eliminate telegraphing issues related to uneven core materials. Tubular stiles and rails or systems incorporating metal reinforcements for the attachment of hardware will not be accepted. Bottom rails shall be a minimum of 2 prior to factory trim to allow for field trimming if required. When styrene or fire rated cores are used the top rail shall be a minimum of 6 ½ prior to factory trim. C. Blocking: All doors shall have solid polymer blocking where located wherever locks, exit devices etc. penetrate the core. Blocking shall be large enough to accommodate the entire hardware prep. 3

D. Door Face Skins: Door face skins shall consist of a Fiberglass Laminate manufactured by the Resin Transfer Molding (RTM) process. Skin thickness shall be 0.090 inches. 1. Face sheet reinforcements shall be either type "A" or "C" glass. 2. Door faces shall be: Select one of the following: Smooth prepped with primer for field finish Smooth painted finish with one of manufacturer s standard colors Smooth painted finish custom matched to color selected by the architect Pebble face with color selected from manufacturer s standard colors E. Vision Kits and Louvers: These accessories shall be furnished by door supplier and made from solid polymers. Fire rated vision kits may be made of metal and will be supplied with fire rated glass. Louvers and vision kits to be installed by the manufacturer. Vision kits to be installed complete with glass. Select one of the following Vision kit with ¼ in tempered glass Vision kits with 1 insulated glass 3.0 Execution F. Frames: All frames shall be FRP pultruded material with an integral stop for the door. Corners of the frames shall be mitered at a 45 degree angle for both knock down and welded applications. Select one of the following All frames to be knock down for field assembly All frames to be factory chemically welded together Frames to be painted the same color as selected for the doors. Galvanized hollow metal frames will be allowed for use at fire rated openings. 3.1 Fabrication: Fabricate all doors and accessories in strict accordance with this specification and door manufacturer's manufacturing specifications. 3.2 Machining and Fitting: All fiberglass doors shall be machined by the manufacturer or authorized manufacturer for cutouts, hinges, locks, closures and all hardware requiring routing and mortising. Doors shall be sized to allow 0.125 inches of clearance at top and each side and 5/8 inch clearance at bottom (unless specified otherwise). 4

3.3 Installation of Hardware Guide Specifications A. Contractor shall install hardware according to approved hardware schedule for proper locations. B. Install with full threaded screw furnished by hardware manufacturer. C. Drill proper size pilot holes for all screws. D. Securely anchor hardware in correct position and proper alignment. E. Adjust hardware and door for proper function and smooth operation, proper latching, without force or excessive clearance. END OF SECTION 08220 08/2014 5