Installation Instructions

Similar documents
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Sikaflex Sealant Installation. Sika Corporation

DIY CABINET REFACING INSTALLATION GUIDE

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Installing Window Trim and Door Trim

Solvent Cementing Instructions For Plastic Pipe & Fittings

Application Instructions for Avery Dennison Films SF S LTR EZ RS, Conform Chrome

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Sun Windows General Information Sun New Construction Window Installation Instructions

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

PANELIZED HOME INSTALLATION GUIDELINE

Installing Window and Door Mouldings

Minor Cracks in Horizontal Surfaces

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version

How to Install Hardwood Flooring Over a Sub Floor

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

INSTALLATION INSTRUCTIONS FOR RIGID VINYL WALLCOVERING

THERMAL TRANSFER PRINTING PROBLEM SOLVER

Set-Up Instructions. (Liner-Based System) UL LISTED. Important Read set-up instructions before assembly. Report any shortages within 72 hours

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

SC2000 CEMENT BONDING PROCEDURES

Resurfacing Concrete. Page 1 of 5

GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS

Shower Walls and Tub Surrounds

Amorim Rubber Flooring Specifications

GENERAL RUBBER LINING PRINCIPLES

Crystal Clear Sealant

How to Build a Poker Table

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

FIVE STAR PRODUCTS, INC. (800)

Chrome Finishing For 3d Powder Prints

Repairing Drywall Techniques for fixing everything from popped screws to big holes

Rudder Repair and refinish

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

Stair Parts Installation. Tricks

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

STAIR TREAD & RISER INSTALLATION GUIDELINES

How to Build Your Own CornHole Game

Autobody/Collision and Repair Technology/Technician CIP Task Grid

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Reasons for reissue are in Section 6, REVISION SUMMARY.

Composite Stone Veneer

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Gear PEPSI CAN STOVE INSTRUCTIONS

JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING. Test Code: 2060 Version: 01

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Brisa UV Gel Enhancements Sculpted on a Tip

Repairing the Seam of the WaterRower Tank

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

Commercial/Residential Linoleum Sheet Installation System

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Armstrong Do-It-Yourself Tile Installation System

Your guide to home maintenance. Flat Roofs

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

PART E SPECIFICATIONS

Chapter. Restoration of Damaged Structures

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

Aspect Metal Peel & Stick Tile Installation Guide

Installation System. Existing Resilient Sheet Floors

SEAMS SEAMING USING SEAM TAPE

WOOD FLOORING ADHESIVES

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

METAL ROOFING INSTALLATION GUIDE

Kemlite Transportation Products

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

Brick Veneer Construction

WOOD FLOORING MAINTENANCE MANUAL

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

3D Printing with Bamboo Wood Filament

Installation for Wood Flooring

Installation Manual for STANDING SEAM ROOFING

GigaCrete Specification PlasterMax

DIRECT THERMAL PRINTING PROBLEM SOLVER

How to Install GoBoard:

3M Scotchcast Mine and Portable Cable Splice Kit

Document Library TS Data Sheet M Windo-Weld Super Fast Urethane. Data Sheet. Public


A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Tundra Series Windows January 2016

SECTION WATER STORAGE TANK PAINTING

Peel & Seal Self-Stick Roofing Solutions

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

FRAMED & MOUNTED TILE MURAL

Installation Directions for RubberForm Recycled Products Spill Berms

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Instruction Manual. Image of SP-3015 & SP Important Safeguards. Automatic Dispensing Hot Water Pot with Reboil Function

PC-Concrete Injectable Concrete Anchoring and Repair System

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Transcription:

Recommended Tools Tape Measure Sharp Knife Miter Saw Duct Tape Mineral Spirits Clean Cloth Isopropyl Alcohol Caulking Tool Jiffy Mixer Margin Trowel 2 Empty, Clean Containers Material Sizing 1. Joints must be sized every 5-7 feet (1.524-2.137 meters) to ensure gap opening is uniform and depth is sufficient for the supplied material. Allow sufficient depth for the material to be recessed 1/8-1/4 in the joint. Material Preparation 1. Store material at a minimum of 68 F (20 C) for a minimum of 24 hours prior to installation, regardless of temperature at location of installation. 2. Store materials in a dry, enclosed area. Make sure materials are off the ground and out of direct sunlight. Material will expand faster when hot and slower when cold. In cold temperatures, store material in a heated area 24 hours prior to installation. In hot temperatures, store material out of direct sunlight and not in an enclosed storage container where temperatures may exceed 100 F. Refer to the SEAMS section for further instruction on preparing the material for proper seam installation. 3. Use a miter saw to make any cuts to the HF before removing the clear shrink packaging. All starting and ending pieces must be square to the termination point. Install the material directly after removing the shrink packaging to ensure the material does not expand past the joint opening. Apply mineral spirits to the knife for a smoother cut. 4. Use a sharp knife to make any cuts after the clear shrink packaging and wooden boards have been removed. P/N: SIC-50N-2001 REV.B PAGE 1 OF 5

Joint Preparation 1. Verify that the joint is clean, sound, and will provide an appropriate surface for installation of the joint sealant. Use compressed air to clean any loose debris from the joint. Apply water or alcohol to a clean cloth and wipe the joint walls to the depth of the sealant material plus 1. 2. Verify that the joint is uniform and repair any spalls prior to installation. 3. Apply duct tape to both edges of the substrate face to prevent the epoxy from contacting the deck surface. 4. Check the material for appropriate length, width, and depth. Supplied material should be pre-compressed to a size smaller than the intended joint opening. Joint depth must allow for the installed material to be recessed 1/4 from the substrate surface. Epoxy Preparation 1. Mix Part A and Part B separately. 2. Transfer the entire contents of Part A (resin) and then Part B (hardener) into a clean, empty container. Mix the material thoroughly with a low speed (approximately 300 rpm) drill or jiffy mixer. Part B must ALWAYS be added to part A, and mixed in a 1:1 ratio. 3. Mix until the black and white is evenly blended leaving no streaks of either color. 4. Transfer the mixture to another clean container to avoid any leftover residue from streaking the final mixture. Mix only the required amount of epoxy that will be used within a 30 minute timeframe to prevent the epoxy from curing prematurely. Epoxy Tips: The epoxy will not cure when the temperature is below 40 F. For every +17 F, the epoxy cures twice as fast. For every -17 F, the epoxy takes twice as long to cure. Greater volume = less time to cure Smaller volume = more time to cure A technique to increase the pot life of the epoxy is to split up the mixed material into smaller units. P/N: SIC-50N-2001 REV.B PAGE 2 OF 5

Sealant Installation 1. Begin installation at one end of the joint and work to the opposite end using butt seams. 2. When fully prepared to install, apply a 1/16-1/8 coating of the epoxy mixture to both joint walls using a 1 margin trowel to a depth of the sealant material plus 1/2. The epoxy must still be wet upon installation of Sealtite 50N; The working time for epoxy is approximately 30 minutes depending on the temperature. If the epoxy hardens on the surface of the substrate before installation, another coat of epoxy can be applied within 8 hours. After 8 hours, the substrate surface must be abraded to eliminate the amine blush that occurs during the final cure. Pay attention to the direction of insertion marked on the packaging. 3. Cut the shrink packaging along the edge of the masonite strapping. Be prepared to install the material immediately once the packaging is removed to prevent the material from expanding past the joint width. Refer to the SEAMS section for further instruction. 4. Verify that the material is cut square at both ends for proper seams. All pieces must be square to the termination point. P/N: SIC-50N-2001 REV.B PAGE 3 OF 5

Sealant Installation 5. Remove the white release liner on both sides of the HF. Make sure not to pull, twist, or stretch the material in the process of installation to avoid tearing the white release liner. 6. Initially, position HF 1/8 above the deck surface. Once the material is partially expanded in the joint, it can then be installed to 1/4 below the surface of the joint using a putty knife or margin trowel. Wedges can be used to aid installation. Remove the wedges once the material begins to expand and before the epoxy cures. Seams 1. Verify that the new piece of material is cut square and not at an angle to the previous piece installed. 2. Apply flexible seal to the butt end of the new piece of material. Do not apply flexible seal to the faces of HF that are in contact with epoxy. If crew size permits and two lengths of material can be prepared, the ends to be seamed can be held above the deck surface and the mitered pieces can be pushed down into the joint together. P/N: SIC-50N-2001 REV.B PAGE 4 OF 5

Seams (continued) 3. Overlap extra material (approximately 1/2-1 ) at seams and splices to ensure that the seam is in compression after installation. 4. Butt seam all T and + intersections After installation, if there are any mitered joints with a hole or void, use the supplied flexible seal to fill and seal the joint. Finish 1. Remove any excess flexible seal or epoxy left on the surface of the material or substrate. Do not allow the flexible seal or epoxy to cure before removal. 2. Remove the duct tape from the joint surface. P/N: SIC-50N-2001 REV.B PAGE 5 OF 5