Central Nippon Highway Engineering Nagoya Co. Ltd., Kanazawa, Ishikawa, Japan,

Similar documents
PROPERTIES AND MIX DESIGNATIONS

Chapter 8 Design of Concrete Mixes

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

Concrete Repair. Applications and Procedures

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

Example Specification for Concrete using Current Building Code Requirements

Lab 1 Concrete Proportioning, Mixing, and Testing

Recycled Concrete Pavement and Other Recycled Materials in Concrete Pavements

Chapter Two Types of Cement The properties of cement during hydration vary according to:

1.5 Concrete (Part I)

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

EVALUATION OF THE PERFORMANCE OF THE PROTECTIVE SURFACE COATINGS FOR CONCRETE


High-Speed Nondestructive Testing and Intelligent Construction Systems

The Concrete Life Cycle: Maintain to Sustain. Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE

STUDY ON THE CHLORIDE DIFFUSION COEFFICIENT CALCULATED FROM A SIMPLE ACCELERATED CHLORIDE PENETRATION TEST USING ELECTRICITY

Properties of Concrete with Blast-Furnace Slag Cement Made from Clinker with Adjusted Mineral Composition

Chapter 2 Basis of design and materials

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

Analysis of M35 and M40 grades of concrete by ACI and USBR methods of mix design on replacing fine aggregates with stone dust

Rapid Chloride Permeability Testing

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Effect of basalt aggregates and plasticizer on the compressive strength of concrete

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Construction Materials Testing. Classes of Test

The AQUAFIN Approach to Concrete Repair


The Strength of Concrete

Stone crusher dust as a fine aggregate in Concrete for paving blocks

A COMPREHENSIVE STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH SUGARCANE BAGASSE ASH, RICE HUSK ASH & STONE DUST

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

AGREGADOS RECICLADOS MITOS Y REALIDADES

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

C. Section TESTING LABORATORY SERVICE.

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

New Refractory Technology Provides Advantages in Monolithic Refractories

Minor Cracks in Horizontal Surfaces

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

A Study on the Flexural and Split Tensile Strengths of Steel Fibre Reinforced Concrete at High Temperatures

CA-48 TECHNICAL SPECIFICATION

EFFECT OF NANO-SILICA ON CONCRETE CONTAINING METAKAOLIN

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

NON-DESTRUCTIVE METHODS. CE 165: Concrete Materials and Concrete Construction

Hydrophobe VII., Lisbon

Moisture and Resilient Floor Covering

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

Assessment of corrosion-damaged concrete bridge decks - a case study investigation. Amleh, L.; Lounis, Z.; Mirza, M.S.

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

How To Determine The Effect Of Frost Deterioration On Chloride Penetration And Carbonation

Sika FerroGard The Unique Multi-Functional Surface Applied Corrosion Inhibitor for Reinforced Concrete. Innovation & Consistency.

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures

Optimum Curing Cycles for Precast Concrete

Cold Weather Concrete Practices

Acceptance Criteria for Durability Tests

Elevated Roads for Sri Lanka

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

SafetyBuletin. Concrete101 Aguidetounderstandingthequalitiesofconcrete andhowtheyaffectpumping

EDUCATIONAL GUIDE TO PROPERTIES OF MASONRY MORTAR

The First Commandment for floor slabs:

Concrete for industrial floors

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

Ron Miedema Cement Contractor 1865 Pine Ridge ~ Jenison, MI 49428

Properties of Fresh Concrete

Resurfacing Concrete. Page 1 of 5

Cementitious Materials Update The effect of ggbs, fly ash, silica fume. concrete.

THERMOSET EPOXY POLYMER CONCRETE FOR THE FABRICATION OF CHEMICAL CONTAINMENT VESSELS.

Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

Lesson 3. Portland Cement and Concrete

Division 9. SignaFlor Pad and Pour Flooring System

STADIUM Software Overview. Durability and Service Life of Concrete Structures

North American Stainless

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

DMS REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION AND PLANT QUALIFICATION

XYPEX AUSTRALIA CHLORIDE PENETRATION TESTS ON XYPEX ADMIX C-1000NF MODIFIED COMMERCIAL CONCRETES. By Gary Kao B.Mat.E, MSc, UNSW Research Engineer

Evaluation of Initial Setting Time of Fresh Concrete

Proposed Revision to Bridge Design & Drafting Manual

ISIDAÇ 40. building chemicals. Special cement for your special products!

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

Solutions Dufferin Concrete Newsletter June 2014 Fast Track Concrete Page 5

NEGATIVE SIDE WATERPROOFING SYSTEMS FOR MASONRY AND CONCRETE

USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.

High Performance PSA in Sheet Membrane in Water Protection

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

Mass Concrete. Robert Moser CEE8813A Material Science of Concrete. Definitions & Standards, Thermal Cracking, and Temperature Rise

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

MASONRY INFORMATION. Selecting and Specifying Mortar and Grout for Unit Masonry. Introduction. Desirable Mortar Properties. Selection of Mortar

BENTLEY ELEMENTS COLLECTION LVT

Transcription:

Abstract DEVELOPMENT OF FAST ACCELERATED SET CONCRETE APPLICATION FOR REPAIRING THE DETERIORATED REINFORCED CONCRETE DECKS Yuichi Ishikawa 1, Doyeon Kwak 2 and Mamoru Moriyama 3 Many reinforced concrete bridge decks in the Hokuriku Expressway, hereinafter called as RC decks, have been damaged by deicing salt attack. The delaminated RC decks have been repaired by patching and applying the ultra rapid concrete. However, ultra rapid concrete application requires a special type of vehicle for mixing concrete, which results in the considerable increase of the total repairing cost of the RC decks. This paper describes the development of a rapid hardening concrete named Fast Accelerated Set Concrete, hereinafter called as FACET. FACET is mixed directly with calcium aluminates and sulfate powder in a mixer truck, and it can develop the compressive strength greater than 24N/mm 2 in 6 hours. In this research work, a total deck area of about 1,000m 2 is investigated to confirm the workability and the supply capacity of the FACET system. A cost-effective and easy supply system of FACET for repairing delaminated RC decks is furthermore proposed. Introduction These days, many RC decks in the Hokuriku Expressway have been damaged by deicing salt attack. The delaminated RC decks are normally repaired through the patch of concrete material. In order to reduce the influence on traffics and logistics on the expressway, a quick repairing method is always requested. As a result, the ultra rapid concrete, whose a unique characteristic is quick setting to reach the concrete compressive strength of 24N/mm 2 in 3 hours has been applied. The ultra rapid concrete requires to be mixed on the site by using a stationary type or portable type, as shown in Fig. 1. The mixing cost on the site of this material is normally ten times higher than that in the plant. A more cost-effective concrete material is therefore required. This paper presents the development of the supply system for FACET. This FACET is mixed directly with powder of the calcium aluminates and sulfate in a mixer truck and enables to develop compressive strength greater than 24N/mm 2 in 6 hours, whereas maintain cost performance. 1 Central Nippon Highway Engineering Nagoya Co. Ltd., Kanazawa, Ishikawa, Japan, y.ishikawa.a@c-nexco-hen.jp 2 Taiheiyo Material Corporation, Sakura, Chiba, Japan,doyeon-kwak@taiheiyo-m.co.jp 3 Central Nippon Highway Engineering Nagoya Co. Ltd., Kanazawa, Ishikawa, Japan, m.moriyama.aa@c-nexco.co.jp

Fig.1 Concrete application types in Japan The Problem in Repairing the Delaminated RC Decks The Hokuriku Expressway began operating in 1970s. In winter season, deicing salts have been used on this expressway. The use of deicing salts have dramatically increased, as shown in Fig. 2, as a result of studded tires being banned in 1990 for heavy snowfall areas in Japan [1]. When the deicing salts (i.e. chloride ion) and water reach down the reinforcing bars, hereinafter rebars, an electrolytic action is started and causes the corrosion of rebars. As the corrosive particles build up, they expand against the concrete cover, eventually exceeding the tensile strength of the concrete. As presented in Fig. 3, this causes the horizontal cracks along the upper area of rebars, which results from the exceedance, can cause a delaminated area of concrete [2]. Delaminated RC decks are normally inspected by using the hammer tapping on the asphalt pavement, as given in Fig. 4. This inspection method is easy to be used and can detect fast the delaminated area. However, this method has low accuracy in estimating the area of delaminated RC decks, as addressed in Table 1. On the other hand, for the use of the conventional ultra rapid concrete application the good estimation of the repairing material volume is always require because if there is a mistake in the estimation of repairing area, mixing problem will occur, as depicted in Fig.5. Therefore, a development of a flexible supply system for the FACET is furthermore proposed. Fig.2 Volume of deicing salts in the Hokuriku Expressway

Table 1. Accuracy rate of hammer tapping Method Visual survey used on the concrete cores Hammer tapping 88% Fig.3 The delaminated RC decks caused Fig.4 Typical investigation of RC decks by deicing Investigation of the RC decks Order > Actual Area of repair Order < Actual A wasteful situation A fair situation Order = Actual An Impossible situation Characteristics of Facet 1. Outline Fig.5 The problem of mixing concrete on the site Mix of FACET applies a new manufacture concept. The ready mixed concrete, which doesn t harden yet, is supplied from a plant with a certification from Japanese Industrial Standard. FACET is made by mixing the ready mixed concrete with delaying agent solution, whose main chemical compound is called oxycarbonic acid, and then the powder of calcium aluminates and sulfate is added in a mixer truck. The typical mix proportion of the FACET is shown in Table 2. On the other hand, Table 3 shows the comparison of FACET with the conventional ultra rapid concrete application. It shown from this table, the cost of using FACET is approximately half times cheaper than that of ultra rapid concrete. The mixing method of FACET also enables it to be a flexible supply system, which is expected if the repairing area is out of the estimation.

2. Material characteristics of FACET in fresh concrete condition Fig. 6 shows the condition of the fresh FACET slump measured in accordance with the JIS A 1101. Because the FACET contains large amount of powder, the shape of slump measured is in viscosity condition. In addition, FACET has less bleed water on the concrete surface. Fig.7 shows the measuring resistance of the penetration proctor in accordance with ASTM C 403. This result shows that the volume of delaying agent solution and temperature are influencing the setting time. Therefore, it is recommended that the material temperature should be measure and then an adjustment of the volume of delaying agent solution should be done to suit the concrete workable time. Table 2. Typical mix proportion of the FACET (Unit: kg) Water Cement Sand Aggregate Chemical Delaying agent Admixing admixture Chemical Water powder compound 168 350 744 1018 3.5 3.5 10 150 Table 3. Comparison of FACET with conventionally ultra rapid concrete application FACET Concrete Ultra Rapid Concrete Compressive strength 24 N/mm 2 in 6 to 12 hours 24 N/mm 2 in 3 hours Starting of the mixed More than 60 minutes 20 to 40 minutes concrete setting time The place of mixing the In the concrete plant On the site concrete then add the powder on the site Supplying ability 15 to 30 m 3 /hour 15 to 30 m 3 /hour Price ( thousand yen) 120 to 180 250 320 Fig.6 The condition of FACET in accordance with slump test (JIS A 1101)

3. Material characteristics of FACET in hardening concrete condition The compressive strength of FACET enables to be developed greater than 24 N/mm 2 in 6 hours and finally reached more than 70 N/mm 2 in 28 days, as shown in Fig.8. Fig.9 shows the salt penetration depth of various concrete measured by Electron Probe Micro Analyzer,hereinafter EPMA. The penetration of chloride ion in FACET is less than that in normal concrete. As a result, the high durability of FACET is confirmed. Resistance of penetration proctor(n/mm 2 ) 40 30 20 10 0 Temperature 5 Temperature 20 Setting Starting Volume of delaying agent 0.1% 0.2% 0.3% 0 100 200 300 400 500 100 200 300 400 500 Setting time from mixed concrete (minute) Volume of delaying agent 0.4% 0.6% 0.8% Fig.7 The measuring resistance of the penetration proctor of FACET Compressive strength (N/mm 2 ) 80 70 60 50 40 30 20 10 0 FACET Ultra rapid concrete 1 2 3 4 5 6 7 Concrete age (days) Fig.8 The compressive strength 28 Fig.9 The salt penetration depth of various concrete measured by EPMA

Feasibility Test of Facet on the Construction Site 1. Feasibility test situation on the construction site In order to repair the RC decks damaged by deicing salts in the Hokuriku Expressway, an experimental repair was performed on the total RC deck area of approximately 1,000 m 2. The production stages of FACET is shown in Fig. 10. First, as the concrete was brought to the construction site from the concrete plant by a mixer truck, the delaying agent solution was mixed with the concrete in high speed mixing for 15 seconds. Second, the fast accelerated admixture is added to the concrete mix in high speed mixing for 3 minutes. Before pouring the FACET, the degraded RC decks were removed with water jet, as shown in Fig. 11. Bleeding was not observed on the surface of the FACET. Therefore, it proves that a concrete with good quality was placed. Furthermore, Fig. 12 shows different curing method on the surface of the concrete which is resulting in different temperature of concrete. As shown in Fig. 13, the compressive strength of the concrete is gradually increasing. In addition, if the concrete surface is covered with a vinyl sheet the temperature of the concrete will be higher, especially at the early hours, compared with open-air curing, and the compressive strength will gradually increase over time by thermal insulation. Even though there are differences in the compressive strength before 6 hours on each curing method, but the compressive strength after 24 hours is almost the same. 2. The occurrence of initial cracks The FACET can be effectively applied for repairing degraded RC decks. The experimental test of the repaired RC decks using FACET has been conducted for two years since 2012. However, only initial cracks with the average width of 0.2mm has been observe on about the area of 70m 2. Additionally, the initial cracks didn t form a directional cracks, as seen in Fig. 14. The crack densities are 3.3m/m 2 in the longitudinal direction, and 4.4m/m 2 in the lateral direction. It is noted that the grid density method counts the number of intersection and cracking grid lines drawn at 125mm intervals. (1) Adding the delaying agent (Mixing time is 15 seconds) (2)Adding the powder(mixing time is 180 seconds) Fig.10 The addition of delaying agent solution Fig.11 Removing the surface of RC and fast accelerated admixture decks with water jet

It is intended to quantify the crack density by dividing the total length of the grid. It therefore would be said that if FACET is applied the direction of crack can be detected easily. Fig. 15 shows a schematic evaporation of water from the concrete surface and the effect of the presence or absence of curing sheet. The surface area of RC deck in contact with the outside air is large. Thus, the initial cracking is likely to occur due to moisture evaporation from the condensation, which happens before. Due to this reason, the concrete surface is covered with a curing sheet until the condensation of FACET ends. This method prevents the temperature change and moisture evaporation of rapid concrete, and therefore, becomes effective. 3. Experiments on the prevention of initial cracks in the FACET concrete In order to prevent the occurrence of initial cracks on the surface of the FACET, the experiment of fresh concrete curing method and different troweling time have been performed. Fig. 16 shows the sketch of the surface crack of the FACET concrete on a typical experimental condition. The specimens used in the experiment are 100mm thick with the size of 1320x840mm, and four specimens with the size of 560x350mm. In the case of applying the coating curing agent to the surface of the fresh concrete, the initial crack does not occur on the surface of the concrete. On the other hand, without applying the coating curing agent to the concrete surface, a countless fine cracks occurred on the surface of concrete. It turns out that it is important to prevent the moisture evaporation on the surface of FACET with a coating curing agent. Moreover, as a comparison without applying a coating curing agent, occurrence of an initial crack can be controlled by adjusting the right time to do troweling on the surface of concrete. There is a tendency that it is possible to remove the initial cracks, if the finishing of concrete surface is carried out at 60 to 90 minutes from mixing the FACET Fig. 12 The difference in the temperature Fig.13 Changes in compressive strength change by different curing method due to temperature change

Therefore, when FACET is used for repairing RC decks, it is better to follow the following procedure. First the coating curing agent is applied and the surface of the concrete is tapped using the trowel. Then the curing method is conducted by covering a vinyl sheet on the concrete surface. This curing method will not make the hydration heat release rapidly by vaporization heat due to water evaporation of the concrete. Laterally 1000mm Total crack length 4.4m/m 2 Longitudinally 1000mm Total crack length 3.3m/m 2 Fig.14 The initial cracks of FACET Wind RC deck Water vaporization rebar Temperature Depth To prevent cracks at the construction phase Wind sheet RC deck rebar Temperature Depth Fig.15 The reason of the concrete cracks Fig. 16 The sketch of the surface crack of the FACET

Conclusions This feasibility study confirmed the cost-effectiveness of the FACET. By adding the fast accelerated admixture and delaying agent solution in ready-mixed concrete, the practical application of the new concrete method is furthermore examined. The examination result confirmed that the proposed method can reduce up to half of the cost, in comparison with the use of the conventional ultra rapid concrete. As a result, the material cost of the repair concrete can be reduced significantly. The basic system of the material supply also can be developed from the ready-mixed concrete plant. This cost-effective supply system can cover the inaccuracy in the estimation of the delaminated RC decks, which is normally conducted by hammering. Because FACET may have a little bleeding and tend to be influenced by the moisture evaporation of the concrete surface, it is suggested that the coating curing agent is applied to the concrete surface. Moreover, it is also proposed that the finishing of concrete surface is carried out at 60 to 90 minutes from mixing the FACET. This will prevent the occurrence of the initial cracks. In addition, it is important to cover the concrete surface with a vinyl sheet in order to prevent the hydration heat from releasing rapidly. References [1] Japan Concrete Institute Technical Report: Technical reports of damaged reinforced concrete structures due to de-icing salts, ISBN4-931451-17-2 C3050, 1999, (in Japanese) [2] Y. Ishikawa, M. Aoyama, Y. Adachi and M. Nagai: Damage assessment of reinforced concrete decks due to chloride-induced corrosion of reinforcing bars and fatigue, IABMAS, 2012.7