NY State Representatives: Alex Zablocki, NYC Regional Lead, Governor s Office of Storm Recovery (GOSR); Chris Gorman, Community Planner GOSR.



Similar documents
Case studies used to calibrate recommendations. Hazard environment Range of businesses Owned vs. leased space Different building types

HHC FEMA- Priority Mitigation Projects

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Duggan Dry Pond and Storm Sewer Improvements. Public Information Session #1 - May 30, 2013

New York State 2100 Commission Report: Energy

THE : SANDY DART Parsons Brinckerhoff s Disaster Awareness Report October 25, 2013

Infrastructure for Adapting to Climate Change Environmental Law Forum April 10, O Brien & Gere

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Implementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned

Click to edit Master title style

SANITARY SEWER BACKUP. Causes & Prevention

How To Install An Overhead Sewer

First in Service First in Safety

A Guide to New National Flood Maps & New National Flood Insurance Program Premiums and Requirements

City of Indian Rocks Beach, Florida NFIP Number

How does NYC Rapid Repairs work?

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

Consumer Education Campaign on Flood Risk, Maps and Insurance. Info Session and Q&A May 9, 2014

Green Streets, Places, and Spaces

Lifeline Road Network Study

Kansas City s Overflow Control Program

Second Avenue Subway. Quarterly Public Workshop. October 21, 2015

A Century of Progress with Pride

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

Protect Your Home From Flooding. A guide for Lethbridge Residents

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions

Hoboken Resiliency & Readiness Plan

a guide to PREVENTING HOME FLOODING DURING STORMS

AGENDA REPORT. Report on July 22-23, 2011 Storm and Flood Event and Stormwater Management Strategies

Climate Adaptation Planning in New York City

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Earth, Wind and Fire: Just Add Water and Stir Vigorously

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

SEWER BACK UP PREVENTION PILOT PROGRAM

Berkeley CERT El Niño Flood & Landslide Planning Activity Guide

Flood Protection Tips

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

City of Green Bay Department of Public Works Engineering Department

How To Build A Backwater Valve

The Council of the City of New York. Economic Development Corporation

foundation designed to keep water out of the basement.

The Hempfield Township Municipal Authority Backwater Valves (aka Backflow Preventers)

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

Flood disaster preparedness and resilience

Lansdowne Stormwater UPDATE

AN ACT IN THE COUNCIL OF THE DISTRICT OF COLUMBIA

Standard Operating Procedures for Flood Preparation and Response

South Florida Resilient Redesign. Dense Urban Community South Beach Miami Beach, Florida

Town of Union Community Rating System News

Proposed General Plan Update Goals, Policies, and Implementation Actions

MEMORANDUM TO CLIENT Attorney-Client Privileged

Storm Ready: How to Prepare Your Business

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs

District of Columbia Water and Sewer Authority George S. Hawkins, General Manager

Protected Bicycle Lanes in NYC

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

Adaptation for City Infrastructure; A Case Study of East Boston, MA

Hurricane Sandy Effects on Communication Systems

National Archives and Record Administration

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

CITY COUNCIL PACKET MEMORANDUM

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Summary of Potential Storm Drain Projects and Programs

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

The Clean Water Project What Is The Stormwater Impact?

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

Brookdale Site. CB6 Update April 1, 2015

The Town of Lakeshore Basement Flooding Information to Residents

Why Homeowners Need a Backup Sump Pump System

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Short-term. Action items that fall into this category need to take place over the next one to two years.

AN UPDATE ON LOUISVILLE MSD s BASEMENT BACKFLOW PREVENTION PROGRAM 10 YEARS AND 6,700 INSTALLATIONS LATER

Downspout to storm sewer. Leaky laterals

PREVENTING WET OR FLO ODED BASEMENTS

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

plumbingfoundation.org

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

11 p.m. to. Tuesday, June. will remain open. 14. closed

New York City, facing one of the nation s largest sewage overflow

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

Implementation Date: May 5, Table of Contents. Section Description Page. 1.0 Description Initial Response 2

Power Problems? Let Us Know!

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

Fairlington Community Center

The New York Recovery Network: E-Bulletin Published August 13, 2014

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Cheong Gye Cheon Restoration Project


Toronto s Wet Weather Flow Master Plan

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Tree Planting Process

Transcription:

Meeting Notes Gravesend and Bensonhurst Planning Committee Meeting #3 August 5, 2014, 6:00pm 8:00pm Block Institute, 376 Bay 44th St, Brooklyn, NY 11214 Attendance: Community Reconstruction (CR) Planning Committee Members: Ligia Guallpa, Executive Director, Worker's Justice Project (WJP); Marnee Elias-Pavia, District Manager, Community Board 11; Scott Barkin, Executive Director, Block Institute; Mel Wolfson, Homeowner; Pamela Pettyjohn, Coney Island Beautification Project; Peter Consolo, Homeowner. NY State Representatives: Alex Zablocki, NYC Regional Lead, Governor s Office of Storm Recovery (GOSR); Chris Gorman, Community Planner GOSR. Firm Representatives: Eric Fang, Perkins Eastman Architects (PEA); Ayo Yusuf, PEA; Jennifer Gonzalez, Louis Berger Group (LBG); Noah Levine, BFJ Planning (BFJ). Guests: Shelia Boyd, Representative from NYS Senator Diane Savino The 3 rd Committee Meeting of the Gravesend/Bensonhurst NY Rising Community Reconstruction (NYRCR) Community began at approximately 6:05 p.m. Eric Fang (PEA) began the presentation with a summary of what we ve learned since the previous meeting. The consultant team then presented the vision statement shaped by the Planning Committee. The majority of the meeting involved a discussion of the needs and opportunities for the six Recovery Support Functions as described in the notes below. Following the discussion, the Planning Committee set dates for the upcoming public engagement event and the next Planning Committee meeting. The meeting adjourned at 8:40 p.m. The following was noted: Agenda Item: Agenda and summary of what we learned from last meeting Presenter: Eric Fang Where we are in the process (2 month look ahead). Summary of 1 st Public Engagement Event. Summary of meeting with NYC Department of EnvironmentalProtection (DEP), and anticipated meetings with other agencies. Summary of existing and proposed projects 1 P a g e

Agenda Item: Vision Statement Presenter: Noah Levine (BFJ) Discussion/Consensus: Preliminary vision statement was presented to Planning Committee Committee was in support of the vision statement with the following two (2) changes: o Remove excellent in front of transportation o Add the phrase We will work in a unified fashion to the beginning of last sentence. Agenda Item Discussion Presenter: Eric Fang (PEA) Discussion of needs and opportunities for the six (6) Recovery Support Functions: Community Planning and Capacity Building, Economic Development, Health and Social Services, Housing, Infrastructure, and Natural and Cultural Services. Discussion/Consensus: Economic Development General Comments o Shore Parkway Economic Corridor between Bay Parkway and 26 th Avenue should be listed as an economic asset o Local businesses along Shore parkway were closed (HSBC Bank) Shore Parkway Economic Corridor o Transportation/Shore Parkway Need: The Shore Parkway Economic corridor has bad transportation access. Also, better transportation access along Cropsey and Waterfront is needed, especially after Sandy when there was no transportation (other than the B) Need: There has been significant residential development as well as the BJs near completion which will lead to congestion. Additional problems include a singular access road, limited parking (on-street parking available on Shore Parkway), and competing traffic. Need: Shore Parkway is a one-way street with only one entrance (Bay Parkway) and one exit. There is a bus route (B6) on Shore Parkway, but express service is a need. Opportunity: Major intervention: suggestion was made to move the entrance of the Belt Parkway east from Bay Parkway, so that the Belt Parkway can be accessed in both directions (from Caesar s Bay and BJ s). Opportunity: Belt Parkway / Shore Parkway - improve existing entrance to Belt Parkway west, so vehicular traffic towards Verrazano is not awkward and unsafe Opportunity: Introduction of a Ferry Service that would bring shoppers to area; Incentivize economic development to do what Ikea did in Red Hook (BJs) Opportunity: Expanded transit opportunity (potentially express bus route). There could be partnerships with existing big box retail stores. 2 P a g e

Infrastructure General Comments o Sandy impacts to subway lines: N was flooded, D had trees all over it, B was the only subway running after Sandy but was extremely congested. Communications network: Consultant team to research fiberoptics availability, wi-fi hot spots, phone service providers (digital vs. analog) Underground phone lines flood during regular heavy rains Lack of investment in the infrastructure in the area, copper wires, few fiberoptics Water goes into sewer and floods manholes, which flood phone lines Many people only have cell phones, can t rely on them without power, spotty cell phone service after the storm Gravesend is mostly overhead wires with large mature trees Bath Beach - Con Edison cut the power on Monday and resumed Saturday afternoon Bensonhurst never lost power Cropsey Ave lost power, Sons of Italy without power (raised utilities when power was restored) Power was restored without people being informed, led to damage especially in flooded basements. o Communication Needs: Hardening overhead wires / telecommunications network Reliable ways to communicate Harden wireless systems Reliable power systems o Communication Opportunities Pruning trees regularly will reduce hazard of branches falling on lines. Work with Verizon to provide mandatory backup batteries; fiberoptics don t have a backup battery therefore customers may not have access to 911 if the fios goes out. Charging stations, solar Improve natural gas connections and generators for resiliency of telecommunications and power networks Solar/microgrid at Coney Island Hospital Water Drainage & Sewer Network o General information on sewer backups Sewer backups happened near Cropsey Ave Backups could be localized, one factor is dimension of pipe in the street, could be that pumping station wasn t operational, could have been sewer backup from Owl s Head Wastewater Treatment Plant Low lying areas were effected the most Water came up from the ground during sandy. Geysers at 26 th Ave and Cropsey Ave. The water receded very quickly o Sewer Need: prevent sewer backups in homes Opportunity: backflow preventer program Need: prevent storm sewer backups in roadways Opportunity: check valve system (need to coordinate with NYC DEP tide gate study two outfalls recommended for further study?) o Coastal Need: lower water table to prevent sink holes 3 P a g e

Opportunity: Reverse seepage basins Need: Coastal protection at Belt Parkway Opportunity: change guardrails to on Belt to concrete barriers (AASHTO standards). Can these barriers also serve as a flood barrier? They did near Banner Ave during Sandy. Look into FHWA funding for this improvement. Opportunity: Raise Seawall (SIRR and USACE) USACE will be studying seawall as a result of the harbor wide study Natural and Cultural Resources Need: Utilize waterfront parks for educational purposes and resiliency Opportunity: Educational opportunities along the Belt Parkway with fishermen, plantings using education with resiliency nonprofit and private partnerships. Opportunities for water-based recreation. Need: beautify community while capturing stormwater Opportunity: planted medians and swales on Cropsey Ave Need: Natural buffer/barrier along the Shore Parkway, Coney Island Creek, Calvert Vaux Park Opportunity: Planting along belt parkway while making it more flood resistant (raise walkway along belt parkway), natural grasses low maintenance plantings Need: pedestrian access along Shore Parkway (tie infrastructure, economic development and recreation along Shore Parkway) Opportunity: continue greenway plan and integrate transportation and resiliency improvements Need: demand for parking consultant team to look into traffic counts, parking counts (New York Sports Club gym doesn t have enough parking) Opportunity: Green infrastructure along parking area along Belt Parkway at Bensonhust Park, green parking at Caesars Bay. Potential swales along Shore Parkway. Need: to improve recreational areas along the promenade Opportunity: Improve & resilient amenities along shore parkway promenade (benches). Housing General information o Very little structural damage to housing. More Damage occurred to infrastructure and economic development assets along Shore Parkway. o Consultant team to investigate damage at Marlboro Houses with help of Peter Consolo. o Waterview Towers elevators out (1 within 24-hrs, 1 within 48-hrs), second building with more flooding took several weeks for elevators to be restored. o High rises lost water, elevator service and lighting in evacuation staircases. : o Need: homeowners do not have an organizational infrastructure for education and information Opportunity: communicate information from the ground to appropriate agencies and vice versa. o Need: Institutions/large employers were not able to serve as a support system to employees regarding disseminating information appropriately/timely. Opportunity: Partner with local institutions/employers to identify resources during a disaster event. o Need: backup power and generators in high rises. 4 P a g e

Community Planning and Capacity Building General information: o Lack of organizational and social infrastructure to ensure adequate communication between homeowners and city agencies o Gravesend was excluded from many recovery programs o NYC didn t identify the Community as needing help because they couldn t communicate with the City and vice versa o Misinformation was an issue o Residents ignored reverse 311 that was intended to alert people evacuate o Bensonhurst-Bay Ridge CERT was out with Inspectors, trying to get information to OEM o 311 was down, 911 was down, Community couldn t get info back to OEM o CERT members were effected themselves and were not able to provide full attention to emergency response duties. o Need: Better communication from City agencies for recovery (didn t know where water and food was). Opportunity: digital tool to map out food banks & supply store locations. o Need: More CERT classes locally Opportunity: working with OEM to expand Community Disaster Network Health and Social Services o Connectivity is always an issue during storms, o Need: More reliable ways to communicate, harden communication networks o Opportunity: Requirement to have backup power with service providers o Opportunity: charging stations Agenda Item: Scheduling - Upcoming Meetings Presenter: Eric Fang (PEA) The Committee agreed to hold the 2nd Public Engagement Event on Tuesday, September 16 th. Location and Time TBD. The Committee agreed to hold the 4 th Planning Committee Meeting on Wednesday, September 3 @ 6:00. Location TBD. Research institutional locations to hold public meeting Discuss format/outreach and location with Co-chairs Confirm Block Institute as location for 4 th Planning Committee meeting with Scott Barkin Ayo/Noah Alex/Ayo/Noah/Eric 8/14/14 8/14/14 5 P a g e