1 Bellevue Hospital Metropolatin Hospital Coler Specialty Hospital Coney Island Hospital HHC FEMA- Priority Mitigation Projects CM Consultant Services Informational Session 1:00 PM July 1, 2015
2 Agenda Introductions Contract Summary NYC Resiliency Plan Overview HHC PMP Project Overview Project Background Project Overview M/WBE Goals EOP Goals RFP Schedule Questions 2
3 Contract Summary Anticipated Contract Term: 5 years (60 months) M/WBE Participation Goal: 25-35% and require State M/WBE certification Estimated Project Budget: $173 million 3
4 Climate Change / 21 st Century Threats A changing climate expands our vulnerability as sea levels continue to rise. Projected floodplain for the 2020s and 2050s Residents Jobs 100-year Floodplain* 2013 PFIRM s 400, , s Projected Change (%) 808, % 555,700 91% Buildings 71, ,000 65% 1-4 Family 57,400 89,000 55% Source: FEMA; CUNY Institute for Sustainable Cities Floor Area (Sq Ft.) * Numbers are rounded for clarity 534M 855M 42% Over 171,000 buildings and 1.2 million New Yorkers projected to live in the floodplain by FEMA 2013 Preliminary FIRMs 100-year Floodplain Projected 2020s 100-year Floodplain Projected 2050s 100-year Floodplain Projected 2080s 100-year Floodplain Projected year Floodplain 4
5 OneNYC On April 22 nd, Mayor Bill de Blasio released a new long-term strategic plan to address our most pressing challenges. OneNYC recognizes a historical moment: in 2025, we will celebrate our 400 th anniversary and begin our fifth century. The plan envisions how we want our City to look in ten years and beyond One New York: The Plan for a Strong and Just City We commit to the goals and initiatives designed to achieve that long-term vision 5
6 Our Resilient City: Neighborhoods With OneNYC, every city neighborhood will be safer by strengthening community, social and economic resiliency INITIATIVES Strengthen community-based organizations Improve emergency preparedness and planning Support small businesses and commercial corridors Ensure that workforce development is a part of all resiliency investments Mitigate the risks of heat INDICATORS + TARGETS Increase the capacity of accessible recovery shelters from 10,000 in 2014 to 120,000 by 2017 Increase the rate of volunteerism among New Yorkers from 18% today to 25% by
7 Our Resilient City: Buildings With OneNYC, the city s buildings will be upgraded against changing climate impacts INITIATIVES Adapt public and private buildings against the impacts of climate change Adopt new land use policies to promote resiliency Work with FEMA to reform the National Flood Insurance Program to promote affordability INDICATORS + TARGETS Increase the percentage of households in the 100- year floodplain with flood insurance policies Increase the square footage of buildings upgraded against flood risk Increase the number of homes elevated through the Build it Back program 7
8 Our Resilient City: Infrastructure With OneNYC, infrastructure systems across the region will adapt to maintain continued services Water and wastewater: $5,500 million Hospitals: $2,900 million Schools: $755 million NYCHA: $3,200 million MTA Fix/Fortify: $10,525 million INITIATIVES Undertake required infrastructure repairs and mitigation Develop standardized resiliency guidelines Call on regional infrastructure operators to make critical resiliency investments INDICATORS + TARGETS Reduce customer-hours of weather-related utility and transit service outages Increase the percentage of patient beds at hospitals and long-term care facilities in the 100- year floodplain benefiting from retrofits for resiliency FEMA 2013 Preliminary FIRMs 100-year Floodplain 2050s Projected 100-Year Floodplain 8
9 Our Resilient City: Coastal Defense With OneNYC, New York City s coastal defenses will be strengthened against flooding and sea level rise Completed Study funded Project funded Unfunded DCP Resilient Neighborhoods Study areas INITIATIVES Continue to implement the city s coastal protection plan Secure new funds for flood risk reduction Implement nature-based strategies for resiliency INDICATORS + TARGETS Increase the linear feet of coastal defenses completed Increase the acres of coastal ecosystems restored FEMA 2013 Preliminary FIRMs 100-year Floodplain 2050s Projected 100-Year Floodplain Increase the number of residents with coastal defenses and restored ecosystems 9
10 Project Background In October 2012, Coney Island Hospital in Brooklyn, Bellevue Hospital Center in Manhattan, Metropolitan Hospital Center in Manhattan, and Coler Specialty Hospital on Roosevelt Island, suffered extensive flood damage as a result of Hurricane Sandy. Sandy flooded various portions within each hospital damaging the critical services and preventing the hospital s from operating at full capacity and in some cases shutting them down temporarily. Damage at Coney Island Hospital HHC has been awarded FEMA funding to advance the city s comprehensive, five- borough resiliency plan. The overall funding totaling $1.72 B is being utilized to repair and protect the city s hospitals damaged during Hurricane Sandy. 10
11 Project Background The overall program is being implemented in phases, and significant progress has already been made. HHC is now focused on completing priority mitigation projects at the four facilities receiving funding. Once complete these initial projects will help further the ultimate goal of ensuring the public hospitals have the necessary safeguards in place to operate continuously during a storm and mitigate damage and power loss. The scope of work for the priority mitigation projects will need to be phased appropriately as the design components for each hospital are at varying levels of completion and work will need to be scheduled and coordinated accordingly. Damage at Coney Island Hospital 11
12 Project Site Map- Overview Metropolitan Hospital Borough: Manhattan Address: st Avenue NY, NY Coler Hospital Borough: Manhattan Address: 900 Main street Roosevelt Island, NY Bellevue Hospital Borough: Manhattan Address: st Avenue NY, NY Coney Island Hospital Borough: Brooklyn Address: 2601 Ocean Parkway Brooklyn, NY
13 Project Overview- Metropolitan Hospital Electrical Switchgear Upgrade It is anticipated that this project involves the relocation and replacement of the existing normal power main distribution service entrance switchgear from the basement to the 1st floor to prevent future storm damage. It will also involve the relocation of several rooms from the 2 nd floor that may be displaced due to the relocated switch gear. Metropolitan Hospital Service Entrance Cables and Ductbank It is anticipated that this project includes the installation of new service entrance conductors for services A and B originating from the Con Edison demarcation point routed into the hospital via a new concrete duct bank. The project will also provide a new manhole and a new service room on the second floor of the hospital. Window Replacement It is anticipated that this project includes the installation of new replacement windows in the Behavioral Health building at the facility. 13
14 Project Overview- Bellevue Hospital Replacement of 1500kw Generator and Fuel Oil System Storage and Delivery Modifications A new 1500kW generator will be installed on site to replace the one previously destroyed. This new generator will be reconnected to existing emergency paralleling switchgear system (total of five generators) located on the 13th floor of the Main Hospital Building. Bellevue Hospital Expansion of Emergency Power Distribution System to Serve Additional Critical loads within the Hospital Emergency power will be expanded to meet the Hospital s projected needs currently being designed and now required for the hospital to sustain itself through a storm event. Vertical Transportation Mitigation: Upgrade and modernize the hospitals elevator system which is original to the Main Hospital Building constructed in the 1970s with the exception of new controllers installed within the past 20 years. Main Hospital Building Domestic Water System Redundancy: The Main Hospital Building's primary domestic water system is currently served by four pumps and associated equipment located in the cellar level. A redundant set of pumps is required to be placed above flood level. Medical Gas System Mitigation: Enhancement and hardening of the medical gas systems in order to maintain uninterrupted services in the event of another natural disaster 14
15 Project Overview- Bellevue Hospital Backup Steam Source and Distribution Implementation of a system of mobile steam boilers, piping modifications, pressure reducing, condensate recovery system to provide an emergency steam system in the event that Con Edison shuts down its service due to flooding. Bellevue Hospital Basement Tank/Pipe Insulation Installation of insulation for steam lines, condensate lines, valves, cold water lines, heat exchangers, condensate flash tanks, return tanks, domestic hot water lines in the basement. Basement and Fire Alarm Restoration Complete remaining restoration work in various areas throughout the basement to be outlined totaling approx. 25,000SF. Restoration of basement Fire alarm systems including smoke detection, horns, speakers and strobes and illuminated exit signs in the locker rooms and old OCME morgue area. Resurfacing of Loading Dock The basement loading dock roadways and drainage systems will be replaced and repaired. Parking Lot Restoration The parking lifts in the viaduct under the FDR drive and the other parking lot across the street from Bellevue access road will be replaced. 15
16 Project Overview- Coler Hospital Permanent Emergency Generator This project will replace the damaged emergency power generator. A new duel level walk in enclosure containing a 1500 KW generator on the lower level and a 5000A SWBD and associated equipment enclosure on the second level will be installed. Coler Specialty Hospital Basement and Crawl Space Lighting This project involves the design and installation of new lighting, wiring, and power receptacles throughout the entire basement and crawl spaces of the facility. Replacement of Temporary Electrical Panels Permanent panels will be replaced throughout all buildings in the facility. Replacement of Telephone System Copper wire was damaged from Hurricane Sandy rendering the telephone system substantially unusable. This project will likely include either an analog copper system, digital voip solution,or some combination of both. Fire Pump Reconstruction from the basement to the 2nd Floor The Fire pump which is currently located in the basement will be removed and reconstructed or replaced on the second floor. 16
17 Project Overview- Coler Hospital Auditorium Reconstruction of the auditorium space which will include revised layout of the space, installation of new MEP equipment, and associated furniture, finishes and equipment. Reconstruction will also be completed in various areas on the first floor and basement as required to correct damages. Coler Specialty Hospital Security and Critical Equipment Reconstruction will be completed for portions of the existing security systems and critical equipment. This project also includes all necessary electrical design, mechanical design, and architectural / structural design related to the installation, setup of the reconstructed equipment. Reconstruction of Ventilation Systems Portions of the ventilation system serving A, B, C and S Buildings will be reconstructed. 17
18 Project Overview- Coney Island Hospital 1st Floor Main Building Renovation This project involves the build out on the 1st floor of the Main Building of two areas to return critical administrative and support services to the hospital. Coney Island Hospital 5th Main Building Floor Radiology/Imaging Suite This project involves the design and build out of a space for imaging services on the 5th floor of the Main Building. This includes pantograph services, bone densitometry services, mammography services, and outpatient radiology services. Basement Removal of abandoned switchgear and replacement of temporary lighting. This project also includes the addition of Pre-connects and all necessary electrical design, mechanical design, and architectural / structural design related to the installation. Off Site Parking Improvements This project will include utility relocations and alterations for temporary off site and on-site parking improvements. Demolition of existing buildings on the campus may be required to facilitate parking modifications. 18
19 M/WBE Goals and Subcontractors Participation Plan M/WBE Participation Goal: 25-35% (as percentage of total contract value) Firms must be certified as MWBE by the State in order to count toward goal Respondents must submit an M/W/DBE Subcontractors Participation Plan (Exhibit 4 of RFP) demonstrating how they will achieve their proposed level of M/WBE participation Respondents must set their own M/W/DBE Participation Goal Respondents must also submit Intent to Perform as Subcontractor forms for each of the firms on the M/W/DBE Subcontractors Participation Plan, providing confirmation that the firms have been contacted and plan to work on the project If awarded, your proposed goal will become a contractual obligation Plan will be rated and factor into selection Respondents submitting proposals with a Participation Goal lower than the lower bound of the range shall receive a score of zero (0) for this selection criteria The higher bound represents the optimum participation goal. Proposed Participation Goals that exceed this higher bound are welcome but do not receive extra points 15% of selection criteria corresponds to the quality of the M/WBE Subcontractors Participation Plan Final M/WBE Goals will be incorporated into the Consultant Contract Selected Respondents will be required to meet the stated M/WBE goals or demonstrate good faith efforts 19
20 Meeting M/WBE Goals Identifying M/WBE Partners Use Empire State Development Corp. (ESDC) directories to find M/WBEs in a specific field. Link below: Check out the Interested Subcontractor and Supplier List for this RFP Network at this info session NYCEDC can assist in identifying M/WBEs Refer to good faith efforts section in draft contract for more ideas Make use of the Kick-Start Loan Program Mobilization loans for M/W/DBE firms participating as either prime or subcontractor Amounts up to $250,000 May be used to buy long lead equipment, material, and/or labor costs 20
21 Opportunity M/WBE: Contacts New York City Economic Development Corporation 110 William Street New York, NY Bomi Kim Director, Opportunity M/W/DBE John Rooney Asst. Vice President, Opportunity M/W/DBE Claudia Flores Senior Program Manager, Opportunity M/W/DBE
22 Employment Opportunity Program (EOP): Leverage City s economic development investments to create opportunities for low-income construction workers EOP Narrative Required for RFP Submission Plans for outreach & marketing of opportunities to Target Population Plans for potential collaborations or partnerships to achieve EOP goal A description of the Respondent s past experience providing employment and training opportunities to members of the Target Population The types of construction training and employment opportunities the Respondent believes may be available to members of the Target Populations Only Required if Selected EOP Goal The CM will be required to submit the % of total project hours of training or labor performed by Target Population workers out of the total hours of labor performed by all workers. EOP Plan The CM will be required to submit details of employment opportunities available to the Target Population including the estimated number of anticipated work hours for each specified construction trade & a designated EOP liaison. Program Purpose EDC created the Employment Opportunity Program to better connect construction job opportunities generated by our economic development projects to low-income residents in need of employment & training opportunities. Target Population Definition The program s Target Population is individuals who earned an income in the last 12 months below 200% of the poverty measure threshold as determined by the NYC Center for Economic Opportunity (<$62K family of four)* *Description of income is available from the NYC Center for Economic Opportunity (CEO):
23 RFP Schedule Question/Clarification Deadline: 5:00 PM, July 8, 2015 Question Response Date: July 20, 2015 Proposal Submission Deadline: 4:00 PM, July 28, 2015 Interviews & Selection: August 2015 Contact Address: Anticipated Notice to Proceed: Fall
24 Questions? Bellevue Hospital Metropolatin Hospital Coler Specialty Hospital Coney Island Hospital 24
Consumer Education Campaign on Flood Risk, Maps and Insurance. Info Session and Q&A May 9, 2014
Consumer Education Campaign on Flood Risk, Maps and Insurance Info Session and Q&A May 9, 2014 Agenda Issue Overview Flood Maps Flood Insurance RFP Overview Tasks Timeline Evaluation Criteria Submission
More informationNYCEDC On-Call Management Consultant Services RFP. Information Session 1.21.2015
NYCEDC On-Call Management Consultant Services RFP Information Session 1.21.2015 Agenda Welcome RFP Overview Scope of Services 6 Topic Areas M/WBE Goals and Requirements Q&A 2 RFP Overview Deadlines RFP
More information6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7.
HHC Program Manager Request for Proposals (RFP) for Consulting Services Project # 6161 Questions & Answers Date: October 1, 2015 1. Q: In CR#2017007 would schedule outsourcing be considered as an appropriate
More informationTHE : SANDY DART Parsons Brinckerhoff s Disaster Awareness Report October 25, 2013
THE : SANDY DART Parsons Brinckerhoff s Disaster Awareness Report October 25, 2013 The Sandy Disaster Awareness Report (DART) presents a summary of key developments and funding priorities in the region
More informationThe New York Recovery Network: E-Bulletin Published August 13, 2014
The New York Recovery Network: E-Bulletin Published August 13, 2014 Headlines Mapping Our Way to Recovery: The Community Recovery Resource Mapping Tool This primer explains how to use the online Community
More informationSchools, Colleges, Universities, and Housing: New Business Opportunities. The City University Construction Fund October 27, 2012
Schools, Colleges, Universities, and Housing: New Business Opportunities The City University Construction Fund October 27, 2012 New York State MWBE Forum New York Works For MWBEs Schools, Colleges, Universities,
More informationFlood Protection Tips
Flood Protection Tips Information About Floodplains and Flood Prevention What is a floodplain? Floodplains serve many useful purposes, and those that are preserved in their natural or nearly natural state
More informationNew York State 2100 Commission Report: Energy
New York State 2100 Commission Report: Energy Improving Strength and Resilience Phil Mihlmester New York Bar Association Columbia University Law School New York, NY May 14, 2014 Context: Aftermath of Hurricane
More informationHealthcare CHAPTER 8 HEALTHCARE 144
Credit: HHC Healthcare CHAPTER 8 HEALTHCARE 144 Kings County Hospital Center in Brooklyn illustrates the size and complexity of hospital campuses. Credit: HHC New York City s population of 8.2 million
More informationReducing Flood Effects in Critical Facilities
Reducing Flood Effects in Critical Facilities HURRICANE SANDY RECOVERY ADVISORY RA2, April 2013 Purpose and Intended Audience In the hours and days after Hurricane Sandy struck, damage to essential equipment,
More informationThe Council of the City of New York. Economic Development Corporation
Hon. Melissa Mark-Viverito Speaker of the Council Hon. Julissa Ferreras Chair, Committee on Finance Hon. Daniel R. Garodnick Chair, Committee on Economic Development The Council of the City of New York
More informationMEMORANDUM TO CLIENT Attorney-Client Privileged
TO: FROM: Structural Occupancy Category I and II Building Owners Adam Leitman Bailey, P.C. DATE: April 8, 2013 SUBJECT: Changes to NYC Zoning and Building Regulations after Hurricane Sandy Question Presented:
More informationInfrastructure for Adapting to Climate Change Environmental Law Forum April 10, 2014. 2014 O Brien & Gere
Infrastructure for Adapting to Climate Change Environmental Law Forum April 10, 2014 1 Agenda Lessons Learned from Superstorm Sandy What are Northeast States Doing About It? State of our Power Grid Role
More informationREBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS
REBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS REBUILDING BELMAR ABFE Maps Preliminary FIRM Maps Flood Insurance Increased Cost of Compliance (ICC) Elevation of Structures Building Permits Acronyms
More informationMechanical, Plumbing, and Fire Protection Conditions
Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred
More informationFloodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management. New Jersey Department of Environmental Protection
Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management New Jersey Department of Environmental Protection U.S. Department of Housing and Urban Development Community Development
More informationWhy should communities invest in resiliency? What are the steps communities can take to become more resilient?
Community Preparedness for Flood Resiliency Nina Peek, AICP New York Planning Federation Board of Directors Senior Technical Director AKRF, Inc. Focus of Today s Presentation Why should communities invest
More informationTelecommunications CHAPTER 9 TELECOMMUNICATIONS 162
Telecommunications CHAPTER 9 TELECOMMUNICATIONS 162 Someone makes a call from a cell phone in Manhattan to a house on Staten Island. That call follows a circuitous path. The call connects to a cell site
More informationUniversity of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood
More informationDepartment of Administration DATA CENTER Two Phase Approach Located at the State Defense Building
DATA CENTER Two Phase Approach Located at the State Defense Building July 17, 2015 Compiled by: Office of Facilities and Property Management 800 SW Jackson, Suite 600 Topeka, Kansas 66612-1216 i I. Programming
More informationNIST Disaster Resilience Framework
NIST Disaster Resilience Framework Communication and Information Systems Presenter: David Mizzen Applied Research Associates Chapter Goals Provide guidance to: 1. Understand potential vulnerabilities/damage
More informationPresentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
More informationSECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING
SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING 10A NCAC 13D.3401 HEATING AND AIR CONDITIONING Heating and cooling systems shall meet the American Society of Heating, Refrigerating, and Air Conditioning
More informationSandy s Effects on Housing in New York City
MARCH 2013 FACT BRIEF Effects on Housing in New York City Four months after Superstorm Sandy, New Yorkers continue to pick up the pieces and rebuild. Sandy devastated many parts of the city, including
More informationElectrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
More informationTO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM
GB6 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Special Meeting of ACTION ITEM APPROVAL OF PHASE 1 OF THE UTILITY LINE REMEDIATION PROJECT RELATED TO THE MISSION BAY DILLER BUILDING, ROCK
More informationImplementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned
Implementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned Pinar Balci, Ph.D. Director, Bureau of Environmental Planning and Analysis NYC Department of Environmental
More informationHurricane Sandy Damage, Hospitalitals and Business Units
5Performance of Critical Facilities and Key Assets Widespread flood damage to all types of critical facilities in dense urban settings prompted the MAT to compare and contrast performance of selected critical
More informationRepair Project for April 7, 2009
Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades
More information29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York
Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE
More informationOPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
More informationDESIGNING FOR RESILIENCY: NYC S NEW LOCAL LAWS Version 1: April 8, 2014
DESIGNING FOR RESILIENCY: NYC S NEW LOCAL LAWS Version 1: April 8, 2014 SUPERSTORM SANDY Breezy Point Queens, New York OVERVIEW OF THE LAWS Local Law! Description! Effective! 96/13! Survey Data and Flood
More informationWORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS
WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,
More informationhttp://www.pbtransportationupdate.com/legislation/hurricane_sandy_supplemental_funding.aspx
THE RESILIENCE DART Parsons Brinckerhoff Resilience Disaster Awareness Report August 29, 2014 The Parsons Brinckerhoff Resilience DART (Disaster Awareness Report) summarizes key developments related to
More informationNational Science Foundation Funds Request
University Corporation for Atmospheric Research National Science Foundation Funds Request 1. (NSF USE ONLY) 2. FACILITY NAME & LOCATION 3. PROJECT NAME 4. UCAR TRACKING NUM. NCAR Mesa Lab 15KV FEEDER REPLACEMENT
More informationFlood Insurance Premium Increases And Increased Cost of Compliance Eligibility
Flood Insurance Premium Increases And Increased Cost of Compliance Eligibility January 11, 2015 (This document is updated frequently, so please consult the most recent edition) Margaret Becker Director
More informationNY State Representatives: Alex Zablocki, NYC Regional Lead, Governor s Office of Storm Recovery (GOSR); Chris Gorman, Community Planner GOSR.
Meeting Notes Gravesend and Bensonhurst Planning Committee Meeting #3 August 5, 2014, 6:00pm 8:00pm Block Institute, 376 Bay 44th St, Brooklyn, NY 11214 Attendance: Community Reconstruction (CR) Planning
More informationFive-Year Capital Plan Request FY 2015-16 through FY 2019-20
Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088
More informationThe Joint Commission Approach to Evaluation of Emergency Management New Standards
The Joint Commission Approach to Evaluation of Emergency Management New Standards (Effective January 1, 2008) EC. 4.11 through EC. 4.18 Revised EC. 4.20 Emergency Management Drill Standard Lewis Soloff
More informationMovie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes
Make It Right Movie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes Few can forget the horrific images from Hurricane Katrina. In 2005, the hurricane
More informationCyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
More informationChatham County Disaster Recovery Plan Recovery Planning Update. Mark Misczak, Brock Long, & Corey Reynolds Hagerty Consulting April 7, 2015
Chatham County Disaster Recovery Plan Recovery Planning Update Mark Misczak, Brock Long, & Corey Reynolds Hagerty Consulting April 7, 2015 Welcome Introduction to Recovery Planning Recovery Planning Process
More informationOptimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
More informationAPPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS
APPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS APPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS This section of the Plan includes a general summary of the results and findings of the Public Participation
More informationHomeowner FAQs. Please see below for answers to frequently asked questions. Future Local Work Questions
Homeowner FAQs Due to the Biggert-Waters Flood Insurance Reform Act of 2012, new flood insurance policies for older Pre-FIRM structures in the 100-year floodplain will be increasing dramatically as of
More informationPost-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY
Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY Prepared by Nathaly Agosto Filión, Resiliency Manager for the New Jersey Resiliency Network, a program
More informationHUDSON YARDS PROJECT. G r e g K e l l y P r e s i d e n t a n d C E O, U. S., C e n t r a l a n d S o u t h A m e r i c a
HUDSON YARDS PROJECT G r e g K e l l y P r e s i d e n t a n d C E O, U. S., C e n t r a l a n d S o u t h A m e r i c a G R O W T H V S. O T H E R U. S. C I T I E S NEW YORK GREW TO BECOME A WORLD CAPITAL
More informationCurrent as of 11/10/08 1 of 1
BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that
More informationBUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
More information11 Common Disaster Planning Mistakes
11 Common Disaster Planning Mistakes The world is full of risk. Floods, fires, hurricanes, thefts, IT system failures and blackouts are just a few of the incredibly damaging disasters that can and do strike
More informationMEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
More informationNYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
More informationHow To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
More informationAdapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff
Adapting to Climate Change Through Asset Management Planning Tiffany Batac David Rose, PhD Parsons Brinckerhoff 1 2 Agenda FTA Transit Climate Change Adaptation Assessment Pilots: MARTA Study Framework
More informationLawyers Alliance for New York
Lawyers Alliance for New York Rebuilding After Hurricane Sandy: Government Aid available to Nonprofits Linda S. Manley, Legal Director (212) 219-1800 ext. 239 Lmanley@lawyersalliance.org Resource Call
More informationIntroduction: Analysis:
Introduction: This analysis describes the decision-making process performed for the proposed rehabilitation of 423 East Magnolia Avenue (SBL618138) in the City of Wildwood, Cape May County (see Exhibit
More informationNORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
More informationFederal Emergency Management Agency (FEMA) Preliminary Flood Insurance Rate Maps (FIRMs) and Preliminary Flood Insurance Study (FIS) for New York City
March 10, 2014 Submitted electronically via http://www.nyc.gov Mayor s Office of Long Term Planning and Sustainability c/o Flood Map Comments 253 Broadway, 10th Floor New York, NY 10007 Federal Emergency
More informationAppendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria
Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards
More informationAPEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT
PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o
More informationHurricane Sandy: Natural Disaster & Business Districts in New York City
Hurricane Sandy: Natural Disaster & Business Districts in New York City JESSICA TAYLOR, EXECUTIVE DIRECTOR NYC DEPARTMENT OF SMALL BUSINESS SERVICES INTERNATIONAL DOWNTOWN ASSOCIATION WORLD CONGRESS &
More informationMastering Disaster A DATA CENTER CHECKLIST
Mastering Disaster A DATA CENTER CHECKLIST Disaster Doesn t Sleep It s not always a hurricane or a power grid failure that causes businesses to lose their data. More often than not, an isolated event like
More informationSubmission to Queensland Floods Commission of Inquiry Order (No. 1) 2011
Submission to Queensland Floods Commission of Inquiry Order (No. 1) 2011 This submission addresses sections b), d) and g), which are listed as matters that the inquiry will address: Private insurers and
More informationOpportunity Knocks. How to do Business with CUCF & Major Construction Project Highlights August 14, 2014
Opportunity Knocks How to do Business with CUCF & Major Construction Project Highlights August 14, 2014 CUCF The City University Construction Fund Baruch College Field Building www.cuny.edu/cunybuilds
More information100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
More informationFlood disaster preparedness and resilience
Flood disaster preparedness and resilience! WHY?! Because Electricity and (flood)water don t mix. Gas flames and water don t mix. Oil and water don t mix. Drinking water and flood water don t mix.!! Besides
More informationFor Sale - $11,000,000 - Negotiable Excellent User Opportunity -
4770 White Plains Road Bronx, New York For Sale - $11,000,000 - Negotiable Excellent User Opportunity - Jerry Houlihan GHP Office Realty One West Red Oak Lane White Plains, New York 10604 Phone: 914.642.9300
More informationPerforming Arts Research/Lab Campus Life Athletics Student Housing Academics Campus Infrastructure Food Services
Performing Arts Research/Lab Campus Life Athletics Student Housing Academics Campus Infrastructure Food Services York State College Pittsburgh www.ba-inc.com Barton Education has provided MEP design services
More informationMicrogrids: Key to Energy Security, Resiliency and Clean Energy. Marita Mirzatuny Project Manager, Smart Power U.S. Climate & Energy EDF
Microgrids: Key to Energy Security, Resiliency and Clean Energy Marita Mirzatuny Project Manager, Smart Power U.S. Climate & Energy EDF Smart Power: Smart Grid + Efficiency 9 state strategy: New Jersey,
More informationTown of Jamestown. Long-Term Recovery Plan
Long-Term Recovery Plan Town of Jamestown Background The Town of Jamestown is a small mountain community of approximately 300 people located in Boulder County, 12 miles northwest of the City of Boulder.
More informationThe Flood. 8501 West Higgins
The Flood. 8501 West Higgins 8501 West Higgins Day 1 The total rainfall at O'Hare -- 6.91 inches as of about 6:50 a.m. -- is the largest single-day rainfall since records began in 1871. At 4:15 a.m. Property
More informationBuilder Specifications for Solar Ready Homes
Builder Specifications for Solar Ready Homes This document specifies the essential elements required to make a new home ready for the future installation of roof-mounted solar domestic hot water and photovoltaic
More informationKeeping Overland Flood Water Out of Your Basement: Dry Floodproofing
Keeping Overland Flood Water Out of Your Basement: Dry Floodproofing Presented at Town Hall Meeting on Flood Mitigation, Heman Park Community Center, University City, MO, December 4, 2014 By Eric Stein
More informationCapital Expenditure. The common definition of capital expenditure is
Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local
More informationINTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
More informationCase studies used to calibrate recommendations. Hazard environment Range of businesses Owned vs. leased space Different building types
Case studies used to calibrate recommendations Hazard environment Range of businesses Owned vs. leased space Different building types Methodology Red Hook Background Business operations Hurricane Sandy
More informationdpd Seattle Permits Tip www.seattle.gov/dpd Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES
dpd Department of Planning and Development Tip 102 Seattle Permits part of a multi-departmental City of Seattle series on getting a permit Small Business: Getting Your Use and Building Permit from DPD
More informationSUBJECT CAN: 2-108. Temporary Systems, Utilities and Equipment. Effective: 4/09/2013. CODE SECTION 2010 California Building Code (CBC)
Facilities Development Division Office of Statewide Health Planning and Development 400 R Street, Suite 200 Sacramento, CA 95811 (916) 440-8300 700 N. Alameda Street, Suite 2-500 Los Angeles, CA 90012
More informationOverview of New Jersey Energy Resilience Bank. Prepared by Michael Hornsby Chief Project Development Officer
Overview of New Jersey Energy Resilience Bank Prepared by Michael Hornsby Chief Project Development Officer Prepared for Mid-Atlantic Solar Energy Industries Association Annual Member Meeting February
More informationColumbia University Master Planning & Optimization
Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District
More informationProposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company
RISK MANAGEMENT PLAN is an integral part of a modernized and sophisticated residential complex. No efforts will be spared in identifying the all possible risks and disasters, evaluating them, installing
More informationPLANNING FOR POST-DISASTER RECOVERY BRIEFING PAPERS
04 PLANNING FOR POST-DISASTER RECOVERY BRIEFING PAPERS AFFORDABLE HOUSING Housing serves as more than just shelter. Research has shown that affordable and stable housing can be a platform for families
More informationCase Studies in Existing Building Audits
Case Studies in Existing Building Audits Erica Brabon Steven Winter Associates, Inc. 307 7 th Ave., NY, NY ebrabon@swinter.com Who we are Steven Winter Associates, Inc. (SWA) is a 37 yearold architecture
More informationHurricane Sandy Rebuilding Task Force
Hurricane Sandy Rebuilding Task Force FACT SHEET: Progress to Date Cutting red tape to help get families back in their homes, get small businesses back on their feet and help communities rebuild their
More informationDisaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc
By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationStandard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
More informationESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK
C H A P T E R 7 ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK OBJECTIVES After reading this chapter and completing the review questions, you should be able
More informationHOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015
HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,
More informationColumbus State Community College MASTER PLANNING
Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT
More informationDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
More informationNEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
More informationPine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center
To: BOS From: Joseph Michelangelo, P.E. Director of Public Works Re: CDBG-DR Pine Creek Culvert Upgrade Date: April 20, 2015 On June 19, 2014, the Town of Fairfield was awarded the above referenced project
More informationAmerican Planning Association
American Planning Association Planning for Post-Disaster Recovery Session 1 Moderator: Tim Gelston, FEMA Region 8 Speakers: Kenneth C. Topping, FAICP, Topping Associates International J. Barry Hokanson,
More informationHFacility-Specific Descriptions
HFacility-Specific Descriptions of Critical Facilities and Key Assets This appendix provides material supplementary to Chapter 5. The Mitigation Assessment Team (MAT) visited eight hospitals: Bayonne,
More informationWhy does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?
Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831
More informationRequest for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital
Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering
More informationFloods Module 2. - Mitigation Definition- Mitigation includes activities that: Prevent Reduce Lessen NORTHERN ILLINOIS UNIVERSITY COPYRIGHT 2007
- Mitigation Definition- Mitigation includes activities that: Prevent Reduce Lessen 1 - Community Mitigation - Manage developments within a flood plain Construct barriers Levees Berms Dikes - Community
More information