FOOTING SYSTEMS Reference - As Residential slabs and footings - construction and BCA.

Similar documents
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

Superform Products Ltd.

6 RETROFITTING POST & PIER HOUSES

Safe & Sound Bridge Terminology

Chapter. Restoration of Damaged Structures

Residential Inspection Guidelines

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

How To Retaining Wall Guide

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

FLAT ROOF BOX SPAN CARPORTS

Designed and Engineered to Perform

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Technical Notes 3B - Brick Masonry Section Properties May 1993

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Lighthouse Engineering, L.L.C.

Elevating Your House. Introduction CHAPTER 5

EAST LYME HIGH SCHOOL

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

Chapter 2 Basis of design and materials

If stepping is required, step at 180mm as seen in this picture.

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Detailing of Reinforcment in Concrete Structures

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

International Greenhouse Company

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

How to secure your property after a disaster

0331 Brick and block construction

DESIGNING STRUCTURES IN EXPANSIVE CLAY

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

How To Build A Luxury Apartment Complex In London

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

CCAA T Guide to Residential Floors. Guide

Construction Technology 3

HOUSE BUILDING DIGEST

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

How to build raised beds page

Proposed Minimum Subterranean Termite Treatment Standards

Residential Foundations and Basements

Chapter 3 Pre-Installation, Foundations and Piers

Uniclass L31:N14:P7111 C1/SfB (16.9) Rn7 (J4) February Foundation Heave Protection

Energy Company Obligation (ECO): Technical Monitoring Questions

COMMONLY USED RESIDENTIAL BUILDING CODES

Hanson Building Products. precast basement solutions

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

How to build a Pizza Oven in 4 days

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: Purpose

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Instruction Manual 19/9/01. Flat Roof Carport

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

Building Construction. Lightweight construction. Conventional Construction

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

GUIDELINES FOR SITE & HOUSE INSPECTION

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

How To Build A Gambrel Roof And A Gable End Roof

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

High Strain Dynamic Load Testing of Drilled Shafts

Technical handbook Panel Anchoring System

What is QuickBase? Traditional foundations (left) compared with QuickBase (right)

TORO STEEL BUILDINGS. BOLTS: o " diam. x " diam. x " diam. C.J. - Control Joints to minimize cracking.(0.

Baton Rouge Foundation Repair

Page & Turnbull imagining change in historic environments through design, research, and technology

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Cold Weather Concrete Practices

Residential Deck Safety, Construction, and Repair

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

BUTE Department of Construction Management and Technology

POST AND FRAME STRUCTURES (Pole Barns)

METHOD OF STATEMENT FOR STATIC LOADING TEST

BUILDER S GUIDE FOR TERMITE MANAGEMENT

symptoms of a faulty foundation

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Design Manual to BS8110

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Guide to working on Public Sewers

Design and Construction of Cantilevered Reinforced Concrete Structures

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

PILE FOUNDATIONS FM 5-134

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

How To Repair A House

CODE OF PRACTICE FOR THE CONSTRUCTION OF HOUSES: AN INSTRUCTION MANUAL FOR FOREMEN AND EXPERIENCED ARTISANS PART 2: STUDENT S MANUAL

Chapter 6 ROOF-CEILING SYSTEMS

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Transcription:

FOOTING SYSTEMS Reference - As 2870 - Residential slabs and footings - construction and BCA. Footings transfer building loads onto foundations. House design and shape must be designed before footing design can occur. AS2870 is based upon inspecting site to determine soil type and designing footing to suit both foundation and structure to be built. Footing construction New footings are constructed from reinforced concrete in accordance with designs set out in AS 2870 or engineering principles. Steel is extremely strong in tension and compression but it rusts. Concrete is extremely strong in compression but relatively weak in tension. It covers the steel and protects it from moisture in the ground. Together they produce a composite material which is strong in compression and tension, easily shaped and durable. Steel is always placed in areas of tension in all reinforced concrete members to stop the concrete cracking. For domestic (residential housing) purposes steel is available in the following forms: Trench mesh -e.g. previously 3-8TM (now called L8) - 3 bars of 8mm diameter steel connected by cross wires to form a fabric laid in trenches for strip footings. No and diameter of bars varies. Comes in 6m lengths (strength of 300 Mpa). Slab fabric -e.g.previously called F62 (now SL 62)= fabric 6mm bars welded together in a 200mm square grid. Sheet size 2.4m X 6.0m. Available as F62, F72, F82, F92, F1018, etc. (strength of 300 Mpa). Bars -e.g. R10 = round 10mm diameter bar. -e.g. Y16 (now called N16)= deformed bar 16mm diameter - (Y= high yield strength of 410 Mpa +) Bars can be ordered cogged (bent) to suit but must be transportable. Basic types of footings Common details Min. strength concrete 20 Mpa. Nominal aggregate size 20mm. Pad footings Also called blob footings. Is a solid mass of concrete ( no reo) laid in ground to support brick, timber or steel piers / posts. Commonly used to support timber floor frames. With reo and engineering design can be used to support suspended concrete floors. Details: Brickwork not acceptable Reo (if used) requires 40mm concrete cover. Suitable for A, S, M, H class sites. Sizes for pads is given in AS1684 Timber Framing code - size subject to area and load of floors. Minimum 400 x 400 x 200 high.

Isolated brick piers on pad footings Strip footing Reinforced strip of concrete laid in trench in ground. Used to support continuous brick walls. Typically 300mmm deep x 300-400mm wide. Process: Dig trench with backhoe or by hand. Tie up reinforcing cage. Lay reinforcing (reo) in trench. Support reo cage to ensure required concrete cover all round. Pour concrete and allow to cure before loading. Details: Reo requires 40mm concrete cover. Lapping of bars min. 500mm or full width at T and L intersections. Stepping techniques - see As 2870 Clause 5.4.3 Suitable for A, S, M, H class sites. Strip footing trench with trench mesh reinforcement Strip footing after pouring of concrete

Pier and Beam This system of footing basically a post and lintel method of load support. This concept permeates almost all structural elements of building. Its basic premise is that the lintel (horizontal member) carries a load from above and spreads it horizontally to the posts (vertical members). The posts then pass the load to another supporting element or the foundation material. The beam (lintel) is a strip footing which is deeper than it is wide. It is constructed in the same as a strip footing. The pier (post) is a vertical cylinder of normally unreinforced concrete (up to 3.0 m deep) which is made by drillling a hole in the ground to the depth required to find a suitable ABP or pass below the reactive zones of a reactive soil. The piers supports the beam at approximately 1800-2400 mm centres. Piles or piers may also be used in all forms of slabs on ground to find adequate ABP or bypass reactive areas. The piers may or may not be tied to the beam by reo (see your engineer for details). Process: Drill pier holes as directed by engineer Fill piers with concrete to level which coincides with bottom of beam then construct beam as per strip footing. Piers are sometimes belled (enlarged) on the end to resist upheaval on reactive sites or reduce pressure by increasing surface contact area. In highly reactive sites beam may require slip joint (2 layers of plastic membrane) to allow soil to slip past beam. Often also utilizes compressible material (foam, corrugated steel, etc) under beam to accommodate ground heave. Ground level Poured strip footing (beam) Piers (posts)

Pile and Beam Piles perform the same function as piers and piers are often called piles. The pile and beam system is identical to pier and beam except for the piles. Piles are preformed units of timber (with steel collars or caps), reinforced concrete or steel which are hammered into the ground much the same as a nail is hammered into timber. When piles are used in clusters ( a group) for large buildings a pile cap (pad footing) is often poured on top to carry the load of the beam or slab. When being hammered piles stop due to : Friction on the sides and end of the pile; or End resistance when the pile hits a very strong or hard foundation. A 1000kg percussion hammer is often used to hammer the piles. Damage to neighbouring buildings from vibration or ground heave is of concern. Piles are often used where collapsing soils exist on the site and drilling pier holes would result in collapsing holes Raft slabs All slabs cast on the ground are considered as raft slabs as they float on the soil. They vary in design to suit the type of foundation material. Slab on Ground ( SOG) Consists of a flat slab sitting on a perimeter beam (similar to a strip footing). Poured as one integral unit. Is used primarily in conjunction with trussed roofs which impart no load to the internal area of the building. Process: Use excavator to cut and fill site as necessary to provide flat building platform. Setout formwork Dig trenches for perimeter beam with backhoe or by hand. Install drainage pipes. Place blinding layer of sand. Pest spray the sand if required. Install vapour barrier Place reinforcement Pour concrete and allow to cure before loading. Details: Suitable for A & S class sites. Reo used- slab fabric over entire area of slab; trench mesh in bottom of edge beam. Reo cover required: Slab fabric where protection from moisture is provided by structure - 20mm Trench mesh at bottom of edge beam protected by vapour barrier - 30mm Trench mesh at bottom of edge beam not protected by vapour barrier - 40mm Uses edge rebate to stop horizontal moisture penetration at floor level and assist flashing system. Internal load bearing walls require the slab to be thickened by 50mm under the wall. Setdowns in top of slab matched by setdown in soffit of slab (special care with reo). Height of Finished Floor Level above ground level determined by: Height of surcharge gully Possibility of local flooding Termite protection method Effects of cut and fill Foundation type and use of perimeter paving.

Slab on ground viewed from underneath showing flat slab on edge beams. Diagram on right hand side shows detail of one corner of a slab with a dropped edge beam. The interior of the slab also rests on soil as do the perimeter beams. Footing slab Identical to slab on ground except edge beam is poured separately from slab. Useful on sloping sites or where soil is soft or collapsing. May utilize brickwork between edge beam and slab on low sides of site. R10 ligatures @ 500 centres used to tie edge beam to slab. Stiffened raft slab This is an extension of the slab on ground and is much stronger. It utilizes internal beams @ 3.0-6.0 m centres in addition to the edge beams to provide a stiff grid of beams. Suited to class M & H sites. Process and details identical to those for SOG.

Diagram showing grid layout of internal and external beams. The shaded section depicts the area of the slab only 100mm thick whilst the lighter areas are beams typically 400mm deep. Waffle raft slab This is the strongest form of standard slab. Utilizes a closely spaced grid of 110 wide internal beams @ 1090mm max. centres in both directions. Edge beams are min 150 high x 300 min wide. Beams are formed by used of expanded polystyrene blocks set apart by spacers which also act as reo chairs. Slab is formed above ground so eliminating trench excavation. Uses N high strength bars instead of trench mesh in beams and uses standard slab fabric over slab area. Slab may be 85 thick. Advantage is accurate concrete quantity estimates. Services cut in through waffle forms. Suited to A, S, M, H class sites.

Egg crate layout of closely spaced beams in waffle slab construction