The London 2012 Olympic Challenge

Similar documents
Case study: The Olympic Challenge

The Mayor of London s Submission:

UK AIRSPACE Introduction

FLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY

3-4 June 2014 Sywell Aerodrome

Discussion Paper 01: Aviation Demand Forecasting

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Best Practice in Economic Regulation: Lessons from the UK

Traffic Flow Management. December 2010

Adapting to air traffic growth in Europe

UK SLOT ALLOCATION PROCESS AND CRITERIA

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Air Traffic Control Disruption 7th December A Report to the Civil Aviation Authority

Aircraft Noise Control at London Luton Airport. August 2015

Overview of NM and CDM

The future development of air transport in the UK Make your views known

Pricing Framework July 2012

DGAC & Aviation crisis management

LONDON SOUTHEND AIRPORT CLASS D CONTROLLED AIRSPACE GUIDE

London Gatwick Airport Noise Report

London Luton Airport Document PPO5 Procedures for Requesting Prior Permission to Operate Version issued 25 th February 2009

GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

How SMS changes the way people travel

A Second Runway for Gatwick Initial response to the Airports Commission s recommendation report

Airspace Change Communications and Consultation Protocol Protocol

CONTROLLING THE MISUSE OF SLOTS AT COORDINATED AIRPORTS IN THE UK MISUSE OF SLOTS ENFORCEMENT CODE

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

Air Traffic Management Services Plan

GATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2015

SESAR BENEFITS: TOMORROW STARTS NOW

User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

years in the community

Third Runway is Key to Hong Kong s Competitiveness. Professor Anthony Cheung Bing-leung Secretary for Transport and Housing

ATFM STATUS REPORT: SOUTH AFRICA

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

Boletín nº5. Julio 2012

EUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin

PRESERVATION OF SLOTS FOR DOMESTIC SERVICES AT LONDON AIRPORTS

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2014

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

Safety and Airspace Regulation Group

Norwegian UK set to takeoff as airline is granted UK Air Operating License

Trends in Aeronautical Information Management

GATWICK - FREQUENTLY ASKED QUESTIONS February 2015

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

A day in the life of an aircraft operator

Heathrow, Gatwick and Stansted market power assessments

Network Manager Annual Report 2012

SESAR RPAS R&D ROADMAP DEVELOPMENT

AIRCRAFT NOISE ABATEMENT OPERATING PROCEDURES AND RESTRICTIONS

CREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE. (according to Article 10 of Commission Regulation (EU) No 1178/2011)

How To Know What Is Happening In European Air Transport

Communications/Navigation/ Surveillance and Air Traffic Management in Africa

AGENCY: Federal Aviation Administration (FAA), Department of Transportation.

EUROPEAN CIVIL RPAS OPERATORS FORUM

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 30 JUNE 2015

HEATHROW AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH Performance Report 1. Notes to the Performance Report 2

Space Applications and Technologies Expo Rome, Italy February 4 6, 2010

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)

MEAUSE Customer Relationship Management Pilot Project Executive Summary

European ADS-B Regulation

CIVIL AVIATION REQUIREMENTS SECTION 3 AIR TRANSPORT SERIES M PART IV ISSUE I, DATED 6 TH AUGUST, 2010 EFFECTIVE: No.

Discussion Paper 01: Aviation Demand Forecasting

1.2 Some of the figures included in this publication may be provisional only and may be revised in later issues.

Tauranga, Bay of Plenty

Arrival of an affected aircraft: Standard Operating Procedure

EUROCONTROL AT THE WORLD ATM CONGRESS

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

FAA / NAA DISPATCHER CERTIFICATE TRAINING PROGRAM

The economic impact of London Luton Airport Oxford Economics

Training program for S2 (TWR) rating

Our strategy and objectives

A-CDM from an airport perspective Oslo Airport

PCP Active ECAC FCM05 REG ASP MIL APO USE INT IND NM

AAIB Bulletin 3/2015 SPECIAL

1.231J/16.781J/ESD.224J Airport Systems Fall Demand Management. Amedeo R. Odoni. Massachusetts Institute of Technology.

Air Traffic Management

Recognition of overseas flight crew licences and ratings

FlySafe Final Presentation

BEFORE YOU GET STARTED

Air Traffic Controllers Performance Objectives

Comparison of Air Traffic Management-Related Operational Performance: U.S./Europe

ICASM Second Announcement September Oxford, UK. 63rd International Congress of Aviation and Space Medicine

Direct Approach Consulting Inc.

Imagine a world class Heathrow London First policy conclusions

Area Navigation (RNAV) and Required Navigation Performance (RNP)

Part 172 CAA Consolidation 1 February 2016 Air Traffic Service Organisations Certification

Central Airspace Management Unit World Cup 2010 Experience (South Africa) Presented by: Armando de Olim Acting Pool Manager: ATFM

OCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING

Block 0: Capabilities within our Grasp

The business of Gatwick Airport Limited

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2015

Our strategy and objectives

2015 Review and Outlook 13 January 2016 DG/ALB

Transcription:

The London 2012 Olympic Challenge

Paul Haskins General Manager, London Terminal Control Brian Wheeler Operations Supervisor, London Terminal Control

The Size of the Challenge?

Departures Heathrow

Departures Heathrow, Gatwick

Departures Heathrow, Gatwick, Stansted

Departures Heathrow, Gatwick, Stansted, Luton

Departures Heathrow, Gatwick, Stansted, Luton, London City

Arrivals Heathrow

Arrivals Heathrow, Gatwick

Arrivals Heathrow, Gatwick, Stansted

Arrivals Heathrow, Gatwick, Stansted, Luton

Arrivals Heathrow, Gatwick, Stansted, Luton, London City

Departures & Arrivals Heathrow, Gatwick, Stansted, Luton, London City

Half a million overseas spectators 70,000 overseas Olympics Family members; 150 Heads of State flights 700 extra commercial flights into London s main airports; 10,000 business jet movements.

Maintain and maximise capacity of London s core airports Create extra capacity to satisfy a significant expected increase in IFR movements to London s secondary airports

Departures & Arrivals Demand from 40 airports

Accommodating the biggest ever Military Operation during peacetime in the UK Multiple fixed wing and rotary fighter and surveillance aircraft

Adjacent ANSP Partners Co-ordination and agreements

Delivering the Solution

Building Critical Relationships; UK Ministry of Defence UK Department for Transport UK Home Office UK Civil Aviation Authority Business & General Aviation Community Commercial airlines IATA Airport operators Airport Coordination Ltd Eurocontrol UK and European Meteorological Offices LOCOG Media and politicians

Dealing with the risks; The UK Aviation Network faced risk of significant ATM delay throughout the Olympics Security restrictions/flights/interceptions affecting civil use of airspace Weather disruption and ability to recover from disruption Additional demand to secondary airfields and non adherence to allocated runway slots

Making the preparations; Creation of new temporary controlled airspace A bespoke Military command centre alongside the civil operation Business & General Aviation briefing and communications Media, political and customer communication programmes ATICCC live throughout

New Temporary Controlled Airspace; Three new areas of controlled airspace - designed, consulted and approved 4 new holds plus new arrival routes Additional contingency airspace Intensive simulator evaluation Consultation with leisure flying community, Military and local communities

Bespoke Military Solution; Temporary Ops Room, Procedures and equipment built and equipped by NATS Managed all flights operating outside CAS in the London area Managed all Flight Plans Statistics 34 Days of operation 18,575 flight plans processed 10,739 aircraft controlled

Business and GA Outreach; Presentations around the world to discuss the Olympics airspace Publicity material detailing the changes including leaflets, podcasts, articles and online tutorials. Telephone hotline and information hub, set up to help the business and GA communities understand the changes and the requirements regarding flight planning.

Stakeholder, Media and Political Engagement; A year of detailed preparatory work with more than 100 commercial airlines Media campaign to raise awareness of the Olympics and the changes to airspace. Briefings for UK and international print and broadcast journalists Briefings for UK Defence and Transport Ministers, Members of Parliament and senior Military Commanders

Air Traffic Incident Crisis Communications Cell (ATICCC); Value established during the Volcano Live throughout Olympics with up to 3 calls per day; text/email updates; ability to run operator liaison cell Single point of truth for UK ATM: Included NATS Centres, FMP, UK and European Met Office, DfT, CAA, Eurocontrol, IAA and Airports Airfield status map updated daily via live portal

The Results

NATS management of traffic across the entire UK network with delays substantially down versus last year, including special slot coordination across 40 airports without any major incidents and using the NATS coordination and communication cell, has led to a great success for the UK transport industry IATA

The Statistics London Airspace handled 6,000 flights per day. 3.5% - 4.5% increase in traffic 26 July = 59% increase in general aviation and business aviation flights 9,708 total Business Aviation slot bookings 11 infringements of NATS Controlled Airspace Three security launches with minimal impact on airline operation A number of significant weather days London Airspace handles 6,000 flights per day.

Service In one of the most challenging periods ever for UK air traffic, NATS generated just 0.1% of total European delay attributable to ATC, despite handling nearly 25% of Europe s traffic

Safety No risk bearing losses of separation attributed to the Olympics. No systems issues. Just 11 infringements of NATS controlled airspace by GA aircraft.

Communications Website had 126,308 visits by 82,411 unique visitors Olympics airspace guide distributed to 60,000 flying schools, aerodromes and events Reached over 8 Million people

What I experienced was one of the most professionally run ATM facilities I ve had the pleasure to visit Roberto Gonzalez, Senior FAA representative, London office

We have received glowing positive feedback from numerous sources regarding the work of the team and the outstanding support that they received from NATS Assistant Chief of the Air Staff, Royal Air Force

Summary Fours years in the planning, NATS is very proud it could play it s part in the success of London 2012, providing a safe and efficient operation despite the huge challenges faced when delivering a project of this size and importance. NATS is the UK based global provider of air traffic services and solutions.

NATS can be found in Exhibition Hall 9, Stand 890. Questions?