For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

How To Comply With The Loss Prevention Certification Board

Fire Protection Industry Scheme Reference SP205 Part 1

PART P SCHEME YOUR GUIDE TO REGISTRATION

Standard the the Raising

ELECSA and the Fire Industry

Guidance for Responsible Persons on False Alarm Management of Fire Detection and Alarm Systems

PUBLICATIONS. Introduction

Electrical Safety Policy

FIRE DETECTION AND ALARM SYSTEMS

Fire Alarm Systems Care and Maintenance

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

OBOA 2009 Huntsville, ON Overview of ULC Standards Affecting Building Occupancy Alan Cavers Area Manager Fire & Security Systems Group

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

COMMISSION REGULATION (EU)

CFP 2/4/8 ZONE CONVENTIONAL FIRE ALARM CONTROL PANEL. user manual & log book. Approved Document No. DFU Rev 1

Contractor Connect Scheme Electrical Contractor and Worker Handbook

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

Risk Management Guidelines

Fire. The Fire Installers Mate. A guide to fire alarm systems design

QUALITY MANAGEMENT PLAN

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

Guidance for Electrical Contractors on Emergency Lighting Legislation

Compliance Schedules and Building Warrant of Fitness

DOCUMENTED PROCEDURE MANUAL

CEA Base requirements for Installers of Automatic Fire Detection and Alarm Systems (AFDS), Intruder Alarm Systems (IAS) and/or CCTV-Systems

1.0 General. Inspection, Testing, and Maintenance 1 of 8

Rail Network Configuration Management

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

ISO/IEC QUALITY MANUAL

Asbestos at work guide

THE POWER TO BUILD YOUR BUSINESS

Skills for Security Ltd ASSESSMENT STRATEGY. for S/NVQ s using. National Occupational Standards

INSTALLATION ELECTRICIAN / MAINTENANCE ELECTRICIAN APPRENTICESHIP ASSESSMENT PLAN

Quality & Safety Manual

Electronic Fire and Security Systems Installation: Commissioning (SCQF level 6)

New Guidelines on Good Distribution Practice of Medicinal Products for Human Use (2013/C 68/01)

DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

PRIVATE INVESTIGATORS (PSA 42:2015)

Electronic Security Systems Certification

1.1.4 The findings from Fire Risk Assessment must be incorporated into the FRAMS Action Plan to manage fire safety at each premise.

section one guide to design, installation,commissioning and maintenance of fire systems in non domestic premises Consultant s Guide

maintenance of CCTV surveillance systems code of practice

The Management of Asbestos containing Materials

Derbyshire Trading Standards Service Quality Manual

Certification criteria for. Internal QMS Auditor Training Course

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

QUALITY MANAGEMENT POLICY & PROCEDURES

NICEIC Certification and Oil Firing Schemes

FIRE SAFETY PRECAUTIONS

AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013

Policy 7 Management of Asbestos

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS

PSA LICENSING REQUIREMENTS CCTV MONITORING AND ALARM MONITORING CENTRES (PSA 33:2014)

BS5839 Part 1:2002 Overview

Domestic Shipping. Safety Management System. Company:

Health and Safety Management Standards

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

Fire Safety Log Book

Quality Management System

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version

OH&S Management Systems Audit Checklist (NAT, E3)

Landlord/Agent Code of Conduct

NABL NATIONAL ACCREDITATION

Check-list for auditors. Audit visit at candidate registered laboratories

Surgi Manufacturing Quality Manual

Loss Prevention Standard

POLICY MANUAL BS EN ISO 9001:2008

Schedule of Accreditation issued by United Kingdom Accreditation Service High Street, Feltham, Middlesex, TW13 4UN, UK

Health and Safety Policy Part 1 Policy and organisation

CONTRACTOR CONTROL CONTRACTOR SELECTION STANDARDS FOR SAFE WORKING

GUIDANCE ON ELECTRICAL INSPECTIONS

Network Certification Body

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN :2009

Fire Safety Risk Assessment Checklist for Residential Care Premises

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

Policy for the Management of Asbestos in the Workplace

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

Vigilant Security Services UK Ltd Quality Manual

Plumbing, Heating & Gas Industry Course Information

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

Reducing false alarms

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

Fire Log Book. Provided by Norfolk Fire & Rescue Service. Name and address of premises:...

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

POLICY Contents. 1.0 Introduction Statement

WORKING IN CONFINED SPACES GUIDELINES

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)

SUB-CONTRACTING PARTNERSHIP POLICY

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Example of a food company quality

Fire Risk Assessment Safety Checklist

Transcription:

BAFE SP203-1 CERTIFICATION SCHEME ASSESSMENT CHECKLIST BAFE Scheme General A minimum of 2 projects, with all relevant documentation and certification are available for review.the projects include work carried out by the organisation covering the scope of certification applied for i.e. design, installation, commissioning and maintenance. Access to the project sites has been confirmed with the customer and they understand the depth of testing and inspection required by the assessment. Sites are within 30 minutes travelling time of the office. A Principal Duty Holder, Sufficient Designer(s) and Key Responsible Person(s) are in place and will be available as required throughout the assessment. Module 1 - System Design This section is only applicable to businesses who are wanting design to be within the scope of their certification. 6.1 System design is only subcontracted to another BAFE certified organisation. (particular attention is required when obtaining design support from manufacturers such as aspirating smoke detection and voice alarm system manufacturers). 6.2.1.1 The competence of the Designer will be assessed. 6.2.1.2 Designer is named and has the authority to sign off designs on behalf of the company is evident within the design procedure. 6.2.1.3 Appropriate level of design resource available to the organisation. 6.2.1.4 If the designer(s) are not available to undertake their work, alternative arrangements are in place or design work is to stop is evident within the design procedure. 6.2.1.5 Actual designs undertaken by the designer will be assessed to demonstrate design competence. 6.2.1.6 Evidence that the designer has knowledge of products and systems. i.e. manufacturer training. 6.2.1.7 Designer has knowledge of BAFE requirements for certification. 6.2.1.8 Evidence that sufficient information is passed onto the installer (i.e. general layout drawings, schematic drawings, specification, standby battery calculations, loop calculations, aspirating smoke detection pipe calculations, cause & effect and zone diagrams etc). 6.2.1.9 Designer has sufficient knowledge to assess the fire risks influencing the system design. 6.2.1.10 Designer has knowledge of EU directives and associated UK legislation and relevant to national safety requirements. 6.2.1.11 Designer can evidence design of systems to minimise false alarms.

6.3 Evidence that the design is in accordance with one or more agreed specification(s) 6.4 Evidence that the equipment specified utilises components and cables that meet the requirements of BS 5839-1 and where relevant the Construction Products Regulations. 6.5.1 The designer can evidence knowledge of requirements in relation to connection to mains power supplies and interface to other systems (fireman s lift, smoke ventilation, etc) 6.5.2 Evidence that when designs are to BS 6266 that ancillary services and fire protection measures are integrated correctly by the designer. 6.6 & 6.7 Evidence that design records are maintained and available for all projects and kept for a minimum of 12 years. 6.8 Evidence of formal completion of design process and evidence that there is provision of design process to continue to the end of the project. 6.8.1 Evidence of design control and sign off process is in place. 6.8.2 Evidence that design only projects provide a provision within the contract for further involvement of the design organisation prior to the certification of the installation and commissioning modules. 6.8.3 Evidence that design documentation is prepared and recorded in a manner whereby design changes can be recognised during the course of the project 6.8.4 Evidence that the company can meet the requirements of BAFE SP203-1 Section 10 for system Verification. Module 2 - Installation This section is only applicable to businesses who are wanting installation to be within the scope of their certification. 7.1 System installation is only subcontracted to another BAFE certified organisation or an organisation that is certified by UKAS accredited Third Party Certification Body to ISO 17065 to operate schemes that are within one or more of the scopes listed in Annex A1.6.2.1 and A1.6.2.2 of BAFE SP203-1 and that are appropriate to the work being undertaken. 7.2 Subcontracting of work to a non BAFE certified organisation is done so on the basis that the subcontractor has been assessed for competency and that they are being supervised and managed and not responsible for the quality and subcontracted work as this remains with the Certified Organisation. 7.3 Evidence that the installation organisation understands the requirements of the installation process and that the installation engineers are competent and understand the requirements of BS 5839-1 Section 4. 7.3.a Evidence of competence and ability to meet the requirements of BS 7671 for the electrical safety of the installation. 7.3.b Ability to interpret design requirements. 7.3.c Understanding of responsibility for BAFE modular certification. 7.3.d Satisfactory knowledge of relevant standards and codes of practice. 7.3.e Evidence of interface with others on project. 7.3.f Understanding of electrical, mechanical and other safety issues relating to the installation. 7.3g & 7.3h Evidence of adequate and competent supervision.

7.4 Evidence that the installation is in accordance with the agreed specified requirements. 7.4.1 All equipment that is used is third part certified to appropriate standards and where relevant meets the requirements of the Construction Products Regulations. 7.5 Evidence that the installation is certified by BS 5839 and BAFE modular certificate for installation. 7.6 Evidence that comprehensive records are kept for each project. i.e. design and specification requirements, certificates, cable test results, as fitted drawings etc. 7.7 Evidence that installation records are maintained and available for all projects and kept for a minimum of 12 years. 7.8 Evidence of formal completion of installation process to which testing and commissioning can commence. Module 3 - Commissioning and Handover This section is only applicable to businesses who are wanting commissioning and handover to be within the scope of their certification. 8.1 Evidence of a review of test results carried out by the installer prior to undertaking the commissioning of the system. 8.2 System commissioning is only subcontracted to another BAFE certified organisation. (particular attention is required when obtaining commissioning support from manufacturers such as aspirating smoke detection and voice alarm system manufacturers and specialist subcontractors). 8.3 Where more than one organisation is responsible for the commissioning of a system. All organisations involved in the commissioning process must be BAFE certified.the organisation which is responsible for the handover of the system must receive sufficient evidence that final testing and commissioning is completed by all other commissioning organisations and that all variations are clearly identified. 8.4 Evidence that there is sufficient competence to initially test, commission and handover the installed equipment and an understanding of the specified requirements. 8.4.1.a Evidence of knowledge and competence to test and commission the equipment installed i.e. manufacturers training for the programming of control and indicating equipment, aspirating smoke detection etc. 8.4.1.b Evidence of an ability to interpret design requirements. 8.4.1.c Evidence of an understanding of responsibility for BAFE modular certification. 8.4.1.d Evidence of a comprehensive understanding of the commissioning process. 8.4.1.e Evidence of knowledge of interfacing with other building services. 8.4.1.f Evidence of a comprehensive understanding of electrical and other safety issues relating to the initial testing and commissioning of electrical systems. 8.4.1.g & h. Evidence of adequate and competent supervision. 8.4.2 Evidence of competence to train others in the use of the system. 8.5 Evidence that the installation is commissioned and handed over to the client as per the agreed specified requirements. 8.6 Commissioning procedure documents the process for commissioning the system when there is not a specification that states the standard or code to which the system should comply.

8.7 Commissioning procedure documents the process for commissioning the system when there is nobody representing the client during the commissioning and handover process. 8.8 Comprehensive records for testing and commissioning for each project which can demonstrate compliance with BS 5839-1 39.2. 8.9 Evidence that commissioning and handover records are securely stored for a minimum of 12 years from the date of handover. 8.11 Evidence of formal completion of commissioning and handover process to which to which the Client takes responsibility for the installation. 8.12 Evidence that adequate records of all phases of the project have been passed to the client and that the client has been recommended to retain records for at least the lifetime of the installed system. Module 4 - Maintenance This section is only applicable to businesses who are wanting maintenance to be within the scope of their certification. 9.1 System maintenance is only subcontracted to another BAFE certified organisation. (particular attention is required when obtaining maintenance support from manufacturers such as aspirating smoke detection and voice alarm system manufacturers and specialist subcontractors). 9.2 Evidence that there is sufficient competence to maintain the installed equipment and an understanding of the specified requirements. 9.2.1 Evidence that the maintenance engineer(s) are fully conversant with BS 5839-1:2013 Section 6. 9.2.2 Evidence that maintenance engineers have attended a recognised course in the safe isolation of mains power supplies by a nationally recognised organisation. 9.3 Evidence that there is sufficient resource within the business to effectively undertake the maintenance contracts to which it is committed and also to investigate and rectify system problems which result in false alarms. 9.4 Evidence that there is an agreement with an alarm receiving centre should any of the systems maintained be connected for remote signalling. 9.5 Evidence that there is sufficient resource to meet response times for requests for corrective maintenance. 9.6 Evidence that if the maintenance contractor comprises of 1 person then they have an agreement with another BAFE SP203-1 maintenance contractor to provide back up emergency call out support. 9.7 Evidence that there is access to spare parts in order to effectively repair the systems maintained by the organisation within any specified timescale. 9.8 Evidence that in the instances of maintained systems being obsolete that the Client has been informed of the situation in writing. 9.9 Evidence that the systems are being maintained in accordance with the contract specification and that there is evidence that any requirements to restore the system to full operational fitness have been specified to the client such that they are able to place an order for the work to be undertaken. 9.10 Comprehensive records for testing and inspection for each project which can demonstrate compliance with BS 5839-1 45.3, 45.4 and 46.2. Records shall be kept for a minimum of 6 years. 9.11 Evidence that there are records for any modifications carried out to the system resulting from system design changes i.e. following fire risk assessment.

9.12 Evidence that any alterations that are outside the scope of maintenance are carried out by an organisation that holds BAFE SP203-1 certification for the appropriate scope. 9.13 Evidence that there is an appropriate maintenance report which meets with the requirements of Annex A1.1.2. 9.14 Evidence that the maintenance reports are revised to meet the requirements of any changes to any relevant standard and code of practice. 9.15 Evidence of the undertaking of a special inspection in accordance with BS 5839-1:2013 46.2. System Verification 10.1 The system has been verified prior to completion of a BAFE certificate of compliance. 10.2 Verification is to be carried out by a person with design competence. 10.3 Verification is to be carried out by a competent person and documented and passed onto the client. 10.4 Verification to highlight problems in the system that is the result of interfaces between the modules. 10.5 Any variation between the design specification and the installed system are to be reported to the client and solutions agreed by the interested parties. 10.6 All installations require verification prior to the completion of a BAFE certificate of compliance. 10.7 The verification organisation must have the minimum scope listed in a) to c) of section 10.7. 10.7 Third Party Certification Bodies are required to assess the competence of organisations in relation to Verification. 10.8 Clients to be informed that all BAFE modules and Verification of the system have to be completed before a BAFE certificate of compliance can be completed. 10.9 Systems installed by non BAFE certificated organisations can be retrospectively assessed and verified by a certificated organisation, if the maintenance is carried out by a BAFE organisation. 10.10 When BAFE verification is undertaken retrospectively and includes verification of non certificated modules, the verification will include an audit of acceptability. 11a 11b 11d 11e Management Systems It is a scheme requirement that businesses have a documented management system (Business Operation Manual). The management system shall include the items details within the section as a minimum. Records to provide evidence of corrective and preventative actions taken when process problems have been identified. Documented procedure to deal with complaints. The management structure of the organisation is documented. i.e. an organisation diagram. All documented procedures detail the responsibilities of key personnel who are involved in each certificated module.

11f Documented procedures to cover the satisfactory initiation, execution, supervision and completion of the processes relevant to the modules of the scheme and appropriate to the scale and complexity of works undertaken by your organisation. 11g A register of all instruments and equipment used for measurement, inspection and testing purposes i.e. multi-meters, sound level meters, insulation resistance, continuity testers, smoke and heat detector testers, battery testers and where appropriate up to date records of calibration. 11.h A register of standards and publications that is maintained showing each document issue status. (note the subscription to a standards on line service is unlikely to satisfy this requirement fully as documents supplied via trade associations and BAFE are unlikely to be included). 11i 11j 11k 11c Suitable documented policies, processes, audits and records etc to ensure that personnel are competent for the work they undertake. Competency records available for all technical staff. Documented procedure to ensure that all relevant personnel have access to and have knowledge of relevant up to date data, Standards and Codes of Practice A register of approved subcontractors, where subcontractors are permitted by the Scheme. (for the avoidance of doubt design, commissioning and maintenance work may only be subcontracted to another BAFE SP203-1 certified organisation. Installation work may be subcontracted to an organisation that is not BAFE SP203-1 Scheme certified however this must be subject to the demonstration of competency and appropriate qualification of the subcontractor). 11o Documented procedure(s) to ensure that products, components and parts are supplied as certified under a recognised product conformity scheme. 11l Records to evidence that the management system and KPIs are regularly reviewed and amended where appropriate to ensure its continuing effectiveness i.e. management review agenda and meeting minutes. 11m Records to evidence that any KPI s as set by the organisation including the level of achievement by month for the execution of both periodic contractual and corrective emergency maintenance. 11n Records of unwanted false alarms and troublesome systems. Evidence of records for all false and or unwanted alarms from systems that are connected to an alarm receiving centre.when trends are identified there shall be evidence that the client has been advised to have an inspection of the system to eliminate the cause and prevent further waste of Fire & Rescue Service resources. 18.2 Changes of personnel. where their competence formed part of the Certification Audit, shall be recorded in a register of competent personnel and the register shall be included as a recognised part of the business's management system. Certification Audit The business shall have available the following items for assessment: 14.1a Holding the necessary reference documents, e.g. manufacturers technical data, product and system standards, relevant regulations. 14.1c A documented list of projects in progress and completed. 14.1d Records of project specifications, drawings, records, certificates and reports relating to work in progress and completed over the previous 12 months.

14.1f Evidence that adequate insurance cover is held for work undertaken i.e. design, installation, commissioning and maintenance of fire detection & fire alarm systems detailed as a business activity within the insurance policy. 14.1g A register of installations where there are ongoing problems and have documented evidence that there is effective management of these installations. 14.2 The workplace premises is adequate for the business being undertaken. 14.3.1 The area(s) used as a workplace are segregated from those used for other purposes. 14.3.2 The area(s) used as a workplace are secured to prevent unauthorised access to important documentation when the area is not occupied. 14.4 The area(s) used as a workplace are protected by adequate security measures i.e. intruder and fire alarm systems or a 24 hour man guarding patrol or a secure site. NOTE This pre-assessment checklist has been designed to help applicants to interpret and be fully prepared for the assessment visit. Please take time to review each of the scheme clauses and requirements and make sure that you are satisfied that you have answers and where necessary, documentary evidence to show to the Assessor. In working through the document you might find it useful to use the '' column to indicate how you have met the requirements. To access the full BAFE SP203 Part 1 reference document please visit www.bafe.org.uk NICEIC, Mansfield Business Centre,Ashfield Avenue, Mansfield NG18 2AE E: technicalassessment@certsure.com SP203 A-CHECKLIST/04-16