1 THE QUALITY POLICY STATEMENT OF: MP Plumbing & Heating Ltd Unit 8,The Metro Centre, Bridge Road, Orpington BR5 2BE Telephone: Fax: Web page: : Controlled / Uncontrolled : Copy No : Authorised Managing Director This quality manual represents the MP Plumbing & HeatingLtd' book of best practice'. It may not be copied, reproduced or released to any third party without the written permission of the directors. Issue 3 Page 1 of 19 Date: 29 March 2011

2 SCOPE OF REGISTRATION The management of the installation, service and repair of gas central heating and plumbing systems including gas appliance installation, maintenance, services and repair, annual landlord gas safety checks and sanitary works. MP Plumbing & Heating Ltd QUALITY POLICY It is the policy of MP PLUMBING & HEATING LTD to provide a professional, high quality service which meets the requirements of the customer and the end user. The company's quality management system has been designed to maintain and improve customer satisfaction at the very highest level. The company supports a fully integrated quality management system for which ultimate responsibility is taken by the managing director. The quality management system ensures that MP PLUMBING & HEATING LTD can fulfil contractual obligations by ensuring that: Quality/Business objectives and targets are in place and reviewed on a regular basis The quality system is communicated and understood by all members of staff Day to day activities are carried out under controlled conditions and regularly checked against the requirements of the system by the internal audit process. The system is continually reviewed and improved by regular management reviews The Directors of MP Plumbing are committed to complying with the requirements of BS EN ISO 9001:2008 and continually improving the effectiveness of the Quality Management System. They will ensure that this policy is communicated, understood and implemented at all levels in the organisation. Signed : Managing Director Date : Issue 3 Page 2 of 19 Date: 29 March 2011

3 1.0 INTRODUCTION: COMPANY PROFILE AND HISTORY M P Plumbing and Heating Ltd have been trading since Tina and Mick, the husband and wife team, returned from Canada in The company has gradually expanded, initially having started from home, and is now leasing a unit at the Metro Centre in Orpington. The majority of the work undertaken is heating and plumbing work for London & Quadrant housing association or other contractors also working for the association. The geographic spread encompasses London, mostly the SE & SW, but extends to Hampshire, parts of Berkshire, East and West Sussex and Surrey, as far as Richmond. 2.0 NORMATIVE REFERENCES 2.1 STANDARDS BS EN ISO 9001 any other standards and codes of practice as required. 2.2 COMPANY DOCUMENTATION This Quality Policy Manual and the associated processes and procedures 3.0 TERMS & DEFINITIONS Company: Product: Practice: Process: Procedure: Discrepancy: BS EN ISO9001 MP Plumbing & HeatingLtd The result of activities or processes. A product may include service, hardware, software, processed materials or a combination thereof The established method for undertaking a task or activity A sequence of tasks or activities A written document describing practices and processes A term used interchangeably with non conformance The standard Issue 3 Page 3 of 19 Date: 29 March 2011

4 4.0 QUALITY MANAGEMENT SYSTEM 4.1 General Requirements This document, the quality policy manual, is indexed such that the major points provide a direct cross reference to BS EN ISO The key processes have been developed to follow the business processes of MP Plumbing & Heating Ltd in a logical order following a plan-do-study-act cycle as demonstrated in the interaction of processes in appendix 1. List of Processes: No Process 01 Procurement of contracts 02 Order Receipt and Contract Planning 03 Installations, Maintenance and breakdowns 04 Servicing 05 Voids- Empty properties with work required 06 Decent Homes property upgrades 07 Applications Billing 08 Invoice Billing 09 Dealing with product and test failures 10 Incident reporting 11 Monitoring 12 Internal audits 13 Communications & Management meetings 14 Document Control 15 Managing Staff & Sub-contractors 16 Facilities & Infrastructure 4.2 Documentation Requirements General The quality system includes: This quality manual A documented quality policy statement and documented quality objectives The documented procedures required by this international standard The documents and records required for M P Plumbing to ensure effective operation and control. The documentation is held in both hard & soft copy Quality manual The quality manual has been developed in accordance with BS EN ISO 9001 and comprises of: Issue 3 Page 4 of 19 Date: 29 March 2011

5 Formal processes/procedures A Quality Management system interaction chart (Appendix 1) Exclusions from the ISO9001 standard: See clause 7.3 & The degree of documentation required for any part of the management system will be dependent on the methods used, the skills required and the availability of trained personnel Control of documents All documentation relating to the requirements of the standard will be reviewed for adequacy by the Directors and Office Management prior to formal issue. This documentation includes: The quality policy manual & operating processes * Technical documentation * Standards and codes of practice - including health & safety information * Statutory regulations * = Key documentation maintained by the quality management representative All computer data is controlled by the Directors to prevent unauthorised access in order to minimise the risk of virus's etc. Any person found misusing the computer system would be subjected to disciplinary action. Computer backup procedures are clearly defined by the management system. Please refer to Process No. 14. Document Control Control of records Records are established and maintained to provide evidence of conformity to requirements and the effective operation of the management system. All records are identifiable, retrievable and the relevant procedure describes the necessary controls including retention times and disposal of records. The following records are managed and controlled: Customer orders / contracts & contract review Job sheets Landlord Gas Safety Records Other test records Method statements/ Risk assessments Technical documentation Training records Audit reports Meeting minutes The company may retain records for a minimum of 5 years unless otherwise stated. Please refer to Process No. 14. Document Control Issue 3 Page 5 of 19 Date: 29 March 2011

6 5.0 MANAGEMENT RESPONSIBILITY 5.1 Management Commitment The directors take ultimate responsibility for all activities of the company. Management responsibility includes: Setting policies and objectives and leading the organisation Maintaining and improving performance Realising continual improvement Communicating to the organisation the importance of meeting customer and regulatory requirements 5.2 Customer Focus MP Plumbing & Heating Ltd is keen to identify client requirements and provide a service that meets or exceeds their expectations. The QMS processes have been developed to include methods of ensuring both customer and client satisfaction. In order to define the clients and residents needs, the company will: Identify key clients, including potential clients Ensure that the company has knowledge of statutory and regulatory requirements Consider any health & safety and/or environmental implications of its actions Gas safety check customer surveys are completed by residents in order to help us improve the service. 5.3 Quality Policy The quality policy for MP Plumbing & Heating Ltd is set out in page 2 of this QPM. The policy has been developed by the Directors and is reviewed annually at the quarterly management review meetings. The Policy is understood and communicated to all members of staff. 5.4 PLANNING Quality objectives The business plan developed by MP Plumbing sets the context in which all objectives including business/quality objectives and targets are developed. Objectives and targets are reviewed regularly during the quarterly management review meetings. Issue 3 Page 6 of 19 Date: 29 March 2011

7 5.4.2 Quality management system planning The quality objectives feed into the planning processes, at the highest level, as documented by the business plan. The business plan in turn is used to drive the budget process and the company, its plans and achievements are monitored and controlled through the various meetings. 5.5 RESPONSIBILITY, AUTHORITY & COMMUNICATION Responsibility & authority The responsibility, authority and interrelation of all personnel who manage, perform and verify work affecting quality is defined by the company organisation chart and the associated job descriptions which can be found in appendix 2 of this document. Additionally, specific quality related responsibilities are detailed in each of the procedures. Ultimate responsibility for the successful operation of the quality management system rests with the directors Management representative The quality management representative (QMR) at MP Plumbing & Heating Ltd is the Business Development Manager, Jo Bissett who is charged with the responsibility for ensuring that the requirements of BS EN ISO 9001 and the company's quality policies are being effectively met. The QMR is the focal point for any communication with the certification body and is responsible for: Ensuring that the quality management systems are properly implemented and maintained Reporting to the Directors on the performance of the quality management system and communication any requirements for change and improvement. Communicating to staff on the performance of the quality management system Ensuring awareness of the importance of customer (residents) and Client requirements It will be ensured that the quality responsibilities of the QMR does not conflict with any of their other functional roles Internal communication The company s activities focus on the provision of heating and plumbing service and as such, internal communications are both formal and informal and will include: The day to day informal face-to-face, telephone conversations and s The provision of job sheets for the work required The provision of policies, procedures and work instruction as required. Issue 3 Page 7 of 19 Date: 29 March 2011

8 Informal staff meetings Monthly management meetings Quarterly team meetings Quarterly management reviews Annual Board meetings 5.6 Management review General Process No 13 - the meetings & communications process defines the quarterly management review. The aim of these reviews is to ensure that the company's quality management system is being operated in the most effective and economic manner while still attaining the overall quality objectives as defined in the business plan and policy statements. The findings of the management reviews are used to initiate corrective, and any long term preventive, action required thereby increasing the overall effectiveness of the company's operation Review input Inputs to the review might include information on: Customer feedback (customer satisfaction/complaints/ feedback from residents ) Performance of processes and operational issues. External or internal changes (this relates to business planning activities and internal process management) Improvement activities Changes to statutory and regulatory compliance Results of recent audits (Internal and external) Follow-up actions from previous reviews and reviewing the effectiveness of corrective actions. Training, Development & resources Health & Safety The agenda for the management review meetings is listed in Process 13 Management meetings Appendix Review output The output of the review will focus on achieving the following objectives: The determination of the effectiveness of the quality management system in meeting the company's quality policies. To expose any defects in the operation of the quality management system and to recommend possible improvements. To identify and eliminate waste or loss. To verify that corrective action procedures are effective. Issue 3 Page 8 of 19 Date: 29 March 2011

9 Suitability of organisational structure and resources Planning for the future 6.0 RESOURCE MANAGEMENT 6.1 Provision of resources MP Plumbing & Heating Ltd will provide the necessary resources to ensure that the objectives of its quality management system and the expectations of its clients are met in full. The resources required are aimed primarily at the continual improvement of the management systems and customer satisfaction by meeting customer requirements. 6.2 Human resources General MP Plumbing & Heating Ltd views its staff and the hired sub-contractors as its most valued investment and the training process has been developed in line with this policy. The supervisors are responsible for ensuring that all hired sub-contractors are competent to conduct their day to day responsibilities Competence, awareness and training All staff holding positions of responsibility will ensure that the personnel/ subcontractors directly involved with the processes covered by the management system possess the appropriate knowledge and skills to enable them to complete their work to a satisfactory level. All staff, management or supervisors holding positions with responsibility for others will ensure that all personnel and hired sub-contractors are: Competent to undertake the tasks required of them Provided with necessary training against specific objectives which will be evaluated Aware of the importance of their activities and effort with regard to the quality management system and its objectives Provided with the necessary training, records which are maintained Process 15 Managing staff and subcontractors describes the recruitment and training process. 6.3 Infrastructure The company s infrastructure consists of a range of facilities at its main office located in Orpington with the appropriate facilities required to deliver heating and plumbing services. The company is constantly reviewing their facilities arrangements to ensure they are adequate for carrying out their operational duties and meet the needs and Issue 3 Page 9 of 19 Date: 29 March 2011

10 expectations of all interested parties. This also extends to support facilities and both aspects are monitored for: Function Performance Availability Cost Safety Security Please refer to Process 16 Facilities and Infrastructure. 6.4 Work environment MP Plumbing & Heating Ltd is focused on the human and physical aspects of its working environment. This environment is aimed at improving or influencing both staff motivation and satisfaction, which in turn creates an atmosphere conducive to enhancing the overall performance of the organisation. Typical examples of human factors affecting the environment include: Opportunities for greater involvement Safety rules and guidance, including protective equipment Ergonomics. Environmental and health & Safety policies have been developed. Other typical examples of physical factors affecting the environment include: Heating Lighting Hygiene Humidity Cleanliness Pollution 7.0 PRODUCT REALISATION 7.1 Planning of product realisation The management system has been written in an order that reflects the logic of the business processes as such these activities are the product realisation processes, for further details see 4.1 above. All activities have been comprehensively documented in the form of flow-chart processes to provide a quality system that represents "best practice" throughout the company. Details of all activities starting with the procurement of contracts and finishing with completion/invoicing of the job and have been documented and responsibility for all activities has been assigned. Issue 3 Page 10 of 19 Date: 29 March 2011

11 Each process has been documented separately and other supporting procedures have been developed where necessary. All activities described being undertaken by properly trained & qualified staff or sub-contractors. 7.2 Customer related processes Determination of requirements related to the product The customer s requirements will be properly identified and documented as part of the enquiry process. All requirements will be accounted for and include: Customer specified requirements Unstated, but necessary requirements necessary for intended use Statutory & regulatory requirements Any additional requirements Changes to customer requirements are documented in the relevant procedures Review of requirements related to the product In order to ensure a clear understanding of the clients requirements exist before starting planned work procedures have been developed for each of the core processes. All orders whether verbal or written, are therefore both documented and reviewed prior to and during the contractual activities. All orders are reviewed, authorised and agreed with the customer to ensure that: The product requirements are defined The customer requirements are confirmed before acceptance where the customer provides no documented statement of requirement The contract requirements differing from those previously expressed are resolved The organisation has the ability to meet the defined requirements Any relevant legislation can be complied with Customer communication Communications between MP Plumbing Ltd, clients and residents will vary depending on the service provided. Details of the various communication activities are therefore defined in each of the business process procedures. 7.3 Design and / or development This clause of the standard is not applicable to the company as they solely provide a building maintenance service. However, should the need arise, a procedure shall be adopted to satisfy this requirement. Issue 3 Page 11 of 19 Date: 29 March 2011

12 7.4 Purchasing Purchasing process Purchases for materials/ components are job specific and can be completed or delegated by the Directors. Orders are made via an account with a major supplier to the business. Other goods and services may be purchased by members of staff at the discretion of the directors Please refer to: Process 2. Order Receipt & Contract Planning Process 16 Facilities & Infrastructure For job specific materials and components the approval of new suppliers is based on the following criteria: Specialist product knowledge Quality of product, costs, lead times and delivery Recommendations or specified by clients The new supplier is used on a trial basis which will be reviewed by the director. MP Plumbing & Heating Ltd routinely hires Gas safe and NICEIC registered subcontractors to assist in fulfilling their contractual requirements. The sub-contractors Process 15 Managing Staff and sub-contractors describes how suitable subcontractors are selected on their trading abilities. An approved sub-contractors & Suppliers list has been developed and maintained. Evaluation of sub-contractors & Suppliers will take place during the quality management review meetings and the results of the evaluation will be recorded in the meeting minutes Purchasing information All materials/components are purchased to the requirements on the customer s specification and any paperwork/documentation related to the purchase may have the following information: A description of the product An internal reference number Price Date of required delivery Any purchasing documentation generated will be maintained, purchases for major components are agreed by the directors. Issue 3 Page 12 of 19 Date: 29 March 2011

13 7.4.3 Verification of purchased product Where required, purchased product will be checked by the Directors or Supervisors to ensure that they meet the relevant requirements. Due to the nature of the type of components purchased, faulty products can only be identified during installation or commissioning. In this instance, process 9 Dealing with product/test failures applies. 7.5 Production and service provision Control of production and service provision The company recognises the need to meet or exceed its customer expectations and have processes in place to ensure that the services provided are carried out in controlled conditions. In addition to the QMS processes the following documentation is provided: Risk Assessments Method Statements Job sheets Job Logic spreadsheets Test records (including LGSR) Also, random quality inspections on Installations and LGSR are completed by the Director or Senior Engineer Validation of processes for production and service provision All equipment can be fully tested prior to handover to client or resident. No special processes are required therefore this element of the standard is excluded Identification and traceability Where traceability is a specific requirement, individual products or components shall be uniquely identified by their serial no s during the test & commissioning processes. To ensure traceability, various quality records are retained, for instance: Contract/order information Test/Inspection / servicing records Landlord Gas Safety Records Customer property Where the client provides either the company with access to their buildings and equipment the MP Plumbing & Heating Ltd will take full responsibility for its upkeep and safekeeping. Any damage caused will be reported to the client and a mutually Issue 3 Page 13 of 19 Date: 29 March 2011

14 agreed solution implemented Preservation of product All materials purchased and equipment used by the company are handled and packaged in such a way as to prevent damage or deterioration. 7.6 Control of measuring and monitoring devices The Gas analysers owned by MP plumbing are calibrated annually against measurement standards traceable to international or national measurement standards. The details of the gas analysers and calibration due dates are recorded on the Asset register. Please refer to Process 16. Facilities & infrastructure All sub-contractors hired by MP Plumbing & Heating Ltd are required to ensure that where applicable, any electrical test equipment is safe to use and has been calibrated against measurement standards traceable to international or national measurement standards. 8.0 MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 General Key business/quality objectives and targets are reviewed at the management meetings to ensure that the company are: on target, improving the business processes and satisfying both customers and staff. 8.2 Monitoring & measurement Customer satisfaction Client satisfaction can be measured in a number of ways: The level of repeat business The growth in sales Ratio of quotes to orders received Client complaints / commendations Resident/Customer satisfaction is measured via the gas safety survey. Also, a customer complaints procedure is available for residents. The results of all monitoring and surveys are discussed during the quarterly Management review meetings. Please refer to Process 10 Incident reporting and Process 11 - Monitoring Internal audit Issue 3 Page 14 of 19 Date: 29 March 2011

15 The company maintains a schedule of management system audits which check the current working practices against the defined processes and procedures and ensures that the techniques employed are effective. The audits are planned taking into consideration the status and importance of the areas to be audited. Audits will take place quarterly with each process being audited at least twice per year. Trained personnel who are not directly responsible for the area being audited will carry out audits. The results of all audit corrective and preventive actions are discussed during the quarterly management review meetings and actioned. Please refer to Process 12 Internal audits Monitoring and measurement of processes The following process measures are included as part of the quality management system: Complaints (Client & Residents) Gas safety Customer satisfaction surveys Gas Advisory (No Access) data Gas Advisory Services- responsive repair performance Details of these measurements can be found in the Business plan and Process 11 Monitoring. The measures are reviewed during the quarterly management review meeting and corrective & Preventive action implemented when applicable Monitoring and measurement of product The company adopts various in-process inspections including: Benchmarking and commissioning Landlord Gas Safety Checks Final sign-off The person completing the service or test /check will sign the relevant documentation The results of the inspections are recorded and the documents maintained. 8.3 Control of non-conformance Non conforming materials (components) are usually identified during commissioning testing or random inspection. The following processes will apply: Process 9 Dealing with product & test failures Process 11 Monitoring The following are examples of typical discrepancies: Deviations from specification requirements Product failing test or inspection procedures. Issue 3 Page 15 of 19 Date: 29 March 2011

16 Other types of non-conformances include: Deviations from contract requirements Deviations from operating procedures, processes, codes of practise or statutory regulations. The Directors and the Business Development Manager are responsible for dealing with non-conformances. Where possible, all non-conformances will be dealt with immediately. Details of the non-conformance will be recorded on the nonconformance spreadsheet and reviewed during the quarterly management review meeting. Please refer to process 13. Meetings and Communications. 8.4 Analysis of data Information and data should be used from all parts of the organisation to evaluate overall performance, results being used to determine: Trends Operational performance Customer satisfaction and dissatisfaction Organisational effectiveness and efficiency Benchmarking of performance 8.5 Improvement Continual improvement MP Plumbing & HeatingLtd will use the business planning and meeting processes to continually improve the effectiveness of the management system in line with the quality policy statement. Data compiled from the monitoring activities and the results of internal and external audits will be analysed as part of business planning and quarterly management review meetings so that the information generated can be used to make decisions on how to improve the organisation Corrective action When any non-conformance or deviation occurs MP Plumbing will take the necessary action to eliminate the cause of the non-conformance and prevent reoccurrence. All non-conformances identified will be discussed in depth at the quarterly management review meeting where corrective and preventive actions will be agreed and implemented. Issue 3 Page 16 of 19 Date: 29 March 2011

17 Results of these actions will be recorded in the meeting minutes and on the nonconformance spreadsheet. The effectiveness of the corrective actions will be reviewed on a regular basis. Please refer to Process 13 Meetings and communications Preventive action Preventative action is generally taken at a strategic level and addressed as part of the business planning process at board meetings or as part of new initiatives or projects. As with corrective action, all potential non-conformances will also be discussed in depth at the quarterly management review meeting where corrective and preventive actions will be agreed and implemented. Results of these actions will be recorded in the meeting minutes. Please refer to Process 13 Meetings and communications Issue 3 Page 17 of 19 Date: 29 March 2011

18 Appendix 1 MP Plumbing & HeatingLtd Interaction of processes Issue 3 Page 18 of 19 Date: 29 March 2011

19 Appendix 2 MP Plumbing & HeatingLtd Organisational Chart Issue 3 Page 19 of 19 Date: 29 March 2011

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011 Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014 Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September

More information

Derbyshire Trading Standards Service Quality Manual

Derbyshire Trading Standards Service Quality Manual Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

D. MCLAUGHLIN & SONS LTD QUALITY MANUAL

D. MCLAUGHLIN & SONS LTD QUALITY MANUAL D. MCLAUGHLIN & SONS LTD QUALITY MANUAL Originated By: Anne Wall (Quality Consultant) Date: Approved By: Date: Issue AMENDMENT DATE Draft 1 Quality Manual QM1 CONTENTS 1 QUALITY ASSURANCE POLICY 1.1 Quality

More information

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems). FAT MEDIA QUALITY ASSURANCE STATEMENT NOTE 1: This is a CONTROLLED Document as are all quality system files on this server. Any documents appearing in paper form are not controlled and should be checked

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

CENTRIS CONSULTING. Quality Control Manual

CENTRIS CONSULTING. Quality Control Manual CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

Vigilant Security Services UK Ltd Quality Manual

Vigilant Security Services UK Ltd Quality Manual Quality Manual Date: 11 th March, 2014 Issue: 5 Review Date: 10 th March 2015 VSS-COM-PRO-001 SCOPE This Quality Manual specifies the requirements for the Quality Management System of Vigilant Security

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration

G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration G & R Labs Light Meters and Calibration Quality Assurance Manual G&R Labs 2996 Scott Boulevard Santa Clara CA 95054 QM01 QUALITY MANUAL ISO9001:2008 Manual Contents QM 01 Manual Contents 2 QM 02 Copy Holder

More information

Micro Plastics, Inc. Quality Manual

Micro Plastics, Inc. Quality Manual ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company

More information

The Prophotonix (UK) Ltd Quality manual

The Prophotonix (UK) Ltd Quality manual The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality

More information

QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL

QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS

More information

ISO 9001:2008 Quality Manual Clause 3.7.4

ISO 9001:2008 Quality Manual Clause 3.7.4 ISO 9001:2008 Quality Manual Clause 3.7.4 Strode Park Foundation for People with Disabilities Approvals The signatures below certify that this Quality Manual has been reviewed and accepted, and demonstrates

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

The President of Inductors Inc. is the senior executive responsible for operations.

The President of Inductors Inc. is the senior executive responsible for operations. Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

DOCUMENTED PROCEDURE MANUAL

DOCUMENTED PROCEDURE MANUAL NAPIT REGISTERED INSTALLERS DOCUMENTED PROCEDURE MANUAL CONTENTS 1. INTRODUCTION 2. DEFINITIONS 3. RESPONSIBILITY FOR QUALITY 4. DOCUMENT AND DATA CONTROL 5. CUSTOMER ENQUIRIES AND QUOTATIONS 6. CONTRACTS

More information

QUALITY MANUAL. 90a BROOMFIELD ROAD CHELMSFORD ESSEX CM1 1SS. Version 3 Page 1 of 67 Feb 2013

QUALITY MANUAL. 90a BROOMFIELD ROAD CHELMSFORD ESSEX CM1 1SS. Version 3 Page 1 of 67 Feb 2013 90a BROOMFIELD ROAD CHELMSFORD ESSEX CM1 1SS 01245 261345 Version 3 Page 1 67 Feb 2013 Copyright 2012. This Manual and the information contained herein are the property Gillett Morrissey. It must not be

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL Printed QMS Documentation is Uncontrolled Page 1 of 19 QUALITY MANAGEMENT SYSTEM (QMS) MANUAL ISSUE/ REVISION DATE DESCRIPTION ISSUE HISTORY PREPARED/ APPROVED BY 09/04/2014 Initial issue G.Rees 11/04/2014

More information

Mossfiel Electrical & Safety Management Pty Ltd

Mossfiel Electrical & Safety Management Pty Ltd ISO 9001:2008 QUALITY MANAGEMENT PLAN Be warned. Any reproduction of this quality management system or associated documents without the express permission of the company and

More information

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision

More information

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA Quality Manual Kellaw Road Yarm Road Business Park Darlington DL1 4YA MANUAL IDENTIFICATION This document is a controlled/uncontrolled copy. Copy Number:...of... Issued to... Title... Holders of controlled

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Quality Management Manual

Quality Management Manual Quality Management Manual CONTENTS 1 Introduction... 1 2 Scope... 1 3 Company quality policy... 1 4 The fundamentals of quality management... 2 4.1 The principles...2 4.2 Plan - Do - Check - Act...3 4.3

More information

Example of a food company quality

Example of a food company quality Appendix A manual Example of a food company quality Contents Date: 13/03/95 RME-QLMN-OO Page 1 of 3 Section Title ISO 9001 reference 01 In trod uction 02 Purpose 03 Scope 04 Definitions 05 Management responsibility

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Quality Assurance System Manual

Quality Assurance System Manual The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22 ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality

More information

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director.

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director. Quality Manual Issue 4 Forth Engineering (Cumbria) Limited QUALITY MANUAL Copy Number: 1 The information contained in this Manual is the property of Forth Engineering (Cumbria) Limited and must not be

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Quality Management System Policy Manual

Quality Management System Policy Manual Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality

More information

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY GE Oil & Gas Quality at GE Oil & Gas GE imagination at work QUALITY 2 - Quality at GE Oil & Gas TABLE OF CONTENTS GE Oil & Gas and Quality Visions Our Customer Commitments The Quality Organization and

More information

BUSINESS MANAGEMENT SYSTEM MANUAL

BUSINESS MANAGEMENT SYSTEM MANUAL BUSINESS MANAGEMENT SYSTEM MANUAL MS-MA-001-10 Page 1-15 Table 1: AMENDMENTS Amendment Number Description of Change Page No Effective Date 09 Full manual revision Full Document October 2012 10 Amendment

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

Title: Rio Tinto management system

Title: Rio Tinto management system Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23

More information

AVNET Logistics & EM Americas. Quality Manual

AVNET Logistics & EM Americas. Quality Manual AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished

More information

Quality Manual ISO9001:2008

Quality Manual ISO9001:2008 Quality Manual ISO9001:2008 Connor Winfield Corp. Date: 4/26/10 Revision: 3 Quality Manual Quality Manual Connor Winfield GENERAL Section 0.1 Section Rev.: 2 Rev. Date: 4/26/10 Section Page 1 Index and

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

Implementation of a Quality Management System for Aeronautical Information Services -1-

Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management

More information

15 Guiding Principles

15 Guiding Principles Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures

More information

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1

More information

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008. ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,

More information

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL 8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents

More information

ISO-9001:2000 Quality Management Systems

ISO-9001:2000 Quality Management Systems ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS WELDING FABRICATOR CERTIFICATION SCHEME DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS 6 th Edition July 2012 Issued under the authority of the Governing Board for Certification All correspondence should

More information

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1. QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1.1 Quality Management System General 1.1.1 Is objective evidence available to demonstrate that the MDSAP site has defined,

More information

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013 UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd

More information

Eagle Machining, Inc. Quality Management System

Eagle Machining, Inc. Quality Management System Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL Table of Contents INTRODUCTION... 4 COMMON REQUIREMENTS... 5 1. SCOPE... 7 1.1 DESCRIPTION OF ORGANIZATION... 7 1.2 SCOPE OF CERTIFICATION... 7 1.3 THIRD PARTY CERTIFICATION... 7 2. REFERENCES... 8 3.

More information

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT THE MASTER VERSION OF JSP 886 IS PUBLISHED ON THE DEFENCE INTRANET. FOR TECHNICAL REASONS,

More information

Contents. Management Policy Manual SEM USA Page 2 of 12

Contents. Management Policy Manual SEM USA Page 2 of 12 SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Quality & Safety Manual

Quality & Safety Manual Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities

More information

SAFETY and HEALTH MANAGEMENT STANDARDS

SAFETY and HEALTH MANAGEMENT STANDARDS SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents

More information

QUALITY MANAGEMENT SYSTEM MANUAL LEC MARINE (KLYNE) LTD

QUALITY MANAGEMENT SYSTEM MANUAL LEC MARINE (KLYNE) LTD QUALITY MANAGEMENT SYSTEM MANUAL For LEC MARINE (KLYNE) LTD In Accordance with the Principles Contained in BS EN ISO 9001:2008 Page 1 of 39 : Issue 12: Authorised by WM Sawyer June 2012 REVISION SHEET

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables (1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS

More information

ISO 9001 : 2000 Quality Management Systems Requirements

ISO 9001 : 2000 Quality Management Systems Requirements A guide to the contents of ISO 9001 : 2000 Quality Management Systems Requirements BSIA Form No. 137 February 2001 This document is the copyright of the BSIA and is not to be reproduced without the written

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368 Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies

More information

ISO 9001:2015 Overview of the Revised International Standard

ISO 9001:2015 Overview of the Revised International Standard ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements

More information

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised

More information

Quality Assurance Manual ISO 9001:2000. Uncontrolled copy

Quality Assurance Manual ISO 9001:2000. Uncontrolled copy ISO 9001:2000 Uncontrolled copy Approved by: Hugue Meloche, Eng. Page 1 of 24 Intellectual Property This document, prepared by Meloche Group Inc. for its company in the Valleyfield region, remains the

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998 Publication Reference EA IAF/ILAC-A4: 2004 EA IAF/ILAC Guidance on the Application of ISO/IEC 17020:1998 PURPOSE This guidance document is for ISO/IEC 17020: General Criteria for the operation of various

More information

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

Quality, Environmental, Health and Safety Manual Toshiba International Corporation Quality, Environmental, Health and Safety Manual Toshiba International Corporation Doc. No. QEHS 001 Rev. 19 (12/12) Title: Prepared By: Revision No.: Table of Contents and Cross Reference Ken Mori/Homer

More information

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,

More information

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

QSS 0: Products and Services without Bespoke Contracts.

QSS 0: Products and Services without Bespoke Contracts. QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents

More information

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003 D LT-422-001 Page 1 of 12 QUALITY MANUAL LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003 Based on ISO 9001:2008 D LT-422-001 Page 2 of 12 INTRODUCTION: This Quality Manual establishes the quality system

More information

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November

More information

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM FOR ACCREDITATION OF COURSE PROVIDERS PROJECT TRANSITION AND IMPLEMENTATION PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information