EasyMotion Sliding Door

Similar documents
Clad Direct Glaze Window Installation Instructions

Window Installation Instructions

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

Sliding Door Hardware Installation Instructions

Chapter 10 - Scaffolding Systems

Premier & Deluxe 3-Season Room Sliding Glass Door

Basement Window Installation Guide Hopper and Sliding

Ceiling Mounted Folding Attic Ladders Installation Instructions

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

INSTALLATION OF A BAY WINDOW

AZEK Rail Install Guide

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

RadianceRail Installation Guide

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Owner's Manual & Assembly Instructions

Protecting Your Home from Wind Damage

PANELIZED HOME INSTALLATION GUIDELINE

Owner's Manual & Assembly Instructions

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

Seismic Installation for Attic Storage System

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

March 14, Installation of Bay, Bow and Garden Windows

1000-LB. TRAILER JACK OWNER S MANUAL

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

Speed-Mat Rectangle Cutter

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model NOTICE TO USER

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

DE Frame with C Series Sidelight

All-Season Sunroom Sliding Glass Door Installation Instructions

Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions

Owner's Manual & Assembly Instructions

Installation Instructions

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

POD Visor Instructions

Hollow or Cinder Block Wall Mount Job Aid

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

Brick Veneer Construction

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

Installation Instructions

PATHWAY Classic Series with Handrails Portable Wheelchair Ramp INSTRUCTIONS FOR USE 6428 REV A

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Installation Instructions For Slider Casement Air Conditioners

MGB Chrome Bumper Conversion

Contractors Guide Central Inverter System Installation

SUPER SHED. Indoor shelter for your outdoor tools.

Installing Window and Door Mouldings

Andersen Electric Window Opener for Andersen Awning and Roof Windows

Best Barns USA Assembly Book

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Roll-Up Door Maintenance Guide

Horizontal Mini Blinds Installation Guide

WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS

OWNER S MANUAL Table Tennis Table Patent Pending

SUPERCHIPPER CASTING MAINTENANCE

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

Protecting Your Home From Hurricane Wind Damage

39HQ Airovision Air Handling Units

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

BUILD A TABLETOP LOOM

Assembly GUIDE. display wine cellar kits. Required. Suggested. Questions? or visit wineracksamerica.com

Awning Instructions. Standard Manual 1.5m to 4.5m

ColdGuard Bi-PARTING DOOR INSTALLATION INSTRUCTIONS

Calvert USA, Inc. Attic Stairs

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

INSTALLATION INSTRUCTIONS

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

SPIRAL STAIR KIT INSTALLATION MANUAL

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

2.9 WINDOW & DOOR BUCKS

ROLLING CURTAIN DOOR INSTALLATION, MAINTENANCE & PARTS MANUAL WINDLOCK MODEL 955WL

INSTALLATION INSTRUCTIONS

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Owner's Manual & Assembly Instructions

Stair Parts Installation. Tricks

SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER MODEL #7200

DIY CABINET REFACING INSTALLATION GUIDE

Residential Roofing Guide

AZEK Rail Install Guide

HORIZONTAL INSTALLATION

Chelsea Loft Bed WARNING:

InsulView Window Installation Instructions

Information Technology Solutions

MODEL# SLA001-3 "SLIDE & LOCK" A-FRAME POOL LADDER

TONNEAU INSTALLATION GUIDE

DYNA RIDER FOOTBOARD KIT

Steering column, steering column tube and steering wheel, servicing

Installation. Smart-UPS VT and MGE Galaxy Maintenance Bypass Panel with Power Distribution (wall-mount) kva 208 V

MEDIUM FLAT PANEL DISPLAY STATIC MOUNT MSR Series

RZ Guardrail System Installation Manual

Transcription:

EasyMotion Sliding Door *Actual door and cladding color may differ. Door Sku# Sliding Door Frame 2015 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. #113853 8' 4" x 8' 4" #113854 10' 4" x 10' 4" #113855 12' 4" x 12' 4" 1

Getting Started READ THIS DOCUMENT BEFORE YOU BEGIN Thank you for purchasing the ClearSpan EasyMotion sliding door. When properly assembled and maintained, this product will provide years of reliable service. This guide includes important information needed to safely assemble and maintain the door. Please read these instructions before you begin. REQUIRED TOOLS The following list identifies the main tools needed to assemble and install the sliding door. Additional tools and supports may be needed. Tape measure and marker Variable speed drill (cordless with extra batteries) Tool to cut metal and corrugated metal Wrench set Socket set with ratchet Hammer and gloves Lifts and/or ladders (or platforms) to work at the height of door. ATTENTION: If you are not familiar with the use of tools common to building construction and installations of this type, enlist the services of a qualified, professional contractor. Assembled door frame is heavy. Assistance is required to lift into position and to install the mounting hardware. SAFETY PRECAUTIONS Wear eye and ear protection. Wear gloves when cutting and handling metal. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with electric power tools and cords. ASSEMBLY PROCEDURE Following instructions as presented will help ensure proper assembly. Basic assembly steps include: 1. Verify that all parts are included in shipment. Notify customer service for questions or concerns. 2. Read these instructions and all additional documentation included with shipment before you begin. 3. Gather tools, materials, and assistants. 4. For best results, assemble components in the order they are presented. TYPICAL INSTALLATION SEQUENCE Complete these steps: 1. Use information on the original building drawings (or next page) to construct a frame for the sliding door (Procedure 1). 2. Assemble sliding door frame (Procedures 2 & 3). 3. Complete Procedure 4 to attach sliding door track above framed door opening (Procedure 1). Measure assembled door frame with attached rollers and use the dimensions to install track above opening. 4. Lift door into position (Procedure 4). ATTENTION: Door is heavy. Use caution, lifts, and assistants when moving or lifting door. 5. Attach J-channel and cladding (Procedure 5). 6. Install stay roller, trim, and receiver seal (Procedures 6-8). 7. Install rain and ice guard (Procedure 9). CUSTOMER-SUPPLIED MATERIALS This sliding door kit includes all materials and fasteners needed to construct sliding door frame and install roller assemblies and exterior metal cladding. Customer is responsible for the following materials and hardware: Materials and fasteners to secure sliding door track brackets (100380) to building. ATTENTION: Use exterior-grade fasteners to secure brackets to building. Lag screw (if included with bracket) may not be suitable for the building material. Select 3/8" fasteners (or larger) if using bolts or threaded rod. Drill larger holes for fasteners in brackets as needed. Fasteners to secure the 100356 stay roller to the building or building foundation depending on design. Materials and fasteners to finish rough door opening to provide a smooth, square frame for sliding door. Materials and fasteners to construct a surface in door opening to install receiver seal. See Procedure 8. Additional miscellaneous materials to cap unfinished edges of door and door opening if desired. Fasteners to secure rain and ice guard to exterior building cladding if Tek screws cannot be used. Do not use Tek screws to secure to non-metal substrate. Install Tek screws into metal framing. 2

General Information The following graphics and photos will help identify the different parts. (Some parts are not shown.) Tek Screws FA4484B 100380 Bracket FALB04B 3/8" Nuts FAME08B 3/8" Washers 100356 Bracket 100441 Nut Setter 100348 Hanger 100362 Door Pull NOTE: Some hardware included with hanger kits is not used for this sliding door. CARE AND MAINTENACE Periodically check the following sliding door components to ensure smooth and continued operation: Verify that all fasteners are tight and in good repair. Adjust stay roller as needed to keep door secure when in use or closed. Lubricate main door rollers and stay roller with a light, multi-purpose lubricate as needed. Keep roller track free from debris and dirt to ensure smooth operation. Keep door opening and area around door free from debris and other objects that could hamper operation. Do not allow snow to buildup along the building where sliding door opens. Remove snow and ice as needed to keep door operating as designed. Periodically adjust door rollers to ensure door seals in framed opening. Replace damaged or punctured cladding to prevent injury or additional damage. If equipped, replace worn or damaged brush seals. To prevent damage to door, building, and door components, keep door closed when not in used. Do not operate door without the stay roller installed and properly adjusted. 104624 Bracket 104625 Bracket 3

Framed Opening for Sliding Door 1 CONSTRUCT FRAME IN BUILDING FOR SLIDING DOOR Door Sku & Size Frame: Door Opening Rough Door Opening The diagram below shows a typical building end wall (or sidewall) framed for a sliding door. Additional diagrams are presented to better explain possible stay roller installations. 113853 (8' 4" x 8' 4") 8'-0"W x 8'-5"H 113854 (10' 4" x 10' 4") 10'-0"W x 10'-5"H 113855 (12' 4" x 12' 4") 12'-0"W x 12'-5"H Rough Opening: See table for dimensions. 1/2" between underside of roller track and top of sliding door frame. NOTE: Depending on track placement and the header dimensions, it may be necessary to attach additional customer-supplied materials above and to the header to secure track brackets to. 2-Ply Header Dimension: See note to the left. ATTENTION: Diagram shows a sample building end wall. Rough door opening dimensions are shown inside-to-inside (door jambs) and from underside of header to top of finished grade. Dimensions shown allow sliding door to remain slightly above finished grade when installed. Use customer-supplied materials to finish inside of rough opening. Framed opening must be square to ensure proper sealing and operation of sliding door. s differ; consult the services of a qualified contractor experienced with the installation of similar doors before beginning. Use this manual as a guide when installing the door. Actual installation may differ. Photo at the right shows installed stay roller as seen from outside building with door closed. Stay roller is attached to foundation of building. May not apply to your building. design may differ. Sliding door mounted outside the building. Stay roller attached to door frame using customer-supplied fasteners. Fastener heads must be flush with bracket to prevent interference with door. Ground Level 2-Ply Doorjamb Inside of Customersupplied fasteners Concrete Floor 4

Assembly 2 ASSEMBLE DOOR FRAME Upper Frame Tube Door Sku & Size Part # Qty The following steps describe one way to assemble the sliding door. Use the diagrams throughout this guide to assemble your door. Complete these steps: Locate the parts shown on this page and construct the main door frame. Tek Screw FA4484B 100441 Nut Setter 113853 (8' 4" x 8' 4") FT2X2G14L096 1 113854 (10' 4" x 10' 4") FT2X2G14L120 1 113855 (12' 4" x 12' 4") FT2X2G14L144 1 104625 FA4482B Tek Screws Upper Frame Tube Identification: See table above. 104625 Bracket 104624 Evenly space horizontal supports between upper and lower door frame tubes. 104624 Bracket FA4482B Tek Screws ATTENTION: Install all Tek screws in locations that will not interfere with the installation of exterior door cladding. Do not install any Tek screw in areas that are toward the building. Inside door surface and door opening of building must remain free of screws and other components that could prevent smooth sliding of door during operation. ATTENTION: Bottom, side, and horizontal tubes are the same. Check dimensions at different points during assembly to ensure frame is square. 5

3 INSTALL STRUTS AND ROLLER ASSEMBLIES Assembly Complete these steps: 1. Install the 100348 hangers using 3/8" nuts and flat washers. See diagrams. Some hardware included with hanger kit is not used for this sliding door assembly. 2. Install 105887B45 diagonal struts. See below. Tek Screws FA4484B FALB04B 3/8" Nuts FAME08B 3/8" Washers 100348 Hanger FALB04B 3/8" Nut & FAME08B Washer FALB04B 3/8" Nuts & FAME08B Washer FA4482B Tek Screw 105887B45 Strut FA4482B Tek Screw ATTENTION: Install all Tek screws in locations that will not interfere with the installation of exterior door cladding. Do not install any Tek screw in areas that are toward the building. Inside door surface and door opening of building must remain free of screws and other components that could prevent sliding of door during operation. 6

4 ATTACH DOOR TRACK AND SET DOOR IN PLACE Assembly WARNING: Track must support weight of door and withstand forces created during operation. Estimated weights: 113853 (200 lbs.); 113854 (250 lbs.); 113855 (325 lbs.). HEADER Customersupplied material and fasteners. ATTENTION: In addition to other factors, track position depends on building design. Consult with a professional contractor experienced with the installation of similar doors. The photos below show an example where additional customer-supplied materials were needed to secure track to building. Photos #1 and #2 show track at each end. Photo #3 shows the underside of the 2-ply header and method used to secure additional frame material to building. Track is then attached to material anchored to header. This is an example. Contact a contractor for additional possibilities. If header does not allow for installation of hanger bracket, add material and then install bracket. 100380 Bracket NOTE: Fasteners to secure bracket to building and additional materials needed to mount track are supplied by customer. 1 Track 2 3 Track Sliding Door Frame Customer-Supplied Bracket Bracket Customer- Supplied Materials and Brackets Track Header 7

Assembly 5 ATTACH Complete these steps: J-CHANNEL AND CLADDING 1. With assistance, hang assembled door frame in roller track attached above rough door opening. STEP 4 J-Channel A Door Track 2. Center door in framed opening and adjust door rollers so door is square with door opening. 3. Test sliding door operation. Do not allow door to slide out of track. Install a Tek screw through track at each end to prevent door from accidently sliding from track if desired. A Tek Screw & J-Channel Door Frame Door Frame ATTENTION: When installing J-channel, align each end with inside edge of door frame. Measure cladding rib spacing and install J-channel Tek screws so these do not interfere with cladding installation. Space screws approximately 16" to 18" apart, depending on cladding. End View of Sliding door Track 4. Locate J-channel included with metal cladding and attach channel to top of sliding door frame. (See note and diagram A in right column.) 5. Clamp a scrap piece of small angle iron or similar material (customer-supplied) to door frame bottom to create a rest for cladding during installation (Photo B). NOTE: Position bottom edge of cladding above where stay roller contacts door frame (Photo C). Reference the stay roller installation steps (Procedure 6) before continuing. B Photo shows clamps used to secure angle iron to door frame creating a ledge for cladding to rest on during installation. Remove clamps and angle iron after installing cladding. C Sliding Door Cladding Stay Roller & Bracket Door Frame Foundation Install cladding an inch above bottom of door frame to create a flat surface for stay roller. Actual installation of stay roller may differ from what is shown. Adjust as needed. 8

Assembly 5 ATTACH J-CHANNEL AND CLADDING continued 6. Slide top of first cladding sheet into J-channel and align cladding with outer edge of door frame. Set bottom on customer-supplied rest if used. (See B previous page.) Check to ensure cladding is above stay roller. 7. Secure sheet first to upper horizontal frame tube of sliding door frame. See photo. STEP 7 Upper Frame Tube Upper Frame Tube NOTE: Install all cladding fasteners into horizontal frame tubes of sliding door frame. Space fasteners according to documentation sent with cladding. Lower Frame Tube Depending on cladding material and fasteners, it may be necessary to predrill fastener holes through cladding to install fasteners. Lower Frame Tube Do not install fasteners along either outer vertical door frame edge. This edge is finished with sliding door trim (113377 & 113378) in a later step. (Specific trim lengths are determined by door dimensions.) 8. Continue adding and securing sheets to upper frame tube until entire door frame is covered. Overlap sheets according to cladding manufacturer's instructions. 9. Next, to prevent conflicts with cladding screws, mark the desired door handle position on lower frame tube. Set handle a few inches in from edge. 10. After marking handle position, move to lower frame tube and secure cladding. Do not install cladding screws where handle will be located. 11. Finally, attach handle to lower frame tube. Install fasteners through cladding into door frame tubes. Dashed lines (right) show positions of horizontal frame tubes for sliding door. STEP 9 Lower Frame Tube Lower Frame Tube Receiver Seal Procedure 8 NOTE: Dashed lines show position of horizontal sliding door frame member that handle is attached to. 12. Continue with the next procedure. Door Cladding Mount handle so it will not interfer with receiver seal when installed. See Procedure 8. Cladding 9

6 INSTALL STAY ROLLER AND TEST DOOR OPERATION Assembly The stay roller stabilizes lower edge of sliding door while allowing smooth operation. Customer-supplied fasteners secure stay roller bracket to building foundation or building frame. Review the information on this page and install the stay roller for your sliding door. After installing stay roller, test door operation and adjust roller as needed to allow best operation and to ensure door seals against building frame. EXAMPLE 1 EXAMPLE 3 Outside Sliding Door Frame Door Jambs Inside Sliding Door Frame Door Jambs Inside Finished Grade Concrete Floor Concrete Floor This example shows a concrete floor inside building, finished level with grade outside building. Stay roller bracket is attached to outer face of door jamb. In instances when concrete extends outside building and you are unable to use stay roller bracket, anchor roller in concrete using a customer-supplied anchor bolt. Contact a contractor if needed to properly set anchor in concrete. Ground Level EXAMPLE 2 Outside Customer-supplied anchor stud Sliding Door Frame Door Jambs Concrete Floor ATTENTION: Securing roller to concrete will not allow for minor roller adjustments. Be sure door operates as desired before you install stay roller as shown in this diagram. For best results, use the stay roller bracket if possible. Inside Stay roller is attached to foundation of building. May not apply to your building. design may differ. 10

Assembly 7 ATTACH SLIDING DOOR TRIM Trim Top View of Door Frame Complete these steps: 1. Locate the 113377 (and 113378) sliding door trim pieces and Tek screws. (Type of trim depends on door dimensions.) 2. Align end of trim piece with edge of door frame and press into position. Long Face of Trim Cladding NOTE: Place long face of trim over door frame so trim overlaps cladding; short face is to the back (or inside surface) of door frame. Long edge overlaps cladding. Inside (back) of door cladding. Short Face of Trim Long Edge Cladding Door Cladding Trim 3. Secure trim to door frame using Tek screws as shown. Space screws 18" - 24" apart along length of trim piece. NOTE: Do not overlap trim pieces. Butt ends together and secure as shown in middle photo. 11

8 INSTALL RECEIVER SEAL Assembly Receiver seal provides a seal for door when closed. Review photos below and attach receiver seal to building. (Depending on how building opening was finished, receiver seal may not be needed.) Secure to metal frame of building using Tek screws, or use customer-supplied fasteners for wood frame. Receiver Seal* Installed Receiver Seal Door *Actual seal may differ in design. 12

9 ATTACH RAIN & ICE GUARD Assembly In locations prone to winter weather, the rain and ice guard helps prevent snow and ice buildup above slider track. Attach guard to wood building using customer-supplied fasteners installed 12" to 16" on-center. Tek screws can be used to secure guard to metal supports of building. NOTE: Do not install Tek screws into metal cladding only. Drive screws through cladding and into frame of building. If needed add a mounting plate on the backside of cladding. Guard Door Track J-Channel Guard Profile Sliding Door Frame Cladding Door Jamb End View 13