Hvor svært kan det være udnyt din viden med omhu!



Similar documents
HV Submarine Cable Systems Design, Testing and Installation

Overview of Submarine Cable Route Planning & Cable Route Survey Activities. Graham Evans Director EGS Survey Group

Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective

Why Submarine Cables?

EXPERIENCE WITH DP-SYSTEMS ON BOARD

London Array. Operations and Maintenance

Pipelines and seabed intervention

HYDROGRAPHIC INFORMATION AND THE SUBMARINE CABLE INDUSTRY

VISION MISSION ABOUT A2SEA. Stay ahead in taking wind power offshore and the future of energy in a sustainable direction.

Cable Laying and Repair - Cable Ship Operations

The installation and servicing

and to mutually agree mitigation measures to reduce identified concerns and risks to acceptable levels.

2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm

Offshore Work Packages

Feasibility Study of Deep Water Power Cable Systems. Enrico Colombo CESI S.p.A

Offshore Wind. Cable Installation Cable Trenching Survey & Seabed Mapping IMR

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Installation, future demands for recruitment and competencies. Speaker: Hans Schneider Date: 4 April 2013

Essex... A great location for offshore wind

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8

NEW DIGITAL TERRAIN MODELING (DTM) TOOLS FOR CABLE ROUTE PLANNING by Dr. Jose M. Andres Makai Ocean Engineering Inc.

Proven expertise and total reliability to support globally recognised oil and gas clients

What is geotechnical risk?

Arctic Fibre Submarine Cable System

MARINE GEOPHYSICS. Oil & Gas PROJECT SUMMARY SHEET. Project Title: BP WEST JAVA, ONWJ, PIPELINE INSPECTION BY VESSEL BASED SURVEY.

Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV)

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Overview of geophysical and geotechnical marine surveys for offshore wind transmission cables in the UK. September 2015

Neart na Gaoithe Meet the buyer event. Chris Whitehead Facilitator

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels

1.0 INTRODUCTION 2.0 SCOPE OF WORK. DATE July 29, 2010 PROJECT No /2000

Invitation for Tender: Sea Bed Survey Services (Geophysical, Bathymetric and Geotechnical)

HVDC Light Cables. Submarine and land power cables

MERMAID FLEET PROFILE SUBSEA SERVICES

NSW Submarine Power. Cables for the future, delivered today.

Horizon Survey and Geotechnical Companies

Irish-Scottish Links on Energy Study (ISLES)

Cable Burial Risk Assessment Methodology. Guidance for the Preparation of Cable Burial Depth of Lowering Specification

Konti Skan Replacement of Cable 1

SUPPLIERS INFORMATION SESSIONS MARITIME LINK PROJECT. Contract for Submarine Cable Design, Supply and. Contract No. E11-18

Figure 1: The existing kw turbines with the Avedøre power plant, source [3].

MORGENBOOSTER 2015 DISRUPTIVE BUSINESS DESIGN

CAMP LOGOS administrated by Boligselskabet Sct. Jørgen (housing agency)

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

An Overview of Seabed Surveys (High resolution Geophysical Site Surveys)

Scottish Enterprise. Offshore Wind Power: Priorities for Research and Development (R&D) and Innovation. Supporting a globally competitive Scotland

NSW Submarine Power. Cables for the future, delivered today

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway

Offshore Structures. Offshore Drilling Equipment

Offshore Windfarm Egmond aan Zee 4 years of Operation

Survey Sensors Hydrofest Ross Leitch Project Surveyor

Features & Fordele river kan udskiftes LED bord kan udskiftes

Cable System Planning and Permitting: Business and Stakeholder Considerations

Turnkey Submarine Cable Systems

OFFSHORE FIELD DEVELOPMENT

Jakten på Skapergleden Hvordan bevare mennesket i loopen?

Water and Environment Theme

installation, operations & maintenance

London Array Off-Shore Wind Farm

Hub North Netværksarrangement d. 14. Juni 2011

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

How To Boot A Cisco Ip Phone From A Cnet Vlan To A Vlan On A Cpower Box On A Ip Phone On A Network With A Network Vlan (Cisco) On A Powerline (Ip Phone) On An

A Deeper Insight into Fault Location on Long Submarine Power Cables

Submarine Cables: Critical Infrastructure Supplier Perspective

Nordic Master in Didactics of Mathematics

Breaking new ground in subsea excavation and trenching.

Effects of Underwater Noise

8 Strait of Belle Isle Marine Cable Crossing

The optimum offshore survey workflow for high-quality GIS results. by integrating CARIS & EIVA software

PERC-RITE DRIP DISPERSAL DESIGN GUIDE FOR SEPTIC TANK OR ADVANCED TREATMENT EFFLUENT MAINE

Cable Care. ABB Power Cables Service Products

The concepts developed in this standard include the following: Oceans cover about 70% of the surface of the Earth.

Benefits of Navigational Port Studies

COMPANY PROFILE PELICAN COMPANY LIMITED

NSW Submarine Telecom Systems. Turnkey solutions for the future, delivered today.

Parker Maritime AS. 11. AICON 3D Forum - March 12th Metrology subsea using AICON's photogrammetry - The timesaver.

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Presentation. Morten Hvenegaard Project Sales

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

Chapter Overview. Bathymetry. Measuring Bathymetry. Echo Sounding Record. Measuring Bathymetry. CHAPTER 3 Marine Provinces

POOLLC PLATFORM HOGAN SUBMARINE CABLE REPAIR PROJECT MARCH & APRIL 2008 SANTA BARBARA CHANNEL

DNV GL. Inleiding Offshore Buisleidingen. Stichting Pipeliner. Pipeliner Offshore dag. Jan Spiekhout. Rotterdam, 1 Mei 2015 SAFER, SMARTER, GREENER

Maskinmesteren. Maskinmesteren. management and technology. Stor fjernvarmeudvidelse hos SK Forsyning

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

Technology in the littorals Below the surface and in-shore. Linus Fast R&D SwAF HQ, Naval Dpt linus.fast@foi.se

The Market for Installation Vessels

Renewable energy consultancy: wave and tidal

GEO-MARINE TECHNOLOGY, INC. A Geological, Geophysical, and Hydrographic Survey Consultancy

Module No. # 02. Impact of oil and gas industry on marine environment

International connectivity submarine cables. Simon Smith Director Regulatory Affairs

Thomas Ludvik Næss Country Manager

Join af tabeller med SAS skal det være hurtigt?

Presentation of Semco Maritime

Section E2 Coastal Engineering: Reconstruction Management and Mitigation

Azfar Bassir. Summary. Experience. Developer at SHFT

OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

Design of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen LICENGINEERING A/S

Site-specific N-regulation in Denmark - a follow up on NLK recommendations

Transcription:

Hvor svært kan det være udnyt din viden med omhu! First Sub sea cable installed 1866 over the Atlantic Why make it so difficult, when it has been done for more than 145 years? Equipment and the technology has developed over 145 years, but the challenge of installing a subsea cable in the seabed has remained the same. Why do we try new methods at every new wind farm, when it delays the projects?

CT Offshore provides a wide range of quality services to the Offshore Wind Sector Consultancy and QA survey Installation and repair Survey and maintenance Rigging Consultancy and survey services prior to installation Installation Survey and maintenance Repair (when/if required) On going survey and maintenance is required in order to avoid cable breaks during the array cables 25 years lifetime Termination Burial

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2002 Paw Cortes founded Consulting Team Offshore offering consulting services for subsea cables 2003 CT Offshore was founded as succesor to Consulting Team Offshore. 2005 Commenced first TSS survey and QA work in UK. 2007 MV NICO, CT Offshore s first cable laying vessel, was put in service. (acquired in 2006) 2009 Cable laying at Gunfleet sands Introduction of MV LINE and Trencher CTO103 MV SIA was acquired 2010 Finalisation and introduction of MV SIA 2012 Sold additional 40 % of CT Offshore to A2Sea. Making A2SEA majority stockholders Received the Danish Børsen Gazelle Award The first vessel MV SIA (the 1.) was introduced Cable repair on Burbo Bank Cable work at Thanet Sold 27 % to DONG / A2SEA 2004 2008 2011 MV Sander was acquired and fully operational the following year. Introduction of ROV CTO 102 Entrepreneur of the year in North funen. Recieved the Danish Børsen Gazelle Award Rebuilding SIA to 3* Loading capacity Cable work on Thanet PAWP and GG Introduction of MV SANDER 2 for 12hrs operation Upgrade of new trencher CTO105 to 800 kw 4

MV LINE 12 hours maintenance and survey operation ROV CTO 104 Multibeam * 1 unit HPR * 1 unit TSS 440 * 1 unit TSS 350 * 1 unit Sonar's * 2 unit Cameras * 3 units Profiler * 1 unit

MV SANDER 2 12 hours maintenance survey & ROV services ROV CTO 106 Multibeam * 1 unit HPR * 1 unit TSS 440 * 1 unit TSS 350 * 1 unit Sonars * 1 units Cameras * 4 units Profiler * 1 unit High def. sonar * 1 units

CLV NICO 12 hours installation, trenching & ROV services DP 1 vessel ROV CTO 103 14 cabins Trencher 250 kw HPR * 1 unit TSS 440 * 1 unit TSS 350 * 1 unit Sonars * 3 units Cameras * 4 units

CLV SIA 24 hours offshore Cable Installation & Repair CLV DP 2 ROV CTO 105 46 cabins Trencher 800 / 200 KW Load out equipment 3 Turntable tot 600 tons Eiva survey set up

Trencher

Trenching & Bathymetric services DATA & Control System 30 kw control system 350 kw surface pump for shallow water ops 4 cameras 3 sonar's (2 aft/1 forward) Auto heading Tracks Depth sensor Jet sword pressure control Back wash flow control Jet flow control TSS 350 option TSS 440

Offshore cables in general Route engineering array cables (secondary cables) Park layout BPI survey GF / GT TOP SEDIMENT PLS 0 5 meters BPI (sediment may vary significantly along the cable trace) Straight lines where possible / Be aware of jack up activities, incorporate! Cable design / Armour design / Installation method J tube design and supplementary protection systems Post lay burial contra simultaneous burial method / Critical path! Plough contra Jetting QA Survey as found online to avoid repetitions of errors (it may be too late upon completion) CLV operation is one of the only activities where set up has to move while working offshore E.g. 700 meters Transformer Foot print jack up!!!! Shore line Export cable E.g. 10 to 30 km

Route engineering Land fall cables (primary cables) Route design land fall cables (longer cables) Bathymetric Bottom profile slopes Variation in seabed along the route GT followed by BPI AC points max 30 degrees Slopes & water depth Landing zones Third party sea bed users Fishing Anchor Traffic lanes Armouring type Burial method (Ploughing/cutting/trenching) X ings RPL Planned / build / installed routing QA Survey as found, during installation It is to late upon completion Residual tensions

Inter Array Cable Installation, briefly jetable seabed!

Optimér Optimér Optimér Optimér Optimér Optimér Optimér PAS på bliv ikke for god!! Målsætninger og optimering alt kan gøres bedre ellers er du gået i stå

Simultaneous installation and burial Preferred for long land fall cables Good in harder soils Requires a significant set up Be aware of residual tension Be prepared for repair Insure onsite post lay control ROV Burial down to 3 metres Poor starter and poor ender!! Weak in areas with steep slopes and large sand dunes Residual tension remains uncontrolled in shorter sections of cable, which propose a risk to the project, and the array cables.

At lede en ROV under skibet og dets propeller!! Stik mod vores normer og principper Nødvendigt som følge af kundekrav At stå fast på metoden og få teamet med på idéen At vise teamet tillid og skubbe dem ud i det nye Høj risiko men bevidst Risiko bevidsthed og evnen til at tro og få andre til at tro også!

Animation, installation Animation, jetting Animation, surveying