Jewett Mine On-call Environmental Services Jewett, TX

Similar documents
National Environmental Policy Act and Permitting Services for the Mining Industry

Avison Management Services Ltd. COMPANY PROFILE

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Summary of Commitments

1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

Comment Invited on Proposal to Protect the Bristol Bay Watershed

RESTORATION & REVITALIZATION

Mine Plan of Operations Reclamation Bond Checklist

WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Carson River Mercury Superfund Site Management Strategies and Goals. May 2011

Work Breakdown Structure Element Dictionary. Final Design

Proposed General Plan Update Goals, Policies, and Implementation Actions

Comparison of HSESAP Revisions 2 and 3

Site Characterization and Adapted Monitoring of a Flood-Disturbed Reclamation Area

Gold Ray Dam Interagency Technical Team Meeting

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

APPLICATION OF GEOSPATIAL TECHNOLOGIES FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

How to Select an Environmental Consultant

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

RECLAMATION BONDS FROM THE SURETY PERSPECTIVE

Restoring Ecosystems. Ecosystem Restoration Services

STATEMENT OF JOSEPH G. PIZARCHIK, DIRECTOR OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE

LR 314 Working Group 5 Final Report

Dear Interested Party:

Mountaintop Mining Fact Book. National Mining Association

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

CLIMATE CHANGE AND GREENHOUSE GAS CONSULTING SERVICES

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

2016 BES Summer Student Intern Program

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

How To Help The Environment

Prepared By: Eric Chamberlain

Project Planning. Project Planning. Map Presentations of System Deficiencies and Project Corridors. Selected. Corridors for the System Plan

Decommissioning BC Hydro s Heber River Dam: Challenges and Practical Solutions

MINING AND WATER POLLUTION

COMMUNITY CERTIFICATIONS

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Polk Commerce Centre CRA Spine Road Alignment Study

Basements and Deep Building Construction Policy 2014

Comanche Trail Pipeline Project. September 2015

APPENDIX I (See Paragraph -6) FORM I

It s hard to avoid the word green these days.

THE KENNECOTT RIDGEWAY MINE A CASE STUDY IN SUSTAINABLE DEVELOPMENT

E&SC Training & Certification

720 Contour Grading. General. References. Resources. Definitions

A Stream Restoration Case Study in the California Central Coast

Restoration Planning and Development of a Restoration Bank

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Section 4 General Strategies and Tools

EFB / Online Wetland Restoration Techniques Class Syllabus

DECISION DOCUMENT NATIONWIDE PERMIT 27

A Self Assessment to Address Climate Change Readiness in Your Community Midwest Region

A Career In CIVIL ENGINEERING: Improving the Quality of Life

Summary of the 2012 Nationwide Permits

Construction Services


The formation of polluted mine water

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Funding & Rehabilitation of Abandoned Mines. Patrick Reid Ontario Mining Association

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

Internship Program Florida Department of Environmental Protection May 2015

Weed Survey and Mapping

Amanda Pitzer, Executive Director. Joint Commission on Water Resources Watershed Celebration Day 2014 ~ Sept. 8, 2014

Answer Keys to Unit Tests

services Imagination. Delivered. Imagination. Delivered. Architecture Automation Bridge Design Electrical Design Environmental

Banks as bridges: Investment in a sustainable and climate-friendly economic system

ENVIRONMENTAL MANAGEMENT: CLEAN WATER RESEARCH AS RELATED TO ACID MINE DRAINAGE

Remediation of a Failed Primary Spillway Device at a High Hazard

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Section LIST OF PREPARERS. 9. List of Preparers

OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT FY 2016 AML ECONOMIC REVITALIZATION PROPOSAL: A COMPONENT OF THE PRESIDENT S POWER+ PLAN

Comprehensive Transportation Services

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1

WELCOME PURPOSE OF THE OPEN HOUSE. To introduce Vulcan Materials Company and Morien Resources Corp. To receive your feedback on the Project

Hydropower. Corps Hydro Plants Non-Federal Plants

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies

USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions Table of Contents

A Developer s Guide: Watershed-Wise Development

STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC

Statement of Qualifications for Natural Resource Management Services October 2014

Overview of Reclamation of Lands Disturbed by Mining for Heavy Minerals in OZ and USA. Heavy Mineral Sands

Resource Management Accomplishments FY 2014

Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012

WELCOME TO MINERAÇÃO PARAGOMINAS. José Flávio Alves - General Manager of Operational Support November 7, 2012

Living on the Fox River

Mehmet Secilmis, GISP Environmental Engineer/GIS Specialist Dewberry Parsippany, NJ

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

CIVIL ENGINEERING ASSOCIATE, 7246

Experienced Planning and Design

Transcription:

MINING SERVICES

Where there is cinnabar above, yellow gold will be found below. Where there is lodestone above, copper and gold will Where there is calamine above, lead, tin and red copper will be found Thus it can be seen that mountains Jewett Mine On-call Environmental Services Jewett, TX

be found below. below. Where there is haematite above, iron will be found below. are full of riches. Guang Zhong Environmental Baseline Studies Confidential Client Species Management for the Federally Endangered Interior Least Tern, Jewett Mine Jewett, TX Mining Client Services Every day in multiple ways, mining touches our lives. Largely unnoticed by most, the benefits derived from mining range from powering our homes to supporting space exploration. By their very nature, the basic activities of mining affect land, air and water systems. The great challenge today is to develop mining projects that are economically and environmentally sustainable. Having an experienced consultant as your partner can help you achieve your goals. Whether it s planning for environmental permitting requirements, engineering for operational infrastructure or design-build options, HDR can help with services from exploration to closure. HDR has the experience and resources to offer a full slate of mine operation support services. Treating the land with sensitivity during exploration and permitting, offering environmentally sustainable infrastructure and production process development, and ensuring proper land restoration and reclamation during closure and decommissioning, are hallmarks of HDR s comprehensive mine support services. HDR offers integrated mining support services in the following areas: Engineering Transportation Environmental Reclamation Industrial Water Remediation Energy

PARTNERSHIP Partnerships A significant part of our PARTNERSHIP philosophy with the mining community is to understand our clients and the industry through membership and participation in the following organizations: American Society of Mining and Reclamation Texas Mining and Reclamation Association Arizona Mining Association-AMIGOS Wyoming Mining Association Illinois Mining Institute Indiana Coal Association Illinois Coal Association Alaska Miners Association Association for Mineral Exploration British Columbia Society for Mining, Metallurgy and Exploration Guiding Principles For every client, for every project, HDR Taps the experience of our skilled personnel, with nationally recognized experts in key service areas tied to mining Commits to achieve zero harm with a keen eye focused on mine health, safety and the environment Manages client relationships alongside project schedules and budgets Backs our work with comprehensive and defensible documentation Offers open communication, trust and respect Whether it s hard rock, coal or industrial mineral mining, HDR provides innovative local solutions, focused to support mine operators.

Engineering Services Facility design Civil, structural and mine engineering Engineer of Record services Project siting, planning and needs analysis Geotechnical engineering Design-build project delivery Treatment process design Engineering, Big Brown Mine and Big Brown Steam Electric Station Fairfield, TX

ACHIEVING BALANCE BETWEEN THE BUILT AND NATURAL ENVIRONMENTS

Environmental Services Full permitting support (NEPA, Section 404, SMCRA and NPDES, along with federal, state and local support) Wetlands, vegetation and habitat analysis and delineation Mitigation planning/environmental baseline studies Air and water quality studies and analysis Macroinvertebrate studies Fisheries analysis Wildlife and threatened and endangered species studies and monitoring Development of mine-specific management plans Cultural resources Endangered Species Survey, Big Brown Mine Fairfield, TX Environmental Baseline Study, Pebble Project Iliamna, AK

Stream Crossing Evaluations and Measurements, Pebble Project Koktuli River, Iliamna, AK ACHIEVING BALANCE BETWEEN THE BUILT AND NATURAL ENVIRONMENTS

Industrial Water Services Mine water treatment plant design and operational management Pump station design Hydrology and hydraulics studies Waste minimization and solid waste diversion Water rights analysis and support Dewatering of abandoned mines Process water treatment Raffinate Booster Pump Station Confidential Client

ACHIEVING BALANCE BETWEEN THE BUILT AND NATURAL ENVIRONMENTS 138-kV Transmission Line Design, Kosse Mine Kosse, TX Substation Design, Kosse Mine Kosse, TX Energy Services Power supply system development Mine equipment load studies Transmission and distribution (T&D) siting, infrastructure design and development Electrical power studies Equipment purchase and construction bidding support

Railroad Design, Kosse Mine Kosse, TX Transportation Services Rail system and connection design Railroad build-out design and support Bridge and waterway crossing design Roadway and infrastructure development, including roadway crossing infrastructure Traffic control systems Ragnar Benson, Cora Coal Spur Rail Facility Cora, IL

ACHIEVING BALANCE BETWEEN THE BUILT AND NATURAL ENVIRONMENTS Jewett Mine Reclamation Services Jewett, TX Reclamation Services Reclamation planning ERP and bond release Soil studies Revegetation plans Land use planning Mitigation planning Mitigation Planning, Monticello Mine Mt. Pleasant, TX

Remediation Services Tailings dam stabilization Acid mine drainage studies Remediation planning Closure planning Phase 1 and 2 assessments Eureka Mills Superfund Site Remedial Action Eureka, UT

ACHIEVING BALANCE BETWEEN THE BUILT AND NATURAL ENVIRONMENTS Tailing Impoundment Stormwater Management Confidential Client Data collection with mobile GPS Multiple Locations,U.S. Other Services Alternatives development and characterization GIS mapping and data development Construction oversight and management Real estate evaluations Cost characterization and cost opinion preparation Sustainable Return on Investment (SROI) proprietary analysis Public outreach and participation

www.hdrinc.com We practice increased use of sustainable materials and reduction of material use. 2010 HDR, Inc., all rights reserved. 2830 0710