Property Development Analysis 2425 Mount Olympus Los Angeles, California 90046

Similar documents
Site Development Information Worksheet for single family residential development

Maximum Floor Area and Maximum Development Area

Division Yard, Lot, and Space Regulations.

Minor Accommodation Planning Review Application

Kirkland Zoning Code

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Section 13 Urban Residential Zones

Neighborhood Business. Neighborhood Mixed Use. Community Business. Factoria Land Use District 1 2A 2A 2A 30 (23) 15 (23) 30 (23) 30 (23)

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

New Home Construction Packet

R 1 Design Review Application

CHAPTER 5 - "R1" SINGLE-FAMILY RESIDENTIAL DISTRICT

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns

ORDINANCE NO

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

Development Variance Permit Application Package

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

Solar Planning and Zoning Implementation Guide

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

Guidance Note on the Need for Planning Permission for the Development of Existing Houses and Flats (effective from 6 February 2012)

Residential Decks. Planning and Development Services Department

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Civil Engineering and Architecture (CEA) Detailed Outline

BUILDING PERMIT SPECIFICATIONS

Single Family Residential Building Permit Questions & Answers

Presentation: Proposed Plan Amendments

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

COASTAL DEVELOPMENT PERMIT

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

SECTION 5 RESIDENTIAL R1 ZONE

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA

Architectural Control Guidelines

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

MOBILE HOME LAW. Revised November 2001

Single-Family Permit Handbook. City of Bellevue. Welcome! When is a permit required? Development Services Handout P-1

SOLAR ENERGY FACILITIES ZONING AMENDMENTS

Time/Date Stamp when received:

B. Improve the appearance and character of areas surrounding new development.

Zoning Most Frequently Asked Questions

TYPES OF PROPERTIES ARE INCLUDED WITHIN THE T3 TRANSECT DESIGNATION?

Measuring Single Family Dwellings Town homes Condominium Units. P) ~ F)

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

Town of Surf City Community Development. General Permit Information

TOWNSHIP OF TOMS RIVER ZONING OFFICE DECK CONSTRUCTION

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

Waterleaf ARB Application

Bureau Veritas Contact Information

Architectural Processing and Inspections for Home Mortgage Insurance

RELOCATION OF BUILDINGS

COMMONLY USED RESIDENTIAL BUILDING CODES

Title 33, Planning and Zoning Chapter /29/14 Single-Dwelling Zones

STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION


EXHIBIT B. Color-Keyed Legend for Tracking Categories of Proposed Ordinance Amendments

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT

Residential Deck Safety, Construction, and Repair

Sample Drawing Package for One and Two Family Dwelling Applications

PRELIMINARY PROJECT REVIEW PROCESS

Residential Building Permits

Do I need planning permission?

ARCHITECTURAL RULES, REGULATIONS & GUIDELINES SOLAR ENERGY DEVICES

Exterior Elevated Elements Inspection Guidelines

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

CPED STAFF REPORT Prepared for the City Planning Commission

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

CHAPTER 2 HYDRAULICS OF SEWERS

Attached/Detached Patio Cover/Carport

RESIDENTIAL WOOD DECKS

DOUGLAS COUNTY ZONING RESOLUTION Section 5 RR - Rural Residential District 3/10/99. -Section Contents-

Guidance on Householder permitted development rights

INTRODUCTION TO ZONING DISTRICT REGULATIONS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

CHAPTER 23 Wireless Communication Facilities

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

2880 International Circle Colorado Springs, CO Telephone Executive Summary Pikes Peak Regional Building Code Revisions

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

Slope Density. Appendix F F-1 STATEMENT OF PURPOSE DISCUSSION OF SLOPE

MISSION VIEJO ENVIRONMENTAL ASSOCIATION PAINTING APPLICATION

VILLAGE OF RIDGEWOOD ORDINANCE NO. 3491

Answers to Commonly Asked Questions

2. What building projects are exempted? (permit not required)

HIGHLIGHTS: Heights in Residential Zoning Districts

Transcription:

Property Development Analysis 2425 Mount Olympus Los Angeles, California 90046

A. Introduction Section I Project Description The subject property is located at 2425 Mount Olympus and adjacent property at 2501 Woodstock in the City of Los Angeles, and is subject to both the Los Angeles Baseline Hillside Ordinance (BHO) and the Los Angeles Municipal Code Development Standards. The following preliminary analysis evaluates development options for new residential structures on the property. B. Property Information Address: 2425 Mount Olympus, 2501 Woodstock Zoning: RE40-1-H Subject to Mulholland Design Review (Outer Corridor) Assessor Parcel Number: 556020034 & 5565020030 Lot size: 274,256 square feet (per assessor s map, to be verified by survey) Max. Lot Depth: 690 feet (per assessor s map, to be verified by survey) Mean Lot Width: 591 feet (per assessor s map, to be verified by survey) Existing Building: 7,066 sq ft (per assessor) C. Primary Development Objective The primary development objective for the subject property is to split the lot into two developable properties, and then develop each property individually with a new single family dwelling along with associated structures. The target square footage for the new structures is between 20,000 to 25,000 square feet. This analysis will generally outline the allowances and restrictions for future development posed by municipal ordinances, and other authorities with jurisdiction over the parcel.

Section III Lot Line Adjustment Because two parcels exist currently, a lot line adjustment can be completed to rearrange the layout of the two lots. Below is a preliminary layout for the revised lot line, which creates two large parcels, each with roughly 12,500 sf of flat pad space. These lots have been designed to maximize development on the flat pad, and provide legal access to each lot. The lot line adjustment process takes roughly 6-9 months.

Section III Building Envelope - Code Requirements and Restrictions A. Maximum Allowable Area and Square Footage Exemptions Maximum Residential Floor Area (RFA): Per the Slope Band Analysis completed by Peak Surveys, the Maximum Allowable RFA per the BHO for 2425 Mount Olympus 53,016 square feet. This will actually be increased slightly, once 2501 Woodstock is incorporated into the Slope Band Analysis. The below sections articulate floor area bonuses and exemptions found within the Baseline Hillside Ordinance, that may be used to increase the permissible RFA. B. Baseline Hillside Ordinance Floor Area Bonuses (20% Area Bonus) 1. 20% Area Bonus: There are various means by which the BHO maximum by-right RFA may be increased by up to 20%, which would increase the allowable RFA for the subject property to 10,603 square feet. A. Proportional Stories Option: The total RFA of each Story other than the Base Floor in a multi-story Building does not exceed 75% of the Base Floor Area. A building pad is flat when the Slope of the building pad area prior to any Grading is less than 15%, as measured from the highest and lowest Elevation points of the existing Grade within 5 horizontal feet of the exterior walls of the proposed Building or Structure. This option only applies to flat building pads, and thus cannot be applied on the subject property. B. Front Façade Stepback Option: The cumulative length of the exterior walls which are not a part of a garage facing the Front Lot Line, equal to a minimum of 25% of the Building width, shall be stepped-back a distance of at least 20% of the Building depth from a plane parallel to the Lot width established at the point of the Building closest to the Front Lot line. C. Cumulative Side Yard Setbacks Option: The combined width of Side Yards shall be at least 25% of the total Lot Width, but in no event shall a single Side Yard setback be less than 10% of the Lot Width or the minimum required by the Zone, whichever is greater. One foot shall be added to each required Side yard for each increment of 10 feet or fraction thereof of height above the first 18 feet of height. The width of a required Side Yard setback shall be maintained for the entire length of a Side Yard and cannot alternate from one Side Yard to the other. D. 18-Foot Envelope Height Option: The maximum envelope height shall be no more than 18 feet. E. Multiple Structures Option: Any one Building and Structure extending more than 6 feet above Hillside Area Grade shall cover no more than 20% of the area of a Lot. Such Buildings or Structures may only be connected by one breezeway, fully enclosed walkway, elevator, or combination thereof of not more than 5 feet in width. This is the best option for the subject property.

F. Minimal Grading Option: The total amount of any Grading on site (including exempted grading) does not exceed the numeric value of 10% of the total Lot size in cubic yards or 1,000 cubic yards, whichever is less. G. Green Building Option: For a new Single Family Dwelling, the new construction must satisfy the Tier 1 Green Building requirements or higher as defined in the LA Green Building Code. C. Square Footage Exemptions 1. Building Area not counted toward Residential Floor Area: In addition to the floor area bonuses articulated above, there are a number of building areas that are exempt from inclusion in the RFA calculation. Taking advantage of the below exemptions can further increase the size of a dwelling. An exhaustive list, and additional details are provided within the text of the Baseline Hillside Ordinance. A. Parking: The first 400 square feet of required covered parking is exempt. B. Detached Accessory Buildings: Detached accessory structure not exceeding 200 square feet individually are exempt, limit two (a maximum of 400 square feet may be exempted). C. Covered Porches, Patios, and Breezeways: The total area of all covered porches, patios and breezeways up to 5% of the building area may be deducted. (53,016) x (.05) = 2,650 sf Exempt from Maximum RFA Calculations D. Lattice and Spaced Roofs: Non-weather tight exterior covered spaces with roofs constructed of members spaced widely enough to permit a sphere of 10 inches in diameter to pass through are exempt. All lattice members must have a minimum nominal width of 2 inches. Spaced Roofs, constructed of members running in one direction only with a minimum clear spacing between the members of not less than 4 inches, are also exempt. E. Over-In-Height Ceilings: The first 100 square feet of any Story or portion of a Story of the main building on a lot with a ceiling height greater than 14 feet shall be counted only once. Except that, for a room or portion of a room which has a floor height below the exterior Grade (or sunken rooms ), when the ceiling height as measured from the exterior natural or finished Grade, whichever is lower, is not greater than 14 feet it shall only be counted once. 2. Basements: A Basement, whether habitable or not, when the Elevation of the upper surface of the floor or roof above the Basement does not exceed 3 feet in height at any point above the finished or natural Grade, whichever is lower, for at least 60% of the perimeter length of the exterior Basement walls, will not be counted towards the RFA. Within the BHO, there is no express limitation on the area of basements other than setbacks and general physical and practical constraints. In order to create a basement lower on the hillside, which may allow the basement to contain more area while maintaining

the 60% perimeter coverage, a 4 to 7 mechanical mezzanine can be utilized. This space will count as a story, but will not count against RFA. In this scenario, the max. 12' basement height will be counted from the basement finished floor elevation to finished floor elevation of the mechanical mezzanine. A. Basement height is limited to 12 feet above grade. If the finished floor level directly above a basement is more than twelve feet above grade, such basement shall be considered a story. B. If the finished floor level directly above a basement is more than six feet above grade for more than 50% of the total perimeter, such basement shall be considered a story. C. For all Lots, a maximum of 2 light-wells which are not visible from a public rightof-way and do not project more than 3 feet from the exterior walls of the Basement and no wider than 6 feet shall not disqualify said Basement from this exemption. Utilizing topographical map and given the desired location of the new building, Crest estimates that a cumulative 15,000 square foot basement could feasibly be constructed for this property underneath the two new buildings. The Guaranteed Minimum Bonus-Added RFA for the subject property is 79,019 square feet*, including day-light lower level and garage. *Max RFA per Zoning Code for entire parcel. This will be split between the two lots developed in this report. Furthermore, Mulholland Design Review Board will provide more restrictive guidelines described later in report. D. Lot Coverage 1. Buildings and Structures extending more than 6 feet above natural ground level shall cover no more than 40% of the area of a Lot. This includes grades raised by the using of retaining walls and fill. E. Height Limits 1. Maximum BHO Envelope Height: Envelope height (otherwise known as plumb line height) is the vertical distance from the grade of the site to a projected plane at the roof structure or parapet wall located directly above and parallel to the grade. Measurement of the envelope height originates at the lowest grade within five horizontal feet of the exterior walls. Limitations for this zone restrict the height of a structure with roof slope of less than 25% to 30 feet. For a structure with a roof slope greater than 25%, the maximum height is 36 feet.

Exhibit A A. Unenclosed/Uncovered Rooftop Decks and Cantilevered Balconies, along with a visually permeable railing no more than 42 inches in height, may project beyond the maximum envelope height no more than five horizontal feet. Exhibit B B. Height Step-backs: Within 20 feet of the front lot line, the height of buildings and structures is limited to 24 in height, as measured from the elevation at the center line of the street.

F. Setbacks 1. Required Yards: Front, side, and rear yard setbacks apply to the subject property, and are governed by the Baseline Hillside Ordinance. These will be the same for both lots. G. Accessory Structures A. Front Yard Setback: 5 feet, per preliminary Prevailing Setback Analysis B. Rear Yard Setback: 25 feet C. Side Yard Setbacks: 12 feet (10' plus one additional foot for each increment of ten feet above the first 18'-0 ) 1. New Accessory Structures cannot be located within the first 55 of the subject properties.

Section IV Conceptual Renderings

Section V Soils and Geotechnical Feffer Geological Consulting completed a preliminary analysis of the property on June 26, 2014. Per the report, review of geological maps indicate that the material underlying the subject slope is comprised of granite in natural slopes and up to 120 feet of fill on the slope that descends to the south. The existing home appears to be located on a ridge that is underlain by stable granitic bedrock. Based on the report, it appears that development of the subject site is feasible from a geologic standpoint. Certain construction measures (i.e. friction piles for construction near the slope) will be required, as is standard for hillside properties. However, development will likely need to be contained to the area near the flat pad at the top of the property. Development on the existing descending slope below the flat pad of the property is likely not feasible due to the steepness of the slopes and the limitation on the steepness of gradient of the driveway that would be needed to access structures on the slope. A large deck extending over the slope is likely feasible, and the flat pad size may be increased by lowering the site. A complete geological report will be required once design of the new development is complete. A. Maximum Grading Quantities Section VI Grading 1. By-Right Grading Quantity: The cumulative quantity of Grading, or the total combined value of both Cut and Fill or incremental Cut and Fill, for any one property shall be limited to a base maximum of 500 cubic yards plus a numeric value equal to 5% of the total Lot size in cubic yards. However, the upper limit in the RE40 zone is 3,300 cubic yards. For the subject property, the following by-right grading quantities shall apply: Maximum Non-Exempt Grading Quantity: 3,300 cubic yards per lot 2. Grading Quantity Exceptions: The grading activities outlined below shall be exempt from the Grading and/or earth transport limitations established in the two sections prior. A. Cut and/or Fill underneath the footprint of a structure(s) (such as foundations, understructures including basements or other completely subterranean spaces, not including pools and sports courts), as well as for water storage tanks, required stormwater retention improvements, and required animal keeping site development that do not involve the construction of any freestanding retaining walls. B. Cut and/or Fill, up to 500 cubic yards, for driveways to the required parking or fire department turnaround closest to the accessible Street for which a Lot has ingress/egress rights.

C. Remedial Grading as recommended in a Geotechnical Investigation Report, prepared in accordance with the LA Municipal Code, and approved by the Department of Building and Safety Grading Division. 3. Import and Export Limits: Because the subject property fronts a Standard Limited Hillside Street, the maximum quantity of earth import is 500 cubic yards, and the maximum quantity of earth export is 1,000 cubic yards. These limits can be exceeded through an approval via a Haul Route Hearing. The Haul Route Approval process takes roughly 6 months from submittal of the Haul Route Application, which requires an approved Soils Report and preliminary civil grading plans. Haul Routes are a by-right process, and the city can impose certain conditions but not deny the hauling entirely. Retaining Walls All properties have the right to construct one 12-foot high retaining wall or two 10-foot high retaining walls on site. Existing retaining walls on site permitted prior to 2004 do not count towards these totals. Based on the Permit Records for the subject property, no retaining walls have been permitted since 2004. Protected Trees On Site There may exist protected trees on the property. The Department of Urban Forestry does allow for protected tree removals provided that the development is reasonable and leaving the tree in place is impractical. In order to do so, four trees will have to be planted in order to remove one tree. The Urban Forestry Dept. takes roughly four months to review and approve these cases. Thus, removal would be applied for during the design phase. The protected trees present on the property will need to be determined by an arborist. Mulholland Design Review Board requires a 2 to 1 on-site replacement for any protected trees to be removed. The board stresses that the design show effort to maintain existing protected trees wherever possible. However, they will approve removal of protected trees when the trees are clearly in the way of proposed development and are replaced to MDRB standards. An arborist s report should be obtained ASAP to locate all protected trees on site. Access Requirements The Los Angeles Building & Zoning Codes stipulate that access driveways may not be steeper at any point than 20%. Additionally, a transition slope of 10% or less is required within the first ten feet and the last ten feet of the driveway. Site design will have to reflect these requirements accordingly. Additionally, a fire department turnaround will be required if the new structure is greater than 150 from the front yard property line. It should be feasible to design two new homes within 150 from the front yard property line. A U-shaped driveway would meet this criterion, if needed.

Section VII Mulholland Design Review Requirements The subject property is listed within the Mulholland Scenic Parkway Outer Corridor. Any new residential structures or substantial remodel/addition will require approval through the Mulholland Design Review Board. The Mulholland Design Review Board will not approve two projects that collectively utilize the maximum allowable floor area of 79,019 sf. A more realistic goal would be 20,000 cumulative sf per site. The MDRB does not have a set calculation for allowable floor area, but they base their decision off of homes in the surrounding area along with an analysis of the impact of the project on the site. For Parcel 1, a 20,000 sf home would represent a roughly 13% Floor Area Ratio. For Parcel 2, a 20,000 sf home would represent a roughly 16% Floor Area Ratio. These Floor Area Ratios are significantly lower than many of the homes in the surrounding area, meaning that the size of the homes relative to the size of the parcels is reasonable, even conservative, for the neighborhood. Projects are reviewed on a case-by-case basis, and thus, the staff is unable to make any definite determinations. While two 20,000 sf homes may be feasible given strong adherence to MDRB guidelines, if the project requires intensive landform alteration, it is possible for the board to deny the project. However, the current design proposals do not propose significant landform alteration, and are respectful of the existing hillside topography. The following guidelines should be acknowledged: Grading should be limited wherever possible. The board requests that grading be utilized when necessary but not superfluously. If more than one retaining wall is utilized, the purpose and necessity for project success must be clear. Two walls cannot be stacked one three feet behind the other to create an essentially 20 retaining wall, even though Building and Safety does allow this. Sloped roof is preferred. If flat roof is to be utilized, must show articulation and variation of roof heights and massing. Utilize earth tones for color of buildings Neighborhood Compatibility is a crucial component. Architect must review the styles and massing of houses in the nearby vicinity to create a product that is cohesive with the neighborhood in terms of size, location on the lot, and colors. Landscaping must be eco-friendly and utilize native plants as specified within the Mulholland Guidelines. The approval process is 3-5 months, depending on the workload of the Board as well as the amount of required changes to the plans.

20,000 square foot structures could be feasible if located on the flat pad and designed to reflect the MDRB guidelines. Section VIII Additional Los Angeles Requirements and Restrictions 1. Equine Keeping Zone: The subject property is within the Equine Keeping Zone in the City of Los Angeles. The zoning ordinance was put into effect in order to maintain existing equestrian zones in the area. Due to this zoning requirement, an Equine Keeping Checklist Form must be filled out. In addition, a site plan must be provided that shows the distance from the neighboring equine keeping areas to the habitable rooms on the property. However, the proposed development on the site will not be restricted by this requirement. 2. Required Covered Parking: There shall be at least two Parking Spaces on a lot per each Single-Family Dwelling thereon. These required spaces shall be provided within a Private Garage, and shall not be located within a required Front Yard. 3. Additional Required Parking Spaces: For any lot with a home over 2,400 square feet, excluding space dedicated to parking, up to three additional parking spaces are required to be provided on-site for each additional 1,000 square feet above the first 2,400. Additional spaces may be uncovered, and may be located within the required Front Yard. Given the proposed size of the planned dwellings, provision for five cars should be anticipated. Covenants, Conditions & Restrictions (CC&Rs) Crest is currently unaware of any active Architectural Review Committee operating within the subject neighborhood other than the Mulholland Design Review Board. Further review of the title report will confirm any additional CC&R s. Bureau of Engineering Dedication Requirement The Los Angeles Bureau of Engineering does not require a dedication for this project. Existing Easements The Title Report may reference easements on the property. In order to ascertain the impact of these easements on future development, a plotted easement map is required. This report will be updated once a survey showing location of the easements is completed. Section IX Conclusion Feasibility Summary Feasibility Report Primary Development Objectives 1. Lot Line Adjustment a. Feasible. Process takes 6-9 months from submittal, and will result in two developable parcels.

2. New Single Family Dwelling on each lot a. New Residences = ~20,000 sq ft. per lot b. MDRB approval likely provided that landform alteration from the resulting construction of the new dwelling is kept to a minimum where possible, and given a willingness to work with MDRB guidelines. Development Analysis Overview The property located at 2425 Mount Olympus and 2501 Woodstock presents a unique opportunity to perform a lot line adjustment and develop two new 20,000 square foot single-family dwellings. Considering the restrictions imposed by the MDRB, the construction of two new 20,000 sq ft. dwellings should be feasible as long as a willingness to meet MDRB guidelines are respected. This is determined by evaluating the surrounding neighborhood characteristics and the developments impact to the existing topography and landscape. Efficient design and proper interpretations of the Los Angeles Zoning Code can create an exceptional home and accessory buildings for this property. The Property Development Analysis above provides for roughly 40,000 cumulative square feet of structures. Terms and Conditions This Property Development Analysis has been prepared for the sole use of the Client, and is not intended to be transferred or assigned to any other party. It is based on publicly available information, and information provided by the Client or its Consultants, that may be incomplete or contain errors. While Crest Real Estate has done its best to provide the highest level of accuracy in its analysis and assessment of the available data, this report is not warranted as exhaustive or free of errors. This report may contain references to the construct-ability of the proposed work. These are good-faith opinions, based on our experience. This report is not intended to be used for cost-estimating purposes. Findings that a property is developable within the parameters of the bodies having jurisdiction over it does not mean such property's development is compatible with the Client's budget, schedule, or other objectives. Client hereby agrees that Crest Real Estate shall not be liable for any special, indirect, or consequential damages arising from the use of this report by the Client or its agents. Please Contact Jason H. Somers of Crest Real Estate to further discuss this report and conceptual plan preparation. Report Prepared by: Jason H. Somers President (310) 344-8474 Jason@CrestRealEstate.com "Trusted through our Knowledge, Hard Work & Dedication"