CUBMOBILE PLANS Detailed Instructions:

Similar documents
INSTALLATION INSTRUCTIONS

Router Table Plans.

Go-kart for little race-drivers

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

MGB Chrome Bumper Conversion

Build a Trade-Show Booth for Under $200!

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13


6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

Ceiling Mounted Folding Attic Ladders Installation Instructions

BUILDINGA 1/10 SCALE FLATBED TRAILER

Owner s Manual Read and keep this manual. Patents World Wide

Cedar Cottage Doghouse Plans

Verify caster, camber and toe-in are correct before proceeding.

How To Launch A Rocket From A Formica

STEERING HANDLEBAR/FRONT WHEEL/ FRONT SHOCK ABSORBER

88-98 Chevy / GMC Fullsize 4WD 6-Lug 2"- 2 1/2" Suspension Lift Installation Instructions

16 April F Dodge Adjustable Track bar with Relocation Bracket 1

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech

Gravity Racing Challenge STEM Team Competition Open Class High School Division Car Assembly Plans And Rules

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

This little motorcycle has been designed

Trundle Bed Plans (For Use Under Twin or Full-Size Standard Length Beds)

Lathe Milling Attachment

How to Build Your Own CornHole Game

Section A. GENERAL INFORMATION

SELF-STEERING AXLE TABLE OF CONTENTS

F250 6 RADIUS ARM KIT

assembly instructions

Front axle components, overview

NBA Arena Portable System

SLACK PERFORMANCE KARTS

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

Assembly and Usage Instructions

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

BUILD A TABLETOP LOOM

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

R O A D M A S T E R, I N C.

ReadyLift (Part# ) Strut Extension, Installation Instructions Toyota Tundra New Body Style 2WD & 4WD

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

How to Build a Poker Table

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

Installation Manual. SKU# series (Base Rails) SKU# series (Overhead Racks)

46431x92A Garden Tractor (1998) Page 1 of 16 Body Chassis

Building an Off-Center Fixture for Turning Pendants

H EAD TUBE BASICS. Figure 1 - Head tube, front fork and hardware

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

TRANS-05, Torque Tube Removal, Rebuilding, and Installation

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

INSTALLATION INSTRUCTIONS COMPETITION SERIES COILOVER SUSPENSION SYSTEM 03+ Scion xb

1.8 CRANKSHAFT OIL SEALS

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

Earthquake Shake Table Original Design by Casey Hagbo Geophysics Major, Class of 2001

FTC DIY Mountain Build Guide

POD Visor Instructions

Hive Top Ventilation Shims

»Product» Safety Warning

Boiler Plan II Table of Contents

Beer Complet. Project from

COMPLIMENTARY WOODWORKING PLAN

WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

Slide the new steering column shaft through the steering column from the driver compartment.

Premier & Deluxe 3-Season Room Sliding Glass Door

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV General. Removal (Left and Right Forks) Kit Number

Rating when used as a weight carrying hitch without spring bars:

Gate Leg Drop Leaf Table Plans

Drive shaft, servicing

Bicycoo BMX Instruction Manual 0014X Series

1993 SUSPENSION Volkswagen Front. EuroVan

DETACHABLE WINDSHIELD AND DOCKING HARDWARE KIT

JK 2.5 Spring Lift Part # # #

ESTATE WAGON MODEL 300 OWNER MANUAL

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Step 1. Item 6. Item 1

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

Little British Car Co.

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

Reproduction. Not for. Coronet RD Series Riding Mowers. Parts Manual. 15.5HP Product. 17.5HP Product

Guidelines for Earthquake Bracing of Residential Water Heaters

AXLE SHAFTS - FRONT Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

EZ-Steer Assisted Steering System

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

Tooling List 17mm Socket 17mm Wrench 24mm Wrench 26mm Wrench 3/8 Drive Ratchet Torque Wrench

Speed-Mat Rectangle Cutter

R O A D M A S T E R, I N C.

READ THE INSTRUCTIONS SEVERAL TIMES BEFORE STARTING ASSEMBLY

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

Service Manual Rol-Lift

Installation manual. 3 suspension system Ford F150. Part # Part # Important customer information: Ford F150

BUGGY SETUP GUIDE. Volume GOKARTSUSA GY6 150, CN250. Buggy Setup Guide

Dave s Sheet Metal Bending Brake

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

4.5 LIFT BOX KIT DODGE RAM 2500 & WD DIESEL ENGINE ONLY FTS23031

DR125 and DR150 Hensim Dirt Runner 125cc and 150cc Dirt Bike (VIN PREFIX LLCH or LUAH)

Transcription:

Detailed Instructions: These instructions along with the detailed diagram that follows should give you the tools, parts, and assembly steps required to create your own cubmobile. Enjoy!!! 1. Cut (1) 2 X 4 52" long for main frame. 2. Cut (2) 2 X 4's 28" for the front and back axles. 3. Make an "X" on each end of each axle, and drill a 5/16 hole at each "X" intersect, 4-6" deep using an electric or cordless drill. 4. On the front axle 2 X 4: a. Drill a 5/16" hole on each end near the back for the rope. b. Drill a 3/8" hole at center of 2 X 4. This would be 14 from either end and 1-5/8 from either long side. c. Attach (2) 2 X 4 blocks to front axle, on either side, 2-1/8" from center hole, (4) #6 X 2" screws per block. This will limit steering. This step can also happen after step 6 and simply allow 1/4 1/2 space between the blocks and the main 2 x 4. 5. At front of main frame 2 X 4, drill a 3/8" hole (centered and 1-5/8" from front). 6. Attach front axle to frame using 3/8" X 4" hex bolt, (4) 3/8 flat washers, and (1) 3/8 lock nut. (djust tightness to allow steering to operate freely). 7. Align the back axle 2 X 4 at 90 degrees right angle with back of main frame 2 X 4, clamp if possible. Drill (2) 5/16" holes diaginally from each other through axle and main frame. Attach main frame to back axle using (2) 5/16 x 4 carriage bolts, (2) 5/16 flat washers, (2) 5/16 split lock washers, and (2) 5/16 nuts. The second nut works to lock the other nut in place thus preventing the assembly from loosening up during use. If this is to be a permanent attachment, glue also. 8. Cut out seat and back rest from plywood. Seat bottom is 15 x 20, back is 8 3/4 x 20 9. Cut one 2 X 4 12-14" in length for back rest support. (Bevel slightly about 10 degrees if possible). 10. Attach back rest support (bevel end down) to main frame using (2) #8 x 3 screws. These will need to be positioned about 1.5 from bottom of the back support board and then angled downward at about 45 60 degrees to properly engage the main 2x4. Length of the long side of the back support depends on size of the boys. Have a scout who is in the average of the heights of the other boys sit on 2 X 4 frame to estimate position. Below is the pattern we used, you can adjust as you see fit. 1-5/8 12 80 19 Page 1 of 5

11. Cut out 2 triangular shaped pieces of plywood and attach to either side of backrest support and main frame with glue and screws (#6 1-1/2"). Drilling small pilot holes helps. 12. Attach seat and back rest using (2) 1/4-20 x 3 carriage bolts, (1) 1/4 flat washer, (1) 1/4 split lockwasher, and (1) 1/4 hex nut. 13. Cut 2 X 2 surveyor's stake to 14-16" at an angle, cover end with rubber (ole tire etc.) using #4 x 1 screws and #4 fender washers, drill a 3/8" hole through stake at location it will meet main frame. Note: Hole should be drilled closer to the rubber end to allow handle end to be heavier so that it will return on it s own once the boys let it go after breaking. 14. Drill hole 5/16" into main frame at point to attach brake. Mount the brake using a 3/8" X 4" lag screw with two 3/8 flat washers on either side of the handle so that it actuates smoothly. 15. Drill and attach the seat belt with fasteners of choice. We used a 3/8 x 6 hex bolt and drilled right through both support boards behind the seat back support. 16. Attach 6-7' of 1/4" rope to front axle as shown. 17. Attach wheels using (4) 3/8 washers (2 on either side of wheel) and a 3/8" X 6" lag screw. (Socket wrench or impact gun really helps here!). Page 2 of 5

Supplies and Tools: cription Tools you will need CUBMOBILE PLANS Qty Description Tools List: 4 8" wheels (solid rubber only! No pneumatics) Power drill x 2 1 2'X4' " plywood 3/32,7/64, 1/4,5/16 and 3/8 wood bits, countersink bit 2 2X4x8 5/8 and 9/16 Wrenches or deep socket set 1 2"X2" surveyor's stake (brake handle) Screwdriver/Driver bits 4 3/8" X 6" lag screws (for wheels) Tape measurer 1 3/8" X 4" hex bolt (for front axle) Wood glue 1 3/8" X 4" lag screw (for brake) Power or hand saw 2 5/16" X 4" carriage bolts (for rear axle) Framing Square 24 3/8" washers Hammer 1 3/8" lock nut 4 clamps (quick or bar) 2 5/16" washers Safety Glasses 2 5/16" lock washers 4 5/16" nuts 32 #6 X 1 1/2" wood screws 8 #6 X 2" sheetrock or wood screws 16 #6 x 1-5/8 sheetrock or wood screws 1 6-7' 1/4" rope 1 seat belt (from auto salvage yard or Fork lift shop) 1 2" X6" piece of rubber (from old tire) 4 1/4-20 x 3 carriage bolts (seat back and bottom) 4 1/4 flat washer 4 1/4 lock washer 4 1/4 hex nuts 2 #4 x 1 wood screws 2 #4 fender washers (around 1 outer diameter) 2 #8 x 3 Sheetrock or wood screws 1 2 x 4 piece of old bike tire or equivalent Page 3 of 5

Cubmobile Diagram: CUBMOBILE PLANS Page 4 of 5

Cubmobile Building Guidelines: 1. Wheels must not exceed 10 inches in diameter. 2. All wheels may only be equipped with solid rubber tires. 3. Car frame is made from 2-by-4-inch construction lumber. 4. The overall length of the car is a maximum of 5 feet; the wheel base a maximum of 4 feet. 5. Use roundhead 1/4-inch bolts to hold frame. Screws are a second choice. Nails are not suitable, because they may work lose. 6. All cars must have a seat with braced backrest, so the Scout can comfortably steer with his feet. 7. Steering is done with the feet, which are placed on the front axle, and by the hands holding a rope fastened to the front axle. 8. If threaded axles are used, the nuts must be secured with cotter pins or wire. 9. Cars must be equipped with an adequate safety belt securely fastened to the main frame of the car. 10. Cars must be equipped with a handbrake with its rubbing surface faced with a rubber material such as a strip of an old tire. This will stop the car when dragged on the ground. 11. During a race, the two 2-by-4-inch blocks fastened 1/4 to 1/2 inch from the centerboard will limit the turning radius. (Very important to test this before the race!) 12. No extra weights, etc. may be placed on the Cubmobile. 13. For the Scout's safety, they should wear long pants, a long sleeve shirt, and shoes that completely cover the feet, and a bike helmet. Page 5 of 5