THE PIER CONCEPTUAL DESIGN DEVELOPMENT PRESENTATION TO COUNCIL. February 17, 2011

Similar documents
STRATEGIC PLAN

SAN FRANCISCO NEIGHBORHOOD PROFILES

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

CHIPPEWA FALLS RIVERFRONT PARK

Economic Development Element

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

PURPLE FLAG FOR BETTER TOWN CENTRES AT NIGHT

Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)

City of Tampa Zoning Districts

Envision Venice Strategic Plan for Fiscal Year Ending. September 30, Preserving and Enhancing the Venice Quality of Life.

Market Analysis for Padre Boulevard Initiative in the Town of South Padre Island, TX

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

APPENDIX 2. NJDEP Environmental and Historic Review Application for EDA and DCA/NEP Programs

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.

MEETINGS AND EVENTS CHICAGO

EXECUTIVE SUMMARY. Mayor and City Commissioners. Fort Pierce, Florida May 2011

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

Mississippi Drive Kickoff Event. 8/31/2015 & 9/1/2015 Meeting Minutes. Blue Zones: Dan Burden Presentation (Rotary Club Meeting)

Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting

FUTURE LAND USE ELEMENT

800 EMAAR (36227) Marina Plaza

Town of Snowmass Village. PO Box Or Delivered To: 1 P a g e

Cobourg Tourism Asset Feasibility Study

Downtown Core Sub-district

Downtown Los Angeles Streetcar Economic Analysis

OSLO, a new step for the city - port relationship

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

Scenario Planning Report. Austin South Shore Central

IT S HARD TO BELIEVE THE INNER HARBOR IS 40 YEARS OLD

6. Social & Community Facilities

Borough of Red Bank 1. Overview of Red Bank and Its Waterfront

Larnaca Urban Sustainable Development Strategy

Zoning Guide* Contents. Section I Introduction page 2. Section II Residence Districts page 3. Section III Commercial Districts page 5

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Downtown Tampa Transportation Vision

Topic 2 11/28/2012 Blocks & Street Network

LONG ISLAND CONVENTION AND VISITORS BUREAU AND SPORTS COMMISSION OVERVIEW

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Rapid Transit Backgrounder

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

Windsor Altlântica Avenida Atlântica, 1020 Copacabana - Rio de Janeiro Tel: (55 21)

315 First Ave NE Minneapolis, MN 55413

ARTICLE 4 COMMERCIAL DISTRICT REGULATIONS TABLE OF CONTENTS

28.0 Development Permit Area #2 (Neighbourhood District)

Broward County Everglades Holiday Park. Gateway to the Everglades

Convention Center Expansion & Headquarters Hotel Feasibility Study for the Washington Convention Center. Summary of Study Findings

Summary Community Workshop #2 Fruitvale San Antonio Senior Center. Wednesday, April 22, :00-9:00 p.m.

P u b l i c. Development Proposal And Rezoning

THE NEW PLACE TO BE AS FEATURED IN BUSINESS IN FOCUS DECEMBER 2012

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

The main objective of this proposal is to enhance the quality of life in Kársnes. It embraces the positive features of the peninsula s tip and weaves

Executive Summary. Does a Streetcar Make Sense in Anaheim

Land Use and Zoning. Land Use Within the Port Madison Indian Reservation

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Advantages and Disadvantages of One Way Streets October 30, 2007

Opal Service District Plan

Chapter 3: Use and Occupancy Classification

Goals & Objectives. Chapter 9. Transportation

Downtown South Salt Lake Redevelopment City of South Salt Lake

Arkansas River Corridor Vision & Master Plan

Glasgow s Tourism action PLAN to 2016

Marina Bay Sands. George Tanasijevich President and CEO of Marina Bay Sands

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

2. Market Area Background and Demographics Deliverable 1B

the music factory las colinas newest entertainment destination For Retail Leasing Information Call Noah Lazes

EMERALD GRAND AT DESTIN 10 Harbor Blvd Destin, Florida, UNITED STATES

Restoration. a brief look at

Railyard Alternatives and I-280 Boulevard Feasibility Study. Planning Commission February 6, 2014

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN

OFFICIAL PLAN REVIEW ENVIRONMENTAL STAKEHOLDERS FEEDBACK REPORT

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

Licensed by the California Department of Corporations as an Investment Advisor Investment Newsletter May 2006

A NEW DEFINITION OF COMMUNITY

Development Opportunity: Estes Peninsula on Joe Pool Lake, Grand Prairie, Texas

Highway Requirements Part 4

HELPING YOU CREATE SUCCESSFUL EVENTS. THAT S OUR PROMISE TO YOU.

Growth of Addis Ababa

SUSTAINABLE TRAFFIC CONCEPT IN MUNICIPALITY OF NEA KYDONIA


OVERVIEW PROJECT SUMMARY

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

The Lancaster Medical District Master Plan. The Lancaster Campus District 1

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

Lincoln Downtown Master Plan Update

DOWNTOWN AND NEIGHBORHOODS

Welcome to our exhibition

Camden Community Conversation. Vibrancy Survey Results May 21, 2009

Buying Local. Contents. What is buying local?

Request for Proposal

Honeymoon of YOUR Dreams!

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

MINIMUM PARKING STANDARDS DRIVEWAY WIDTH AND SLOPE TABLES

REQUEST FOR QUALIFICATIONS. On-Call Conceptual Architectural and Engineering Design Services

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING

Attachment B Policy Audit Template

S. BLOCK 68 REDEVELOPMENT PROJECT AREA

Hudson Valley Casino & Resort The Superior Choice for Strengthening the Hudson Valley

Transcription:

THE PIER CONCEPTUAL DESIGN DEVELOPMENT PRESENTATION TO COUNCIL February 17, 2011

scope

GOALS Determine core principles and vision Analyze integration of Pier with Waterfront park system and downtown core Determine pedestrian and vehicular transportation/parking access requirements Evaluate view corridors and vistas relative to height, location and massing of project components Define development constraints and environmental permitting issues including viability of a causeway option Formalize and validate final overall vision for the Pier project through an inclusive process of public input

PLANNING TASKS Task 1.1 Summarize work to date Task 1.2 Workshop / Kick-off Task 1.3 Programmatic alternatives Task 1.4 Public programming presentation Task 1.5 Pier alternatives Task 1.6 Waterfront integration Task 1.7 Workshop The role of the Pier to the City The commercial success of the Pier The integration of the project in the waterfront Overall costs

PLANNING TASKS Task 1.8 Massing model Task 1.9 Public presentation Task 1.10 Detailed alternatives Task 1.11 Workshop Task 1.12 Public presentation Task 1.13 Environmental issues (by others) Task 1.14 Selection and plan implementation Task 1.15 Final presentation

PART 1 The individual pieces

DEVELOPMENT ISSUES Overall program Pier program Length of Pier Runway impact Height Limitations Width of Pier Alignment of Pier Environmental Economic

Question Newton Kennedy Dudley Danner Kornell Nurse Polson Mayor Is there a particular feature of the pier you feel is historic? 1 Pier Structure 2a 2b Should the new facility be commercially self sufficient? Should it pay for the capital? What criteria do you use to justify subsidies - jobs, tourism? 2c 3a 3b Jobs Tourism Is there a pressing requirement to maintain the pier as long as it currently is? How long's long? Shorter Same Length Longer 4 Is there a need for a wide pier with parking? 5 Is the causeway vs. pier option purely a cost decision? 6a 6b Is the Pier a walkable component of the waterfront? Should we link up north and south? 7 Can the Pier be walkable from the parking? Are there any uses that the Council does not agree on 8a including? Retail in the mainland is struggling, should waterfront retail be 8b a major use? How open is Council to exploring all forms of "Iconic" 9 landmarks?

Question Newton Kennedy Dudley Danner Kornell Nurse Polson Mayor Is there a particular feature of the pier you feel is historic? 1 Pier Structure 2a 2b Should the new facility be commercially self sufficient? Should it pay for the capital? What criteria do you use to justify subsidies - jobs, tourism? 2c 3a 3b Jobs Tourism Is there a pressing requirement to maintain the pier as long as it currently is? How long's long? Shorter Same Length Longer 4 Is there a need for a wide pier with parking? 5 Is the causeway vs. pier option purely a cost decision? 6a 6b Is the Pier a walkable component of the waterfront? Should we link up north and south? 7 Can the Pier be walkable from the parking? Are there any uses that the Council does not agree on 8a including? Retail in the mainland is struggling, should waterfront retail be 8b a major use? How open is Council to exploring all forms of "Iconic" 9 landmarks? See minutes to meeting for detailed lists

WHAT WE LEARNED FROM COUNCIL St Pete will have a pier There is no need to substitute in kind We don t have to be as long as it is Should be walkable component of the waterfront The pier should not pay for the capital Justify through the impact on tourism and jobs It should reduce or eliminate the annual subsidies Do not compete with the downtown

WHAT HAVE WE LEARNED ABOUT THE PIER? Its about being on the water Away from the City Looking back at the City Water experience Eating, dining Landmark An integral part of the waterfront Gathering and public spaces Tourist attraction Family attraction The beach is an unexploited asset Connectivity It is not about shopping

Maximum Height: 108 program

POSSIBLE USES Revenue Positive Compatible with the waterfront Candidate for iconic Architecture Destination Draw Dining, themed restaurants and bars Unique shopping, retail Amusement Event venue Hotel Theater, performing arts Museum Education Public Buildings Farmers market Water related functions [fishing, day cruise, eco] Banquet, multi-function, large assembly events

EVALUATION MATRIX Dining, themed restaurants Unique shopping & retail Amusement Event venues Theatre, performing arts Museum Education Public buildings Farmers market Fishing, boating Banquet, multi-funtion Water dependent Needs to be away from the City Views Water experience Eating, drinking Landmark Integral part of waterfront Gathering and public spaces Tourist attraction Family attraction Beach integration Connectivity Not about shopping

EVALUATION MATRIX Dining, themed restaurants Unique shopping & retail Amusement Event venues Theatre, performing arts Museum Education Public buildings Farmers market Fishing, boating Banquet, multi-function Water dependent Needs to be away from the City Views Water experience Eating, drinking Landmark Integral part of waterfront Gathering and public spaces Tourist attraction Family attraction Beach integration Connectivity Not about shopping

PROGRAM VISION Over the water space and park Vistas Experience the Bay Tourist draw Small event venue Intermittent events Regular events Landmark

SUGGESTED PROGRAM - THE NEW PIER Full Service Restaurant and Banquet Facility (4,000 to 10,000 ft 2 ) Quick Service Food and Beverage Concession (1,000 to 2,000 ft 2 ) Entertainment and Performance Stage Amphitheater (200 to 400 seats) Water Related Activities Fishing Boating Cruises Wading Touching Marina Maximum Height: 108 Community Events Plaza/Farmer s Market Observation Deck/Platform Public Restrooms Central Water Feature/Entertainment Attraction Tourist Information

THE REST OF THE WATERFRONT Major amphitheater (+5,000 people, on-land) Family entertainment park Open space Marinas Move the shopping and more dining on shore Near the city Adjacent to parking On the water

Maximum Height: 108 length

LENGTH Views to and from the City Environmental Impact on new structure Height restrictions at different locations from shoreline Costs to construct size of pier structure

AIRSPACE AND BUILDING RESTRICTIONS 401 feet* 1,016 feet 427 feet No Structures Maximum Height: 108 Maximum Height: 158

BUILDING HEIGHTS No structure to be aligned with primary N-S runway at airport Maximum height of 158 feet beyond 1,200 feet from shore Maximum height of 108 feet within transition zones

VIEWS SHORTEST LENGTH 450 FEET 452 feet

VIEWS MID LENGTH 735 FEET 735 feet

VIEWS FULL LENGTH 1,000 FEET 1016 feet

TOOLS 3 D MODEL

PRELIMINARY DIRECTIONS Once the commercial program is off the pier, the need to functional reduce the length of the pier is no longer there Therefore views and experience control Preliminary recommendations: Maintain current length for now Maintain option to shrink back to mid-length for budget purposes

Maximum Height: 108 width

WIDTH The biggest factor in reducing costs Width impacts environmental permitting issues Width affects the ongoing maintenance costs Accessibility for Pedestrian Service / emergency vehicles Trolley

WIDTH IS A FUNCTION OF: Uses Program Density Flexibility The current 100 feet wide approach is a function of roadway and parking

Is the pier approach A means or journey to the end?..or an end onto itself?

OPTION THE APPROACH AS OPEN SPACE? Very expensive The downtown has a plethora of green unprogrammed open space The key is the terminus

WIDTH - CURRENT Existing Pier 100

SAN FRANCISCO EMBARCADERO 16 wide circulation Total width = 20

NEW YORK HIGHLINE Most = 25 wide

PROMENADE PLANTÉE, PARIS 25 to 30 wide

EPCOT Major pedestrian ways 30 to 40 wide

PEDESTRIAN ONLY 24

TROLLEY ONLY 20

DUAL SIDEWALK + TROLLEY 40

OPTIMIZED DUAL SIDEWALK + TROLLEY - 30

LEVELS OF SERVICE WALKING AREAS LOS A LOS B LOS C LOS D LOS E LOS F 35 sq ft (3.3 m 2 ) per person or greater 25 sq ft (2.3 m 2 )-35 sq ft per person 15 sq ft (1.4 m 2 )-25 sq ft per person 10 sq ft (0.93 m 2 )-15 sq ft per person 5 sq ft (0.46 m 2 )-10 sq ft per person 5 sq ft (0.46 m 2 ) per person or less

PRELIMINARY FINDINGS The full width pier is unaffordable It minimizes the over the water experience It will make the place look empty Recommendations A pedestrian / tram / service and emergency only access No curb design Flexible use of surface Range will be near 40 feet With 40 by 1000, the pier can handle 2,500 to 4,000 people walking Maintain the 30 as a viable cost cutting measure

INTEGRATING RECREATION & TRANSPORTATION

environmental

SEAGRASSES Potential Sea Grass Locations

ENVIRONMENTAL ISSUES Change of footprint Protection of Sea Grasses Water Base Use Requirements Fill implications and limitations Permitting Timeframe

PART 2 Putting it all together

Maximum Height: 108 concepts

GOALS

GOALS Widen the over-the-water experience Engage the entire waterfront Make the beach a focal point Strengthen linkages The pier as a landmark A unique pier Maximize views Create the maximum bay interaction

TWO DISTINCT PARTS The pier A journey experience The terminus A reason to go

Maximum Height: 108 themes

1 Theme 1- A continuation of history

SAME APPROACH.. 1

REUSE OF EXISTING FOOTPRINT Same pier alignment Narrower pier 1 Like before change the program and terminus Focus on the program Better integrated into the park More open space More Bay interaction Financially more successful

1

1 Pier to Mainland Tower with Observation Platform Transit turnaround Water Basin Stage Amphitheater

2 Theme 2 - a pier unlike any other pier

Just like St Pete did many years ago, these piers, opted to rebuild on their old footprint.straight programs from the land out what if?...

EVOLUTION

A NEW EXPERIENCE A pedestrian bridge that allows an interactive journey over the bay Connectivity A pedestrian experience 2 A round trip journey

2

Pier to Mainland (Vehicular Access Only) 2 Island Feature Plaza for Community Events Amphitheater Pier to Mainland (Pedestrian Access Only) Water Basin Stage Tower with Observation Platform

A CONNECTED PARK SYSTEM 2

FUTURE CONNECTIVITY 2

ACCESS TO THE PIER END 2 Trolley Valet Parking

3 Theme 3 - Further development

SEPARATION OF THE ICON FROM THE EXPERIENCE Less expensive Bring the stage closer to the City Maintain the terminus for a symbolic landmark 3

3

Light House Pier 3 Amphitheater Pier Extension Pedestrian only Community Events Pier to Mainland Plaza (Pedestrian Only Access) Tower with Observation Platform Water Feature/ Stage

4 Theme 4 - The beach as a stage for St Pete

LANDSCAPE AND OPEN SPACE LANDMARKS

ACTIVATING THE BEACH The Bay beach cannot compete with the Gulf beaches for swimming 4 However what if..

BEACHES Nice Acapulco Copacabana Bondi Marbella South Beach Waikiki Malibu 4 St Petersburg beach

THE BEACH AS A FOCAL POINT AND STAGE 4

4

4 Amphitheater Light House Island/ Pier Public Beach Pier Extension Pedestrian Access Only Tower with Observation Platform Promenade to Mainland Community Events Plaza Water Feature/ Stage

5 Theme 5- The island destination

THE SCULPTURED PIER Ever changing views of the bay and the City A symbolic recreation of the historic approach 5 A lighted guideway to the terminus A continuous celebration of being in the Bay

5

5 Pier to Mainland Plaza for Community Events Tower with Observation Platform Water Basin Stage Amphitheater Original Pier Supports

6 Theme 6 - A total over water experience

WHY GO OUT THERE? The pier as is offers a single destination 6 What if multiple destinations With multiple uses And multiple audiences could accommodated????????

THE BAY AS A STAGE The pier becomes an interlinking route to a series of activity elements 6 A series of areas maximizing the opportunity to experience the Bay Exercise Passive Arts Fishing Viewing

6

ISLANDS OF ACTIVITIES

Pier to Mainland Vehicular Access Only 6 Pier to Mainland Pedestrian Access Only Tower with Observation Platform Water Basin/Stage Pedestrian Pier to Island Community Events Plaza

7 Theme 7 - Waterworld

THE PIER AS A POINT OF ARRIVAL Marina The marina as a focal point 7

7

Pier Island 7 Amphitheater Marina Pier to Mainland Tower with Observation Platform Pedestrian Pier to Island Water Basin/Stage Community Events Plaza

Maximum Height: 108 terminus

Pier to Mainland Vehicular Access Only Pier to Mainland Pedestrian Access Only Tower with Observation Platform Water Basin/Stage Pedestrian Pier to Island Community Events Plaza

FORMS

EVENT SPACE

ATTRACTION

EVENT

Maximum Height: 108 affordability

RELATIVE SIZE COMPARISON (PIER ONLY) Pier Footprint Terminus Footprint Total Footprint Total Difference from Existing % of base Existing 103,922 127,378 231,300 0 100% 1 72,168 97,128 169,296 62,004 73% 2 76,666 73,312 149,978 81,322 65% 3 & 4 44,157 62,056 106,213 125,087 46% 5 63,985 67,872 131,857 99,443 57% 6 120,066 54,835 174,901 56,399 76% 7 95,620 96,749 192,569 38,731 83% ALL VALUES ARE IN SQUARE FEET 1 2 34 5 6 7

1 2 3 4 5 6 7

THE PIER CONCEPTUAL DESIGN DEVELOPMENT PRESENTATION TO COUNCIL February 17, 2011

EVALUATION MATRIX 1 2 3 4 5 6 7 Water dependent 6 5 5 4 3 2 1 Needs to be away from the City 1 1 1 1 1 1 Views 6 5 4 3 2 1 2 Water experience 7 2 1 Eating, drinking 1 Landmark 1 Integral part of waterfront 1 Gathering and public spaces 1 Tourist attraction 7 1 Family attraction 1 Beach integration 4 3 2 1 3 3 3 Connectivity 2 1 1 1 1 1 1 Affordability 7 3 1 1 2 4 6