Shell Buildings -Tenant Improvements Bulletin # 26

Similar documents
Commercial Building Permit Application & Submittal Guidelines

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Residential Building Permits

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

dpd Seattle Permits Tip Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

General Fire Code Requirements Within Commercial Tenant Spaces

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

SECTION THREE CONSTRUCTION CODES

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

BUSINESS USE PERMIT APPLICATION

BUILDING PERMIT SPECIFICATIONS

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Building Permit Application

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Single Family Residential Basement Finish

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

dpd Seattle Permits CAM Establishing an Attached Accessory Dwelling Unit (ADU) What is an ADU?

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

Building Code Clarifications - 7. Fire Resistance

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

Design Development Quality Management Phase Checklist Project Phase Checklist Series

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Errata has been identified as follows:

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

City of Oviedo Commercial Shell Building Permit Application Guidelines

Indiana Building Rehabilitation Standard

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

ESTABLISHMENT OF A NEW BUSINESS

Items Required to Submit for Specialized Certificate of Occupancy for Operating a Sexually-Oriented Business City of Fort Worth, Texas

Botetourt County, Virginia. Frequently Asked Questions

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Sample Drawing Package for One and Two Family Dwelling Applications

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Clark County Department of Building & Fire Prevention 4701 West Russell Road, Las Vegas, NV ~ (702)

Fire Alarm Submittal Requirements and Acceptance Testing

Bureau Veritas Contact Information

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

Fire Safety Requirements for Child Care Centre

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Data Center Due Diligence List

Town of Surf City Community Development. General Permit Information

2014 Limited Plan Submittal Checklist

TOWN OF DAVIE BUSINESS TAX RECEIPT 6591 ORANGE DRIVE DAVIE, FLORIDA PHONE: FAX:

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

Building Permit, Fire Inspection and Operating Permit Fee Schedule

BUILDING PERMITS. Santa Rosa County Building Inspection

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

How To Build A Basement House

Commercial Business Licensing Requirements

City of Riverside Building & Safety Division Phone: (951)


CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

WHEN IS A PERMIT REQUIRED?

ATTENTION BUILDERS, CONTRACTORS AND DEVELOPERS

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

Bold items are particular to the City of Euless

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

A&E PRACTICE BUSINESS OFFICE PACKAGE APPLICATION

Minor Accommodation Planning Review Application

BUILDING SAFETY UNIT

Schedule B to By-law

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

PRE APPLICATION CONFERENCE - INTRODUCTION

HATFIELD TOWNSHIP. FLAMMABLE and COMBUSTIBLE LIQUIDS PERMIT APPLICATION PROCEDURES

PLAN REVIEW GUIDE FOR FIRE ALARM

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

Flammable Storage in a Biotech Facility

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

HERNANDO COUNTY FIRE ALARM GUIDELINES

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Building Code Inspections and Fees

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

BUILDING MOVE PROCESS INSIDE CITY LIMITS

Overview of Hotel Fire Safety Requirements

Building Information Packet

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

MEANS OF EXIT / ESCAPE / EGRESS SELF INSPECTION CHECKLIST

Transcription:

Shell Buildings -Tenant Improvements Bulletin # 26 Department of Planning and Land Services, June 2015 Division of Building Safety and Inspection for 2012 I Codes What is a Shell Building? Many buildings are constructed without specific tenants or their improvements. These are shell buildings. The International Building Code (IBC) classifies all buildings by type of occupancy or use. There are many classifications, but they all fall into ten general categories: A - Assembly, B - Business, E - Educational, F - Factory and Industrial, H - Hazardous, I - Institutional, M - Mercantile, R - Residential, S - Storage, U - Utility. A shell building is a structure with empty spaces that have not yet been classified with a defined use due to a lack of tenant. This condition will remain until a future tenant proposes a use to the building department. At that point that shell space will be reviewed as to the proposed use and if approved will now have a use and an occupant. Shell buildings may be divided up to have one tenant or several tenants. Prospective tenants are generally similar in nature. Shell buildings are typically retail stores, office or a mixture of light to heavy industrial. Separate Tenant Improvement Permits are required for each tenant. What is a Tenant Improvement? A Tenant Improvement Permit is needed for the creation of a new tenant, space, or the remodel/alteration of a space within an existing building or for the change of use in a previously occupied space. Plans are submitted and reviewed for applicable code requirements, a permit is then issued to do the work shown on the plans, and when the work has been completed and inspected a Certificate of Occupancy is issued for the tenant. Shell Buildings/Tenant Improvements - Page 1 of 8

What is a Certificate of Completion? Since there is no tenant, a Certificate of Occupancy may not be issued when the work on the shell is complete. Instead a Certificate of Completion will stand-in for the Certificate of Occupancy until the space has been filled. A Certificate of Completion is issued upon inspection approval of all required work related to the shell permit. The contractor often needs documentation for the owner or lending agency to satisfy contract or loan requirements. The Certification of Completion provides that documentation. What Is A Certificate Of Occupancy, And When Is One Required? A Certificate of Occupancy is issued indicating that a building or individual tenant space has been inspected by the Building Official and no code violations have been found. For new commercial or industrial construction, a separate Certificate of Occupancy or Certificate of Completion is issued after the building passes final inspection and is in compliance with all other agencies. In multiple tenant buildings, a Certificate of Occupancy is required for each tenant space with the exception of R-1 (apartment) occupancies. Modification of a Shell Building In order to change an element of the shell building that may not be related to any specific tenant, a building permit (BPCO) is required. Examples of this are a new fascia, structural changes to the building, redesign of a stair system. This type of permit does not result in a Certificate of Occupancy or grant approval for a new tenant. Are Separate Permits Required for Each Tenant? Yes. Each tenant that moves into or within a shell building is required to obtain a permit in order to issue a Certificate of Occupancy for the tenant. This is true even if no construction work is required for the tenant to begin business. Since the shell was set up without specific tenant information, many code requirements were not reviewed. Now that specific tenant information is available, the occupant load can be established and exits can be identified. Occupancy group and division can also be established and building construction type can be confirmed. Change of Use and Building Additions If you are changing the "use" of a building or tenant space, or adding onto a building, there are requirements that go beyond the scope of this bulletin. For example, changing the "use" from office to mercantile may require changes to the building construction, number of exits and accessibility features. Shell Buildings/Tenant Improvements - Page 2 of 8

Permit Process The permit process when constructing a new shell building is essentially the same for any new building. The variable is not having the exact tenant information. The plan review process assumes a general type of tenant, based on the applicant's information. The shell building installs the common elements like the building sewer, while the tenant might install the plumbing fixtures. There are many variations to who is responsible for portions of the work therefore, it is important to develop what we call a shell-building file. Shell Building File The shell-building file is a record of how the building was plan reviewed. Most important the file lays out what was included in the shell construction and what each tenant is responsible for. For example, the tenant may be responsible for the heating or mechanical design that must match up with a specific insulation level of the building envelope. Or, the tenant may also be responsible for the insulation. The shell-building file establishes all the variables so tenant plans may be easily and quickly reviewed. The owner or applicant constructing the building shell is required to develop a tenant improvement specification sheet. This will be the primary plan review aid when reviewing tenant improvement plans. It is also a valuable tool for prospective tenants. Submittal Requirements for Building Permits (BPCO) A meeting with a Plans Examiner is required before making an application. Call 253-798-7218 to schedule. You must also make an appointment with our Development Center to make the application. Call Donna Zierow 253-798-3291 to schedule. When you apply, you will need a copy of the contractor s current registration. The plan review fee is due at time of application and the remainder when the permit is issued. If you are applying for a BPCO for a Shell Modification, or if your tenant improvement application includes structural work, the plans should reflect sufficient structural details for the proposed work. Required Documents: 1. Two (2) copies (on 8 1/2 x 11-inch paper) of the complete legal description of the property, consistent with the site plan. 2. Two sets of plans are required. One hard paper copy and one electronic copy. The sets of plans should consist of: Shell Buildings/Tenant Improvements - Page 3 of 8

Cover sheet including: * A clear statement describing the scope of the work to be done, including a code analysis * Building construction and occupancy types * The tenant s name and mailing address * The agent or contact person s name, mailing address and phone number * The type of business and proposed business name * Parcel number * The permit or application number for any permits related to the tenant space or shell (if known) * Any information about the building (e.g. sprinklered, alarmed, fixed systems monitored, etc.) * The square footage of the tenant space * Method of heating (electrical vs. gas, etc.) Architectural plans. Construction drawings should be drawn to scale and include the following: * The scales used * North Arrow * Existing space and what is proposed * Floor plans including entrances, exits, windows, partitions, fixed equipment, fixtures * Uses of all areas labeled (also include the use of adjacent tenant spaces) * Room and door finish schedules * Details and/or cross sections of walls and ceilings * Demonstrate barrier-free accessibility to and within the tenant space * Specify if any storage in excess of 12 feet in height is to be used * Identify any flammable, combustible liquids use, storage and hazardous materials or processes * Demonstrate compliance with current Washington State Energy Code (or Northwest Energy Code until July 1, 1991), where any changes are being made to the thermal envelope of the building. Site Plan. See sample drawing, site plan should match the legal description and include the following: * Location of all property boundary lines, buildings, parking and driveways fully dimensioned. * North directional arrow. * Show fire access lanes. * Show location of fire hydrants. * Identify Accessibility route of travel and handicapped parking areas. * Identify location of solid waste and recycle collection area. (WAC 51-50-009) * Indication of where the tenant space is that is covered by this permit. Other Permits May Be Required: Shell Buildings/Tenant Improvements - Page 4 of 8

Mechanical Permit: Energy and ventilation code compliance information shall be included in the mechanical permit information submittal. Type I Hood and Suppression Permits: Separate permits are required for the Type 1 Hood and Fire Suppression System. (these are frequently installed in food service uses) Fire Alarm System Permit: Installation of and revising fire sprinkler systems require separate permits. Sprinkler System Permit: Installation of and revising fire sprinkler systems require separate permits. Plumbing Permit: Plumbing riser diagrams and fixture count tables are required for all food service tenants and tenants with banks of fixtures. Tenants with plumbing serving only a restroom group (two) need not provide a riser diagram. When we issue a shell-building permit, we should always issue the under-slab plumbing permit. Our current fee table provides for this under items 8 and 9. The fee should be $64 and provides for the installation and inspection tracking. This permit is in addition to the plumbing permit(s) issued for any tenant(s). Plumbing Pretreatment: Review by Pierce County Utilities may be required if the building is on sewer. Sign Permit: Sign permits are separate permits and must be specifically applied for. Awning Permit: Awnings are sometimes considered signs and require separate permits. Call Zoning information at 253-798-3739. Elevator Permit: Permits are obtained from Washington State Department of Labor and Industries Electrical Permit: Washington State Department of Labor and Industries or Tacoma City Light issues the electrical permits depending on where your project is located. Other Considerations: If you are a new tenant check to see if the use you are proposing is allowed in the land use zone where you want to locate. Call Zoning information at 253-798-3739. Tacoma Pierce County Health Department If any food service/preparation or sales is involved check with the Tacoma-Pierce County Health Department for their requirements at 253-798-3740. Changes or modifications to the plumbing system for buildings served by On-Site Sewage (Septic) System require Health Department permit and review. Shell Buildings/Tenant Improvements - Page 5 of 8

Shell Buildings/Tenant Improvements - Page 6 of 8

Shell Buildings/Tenant Improvements - Page 7 of 8

Shell Buildings/Tenant Improvements - Page 8 of 8