INSTALLATION INSTRUCTION

Similar documents
How to Install Hardwood Flooring Over a Sub Floor

Installation for Wood Flooring

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Herringbone Pattern Flooring

Euro Oak Installation

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Installation instructions for all Egger floors with the glueless system JUST clic!

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

DIY CABINET REFACING INSTALLATION GUIDE

How To Level A Subfloor

ENGLISH Installation guidelines for 10mm Engineered LOC flooring

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING

How to build a Pizza Oven in 4 days

Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1

INSTALLATION INSTRUCTIONS

Cedar Cottage Doghouse Plans

Solid Wood Worktops Installation and Aftercare Instructions

Care and Maintenance for Wood Flooring

How To Install Hardwood Flooring

10 Year Guarantee. 15 Year Guarantee LAMINATE FLOORING

Shower Walls and Tub Surrounds


INSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation

Guide Specifications for Maple Flooring Systems

Choosing the Right Floor Protectors

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

SHELVES.

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version

Building an Off-Center Fixture for Turning Pendants

Installation Instructions

Beautifully Traditional

PANELIZED HOME INSTALLATION GUIDELINE

ENGINEERED FLOORING INSTALLATION

Best Barns USA Assembly Book

39HQ Airovision Air Handling Units

INSTALLATION THE SIMPLIFIED VERSION

Installing Window and Door Mouldings

Air Conditioner Duct Construction & Repair

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

Active and Passive Sash Replacement

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Mezzanine. Technical manual

Installation guide. ENGINEERED and LOC. 1/2 in and 3/4 in (13 mm and 19 mm) INNOVATION TRADITION PERFECTION

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

DTU Animal Cart Programme

Composite Stone Veneer

The JIG is UP Or A couple hours up front pays in the long run.

Combination Unit 5'6" Windows a i o P t

FRAMED & MOUNTED TILE MURAL

FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS

Armstrong Do-It-Yourself Tile Installation System

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Installation Instructions for Fletco Carpets

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

INSTALLATION INSTRUCTION

Hardwood Flooring. Urbania Flooring

Installing Laminate Floor and Carpet Mike Teets July 2003

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

BUILD A TABLETOP LOOM

Installation Guide ¾ Prefinished solid hardwood

Window Installation Instructions

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

SolidfloorTM. - Installation instructions - Maintenance instructions - Heating and cooling - Guarantee provisions.


The Solid Wood Flooring Company Unit 1 Helena Court, Hampton Street, Tetbury, Gloucestershire GL8 8JN

Premier & Deluxe 3-Season Room Sliding Glass Door

Raised Panel Doors Made Simple With Freud s 2+2 Raised Panel Bit Set

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Speed-Mat Rectangle Cutter

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

DASH KIT INSTALLATION

WINDOW REPAIR MANUAL & REFERENCE GUIDE

ATLANTA 90CM HIGH BEDSTEAD

Written By: Walter Galan

SCHWARTZ WATER-BASE WOOD FLOOR SEALER AND WATER-BASE PREMIIUM WOOD FLOOR FINISH

TopSky DLG Installation Manual

All-Season Sunroom Sliding Glass Door Installation Instructions

Engineered Hardwood Flooring Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions

12.1 Schlüter -KERDI-BOARD

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

REPAIR GUIDE. 940 Centre Circle, Suite 1000 Altamonte Springs, Florida, Tel: Fax:

FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Tools and Glue. Required Materials

Gate Leg Drop Leaf Table Plans

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

How to Install UnderDeck The Original.

Go-kart for little race-drivers

Engineered Installation Instructions

Wooden floors over underfloor heating

Basic Spring Motor Roller Shades

Transcription:

INSTALLATION INSTRUCTION BJOORN PARQUET STRIP, HERRINGBONE PATTERN, WITHOUT FRIEZE ANGLE/SNAP LOCKING SYSTEM PRODUCT INFORMATION A European parquet strip with a core of high-end plywood approx. 2.7 mm wear layer, pre sanded to 120 grains. Strips A & B. Strip size L = 340 mm, W = 68 mm, T = 12 mm. 1 box contains 24 strips = 0, 554 m 2. Sorting: Select or Rustic. Surface finish: Untreated or oiled. The product is available in two types, A-Strip, B-Strip, which is marked on the reverse side of the strip. Both the A- and the B-strip are required for installation of the HERRINGBONE pattern. IMPORTANT When purchasing this flooring add always approx. 10-15% margin/overflow for processing and materials customization. Read through the entire installation instructions carefully before you begin to install the floor. Keep all flooring packages unopened at least 48 hours at room temperature before work start. Stacking packages airy. Then open the packages as the floor is laid. The room temperature must be at least 18 C before and during the orientation, the relative air humidity in the room should be 30-60%. TOOLS Important to be careful so as not to grease stains and dirt get stuck on the strips during the installation. Therefore, use rubber gloves or similar. The protective paper, without a polymer layer, is placed over the surface of the floor during the installation. Protect the floor prior to surface treating. Use clean shoes, with a bright sole. Distance strips (see drawing), spacers, see table for gap distance. Table saw or jig saw. Fine pencil (0,5 mm), ruler, set square. White glue(d3) for adjustment at radiator tubes. Bjoorn taping block (T). Special pull bar (for snapping first/last column along side walls). A screwdriver and a protective disc: (To take up a snapped strip). Special pull bar tool *Recommended gap distance table Longest distance (m) Gap (mm) Skirting thickness (mm) < 4m 6 12 4-7m 10 16 > 7-10 15 22 2015.03.17. Replaces all previous versions. Page 1/10

FLOOR SIZE AT DOMESTIC OR PUBLIC APPLICATION AREAS In a domestic environment and normally furnished symmetrical floor areas / rooms, areas larger than 10x10 m (maximum 100 m2) or between adjacent rooms, in L-rooms, transition to corridors etc you should use expansion joints to prevent joint openings. This is done by splitting the floor of the sections depending on the orientation pattern and direction. Consult Bjoorn.se In public environment floors, for example in offices, shops, exhibitions, etc. with heavier custom furnishings for example.counters, islands, vast product interiors, bookcases, safes, etc. must be divided into smaller sections, separated by expansion strips as heavy furnishings on the floor forming the so called fixed points (i.e., the floor area permitted not to adapt to the current climate in the room). Consult Bjoorn.se PREPARATION Remove the old skirting boards. The floor should be floating installed, i.e. the strips should not be glued or nailed down to the construction sub floor or installed against solid structures/objects. Leave an expansion gap between the floor and all fixed structural elements such as walls, thresholds, pillars or pipes in the room. See table above gap distance*. Measure out the room and calculate the number of columns required, usually longitudinally or in main light direction. See section STARTING TRIANGLES below. THE SUBFLOOR, THE LOAD-BEARING SURFACE Bjoorn Parquet Strip can be installed on almost any type of subfloor such as wooden floors, PVC or cement concrete floors. Wall-to-wall carpets, for example needle felt carpets needs to be removed. Ensure that the subfloor is leveled, flat (± 1 mm over 2 m), dry and clean Subfloor of wood up to 50% RH or about 8-10% moisture content at 20 C. Subfloors of concrete and concrete slab on ground max 90% RH at 20 C. NOTE! Age resistant PE film, 0.20 mm, is required. RH-Moisture tests according to the swedish RBK-method, www.rbk.nu Elevated areas such as wood, concrete edges, tops must be sanded down or evened up. Screw loose areas that squeaks and replace damaged parties that is loose or damaged by humidity. UNDERLAY Install an underlay material as a noise reduction/aliasing, it shall be slight compressible and with a maximum thickness of 2 mm. Foam (density > 30 kg/m3), 2 mm Cork Underlay, Excel are suitable materials. If floor paper is used, the substrate must be quite flat. All types of concrete sub floor and ceramics also require moisture protection, even if damp insulation is in the floor construction. Moisture insulation (vapor barrier) shall be at least 0.20 mm thick, age resistant PE--film (LDPE). The film/foil should be at least 20 cm overlap between the joints, taped, folded up against the walls and will be cut after floor skirting are installed. 2015.03.17. Replaces all previous versions. Page 2/10

UNDERFLOOR HEATING At all In-floor heating floor systems, a vapor barrier (a PE-foil 0.2 mm) must be placed between floor heating system and the underlay material at any type of subfloor. All underfloor heating must be turned off during installation and during the floor s temperature must be between 15 C and 25 C. Occurring non heated floor areas within the floor area must be separated with expansion joints (profiles). Max permissible heat output is approx. 75 W/m2. Maximum allowed surface temperature on the floor is 27 C. This is true even under carpets and other overlays that can act as thermal insulation and increase the floor temperature over the allowed maximum surface temperature. Temperature control after installation or if the heating system has been switched off for a longer period of time The first week should have low temperature heating system 16-20 C. The second week, the heating system must be adjusted as described above. Further information about floor heating in buildings please go to https://www.golvbranschen.se/publikationer/ branschregler-och-standarder, file: Wooden floors over underfloor heating 1-2005. ROOM CLIMATE Ambient climate for wood floors should be 30-60% relative humidity (RH) at 20 C. At low RH, fine cracks can occur in the joints between the strips, which are best remedied by an indoor air conditioner for temperature and vapor, especially during winter time. Ventilation: If out-and-in air conditioning system in the property, moisture must be added to the air. INSTALLATION HERRINGBONE A-and B-strips Two different types of strips, A & B, are used for installing the herringbone pattern. A respectively B-type is marked on the back of the strip profile. How to identify? Place both strips with decorative surface upwards and the long side locking profile facing you. The A-strip is characterized by the short side locking profile is to the right and for the B-strip to the left. STARTING TRIANGLES To quickly get started, the first starting triangles must be produced. Calculation - number of starting triangles. Measure the length of the wall where you wish to start = (L) mm Select offset from wall. See table on page 1 the wall distance*. A starting triangle has the size, as shown in figure. Calculate the number of whole triangles (L 2 x 10)/481. Please carefully note the dash-dotted center-line s location! EXEMPLE Preconditions: Finished flooring width: Number of triangles: Room width 4000 mm. Selected gap 10 mm. 4000-2x10 mm = 3980 mm. 3980/481 = 8,27 pcs i.e. 8 pcs. B A 2015.03.17. Replaces all previous versions. Page 3/10

PRODUCTION STARTING TRIANGLES A starting triangle is made up of 6 strips (3A + 3B) according to the diagrams below. Combination of a A and a B strip is shown in the figure below: i.e. Press A at an angle in the groove of B and fold down, tapping it slightly with a hand tapping block on A. Is a strip difficult to get in place, take it up and make sure the groove is free of residue or others. IMPORTANT: The construction of a starting triangle is shown in figures below where the gray ruler (for example a strip)define the straight line Hint: Check the joint between the strips by dragging a finger across the joint no bump (protruding edge) may be felt! fk = tongue shortside able to snap into grooves. fl = tongue longside NOT able to snap. B When all 6 strips are connected to a sheet, cut the triangle as shown below. Starting triangle 2015.03.17. Replaces all previous versions. Page 4/10

INSTALLATION METHOD The example below shows the installation method. Room width is approximately 2.2 m. Installed triangles: 4 x481 mm + 48 mm = 1972 mm. Triangle installation 1. 2. Make sure the starting wall is straight and 90 to the center line (C) of the floor. Hint: Mark the C-line on the underlay material. Merge the starting triangles ( hooked into each other) along the starting wall and center towards the center line. If the starting wall is not straight and perpendicular to the center line (C) of the room the triangles must be adjusted. Straight panels can be laid out to ensure alignment. Adjustment of starting triangles Move the connected triangles row out from the wall, draw a line on the strips with e.g. a drawing tool (piece of wood with the pencil) as shown in figure. Cut with a circular saw + guide rail (protect the substrates with a thin board!), or disassemble the triangles (in the reverse installation order) and cut each. 3. After reinstallation check the corner line with a straight edge. Progressively make this control throughout the installation,( i.e. every fifth row). 4. Replace the straight panel with distance strips and push the floor to the wall. It is important that the distance strips remain throughout the installation, as the installation method entails small taps on parquet strips short sides, which can offset the installed floor see below. 2015.03.17. Replaces all previous versions. Page 5/10

Strip installation 5. 1. The first B-strips row, installed to the left, connect the starting triangles. 2. Place the B-long side tongue in the groove of the strip in front of it, and fold down, so the short side tongue at * just touch the former triangle (to the right). Position with tapping block. 3. The B-strip is then connected by tapping it into the groove at *by tapping on the free short side as shown. 4. Always check that the joints in the triangles are tight. 5. Place a distance strip along the wall to the left. Measure and cut the last two B-strips. Fold down in the corner. 2015.03.17. Replaces all previous versions. Page 6/10

6. 6. The installation direction reverses and A-strips are connected according to the same principle as the B-strips. 7. The last A-strips (column) along the right wall. Measure, cut and snap into the triangle using the special pull iron. Place a distance strip according to figure. Proceed in the same way, i.e. switch to install all B-strips over the entire width of the floor and then again A-strips. Check that each joint that closes tightly. Important: After about every 5 row make sure the strips corner row = red line H1-H2-H3-H4 are aligned and perpendicular to the center line C, which is marked on the substrate. 2015.03.17. Replaces all previous versions. Page 7/10

The gradually imposed distance bars remain throughout the facility, as the snapping method can move the floor. Last row Mät och kapa stavarna i den sista raden till rätt storlek. Vi rekommenderar användning av lim vid installation av de minsta stavbitarna. Applicera en mindre mängd lim på låslisten. Avlägsna distanslister/distanskilar och täck expansionsgapet med sockellister eller pärlstavar/kvartsstavar. 2015.03.17. Replaces all previous versions. Page 8/10

7. Disassemble an installed strip The picture shows taking up a snapped strip. Lift the parquet strip a bit and insert a protective disc (for example a thin, strong plastic sheet) under the parquet strip to protect the backing material and the floor. Insert vertically a slotted screwdriver (width 4-5 mm) into the joint between the A & B strips (see picture) by gently tapping on the screwdriver. The parquet strip snaps out and you can easily unlock it by tilting it up. The strip is undamaged and can then be installed. Instruction film: https://www.youtube.com/watch?v=xtlfjrjxraq HINT! When angling not possible. Remove the locking element /hook according to picture. Place white glue in the groove and install next strip. Press- place distance wedges between the glued strip and the wall. 2015.03.17. Replaces all previous versions. Page 9/10

HINT! Installation at radiator tubes Mark the center point of the tubes on the strip. Drill holes 20 mm bigger than the tube diameter. Cut according to the figure. Put white glue and replace. Cover the holes or fill with joint sealer type SMP/ MS (silicon free and paintable). Finally Remove the distance strips. SURFACE TREATMENT Treat the floor immediately according to Bjoorn information. Have you chosen a factory oiled product, the floor must be oiled after installation and then regular be maintenance oiled. We recommend Bjoorn Hardwax Oil Adam or Bjoorn Hardwood floor Oil Bertil and for maintenance Bjoorn Maintenance Oil David. If not possible cover for a short term (days) with flooring paper (without plastic film). SKIRTINGS Mount skirting boards along the walls. Never attach the skirting to the floor nor press them down. CLEANING AND USAGE After surface treatment clean the floor regularly with a hoover or mop dry Maintain the floor according to the instructions for surface treatment material. We recommend products from the Bjoorns floor care program for maintenance and cleaning. Felt pads are recommended under furniture, protective mats under chairs with hard wheels. Always use good entrance mats. CRAFTSMAN NEEDED If required, please contact BJOORN for flooring installation or finishing. We cooperate with Bjoorn authorized craftsmen and offer several different craft services. MISCELLANEOUS If you have any questions or advice for choosing surface treatment, contact Bjoorn.se via the website www. bjoorn.se or email sales@bjoorn.com or telephone 020 51 50 10. Accessories are available for purchase at www.bjoorn.se 2015.03.17. Replaces all previous versions. Page 10/10 The manufacturer reserves the right to change specifications in the instructions without notice.