Installation BUILDING REGULATIONS

Similar documents
Passive Fire Protection

Fire Collars For Plastic Pipe Penetration

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES

Composite Panel Firewall Systems

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Mold Preventing I nterior System

Tremco Fire Protection Systems Group Technical Bulletin

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

plumbing products guide

TPM 006/99 Revision 1 VALID FROM: 8/2/2013 REPLACEMENT FOR TPM 006/99 FIRE SHUTTER

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

PRODUCTBLADEN GT ROCKPANEL STRUCTURE

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

Fire-resistance test on fire collars protecting a concrete slab penetrated by services

Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork

Rockwool Flexi Insulation Application Guide

Multi-layer Insulation Blanket for Roofs

Report Number BTC 17755F

Puddle Flange. FRANK Puddle Flange

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

Pipe Clamps and Accessories

12.1 Schlüter -KERDI-BOARD

Understanding BS EN 771-3: Aggregate concrete masonry units

Guide to working on Public Sewers

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Window Installation Instructions

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

WATERPROOFING OF WET ROOMS

FIRE RATED GLAZING System Guide

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

European Organisation for Technical Approvals

Introduction to cable fire stopping

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

Saferand easierinstallation

CERTIFICATE OF APPROVAL No CF 291 SCHOTT UK LIMITED

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Fire Barriers & Fire Stopping

Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment

Formwork Direct International Ltd Phone No +44 (0151) Fax no +44 (0151)

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Fire Stopping and Sealing Product: Penetration Seals

Module 3.7. Thermal bridging

Cannon T4 Modular Data Centres. For Outside Deployment & Challenging Environments

Guidelines for Earthquake Bracing of Residential Water Heaters

VeMet, Utrecht, NL «Solution in Wear Protection» Dipl.-Ing. Wolfgang Leichnitz. Quit

Cable Trays Technical Instructions & Specifications

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

sound reduction systems for commercial, educational and industrial environments

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Concrete Waterproofing Systems. Integral Protection.

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

How to build a Pizza Oven in 4 days

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

RIW SHEETSEAL 226 BENEFITS APPLICATIONS APPLIED TO. CI/SfB TN6 L6813. November l Water and water vapour barrier. l Factory controlled thickness

Complete System Shelter

GENERAL SHIELDING REQUIREMENTS FOR DIAGNOSTIC X-RAY FACILITIES. Major Medical (Radio/Fluoro/CT/Cardiac/Chiropractic)

Fire Barrier Systems. For inhibiting the spread of fire and smoke in concealed spaces

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Manual lifting and handling

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Technical Data Sheet W13. Edition Knauf Fire Walls

FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

GYPSUM AREA SEPARATION FIREWALLS GA

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Fire Resistance of Brick Masonry

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

TECHNICAL SPECIFICATION

Edition: Export Published: 09/2010. Product catalogue. Technical and industrial insulation. Lapinus

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

FIRESTOPPING & SMOKE SEALS

Removable Aluminium posts

OLDROYD. Interior Walls. Interior Walls. below and above ground. below and above ground

ACO Building Services

Energy Company Obligation (ECO): Technical Monitoring Questions

Excerpts from the Canadian National Building Code (NBC)

Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning.

Section Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Grilles & Diffusers Series LFP Incorporating

STENCA PIPE. High quality pipe insulation.

Colonnade Security Pipe

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

Tunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Transcription:

The OPAL plastic pipe collar is a powder coated mild steel or stainless steel casing containing OPAL graphite intumescent layers for Polypropylene, Polyethylene and ABS plastic pipes. OPAL intumescent is also suitable for upvc pressure and non-pressure pipes. These layers expand at approximately 150 o C to crush the softening plastic pipe and thereby close the penetrations through fire rated walls and floors. The OPAL fire collars can be surface mounted and they can be cast in when fixing space is not available. Fixing is with non-combustible metal screws, anchor or cavity fixings. The OPAL fire collar is fully tested for upvc, Polypropylene, Polyethylene and ABS plastic pipes for both wall and floor penetrations. and floors, OPAL fire collars have been tested at Warrington Fire Research Centre and Building Research Establishment Ltd. (BRE) to BS476 Part 20 1987 and Station d essais CTICM 98-E-275 for wall collars and 98-H-276 for floor collars. OPAL fire collars meet both integrity and insulation requirements to this standard for both two and four hours, when surface mounted and cast in a concrete floor or in a masonry or blockwork wall. Surface mounted to wall Surface mounted to floor The OPAL fire collar can be used through plasterboard, concrete, blockwork and brickwork constructions. The OPAL fire collar has achieved performance from 2 to 4 hours in tests to relevant British standards at approved laboratories. OPAL fire collars are available in all pipe sizes up to 315mm dia. (Remark: Size not mention may be Specially offered by the Manufacturer.) BUILDING REGULATIONS Installation OPAL fire collars must be fitted on each side of a wall where both sides are at risk from fire. Penetrations through floors require an OPAL fire collar fitted to the underside only of each penetration. Non-flammable screws, anchor or cavity fixings must be used to secure OPAL fire collars to walls and floors. To satisfy building regulation requirements on all penetrating fire rated compartment walls

Surface Mounted Type Full Cast In Type Surface Mounted Type Surface Mounted Type Availability of Fire Collars upvc Polyprop Polyeth ABS Nominal BS 5255 BS 4514 BS 3505 (JIS K6741/2) Surface Cast In 2 hr 2 hr 2 hr Dia. 2 hr 4 hr 2 hr 4 hr 2 hr 4 hr 15 mm * * 20 mm * * 25 mm * * 30 mm * * * * * 32 mm * * * * 40 mm * * * * * * * * * 50 mm * * * * 55 mm * * * * * 63 mm * * * * * 65 mm * * 75 mm * * * * * 80 mm * * * * 82 mm * * * * * 90 mm * * * * * 100 mm * * * * 110 mm * * * * * 125 mm * * * * * * * 140 mm * * * * * 150 mm * * * * 160 mm * * * * * * * 175 mm * * 200 mm * * 225 mm * * 300 mm * *

2 Hours Fire Collars Height Fixing Lug Details for fixing upvc Pipes to BS5255/BS4514 Nominal Actual Minimum Total Collar Total Available Recommended Diameter Outside Number of Thickness of Height Number of Min. No. Min. Sizing of of Pipe Diameter Intumescent Intumescent (2 Hours) Fixing Lugs of Fixing Mild Steel Anchor of Pipe Layer Lugs for Mounting (2 Hours) 32 36.5 2 4 60 2 2 M3 x 25mm 40 43 2 4 60 2 2 M3 x 25mm *50 56 3 6 45 3 2 M5 x 25mm *80 83 5 10 45 3 2 M5 x 25mm *100 110 5 10 45 4 2 M5 x 25mm *150 160 8 16 45 6 4 M5 x 25mm Remark: All Dimension in (mm) * 60mm Collar Height is available upon request. Details for fixing upvc Pipes to BS3505 Nominal Actual Minimum Total Collar Total Available Recommended Diameter Outside Number of Thickness of Height Number of Min. No. Min. Sizing of of Pipe Diameter Intumescent Intumescent (2 Hours) Fixing Lugs of Fixing Mild Steel Anchor of Pipe Layer Lugs for Mounting (2 Hours) 20 26.8 2 4 60 2 2 M3 x 25mm 25 33.6 2 4 60 2 2 M3 x 25mm 32 42.3 3 6 60 2 2 M3 x 25mm 40 48.3 3 6 60 2 2 M3 x 25mm 50 60.3 3 6 60 3 2 M5 x 25mm 65 75.3 4 8 60 3 2 M5 x 25mm 80 88.9 4 8 60 3 2 M5 x 25mm 100 114.3 4 8 60 4 2 M5 x 25mm 150 160.25 6 15 60 6 4 M5 x 25mm Remark: All Dimension in (mm)

2 Hours Opal Stainless Steel Fire Collar Height Fixing Lug Details for fixing upvc Pipes to BS5255/BS4514 Nominal Actual Minimum Total Collar Total Available Recommended Diameter Outside Number of Thickness of Height Number of Min. No. Min. Sizing of of Pipe Diameter Intumescent Intumescent (2 Hours) Fixing Lugs of Fixing Mild Steel Anchor of Pipe Layer Lugs for Mounting (2 Hours) 32 36.5 2 4 60 2 2 M3 x 25mm 40 43 2 4 60 2 2 M3 x 25mm *50 56 3 6 45 3 2 M5 x 25mm *80 83 5 10 45 3 2 M5 x 25mm *100 110 5 10 45 4 2 M5 x 25mm *150 160 8 16 45 6 4 M5 x 25mm Remark: All Dimension in (mm) * 60mm Collar Height is available upon request. Details for fixing upvc Pipes to BS3505 Nominal Actual Minimum Total Collar Total Available Recommended Diameter Outside Number of Thickness of Height Number of Min. No. Min. Sizing of of Pipe Diameter Intumescent Intumescent (2 Hours) Fixing Lugs of Fixing Mild Steel Anchor of Pipe Layer Lugs for Mounting (2 Hours) 20 26.8 2 4 60 2 2 M3 x 25mm 25 33.6 2 4 60 2 2 M3 x 25mm 32 42.3 3 6 60 2 2 M3 x 25mm 40 48.3 3 6 60 2 2 M3 x 25mm 50 60.3 3 6 60 3 2 M5 x 25mm 65 75.3 4 8 60 3 2 M5 x 25mm 80 88.9 4 8 60 3 2 M5 x 25mm 100 114.3 4 8 60 4 2 M5 x 25mm 150 160.25 6 15 60 6 4 M5 x 25mm Remark: All Dimension in (mm)

2 Hours Pipe Wraps Height Intumescent Length Details for fixing upvc Pipes to BS5255/BS4514 Nominal Actual Number of Total Height of Minimum Diameter Outside Intumescent Thickness of Intumescent Length of of Pipe Diameter Layer Intumescent (2 Hours) Intumescent of Pipe (2 Hours) 32 36.5 3 6 60 122 40 43 3 6 60 142 50 56 3 6 60 184 80 83 4 8 60 268 100 110 4 8 60 354 150 160 6 12 60 520 Remark: All Dimension in (mm) Details for fixing upvc Pipes to BS3505 Nominal Actual Number of Total Height of Minimum Diameter Outside Intumescent Thickness of Intumescent Length of of Pipe Diameter Layer Intumescent (2 Hours) Intumescent of Pipe (2 Hours) 20 26.8 2 4 60 90 25 33.6 2 4 60 112 32 42.3 3 6 60 140 40 48.3 3 6 60 160 50 60.3 3 6 60 194 65 75.3 4 8 60 246 80 88.9 4 8 60 288 100 114.3 4 8 60 372 150 160.25 6 12 60 520 Remark: All Dimension in (mm) Note: The plastic bag with self adhesive tape is our original design for ease of installation. It can be removed away subject to project requirement. But our above required number of intumescent layers must be strictly followed and used to ensure the fire resistance performance.

INTUMESCENT TECHNICAL DATA COLOUR CONSISTANCY DENSITY WEIGHT FIRE PERFORMANCE EXPANSION TEMPERATURE EXPANSION RATE EXPANSION PRESSURE THORN FLEXIBILITY RESISTANCE TO UV RADIATION HEAT CONDUCTIVITY HUMIDITY CHARACTERISTICS ANTHRACITE GREY SOLID, FLEXIBLE 1 +/- 0.2 g/cm 2.5 mm THICKNESS: 2.5 +/- 0.3kg/M CLASSIFICATION B1 (DIN 4102) START AT APPROX. 150 C MINIMUM 7:1 (15 min./300 C) MINIMUM 0.6N/mm MINI. 7:1 (15 min./300 C) 3 EXCELLENT 1.2 W/mK (UNEXPANDED) INSOLUBLE IN WATER 2 O O O 2 BUN KEE (INTERNATIONAL) LIMITED OFF. ADD. :12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE,TSIM SHA TSUI, KOWLOON, HONG KONG. TEL. : (852) 2728 7237 (16 LINES) FAX: (852) 2387 2999 SHOP : 1) G/F., 618 SHANGHAI STREET, KOWLOON. 2) G/F., 30 HOP YICK ROAD, YUEN LONG. 3) SHOP A, G/F., 7-11 TAI WONG ST., EAST, WAN CHAI. GODOWN : LOT 3719 IN DD 104, YUEN LONG, N.T. E-MAIL : sales@bunkeeintl.com.hk

Installation Manual For OPAL Fire Collars METAL PIPE SLEEVE SEALANT STEP 1. BACK FILL THE GAP WITH MASTIC / MORTAR OR MINERAL WOOL BETWEEN upvc PIPE AND METAL PIPE SLEEVE. ADD SEALANT / JOINT FILLER FOR FINISHING STEP 2. STICK THE FIRE COLLAR TO THE CEILING OR WALL AND TEMPORARY LOCK IT ON THE PIPE STEP 3. MARK AND DRILL THE HOLES ON CEILING OR WALL MATCHING WITH FIXING LUGS ACCORDINGLY STEP 4. LOCK THE FIRE COLLAR AND FASTEN

Installation Manual For OPAL Pipe Wraps METAL PIPE SLEEVE STEP 1. CLEAN UP THE UPVC PIPE AND STICK THE PIPE WRAP AROUND THE PIPE STEP 2. GLIDE THE PIPE WRAP INTO THE OPENING OF CEILING / FLOOR SLAB OR WALL SEALANT STEP 3. BACK FILL THE OPENING WITH THE MASTIC / MORTAR OR MINERAL WOOL POINTING SURROUND THE UPVC PIPE STEP 4. CLEAN UP THE UPVC PIPE AND ADD SEALANT / JOINT FILLER FOR FINISHING