2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS



Similar documents
The Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

4.2 Option 1 Expand Existing Lagoon System

Aquatera 2015/16 Business Plan Highlights

City of Charlottetown Wastewater Treatment Expansion & Upgrading

Update on Aquifer Storage and Recovery

BRO: the Dutch Key Register of the Subsurface

NuGeneration Ltd Site Investigations

ARIZONA DEPARTMENT OF WATER RESOURCES

Hydrogeology Experiment on Surface-Groundwater Interactions: How Do Our Actions Affect Water Quantity and Quality?

4 Water supply description

Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation.

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

ources of Drinking Water

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

Water Security Agency. Plan for saskatchewan.ca

Getting to Know Your Watershed: Lewis Bay

action plan water for life water for life action plan 1

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems

Trevor Lloyd Director

Ground Water Surveys and Investigation

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

Newsletter #5: Groundwater In The National Water Balance

Groundwater Flooding: a UK Perspective

U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

(

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

How To Improve The Infrastructure Of The City Of Germany

LDPCSD Water Supply Emergency Response Plan Status Update

A Conceptual Software System for Water Allocation, Planning and Catchment Management

Construction Services

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Groundwater Training Course SOPAC, April Electromagnetic (EM) Induction method for Groundwater Investigations

UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

AQUIFER STORAGE RECOVERY

Recovery of full cost and pricing of water in the Water Framework Directive

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

Presentation from the 2013 World Water Week in Stockholm

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

Hashemite Kingdom of Jordan Ministry of Water and Irrigation. Water in Jordan: Water security and protection

Sustainable Groundwater Management for Tomorrow s Livelihoods

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

Foothill Municipal Water District Recycled Water Project

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT

Town of Mattawa Asset Management Plan. December 2013

Getting More Out of the Water We Have

How To Create A 3D Model Of The Phanerozoic Succession In Southern Manitoba

FINAL REPORT Increase of Water Supply Safety by Managed Aquifer Recharge along the North-South Carrier A pre-feasibility study

Basements and Deep Building Construction Policy 2014

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015

FREQUENTLY ASKED QUESTIONS

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S Växjö, Sweden

RE: Award of Request for Proposal PW-ES Engineering Services for Upgrades to the Dunnville Wastewater Treatment Plant

CHAPTER 8 ASSET MANAGEMENT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Draft Water Services Strategic Plan

WILLOCHRA BASIN GROUNDWATER STATUS REPORT

INVENTORY AND ANALYSIS

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Report prepared by: Kelly Hagan and Mark Anderson Grand River Conservation Authority 400 Clyde Road Cambridge ON N1R 5W6

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

Other Rev., 1.39% CIC, 9.82% Meter Sales, 1.45% Interest, 0.82% Connection Fees, 5.16% Penalty Charges, 2.35% OU User Fees, 3.48%

6 Chemicals from human settlements

Tools from the US EPA s Climate Ready Water Utilities Initiative (CRWU) EPA Region 3 Conference Extreme Weather Events: Adapt, Mitigate, and Survive

Kansas City s Overflow Control Program

Emerging Technologies in Wastewater Collection Systems

SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS

GOALS, OBJECTIVES AND POLICIES

of geological storage of CO 2 in

GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA. N$36.40 WINDHOEK - 19 December 2013 No. 5367

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE >

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Alberta Environment Standards for Advanced Waste Systems

Coxwell Sanitary Trunk Sewer Emergency Repair: By-pass Sewer Tunnel Construction Final Report

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission

Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation

DCU BULLETIN Division of Credit Unions Washington State Department of Financial Institutions Phone: (360) FAX: (360)

Development of National Geotechnical Management System Standards for Transportation Applications

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Transcription:

Council November 28, 2011 2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS ISSUE As a component of the Town s 2011 Major Projects budget, Council approved the Wellfield Expanded Hydro geological Study (Phases 1 and 2) and the Wastewater Treatment Plant Zero Effluent Impact & Future Treatment Analysis projects. Phase 1 of the Wellfield Expanded Hydrogeological Study is complete and representatives from Stantec and EPCOR will be in attendance to provide a summary of their findings. BACKGROUND Raw water supply wells: When new wells are developed, a series of boreholes are completed in a promising wellfield location and pump tests are conducted to determine the potential long term yield (pump rate) that can be expected at that location. If the yield shows an adequate and continuous supply can be achieved without interfering with other wells in the area, an application to complete the well is submitted to Alberta Environment for approval. After this process is completed and a licensed approval is granted with a specific pump rate, the well is completed by installing a well casing, screen, a pump sized to meet the approved rate of diversion, and pipeline to the water treatment facility. Over time and after years of production, wells will tend to lose their ability to pump at the original designed rates due to mineral deposits, deterioration of the screens and the gradual filling of voids around the well structure from silt events / flooding etc. Routine maintenance activities such as purging the well structure and the subsurface aquifer around the well every few years reduces the reduction in pumping capacity but like any subsurface infrastructure will eventually need to be replaced or upgraded. The maximum licensed pump rate remains with the original well license regardless of what the well is actually able to produce. In addition, the owner of a number of wells located on the same parcels of land can transfer allocations and pump rates to other wells that are capable of pumping the volume specified in the original license, providing that the overall allocation and pump rates listed on the total of the licenses is not exceeded. Such is the case with both of the Town of Okotoks well fields whereby supplemental wells have been installed to ensure the ability to pump the necessary water to supply the Town s water supply needs is maintained. These wells have a licensed pump rate attached but do not have a specific annual allocation of water approved. The allocation is transferred from other existing licensed wells that do not have sufficient pumping capacity left to divert the maximum water allowed and from new wells acquired through purchases and transfers. It is important to note that in order for the Town to receive approval for the transfer of a well license through a purchase or transfer process, the Town must first

ensure that the works (pumping capacity and pipelines) are in place to be able to divert the volume of water being transferred in accordance with the approved pump rate. Otherwise the transfer will not be approved. REPORT 1. Wellfield Expanded Hydrogeological Study Phase 1 - $80,000 - Complete Phase 2 - $200,000 - Planned completion in 2012 This project is intended to investigate future raw water sources and locations available to enhance the Town s existing well pumping capabilities and ensure that the pump rates aquired with the new well licence transfers that the Town is securing will be available to meet future water demands within the community. This project is divided into two phases. The first phase was designed to scope out the options for raw water supply expansion. The second phase is designed to pursue a detailed analysis of the preferred options identified in Phase 1 and develop an appropriate future expansion plan complete with cost estimates and timelines. Phase I: ($80,000) of this project was designed to scope out the potential feasible options available to increase the Town s wellfield water production capacity to ensure sufficient raw water production is in place to meet the Town s finite growth model needs. It included providing a desktop review of available reports and studies, discussions with local well drilling companies to garner any additional information, review of options available and the viability of these options as they relate to the Town of Okotoks needs. A summary of the list of options explored is as follows: Expand east well field (in any / either direction) Expand west well field; Develop a new well field Deep well (groundwater) source Direct intake from Sheep River (surface or infiltration) Raw water storage Upgrade raw water wells to collector wells (similar to well 6) Develop conceptual level designs for viable options and obtain approximate capital costs. Cost benefit analysis of alternatives Submission of a Phase 1 study report identifying short listed alternatives recommended for subsequent detailed study in Phase 2

Phase II: ($200,000) is planned to proceed immediately and will take most of 2012 to complete to capture accurate seasonal data and due to the nature of the work involved. The program involves further analysis of recommendations from Phase 1 including such activities as: Subsurface geophysical investigation of potential raw water sources identified by the report in Phase I within the existing well field. Subsurface geophysical investigation of potential new well field opportunities east and / or west of the existing well fields as identified in Phase I of the report. Further exploratory test well drilling of possible new well opportunities as identified in Phase I of the report. More detailed investigation of findings from Phase I of the report. 2. WWTP Zero Effluent Impact & Future Treatment Analysis To complete a study of what wastewater treatment improvements are required to achieve as near as possible a zero Wastewater Treatment Plant effluent impact on the receiving waters (Sheep River). As a leading edge initiative, this project involved working directly with the regulators Alberta Environment and Environment Canada to establish final effluent parameters that far exceed the current requirements and produces the minimal amount of loading on the Sheep River as possible with today's technologies. In addition this study will assess the impacts of increased capacity beyond the current facility's design of 10ML / day (30,000+ people) in order to determine potential technologies and costs should there be a desire to become a semi-regional hub for Wastewater Treatment. The study noted above has been completed and is presented for Council s consideration. RECOMMENDATION That the Wellfield Expanded Hydrogeological Study (Phase 1) and WWTP Zero Impact Analysis reports be received as information. Attachments: 1. 2011 Capital Project Sheet - Wellfield Expanded Hydrogeological Study 2. 2011 Capital Project Sheet - WWTP Zero Effluent Impact & Future Treatment Analysis 3. Stantec Presentations - Raw Water Study Phase 1, November 28, 2011 and WWTP Zero Impact Assessment, November 28, 2011 Prepared by: Dave Robertson Operations Manager November 21, 2011

Project Name: Wellfield Expanded Hydrogeological Study Project Code: 41011 Project Costs: $280,000 Funding Sources: Water & Sewer Depreciation $280,000 Council Strategic Direction: MANAGING COMMUNITY GROWTH, ENSURING QUALITY INFRASTRUCTURE, PROMOTING ENVIRONMENTAL RESPONSIBILITY AND STEWARDSHIP - With the efforts by the Town of Okotoks to secure additional well licenses to increase overall withdrawal volumes of raw water, it is important to ensure that well capacities meet withdrawal volumes and therefore raw water sources are required. To ensure that there are no delays between initial investigation and testing of new raw water sources it is important that Phase II of this project be included at this time as well. Project Description: This project would investigate future raw water sources available to enhance exiting well allocations and ensure that well licence transfers that the Town is securing will be available to meet future water demands within the community. Study, investigation and testing to be conducted involving the area outside of the existing East Well Field site. This project will be completed in two phases. Phase I: Desktop review of available reports and studies Discussions with Aaron Drilling to garner any additional information Review of options available and the viability of these, preliminary list of options as follows: Expand east well field (in any / either direction) Expand west well field Develop a new well field Deep well (groundwater) source Direct intake from Sheep River (surface or infiltration) Raw water storage Upgrade raw water wells to collector wells (similar to well 6) Develop conceptual level designs for viable options and obtain approximate capital costs. Cost benefit analysis of alternatives Stakeholder workshop (to be attended by Town, EPCOR and Consultant Team) Submission of a Phase 1 study report identifying short listed alternatives recommended for subsequent detailed study in Phase 2 Phase II: Further analysis of recommendations from Phase II, which could include such activities as: Subsurface Geophysical investigation of potential raw water sources identified by the report in Phase I within the well field. Subsurface Geophysical investigation of potential new well field opportunities east and / or west of the existing East Well Field that may be identified in Phase I of the report. Further exploratory test well drilling of possible new well opportunities as identified in Phase I of the report. More detailed investigation of findings from Phase I of the report Project Benefits: Maximum licensed raw water pump rates are maintained and supply issues during severe drought periods can be achieved. This gives assurance to residents that the water supply is maintained at a level sufficient to meet their needs even under extreme circumstances. This project will identify raw water sources required to meet the needs of the community and to ensure that as growth occurs the demand that accompanies that growth can be met.

Project Name: WWTP Zero Effluent Impact & Future Treatment Analysis Project Code: 42010 Project Costs: $80,000 Funding Sources: Water & Sewer Depreciation Reserve $80,000 Council Strategic Direction: PROMOTE ENVIRONMENTAL RESPONSIBILITY AND STEWARDSHIP AND ENSURES QUALITY INFRASTRUCTURE by utilizing the latest technologies available. The project shows the Town of Okotoks desire to step outside the box in a lead role and work with the regulators to establish higher environmental quality standards for the region and the Province. Project Description: To complete a study of what wastewater treatment improvements are required to achieve as near as possible a zero WWTP effluent impact on the receiving waters (Sheep River). As a leading edge initiative, this project involves working directly with the regulators AE & EC to establish final effluent parameters that far exceed the current requirements and produces the minimal amount of loading on the Sheep River as possible with today's technologies. In addition this study will assess the impacts of increased capacity beyond the current facility's design of 10ML / day (30,000 people) in order to determine potential technologies and costs should there be a desire to become a semi-regional hub for Wastewater Treatment. Project Benefits: Public confidence and high regard with the regulators and Environmental Stewardship Groups that the Town of Okotoks is committed to and is in fact delivering on the highest quality return flows to the Sheep River. The project clearly shows the Town's commitment to stepping outside the box in a proactive manner with respect to raising the bar for quality of wastewater effluents.well before changes are imposed by the regulators. It sets Okotoks alone with respect to Environmental Stewardship in the fact we are driving changes. Working with the Regulators, this analysis will define the next generation of treated effulent quality parameters required to ensure the Return Flows from the Town of Okotoks Wastewater Treatment Plant are of such a high quality as to mitigate/eliminate any impact on the receiving stream (Sheep River).