DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

Similar documents
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

BUTE Department of Construction Management and Technology

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Chapter. Restoration of Damaged Structures

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

METHOD OF STATEMENT FOR STATIC LOADING TEST

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

Design and Construction of Auger Cast Piles

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Milan M5 metro extension the construction of Lotto station

SECTION 411 DRILLED PIERS

Construction Dewatering and Ground Freezing

Watershed Works Manual

Construction sites are dewatered for the following purposes:

EXCAVATION and BASEMENT CONSTRUCTION. Introduction

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Emergency repair of Bridge B421

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

PILE FOUNDATIONS FM 5-134

Construction Technology 3

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

Designed and Engineered to Perform

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Stormwater/Wetland Pond Construction Inspection Checklist

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Geotechnical Building Works (GBW) Submission Requirements

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

The minimum reinforcement for the stem wall is the placement of:

Monitoring of Tunnel End Plug Performance in ONKALO

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

SikaProof A Technology

If stepping is required, step at 180mm as seen in this picture.

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

symptoms of a faulty foundation

Residential Foundations and Basements

Installation of Large Diameter Buried Pipes

CIVL451. Soil Exploration and Characterization

TBM CROSSING OF STATIONS

WATERPROOFING SikaProof -A TECHNOLOGY

FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process

SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA

Membrane for tunnels and underground construction

SECTION SUPPORT OF EXCAVATION

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

Foundation engineering

Page & Turnbull imagining change in historic environments through design, research, and technology

6 RETROFITTING POST & PIER HOUSES

Formwork for Concrete

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Moving Small Mountains Vesuvius Dam Rehab

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO

Building Pit Roche Building 1 Basel, Switzerland

Chapter 2 Basis of design and materials

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

Chapter 3 Pre-Installation, Foundations and Piers

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction

Lighthouse Engineering, L.L.C.

SOME EXPERIENCE FROM THE SOFT GROUND TUNNELLING IN URBAN AREA

High Capacity Helical Piles Limited Access Projects

COMMONLY USED RESIDENTIAL BUILDING CODES

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

Excerpts from the Canadian National Building Code (NBC)

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Contiguous Pile Wall as a Deep Excavation Supporting System

Section 2100-Trenching and Tunneling

Section Installation of pipe and casing for sanitary sewer by methods of augering.

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

How To Design A Foundation

Walls Datasheets. Diaphragm walls Slurry trench Bored pile walls

1. Safety. 2. The Lining Contractor. DEPARTMENT OF AGRICULTURE, AND FOOD Farm Development Service November 2002 S126

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

CHAPTER 4 WELL COMPLETION AND MAINTENANCE

Piling Datasheets. Continuous flight auger (CFA) Driven Rotary

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

SECTION STORM DRAIN SYSTEM

SECTION STORM DRAINAGE SYSTEM

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

High Performance PSA in Sheet Membrane in Water Protection

Guide to working on Public Sewers

Elevating Your House. Introduction CHAPTER 5

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Transcription:

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

Diaphragm Walls Diaphragm wall excavation Diaphragm walls are concrete or reinforced concrete walls constructed in slurry-supported, open trenches below existing ground. Concrete is placed using the Tremie installation method or by installing pre-cast concrete panels (known as a pre-cast diaphragm wall). Diaphragm walls can be constructed to depths of 100 meters and to widths of 0.45 to 1.50 meters. Excavation pit retained by tied back diaphragm wall and partially braced by cast-in-place building floor slab. Diaphragm wall construction methods are relatively quiet and cause little or no vibration. Therefore, they are especially suitable for civil engineering projects in densely-populated inner city areas. Due to their ability to keep deformation low and provide low water permeability, diaphragm walls are also used to retain excavation pits in the direct vicinity of existing structures. If there is a deep excavation pit at the edge of an existing structure and groundwater is present, diaphragm walls are often used as the most technically and economically favorable option. They can be used for temporary support or as load-bearing elements of the final building. Diaphragm walls can be combined with any anchor and bracing system. Diaphragm wall panels are also used in deep, load-bearing soil layers as foundation elements to carry concentrated structural load in the same way as large drilled piles do. These foundation elements are known as "Barrettes". Excavation pit retained by diaphragm wall and bracing

If diaphragm are socketed into impermeable soil layers of sufficient thickness or if they are combined with seal slabs (grout injection or tremie concrete slabs) almost waterproof excavation pits are created. After reducing the initial groundwater level within the excavation, only small amounts of residual water will penetrate. Diaphragm wall excavation using hydraulic cutter disk and grab excavation Diaphragm Wall construction using grab excavation and removable Stop-End Pipes Guide wall Preliminary excavation to 1.0-1.5 meters below ground elevation to install guide walls Prior to diaphragm wall excavation, cast-in-place or pre-cast concrete guide walls are placed. These braced guide walls stabilize the soil in the upper diaphragm level and provide a stable guide-way for the grab. In addition, they also support the diaphragm wall reinforcement and provide sufficient bearing for the hydraulic jacking system to remove the Stop-End Pipes. The space between both guide walls serves as a storage space for the stabilizing fluid. Lamella excavation Using hydraulic grabs with clam shell sizes of 2.8, 3.4 or 4.2 meters, single diaphragm panels can be excavated down to tip elevation. To avoid collapsing ground, trixotropic stabilizing fluids (Bentonite slurry = clay/water slurry) are pumped into the excavated panel. Depending on ground condition and geotechnical design, several single panels can be combined to one large lamella. Hard soil, rock or obstructions can be removed using chisels in addition. Diaphragm wall chisel

Stop End Pipe Installation. To separate the single concreting phases, stop-end pipes are installed at both panel fronts. These have the same diameter as the panel s wall thickness and are removed after initial concrete setting. The remaining semicircular joint provides a very good interlock between the individual concrete panels. Slurry Refreshing. Placing of Rebar Cage Concrete Placing by Tremie Method. Simultaneously with placing concrete, slurry is pumped from the panel to be refreshed and re-used in the next panel excavation. Since the slurry is replaced by concrete, this method is called Double-Phase Method. Removal of Stop -End Pipes after concrete setting using hydraulic pipe extractors. Diaphragm Wall Joint Design There are three (3) types of joint design used for diaphragm walls constructed by the grab excavation method Steel stop-end pipes, which are removed before the concrete has set completely (as mentioned before). Concrete seeped around the stop-end pipes can be safely removed by the use of chisels. Pre-cast reinforced concrete panels, which remain in the panels as permanent stop-ends (high weight, twice the number of joints). Seeping concrete can not be removed safely. Steel joint element. This flat steel panel element contains one or two elastic joint tapes, which remain in the setting concrete after the joint element has been removed. Removal of the element can only take place after the adjacent panel was completely excavated. Diaphragm wall reinforcing cage with block-out Stop-end pipe with hydraulic pipe extractors Flat steel joint element

If diaphragm walls are constructed using the hydro-cutter technique, stop- end pipes do not need to be installed. After the primary panel set sufficiently, the secondary panel excavation will slightly cut into the fresh concrete to ensure a tight overlap during the concrete placement. Excavation Double rope grabs as well as grabs guided by telescoping Kelly bars are commonly used for excavation in soils. Hydro-cutters can be employed for rock as well as soft soil excavations. They continuously cut into one panel by sucking the soil-bentonite slurry at the cutter head while replacing it with fresh bentonite at the panel s top. Construction sequence Two different construction techniques, the alternating method (or Pilgrim) and the continuous method can be distinguished for excavation. During the alternating method, only primary panels will be placed leaving out the following secondary panels. Following the first primary panels, gaps will be closed by the adjacent secondary panels. Primary and secondary panels will have different sizes due to the use of stop end pipes. During the continuous excavation method (Endless Panel), all the panels are excavated in one continuous process. Therefore they all have the same size. Concrete placement at a diaphragm wall panel Two phase construction using the alternating method Hydro-cutter head

Cut-off Walls Cut-off wall applications Cut-off walls are vertical slurry walls with very low water permeability to minimize the ground water flow. In contrast to the known load-bearing, impermeable retaining walls such as: Cut-off wall Rostock, Warnowquerung Concrete secant pile walls Reinforced two-phase diaphragm walls Sheet pile walls Cut-off wall site set up are cut-off walls mostly without any load-bearing function. The following cut-off wall types can be distinguished: Cut-off walls constructed using diaphragm wall techniques Secant pile walls from concrete of slurry Thin slurry walls Injection walls Jet-Grouting walls Freezing walls They can be used as: Cut-off walls underneath water dams with core seals in areas of permeable soils to socket into lower impermeable layers to prevent undercurrent Cut-off walls for watertight excavation pits outside of the load-bearing retaining structure to minimize water inflow into the pit Cut-off walls to enclose brown fields and contaminated areas with penetration into lower impermeable soil layers

Cut-off walls constructed using diaphragm wall techniques If slurry walls are intended to act as cut-off walls without any load bearing function, a mixture of water, bentonite, cement and maybe filler can be used. This slurry remains in the excavated panel and hydrates. It also remains as a plastic seal, so that the wall can follow small displacements in the soil without cracking. Since the slurry remains in the panel, this is called the Single-Phase technique. Slurry wall excavation, DW Rostock, Warnowquerung Installation of plastic liner sheet, combination cut-off Wall, Central Waste Dump, Huenxe After completion of the guide wall, the excavation proceeds with: One long-boom excavator (max. depth of 10m) Or by the use of slurry wall grabs or hydro-cutters Using the single-phase technique, panel depth is limited due to the relatively short time from placing and setting of the suspension. In deeper panels, the Two-Phase technique is used to construct a slurry wall. Construction is similar to the cast in-situ diaphragm wall installation. After completion of the panel s excavation, the actual sealant slurry will replace the stabilizing bentonite fluid. This sealant has to be placed using the slurry-displacement or tremie method and needs to have a 0.75 to/m³ higher unit weight than the bentonite slurry to replace it. To improve permeability and contaminant resistance, combination cut-off walls can be installed using the Single-Phase system. Sheet piles or plastic liner sheets can be installed within a bentonite-cement-slurry wall. Cut-off Wallh head cover

Cut-off walls with embedded sheet piles or structural beams being constructed using the single phase method can also be used as "water- tight" excavation pits. In the process the sheet piles or beams act as load transferring elements and will extend to required depth below the excavation pit. The Cut-off wall as sealing element will only penetrate the artificial seal slab or reach down to the natural impermeable soil layer. Sheet pile or beam walls can be tied back. Cut-off wall with embedded sheet pile wall as retaining wall for an excavation pit, Salzufer, Berlin Cut-off wall with embedded H-beam wall as retaining wall for an excavation pit, TG Seestern, Duesseldorf Watertight excavation pit

Thin Slurry Walls Thin slurry walls also can act as vertical cut-off walls to retain horizontal groundwater flow. In contrast to cut-off walls constructed using the diaphragm wall technique (replacing the soil by slurry sealant), thin slurry walls displace the soils using a vibrated steel profile. During the extraction process, sealants are injected into the created cavities. Drivable soils, such as sands and gravels, are required for this installation method. The created slurry wall thickness depends on the shape of the steel profile used and the soil conditions. Thickness varies between 5 cm in sands and 20 cm in gravel. In combination with high-pressure jet grouting, wall thickness of up to 30 cm can be achieved. A continuous wall is created by overlapping single penetration elements installed one after another by the vibrated steel profile. A guide plate attached at the beam`s flange is running down the already completed web of the previous panel. This ensures the correct overlap to the previous panel. Construction of a vibrated thin slurry wall, Doemitz Vibro-beam Thin vibro slurry wall