ATTENTION! READ BEFORE INSTALLING!

Similar documents
How to Install Hardwood Flooring Over a Sub Floor

INSTALLATION INSTRUCTIONS

VINYL CLICK FLOORING INSTALLATION GUIDE

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Armstrong Do-It-Yourself Tile Installation System

ENGINEERED FLOORING INSTALLATION

BENTLEY ELEMENTS COLLECTION LVT

How To Level A Subfloor

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Installation for Wood Flooring

Country Series. 12.3mm V-Groove Edge Engineered Laminate Flooring. Laminate Flooring Care and Maintenance. Routine Cleaning

Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Euro Oak Installation

INSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS

Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut

Engineered Hardwood Flooring Installation Instructions

Installation System. Existing Resilient Sheet Floors

Herringbone Pattern Flooring

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING

Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered

How To Install Hardwood Flooring

Vinyl Composition Tile Installation System

INSTALLATION GUIDE. Imago Installation Guide - January

Care and Maintenance for Wood Flooring

Installation Instructions for staple/nail down applications

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

Division 9. SignaFlor Pad and Pour Flooring System

HARDWOOD WARRANTIES Limited Warranty for Prefinished Solid, Engineered, and Longstrip Floors Manufacturing Defects Finish Warranty

Amtico and Spacia Commercial Maintenance Guidelines

Fiberglass-Reinforced Sheet Flooring Installation System

Engineered T&G Hardwood Flooring. Installation, Care and Warranty Guide

Installation Instructions, Care and Maintenance Guide & Warranty Information for Engineered Woods

Installation Instructions Waterproof Core Vinyl Planks

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Hardwood Flooring. Urbania Flooring

FRAMED & MOUNTED TILE MURAL

Engineered Hardwood Flooring. Installation, Care and Warranty Guide

RESIDENTIAL HARDWOOD WARRANTIES

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

Columbia flooring will resist fading from exposure to sunlight or artificial light.

Guide Specifications for Maple Flooring Systems

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

Carpet Tile Installation Guidelines

How To Warranty Shawfloors

LAMINATE LAMINATE FLOOR CARE AND MAINTENANCE. Routine Maintenance. Minor Repair Instructions: Glueless Laminate Board Replacement Repairs


Installation guide. ENGINEERED and LOC. 1/2 in and 3/4 in (13 mm and 19 mm) INNOVATION TRADITION PERFECTION

SOLID FLOORING 3/4 INSTALLATION GUIDELINES

Care and Warranty Guide

Installation Instructions. For. Tuscan Solid Wood Flooring

WATER AND WOOD DON T MIX KEEPING YOUR TRIÂNGULO HARDWOOD FLOOR BEAUTIFUL SCRATCHES, INDENTATIONS AND GOUGES

The length of this warranty varies by product. Please see product sample or your retailer for duration of this warranty on specific products.

Engineered Installation Instructions

ECOfit Interlocking Tile

installation Mannington Works manningtoncommercial.com Mannington Commercial Luxury Vinyl Tile Installation Instructions GENERAL

INSTALLATION INSTRUCTIONS Masters Choice Bamboo floors

Annapolis Valley - Engineered Floors - Installation Instructions

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Shower Walls and Tub Surrounds

ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) Menards Products

These instructions apply to the DREAM HOME Laminate collection

SCHWARTZ WATER-BASE WOOD FLOOR SEALER AND WATER-BASE PREMIIUM WOOD FLOOR FINISH

INSTALLATION THE SIMPLIFIED VERSION

Installation instructions for all Egger floors with the glueless system JUST clic!

ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY)

THINGS YOU SHOULD KNOW

Choosing the Right Floor Protectors

Cleaning guide for senior living facilities

How To Install Hardwood Flooring

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Engineered Hardwood Flooring Installation Instructions

Aspect Metal Peel & Stick Tile Installation Guide

INSTALLATION INSTRUCTIONS Pre finished Solid plank "INSTALLATION IMPLIES ACCEPTANCE"

FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS

Engineered Hardwood Flooring Installation Instructions

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS


Engineered Hardwood Flooring Installation Instructions

CHAPTER 3 MOISTURE TESTING

ENGLISH Installation guidelines for 10mm Engineered LOC flooring

Lock&Fold Locking Laminate Planks - Wood and Tile Visuals Installation Instructions

If you hire a Professional Wood Fitter. If fitting the Wood Floor yourself (DIY)

INSTALLING PREFINISHED HARDWOOD FLOORING

3/4 Solid Hardwood Flooring Installation Instructions

Window Installation Instructions

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

Pergo Installation Essentials Guide For Laminate Flooring

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Amorim Rubber Flooring Specifications

Composite Stone Veneer

Maintenance Guide. for your Mercier prefinished floor PRINTED IN CANADA SP-CAREGUBIL 10-12

DIY CABINET REFACING INSTALLATION GUIDE

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Installation and maintenance instructions warranty policy

installation Mannington Works manningtoncommercial.com Mannington Commercial Hardwood

Transcription:

ATTENTION! READ BEFORE INSTALLING! FOR BEST VISUAL REPRESENTATION OF YOUR FLOOR This flooring replicates the look of a natural product which has natural variations in color and texture. For best visual effect, shuffle planks from several cartons and do not install similar boards next to one another. SUBFLOOR PREPARATION Subfloor must be level, dry and free of imperfections. An uneven subfloor will make the floor feel unstable and cause premature damage. Engineered Vinyl Tile Floating Floor Installation Instructions READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. If the following instructions leave any unanswered questions or if additional information is required, please call WPS (706-255-1123). FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION Responsibility for the suitability of WPS flooring and accompanying products for each individual installation cannot be assumed by WPS, since WPS has no control over the installer's proper application. Should an individual piece be doubtful as to appearance or dimension the installer should not use this piece. WPS will send replacement in a timely fashion. NOTE: FUSION floors may be installed with a direct glue-down method on approved wooden (or) concrete substrates that are on or above grade only. Use only a premium multipurpose flooring adhesive. READ BEFORE INSTALLING While FUSION is waterproof, it s not a moisture barrier. It s still a good idea to make sure concrete is cured and tested for moisture and that a moisture barrier is installed in the crawl space. Moisture won t damage FUSION, but it can get in the walls and structure of the home. A couple of extra dollars and a few minutes is a small investment for the added protection and peace of mind. Use good common sense installation practices, and you ll have a successful installation that results in a beautiful floor. PRE-INSTALLATION JOBSITE REQUIREMENTS WPS cannot be held responsible for site conditions. Carefully examine the flooring prior to installation for color, finish and quality. Ensure adequate lighting for proper inspection. If flooring is not acceptable, contact your supplier immediately and arrange for replacement. WPS cannot accept responsibility for flooring installed with visible defects. Prior to installation of any flooring, the installer must ensure that the jobsite and subfloor meet the requirements of these instructions. WPS is not responsible for flooring failure resulting from unsatisfactory jobsite and/or subfloor conditions. Flooring should be one of the last items installed in any new construction or remodel project. Crawl spaces must be a minimum of 18 (46 cm) from the ground to the underside of the joists. A ground cover of 6 20 mil black polyethylene film is essential as a vapor barrier with joints lapped 6 (15 cm) and sealed with moisture resistant tape. The crawl space should have perimeter venting equal to a minimum of 1.5% of the crawl space square footage. These vents should be properly located to foster cross ventilation. Where necessary, local regulations prevail.

PRE-INSTALLATION SUBFLOOR REQUIREMENTS All Subfloors must be: Dry Structurally sound Clean: Thoroughly swept and free of all debris Level: Flat to 3/16 per 10-foot radius Wood subfloors must be dry and well secured. Nail or screw every 6 along joists to avoid squeaking. If not level, sand down high spots and fill low spots with a Portland Based leveling patch. Concrete subfloors must be fully cured, at least 60 days old, and should have minimum 6-mil polyfilm between concrete and ground. Subfloor should be flat and level within 3/16 per 10 radius. If necessary grind high spots down and level low spots with a Portland leveling compound. Ceramic Tile, resilient tile and sheet vinyl must be well-bonded to subfloor, in good condition, clean and level. Do not sand existing vinyl floors, as they may contain asbestos. INSTALLATION TOOLS For all installation methods: Tape measure Pencil Pry bar or pull bar Chalk line Crosscut power saw 3M Scotch-Blue 2080 Tape Acceptable subfloor types: CDX Underlayment Grade Plywood (at least ½ thick) Underlayment grade particleboard OSB (at least ¾ thick) Concrete slab Existing wood floor Ceramic tile Resilient tile & sheet vinyl INSTALLATION INSTRUCTIONS Inspection: Prior to installation, inspect material in daylight for visible faults/damage. Check if subfloor/site conditions comply with the specifications described in these instructions. If you are not satisfied, do not install, and contact your supplier. Before laying: Measure the room at right angle to the direction of the flooring. For the best visual effect, planks or tiles in the final row should be at least at least 1/3 the width of the plank or tile. For this purpose, planks or tiles in the first row can be cut to smaller size. Shuffle boards in order to obtain a pleasant blend of shades. Lay boards, preferably following the direction of the main source of light. We recommend laying on wooden floors crossways to the existing floorboards.

GENERAL The angle/angle locking system has a specially shaped tongue and groove for glue-less installation. This sophisticated and highly accurate milled shape ensures a very tight connection during installation and beyond. Begin by installing the floor in one corner (preferably parallel to the longest wall) and following the direction the light falls. Install preferably from left to right. Always insert the tongue into the groove, not the other way around. STRING LINE: Choose the longest wall that will be parallel to the plank floor. Tap a nail part way into the subfloor ½" from the wall at each end of the room. String a line between the nails ¾ above floor level. Use this string as a guide-line for the first row of planks. The ½" space from the wall allows room for expansion. Shuffle tiles for best visual mix. Mix planks from various cartons to maintain natural color and pattern variation. FIRST ROW: Facing the guide-line, place the first plank at the left-hand end, tongue side facing wall, starting ½ off the wall (Figure 1). It is necessary to remove the tongue from all planks lining the starting wall. Use ½ spacers at the end and along the wall (2 to a plank) while keeping the planks aligned with the string. Spacers keep planks from shifting when subsequent rows are added. Hold the next plank being joined, at an angle to the first one, and lay it flat on the floor. Complete the installationn of the succeeding planks in the same manner. The ends of the two planks are firmly joined, with the joint completely closed up. Continue this process until you reach the end wall. Cut the last plank to fit allowing for a ½" perimeter expansion space on all sides. NEXT ROWS: If the cut-off piece from the previous row is more than 10 long it can be used to start the next row as long as end-joints between adjacent rows are always staggered by at least 10 (Figure 2). Firmly holding row 1 in place, (a weight such as a full pack of planks may be helpful). a) Position the long side of the plank to be installed at an angle of 20-30 to the plank already installed (Figure 3). Move the plank to be fitted slightly up and down at the same time as exerting forward pressure (Figure 4). b) In some cases, such as under door frames, the planks cannot be rotated into one another. In these situations, the planks can be fitted horizontally by cutting away the locking edge and using an adhesive/glue to secure the joint (i.e. PVA Glue, class D3). In order to cut around pipes, take a drill bit with a diameter similar to the diameter of the pipe + ¼ for expansion. LAST ROW: Usually the last row will require all planks be cut lengthwise. Measure each plank at several places along the length to ensure a proper fit. Remember to allow a ½" expansion space along the wall side. FINISH: One of the major benefits of using the glue-less locking system is that after installation you can immediately walk on the floor. Remove all spacer blocks. In order to fill in the expansion gap around pipes and any other areas not covered by trim, use a flexible caulk. Figure 1 Figure 2 Figure 3 Figure 4

GLUE DOWN INSTALLATION One of the key features of FUSION Hybrid Floors is the ease and speed with which they install as a glueless floating floor. However, there are instances where the customer may wish to install these floors using the direct glue down method. In addition, there are two instances where WPS requires that FUSION Hybrid Floors be installed using the direct glue down method: When installing FUSION Hybrid Floors in areas, such as sun rooms. Where the floor is exposed to strong direct sunlight, where the temperature of the floor can exceed 140 F. High heat exposure will result in dimensional stability changes causing distortions. When installing FUSION Hybrid Floors using the glue down method, a multi-purpose adhesive should be used and applied to the subfloor using adhesive manufacturer s recommended trowel. Surfaces must be clean, dry and smooth, free of voids, projections, loose materials, oil, grease, sealers, and all other surface contaminants. Maximum floor variation is 1/8 in 10. Concrete slabs requiring patching or leveling should be repaired with Portland cement based material. Adhesive instructions should be followed completely. When employing the direct glue down installation method, DO NOT include a 6-mil polyfilm vapor barrier in the assembly. Flooring material must be adhered directly to the subfloor. Flooring should NEVER be glued to a polyfilm vapor barrier. IN-FLOOR RADIANT HEAT: FUSION Hybrid Floors can be installed over in-floor or embedded radiant heat systems using the floating or glue down method. When gluing floor, use a PREMIUM MULTI PURPOSE and follow manufacturer s recommended instructions. Turn the heat off for 24 hours before, during and 24 hours after installation when installing over radiant heated subfloors. Failure to turn the heat off may result in significantly shortened working time of the adhesive Floor temperature must not exceed 85 F (30 C). Once the installation has been completed, the heating system should be turned on and increased gradually (in increments of 5 F) until returning to normal operating conditions. Failure to strictly follow adhesive manufacturer s guidelines may result in failure and void the warranty. Warning: Electric heating mats that are not embedded into the subfloor are not recommended for use underneath FUSION Hybrid Floors. Using electric heating mats that are not embedded and applied directly underneath FUSION Hybrid Floors could void the warranty for your floor in case of failure. It is best to install FUSION Hybrid Floors over embedded radiant floor heating systems and adhere to the guidelines listed above. AFTER INSTALLATION Flooring should be one of the last items installed in a project. In order to protect the floors while other trades are finishing their work prior to final cleanup and turnover to the owner, use rosin paper and only use 3M Scotch-Blue 2080 Tape to hold the rosin paper to the floor (other blue tapes may damage the finish). Clean the floor thoroughly before laying the rosin paper to ensure that no debris is trapped underneath. DO NOT USE plastic film or other non-breathing coverings as this can cause the floor to become damaged from humidity buildups. Dust mop or vacuum your floor to remove any dirt or debris. It is suggested that you buff the floor with lamb s wool pads in order to remove any loose splinters, residues, foot prints, etc. 1710 North Leg Court Augusta, GA 30909

Protection and Maintenance of Your Floor Lasting beauty can be achieved through purchasing a quality floor covering and providing proper on-going maintenance. Furniture should be moved onto the newly installed floor using an appliance hand truck over hardboard runways. Avoid exposure to long periods of direct sunlight. Close blinds or drapes during peak sunlight hours. Floor covering subjected to excessive heat and light is subject to thermal degradation and, in the case of FUSION, to changes in dimensional stability. Use appropriate precautions to minimize potential effects on the floor covering. Oil or petroleum-based products can result in surface staining. Do not track asphalt-driveway sealer or automobile-oil drips onto the vinyl floor covering. Use non-staining mats. Rubber may discolor the floor. Frequently moved furniture should be equipped with felt pads to avoid scratching the floor. Heavy furniture and appliances should be equipped with non-staining large surface floor protectors. Furniture with castors or wheels must be easy swiveling, large surface non-staining and suitable for resilient floors. Do NOT use ball type castors as they can damage the floor. Use floor protectors under furniture. Use walk off mats at entrances to prevent dirt and grit from being tracked on to the floor. Sweep or vacuum the floor regularly to remove loose dirt. Do NOT use vacuums that use a beater bar or turn beater bar off. Do NOT use electric brooms with hard plastic bottoms with no padding. Clean up spills immediately. Damp mop as needed using clean water and a diluted floor cleaner. Do NOT use harsh cleaners or chemicals on the floor. Do NOT use abrasive scrubbing tools. Do NOT use detergents, abrasive cleaners or mop and shine products. Vinyl Flooring, like other types of smooth floors, may become slippery when wet. Allow time for floor to dry after washing. Immediately wipe up wet areas from spills, foreign substances or wet feet 1710 North Leg Court Augusta, GA 30909