Nuclear Power Plant Instrumentation and Control in MEXICO



Similar documents
Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

Long term support solutions for Nuclear Instrumentation & Control

Introductions: Dr. Stephen P. Schultz

IAEA Research Reactor Operations & Maintenance Support 2014 TRTR Meeting August 3rd-7th, 2014 Benson Hotel Portland Oregon

Dynamic Behavior of BWR

Cyber Security Design Methodology for Nuclear Power Control & Protection Systems. By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC)

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

AN APPLICATION STUDY FOR THE CLASS IE DIGITAL CONTROL AND

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS -

Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

LATIN AMERICAN NETWORK FOR EDUCATION AND TRAINING IN NUCLEAR TECHNOLOGY LANENT R. Barrachina, J.L. François

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

RADIATION MONITORING SYSTEMS

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

Improving reactor safety systems using component redundancy allocation technique

Status on Spanish Regulations and Industry. actions related to Filtered Containment. Venting Systems (FCVS)

TRANSFORMERS AFTERMARKET SPARES, SERVICE & REPAIR

Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3

Technical support for nuclear power operations

Nuclear Energy: Nuclear Energy

Accidents of loss of flow for the ETTR-2 reactor: deterministic analysis

Management of delayed nuclear power plant projects

RENCEE SAFETY MARIES

At the request of CFE s Area of Electric Systems Programming

IMPLEMENTATION OF A MANAGEMENT SYSTEM FOR OPERATING ORGANIZATIONS OF RESEARCH REACTORS

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective

I&C Status in France & Recommendations to IAEA

UTILIZING RESEARCH REACTORS FOR EDUCATION AND TRAINING: INTERNET REACTOR LABORATORY

TENDER FOR TECHNICAL BUILDING MAINTENANCE SERVICES TERMS OF REFERENCE. April 2013 OVERALL PURPOSE

Advanced Safeguards Measurement, Monitoring and Modelling Laboratory (AS3ML) at JRC-ITU-Ispra

Poznan University of Technology Faculty of Electrical Engineering

Report WENRA Safety Reference Levels for Existing Reactors - UPDATE IN RELATION TO LESSONS LEARNED FROM TEPCO FUKUSHIMA DAI-ICHI ACCIDENT

July 30, 2012 Nuclear Emergency Response Headquarters Government-TEPCO Med-and-long Term Response Council

FPGA- based technology and systems for I&C of existing and advanced reactors

Technical Meeting on Evaluation and Dependability Assessment of Software for Safety Instrumentation and Control Systems at Nuclear Power Plants

Training in Emergency Preparedness and Response

Portuguese Health Physics Society: Calibrating Pen Dosimeters with and without a Phantom

ELECTRICAL AND COMPUTER ENGINEERING By Joan Omoruyi, Engineering Librarian, Northeastern University

ELECTRICAL AND I&C EQUIPMENT OF A NUCLEAR FACILITY

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

Mexican Efforts Towards Building a Design Basis Threat for Radiological and Nuclear Environment.

PIONEER ROBOT TESTING PROGRAM AND STATUS

International Symposium on Nuclear Security

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Long term operation integrated processes for delivering extended asset performance

Alstom Grid Services. Transformer lifecycle management GRID

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

IAEA-TECDOC-1402 Management of life cycle and ageing at nuclear power plants: Improved I&C maintenance

SafePoint RMS. Sustainable Committed Secure. SafePoint. Monitoring Solutions

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

Source Term Determination Methods of the Slovenian Nuclear Safety Administration Emergency Response Team

Turbo generators Best quality for thermal power plants

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2

Optimization of Digital Industrial Radiography (DIR) Techniques for Specific Applications: An IAEA Coordinated Research Project

Government Degree on the Safety of Nuclear Power Plants 717/2013

FACILITY AND VENUE PROTECTION

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

V K Raina. Reactor Group, BARC

PROPOSALS FOR UNIVERSITY REACTORS OF A NEW GENERATION

Spent Fuel Project Office Interim Staff Guidance - 17 Interim Storage of Greater Than Class C Waste

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Development and Application of POSAFE-Q PLC Platform

Study Plan. MASTER IN (Energy Management) (Thesis Track)

Critical Review of the Swedish Stress Tests Report

Atlas Copco Construction Technique Service. Extended Warranty and Service Agreements The peace of mind you need to focus on your business

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

EQUIPMENT QUALIFICATION

Code of Conduct on the Safety and Security of Radioactive Sources

A MTR FUEL ELEMENT FLOW DISTRIBUTION MEASUREMENT PRELIMINARY RESULTS

Office for Nuclear Regulation

February 19, Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

ABB Dedicated Products, Systems and Services for the Power Generation Industry

centre for radiation protection

What s It All About? The Sun as a Power Source Instructor Guide

Nuclear Energy of Ukraine - History

TECHNICAL MEETING ON IN-PILE TESTING AND INSTRUMENTATION FOR DEVELOPMENT OF GENERATION-IV FUELS AND STRUCTURAL MATERIALS

INTRODUCTION. Three Mile Island Unit 2

Belgian Stress tests specifications Applicable to power reactors 17 May 2011

Holtec International. Multi-Purpose Canisters for Long-Term Interim Storage. June 17, Rick Springman, Ph.D. Director of International Projects

Chlorine Gas Detection System Operation & Maintenance

Human Resource Management in Nuclear Safety

Announcement of a new IAEA Co-ordinated Research Programme (CRP)

Bonn Call-for-Action Joint Position Statement by the IAEA and WHO

7.1 General Events resulting in pressure increase 5

Transcription:

25 th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation and Control (TWG -NPPIC) Nuclear Power Plant Instrumentation and Control in MEXICO Dr. Francisco Javier Ramírez-Jiménez May 27-29, 2015, IAEA, Vienna

25 th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation and Control (TWG -NPPIC) Introduction OUTLINE Main Projects Developments Recommendations May 27-29, 2015, IAEA, Vienna

INTRODUCTION Laguna Verde Nuclear Power Plant

TWO General Electric (GE) Boiling Water Reactors (BWR) UNIT 1 started in 1990 25 years old UNIT 2 started in 1995 20 years old MEAN POWER : 1.6 GW ( 2.6 % ) Total energy generated : 11 800 GW hr (4.5 %) Mean efficiency in the last 12 years: 83.6 %

20 th Anniversary of U2

Location of the Nuclear Power plant

Laguna Verde Nuclear Power Plant

Two important activities of the Nuclear Power Plant: POWER UPRATING OF THE LVNPP From 1.4 GW to 1.6 GW LIFE EXTENSION OF THE LVNPP Assurance of the long term operation From 30 years to 60 years

The operator of the plant is the Federal Commission of Electricity, CFE, of MEXICO GOVERNMENTAL The National Institute for Nuclear Research, ININ, is an advisor that provides scientific and technical support to the plant.

Life Extension to 60 years MAIN PROJECTS Proactive Ageing Management for Long Term Operation of Laguna Verde Nuclear Power Plant, LVNPP. (IAEA TC) Dry Storage of used nuclear fuel Chemical cleaning OBJECTIVES: Focus: To increase the reliability To reduce the collective dose * Spare parts

Project IAEA-MEX 2017 Instrumentation & Control Proactive Ageing Management for Long Term Operation of Laguna Verde Nuclear Power Plant, LVNPP Design, selection, installation, calibration, maintenance, repair, and optimization of nuclear instrumentation Deal with the obsolescence of electronic instrumentation, and control systems. Deal with the upgrading or reinforcement of nuclear instrumentation.

I&C ISSUES THAT AFFECT THE LONG TERM OPPERATION - OBSOLESCENCE OF SOFTWARE AND HARDWARE Operating systems for computerized instruments Memories Microcontrollers Integrated circuits Complex systems -AGEING OF INSTRUMENTATION AND CONTROL COMPONENTS Cabling Capacitors Relays Transformers

Ageing Management of Specific Instrumentation and Control Systems of the LVNPP - several systems of the plant have been identified as possible fields of action for upgrading or reinforcement. - we focus in common problems encountered in I&C systems i.e. in the Starting Range Neutron Monitoring System, SRNMS

- Measurement of the neutron fluxes -Review of the instrumentation used in the Starting Range Neutron Monitoring System, SRNMS -Recomendations for the verification and inspection of the SRNMS in LVNPP -Grounding,shielding and protection of electronic equipments to reduce the electromagnetic interference and transients in nuclear instrumentation

DEVELOPMENTS Optimization of the Off Gas Radiation Monitoring System Instituto Nacional de Investigaciones Nucleares, March 2015 México

Improvements in the Radiation Monitoring System Ventilation of the Turbo Generator Building

Radiological Monitoring Network around the Nuclear Power Plant

Gamma radiation detector NUMAC Simulator for training Personal Computer based Simulator

Measurement of process variables Oxygen Hydrogen Conductivity

Upgrading and Refurbishment of electronic modules Booster Unit for the Turbo Pumps Electro-Hydraulic System, Turbo Pumps

Diagnostic of damaged circuits Transponder, Reactor Manual Control

SPECIAL RADIATION MEASUREMENTS Gamma-spectrometry in the vent sampling, TGB

Pool deep Exposure rate profile along the control rods, Unit 2

RECOMMENDATIONS Consider a training course on Wireless Technologies applications on NPPs in 2016. Add a worshop on aging management of I&C components in 2016. Look for more benefits for MS in: - Application of codes and standardscc., 2016 -Application of diversity, independence and physical separation in different levels of I&C systems, 2017 Add a training course on the process performance optimization, including new radiation detectors technologies, and stressing the importance of full understanding of the processes, 2017. Add a training course on maintenance of digital I&Csystems in 2016. Add a training course on dedication of I&C systems and components in 2016. Consider a consultant meeting that includes also sellers of new I&C components for NPPs in 2016. Discuss the importance of right selection of participants in the propossed events (WS, TC mainly)