TITAN FLOW CONTROL, INC.

Similar documents
INSTALLATION, OPERATION & MAINTENANCE MANUAL

Float and Thermostatic Traps Series H, C and X

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

Operation & Maintenance Manual

SINGLE STAGE INLINE FIRE PUMP

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

V47 Series Temperature Actuated Modulating Water Valves

TYPE E Main Valve Sizes 3 /8 through 12

PBX Series Quick Fit Connector Bimetallic Steam Traps

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

Wafer Check Valve ASAHI AV VALVES. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

TECHNICAL SERVICE MANUAL

Installation, Maintenance, & Repair Series 4000B/LF4000B

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

MODEL G300 BRAKE BLEEDER

Chapter 7 Hydraulic System Troubleshooting

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

81000 Series Aluminum Gate Valve Installation and Repair Manual

Rental Services Temporary Cooling - Flexible Water Hose

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M (Angle) Schematic. Standard Components

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

ATS Overhead Table Shelf System INSTRUCTION MANUAL

PRESSURE REDUCING CONTROL VALVE

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual

Instructions and precautions. Fork Height. Visit our website at:

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

MAINTENANCE MANUAL INDEX DOUBLE CHECK ASSEMBLIES MODELS 850 & 850U 1/2" - 2"

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Trouble Shooting. Pump

RMF Engineering

SureSite Magnetic Liquid Level Indicator

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

FOAM CHAMBER MODEL - FCA & FCA-S HD FIRE PROTECT PVT. LTD. TECHNICAL DATA FEATURES APPLICATION. Carbon Steel Construction FCA-65, FCA-80 & FCA-100

OPERATING AND MAINTENANCE INSTRUCTIONS PUMP TYPE

NEWCO VALVES Newmans Inc., Newmans Valve Ltd. NEWCO/OIC Cast Valve Operation & Maintenance Manual

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

Table of Contents WARNING SYMBOLS AND DEFINITIONS

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

Fluid Regulator. Instructions Parts List L LOW PRESSURE

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

Installation, Operation, & Maintenance Instructions For JFD Shell & Tube Heat Exchangers

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

Product Manual. CVS Type 67AFR Filter Regulator. Introduction. Installation. Description

Owner s Manual & Safety Instructions

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

MODEL 341A SINGLE STAGE END SUCTION PUMPS

Air Eliminators and Combination Air Eliminators Strainers

FT43, FT44, FT46 and FT47 Ball Float Steam Traps

PROAIR Water-Cooled Air Conditioner. CR43WC Model INSTRUCTION MANUAL. Rev. E 2013 Pentair Technical Products P/N

BRAZED PLATE INSTALLATION MANUAL

American Fireglass Outdoor Fire pit kit information. General instructions/warnings for outdoor gas pan and burner systems

10 TON HYDRAULIC PRESS

staple gun with 5/16 Long staples

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

3620 W 11th Streetб Houston, TX Telephone: sales@kellogg-american.com Website:

1/3 HP Submersible Sump Pump with Vertical Float Switch

Pipe Valves, Fittings and Nipples Pressures to 15,200 psi

PNEUMATIC PLANISHING HAMMER

LIFT N RACK PRO OPERATING & INSTALLATION GUIDE 5500 Lb. LIFT CAPACITY

HYDRAULIC LIFT TABLE CART 2200-LB.

Fire Hydrant Troubleshooting

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

Digital Fingerprint safe

Installation Instructions

This instruction is valid for all ACD pump models shown on page 2

tire inflator with pressure gauge

12V Portable Diaphragm Compressor Operating and Maintenance Instructions

USER MANUAL. Bottom Loading Bottled Water Dispenser SAVE THIS MANUAL FOR FUTURE USE. Model #

Calvert USA, Inc. Attic Stairs

Model RV-1 Pressure Relief Valve 2 to 8 Inch (DN50 to DN200), 250 psi (17,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description

Type HSR Pressure Reducing Regulator for Residential, Commercial or Industrial Applications

Global Water Instrumentation, Inc.

8 ton air/hydraulic long ram jack

Theory, Application, and Sizing of Air Valves

PAINT SPRAY GUN WASHER

KOBOLD VKP FLOWMETER/SWITCH. User Instructions

PALLET JACK TON

Installation, Operation and Maintenance Manual for Pilot Operated Valves

Instruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN

Installation Manual DIAPHRAGM WELL TANK

Hydraulic Punch Driver Kit

BOWIE PUMPS OPERATION - MAINTENANCE

1 TON FOLDING CRANE CFC1000

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

SE-100-1, SE-200-1, SE-500-1, and SE AIR CHAMP PRODUCTS. User Manual SE BRAKE MODELS: (i) MTY (81)

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

OAK WORKBENCH WITH 2 DRAWERS

Air vacuum pump with r134a & r12/22

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version

3/4 PIPE CLAMP WITH STAND

1805 Series Relief Valves

HYDRAULIC TABLE CART

Hydraulic Transmission Jacks Operating Instructions & Parts Manual

Transcription:

PREFACE: This manual contains information concerning the installation, operation, and maintenance of Titan Flow Control (Titan FCI) Globe Style, Silent Check Valves. To ensure efficient and safe operation of Titan FCI Globe Style Check Valves, the instructions in this manual should be thoroughly read and understood. This manual is general in nature and is not meant to take the place of an on-site, process engineer or pipe fitter. As such, Titan FCI recommends that only experienced, skilled personnel be allowed to install and maintain Titan FCI Globe Check Valves. Please retain this manual in a location where it is readily available for reference. GENERAL INFORMATION: Titan FCI s Globe Style Check Valves are designed to automatically prevent back-flow in systems where it is desirable to permit flow in one direction and prevent flow in the opposite direction. When the pump starts and the downstream flow creates the required pressure drop in the forward direction, the disc will automatically open. When the pump stops and the flow ceases, the force of the spring will automatically close the disc prior to flow reversal. This creates a positive shutoff against flow reversal and eliminates system surges and water hammer. For additional information regarding Titan FCI s Globe Style Check Valves, please refer to the engineering specification sheet for each model. Further information may also be obtained from Titan FCI s Check Valve Selection and Technical Data Guide. Prior to selection of a Titan FCI Globe Style Check Valve, the following factors must be determined: Material construction requirements of the Check Valve. Design and working pressure/temperature requirements. Operating conditions (throttling, pressure drop, condensation, flow reversal, operation frequency, etc.). Service media type (liquid, gas, abrasive, corrosive, dirty, etc). Pipeline Media Flow-rate and Viscosity. Clean Start-up Pressure of the Pipeline. Space availability for installation. Please contact a Titan Design Engineer to assist in the determination of these requirements prior to selection and purchase. Figure 1: CV 52-DI ANSI Class 250/300 Ductile Iron Figure 2: CV 51-SS ANSI Class 150 Stainless Steel Titan FCI s Globe Style Check Valves are intended for liquid service that does not exceed 10 ft./sec. They are not recommended for steam service or flow media that contains solids. GLOBE STYLE CHECK VALVE 1 CVGIOM0306

UNPACKING AND INSPECTION: Upon receipt of product, it is important to follow these unpacking and inspection procedures. All Titan FCI Globe Style Check Valves are shipped in specialized shipping containers designed to prevent damage during transportation. If external damage to the shipping container is evident upon receipt of product, please request that a representative of the shipping carrier be present before unpacking the product. Carefully open the shipping container, following any instructions that may be marked on the container. Remove all packing material surrounding the Check Valve and carefully lift it from the container. It is recommend to keep the shipping container and all packing material for reuse in storage or reshipment. Visually inspect the Check Valve for any signs of damage including scratches, loose parts, broken parts or any other physical damage that may have occurred during shipment. If damage is observed, immediately file a claim with the shipping carrier. Check Valves that are damaged during transportation are the responsibility of the customer. For information regarding Titan FCI s warranty policy, please refer to the last page of this document. Before installation, the check valve should be inspected internally for any loose or foreign materials that may have become trapped inside the Check Valve during transportation. If the Check Valve is not required to be installed immediately, it should be stored indoors in a clean, dry, consistent temperature environment. It is also recommended to utilize the original shipping container and packing materials to properly store the Check Valve. If long term storage is required, a desiccant may be necessary. This would be based upon the local, environmental storage conditions. Please consult a Titan FCI Design Engineer to assist in this determination. Figure 3: CV 50-DI ANSI Class 150 Ductile Iron Figure 4: CAD Illustration No. PARTS LIST PART 1 Body 2 Disc (1) GLOBE STYLE CHECK VALVE 2 CVGIOM0306 When ready to install, remove any preservatives with solvent dampened cloths. Remove any loose material and protective packing material. 3 Spring (1) 4 Bushing (1) 5 Seat (1) 6 Bolts 1. Denotes recommended spare parts.

INSTALLATION: Pre-Installation Checklist Ensure Working conditions (pressure and temperature) are with in the specified capacity of the product being installed. Please refer to the Engineering Specification Sheet for each Check Valve model to determine these values. Make sure that the construction material of the Check Valve is compatible with the media flowing in the pipeline. Additionally, ensure that the service media is filtered to remove unwanted debris prior to entering the Check Valve. If the service media is not sufficiently clean, debris particles can prevent the Check Valve from sealing correctly and degrade overall performance overtime. Inspect sealing surfaces that they are clean and smooth; no nicks or cuts. The pipeline should also be checked for proper alignment. Titan FCI Check Valves should never be utilized to realign an existing piping system. For efficient function and improved service life, recognized piping standards stipulate placing Check Valves 5 to 10 pipe diameters from any turbulence producing devices (elbows, pumps, tees, expansions, reductions, and swages). PRE Titan Globe Style Check Valves are designed for steady flow conditions and are not recommended for use in reciprocating pump, compressor or other types of physical/thermal shock-load applications. In this type of application, the Check Valve will not perform efficiently and will ultimately fail. PRE Titan Globe Style Check Valves are designed to operate properly for flow rates between 5 ft./sec. to 10 ft./sec.. It is not recommended to exceed the maximum flow rate of 10 ft./sec. or the minimum flow rate of 5 ft./sec.. INSTALLATION: Continued... Step 1: Remove the plastic flange protectors and other packaging materials from the Check Valve. Step 2: Orientate the flow arrow (cast into the side of the valve body or printed on the nameplate) in the direction of the pipeline flow. In the correct position, the valve disc will move away from the valve seat, in the direction of the pipeline flow. Titan FCI Globe Style Check Valves can be installed in any position: horizontal, vertical (with upward flow) or any varying angle. For vertical installation with downward flow, please consult factory as a stronger spring may be required. Step 3: While supporting the existing pipeline, lift the Check Valve into position. For large or heavy Check Valves, the appropriate material handling equipment must be used in order to prevent injury and possible damage to the Check Valve. When lifting the Check Valve, place hooks in the flange holes or slings/chains around the valve body. Never lift the Check Valve by attaching slings/chains to the trim/ seat assembly. The trim/seat assembly is not designed to withstand the weight of the unit. Step 4: Install a standard, 1/8 thick flange gasket (in accordance with ANSI B16.5) between valve and mating flanges (on both sides). Ensure the flange gaskets are centered correctly to prevent internal leakage. GLOBE STYLE CHECK VALVE 3 CVGIOM0306 PRE A Titan FCI strainer should be installed ahead of the pump to ensure protection and proper operation of the check valve and the pump.

INSTALLATION: Continued... Step 5: Install lubricated flange bolts and hand tighten. Flange bolts should then be tightened using a star or crisscross pattern to evenly load the bolts. This is illustrated in the diagram below. 8 OPERATION: 1 4 Start-up Procedure: Once proper installation has been successfully completed, start the system gradually, at start up as well as after shut down. This eliminates sudden shock to the Check Valve and other equipment in the line. MAINTENANCE: 5 6 Figure 5: Bolting Pattern Excessive bolt torque may damage the Check Valve Flanges. Please refer to established flange bolt torques. 3 2 7 MAINTENANCE: Continued... Valve Removal Before removing the Check Valve from the pipeline, the pressure inside the vessel must be reduced to atmospheric via suction or venting. Failure to do so may result in serious bodily injury. Before removing the Check Valve from the pipeline, ensure that the media that is flowing in the pipeline is known and any special handling precautions are understood. Please review the Material Safety Data Sheet (MSDS) for that specific fluid. Step 1: To remove the Check Valve from the pipeline, first isolate the Check Valve by shutting off the upstream pump and closing the downstream isolation valve. Drain the system as much as possible. Step 2: Relieve pressure from both sides of the Check Valve by venting the line. Step 3: Loosen the outlet side first, never loosen the inlet side first. Once pressure has bee relived, loosen inlet side. Step 4: Remove Check Valve from the pipeline and place the Check Valve with outlet side on the ground. Inspect internal components for wear or damage. If replacement parts are required, please constant Titan Flow Control for repair recommendations. GLOBE STYLE CHECK VALVE 4 CVGIOM0306 Titan FCI Check Valves are designed to provide trouble-free service and seldom require maintenance. If removal of Check Valve is required for inspection, please follow these steps. SPARE PARTS LIST: For the bill of materials and spare parts listing of each Globe Style Check Valve, please refer to the corresponding Engineering Specification Submittal Sheet.

MAINTENANCE: Continued... Trouble Shooting: WARRANTY: Leakage: Periodic inspections for leakage should be performed. If leakage is present, check the flange gasket and flange bolt torque. In some situations, it may be necessary to isolate the Check Valve by shutting off upstream and downstream valves. Then remove the Check Valve and inspect the seating surfaces for damage. When removing the Check Valve for inspection, please follow the removal instructions presented in this manual. Always relieve pressure from both sides of the Check Valve before inspection. Vibration: Verify that flow rate is within acceptable ranges (5 ft./sec. to 10 ft./sec.). Additionally, verify that the Check Valve is 5 to 10 pipe diameters from any turbulence producing devices (elbows, pumps, tees, expansions, reductions, and swages). Slamming: Remove Check Valve from piping system and inspect the spring. Verify that the spring is providing the proper tension. Restricted Flow: If flow is halted at the Check Valve, verify that the flow direction arrow (casted into the side of the body or printed on the nameplate) is pointing in the direction of the flow. Seller warrants each of the products and parts sold hereunder, under normal use of service, and subject to user s compliance with any operating instructions and other directions given by seller, to be free from defects in materials or workmanship for a period of one year from date of shipment from seller s plant. Seller s liability, under this warranty, shall be limited to, at the seller s option, to repairing or replacing any such defective product FOB seller s plant in Lumberton, NC, and reimbursing purchaser for shipping costs, subject to the following: (1) Timely receipt of purchaser s written notice that such products are defective. (2) Seller s written authorization to purchaser for the return of such products, (3) the return of such products to seller with shipping charges prepaid and (4) seller s inspection of and confirmation that such products are defective in materials or workmanship. If seller s inspection shows that the products returned are defective due to dirt, rust or any foreign material not attributable to seller: improper usage, over tightening on threads, abuse or incorrect assembly in the field, or other cause not due to seller s improper manufacture, seller will, subject to purchaser s written authorization, repair or replace such products at cost. Seller s factory inspection and testing reports will be made available to purchaser upon request. THIS WARRANTY IS IN LIEU OF ANY OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF FITNESS OR MERCHANTABILITY.SELLER SHALL NOT BE LIABLE FOR ANY SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES.NO REPRESENTATIVE OR SELLER HAS AUTHORITY TO MAKE ANY REPRESENTATIONS OR WARRANTIES, EXCEPT AS STATED HEREIN. GLOBE STYLE CHECK VALVE 5 CVGIOM0306