The H-25/H-15 Gas Turbine A Product of Hitachi Quality

Similar documents
LPG Burning Gas Turbine for Power Generation

THM Gas Turbines Heavy duty gas turbines for industrial applications

Hitachi H-25 Gas Turbine in Oil and Gas Market

Siemens Gas Turbines over 100 MW

Technical Specification. Generating Set with Waukesha engine burning natural gas

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Pre-designed Steam Turbines

Gas Turbine Power COMPACT, EFFICIENT, RELIABLE

Top Technology for Industry, Agriculture, Business and Communities

GE Energy LMS100. Flexible Power

Siemens Gas Turbine SGT5-4000F. Advanced performance. Answers for energy.

Turbine Inlet Cooling

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications

Performance Monitoring For Gas Turbines

Industrial Steam Turbines

Industrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

SGT5-4000F Trusted Operational Excellence

Development of Power Supply System with Hybrid Turbocharger for Marine Application

The SGT5-8000H proven in commercial operation

PREVENTIVE MAINTENANCE PROGRAM AND NOVEL TECHNIQUES TO REDUCE DOWNTIME AND INCREASE OPERATING EFFICIENCY AT DISTRIBUTED COGENERATION FACILITIES

Power Island. Industrial Power Plants. / energy

Dharam V. Punwani President, Avalon Consulting, Inc. Presented at Turbine Inlet Cooling Association Webinar April 9, 2014

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines

GLOBACON 05 HVAC Systems for Cogen

Bergen Engines Products and Applications

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

Source: EIA Natural Gas Issues and Trends 1998

OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM

Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems

INDUSTRIAL POWER GENERATION EQUIPMENT Typhoon SGT MW / 5340 KVA 50Hz 11KV Duel Fuel Power Station

Unit 96: Marine Propulsion Power Plant

4000 Series 4008TAG2A Diesel Engine ElectropaK rpm

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

Flexible performance, convincing quality economical and future-proof packages

The Lodi Energy Center, owned

Electric Coolant Pumps. Always at the Correct Temperature

Screw Compressors 11-22kW

INTEC Engineering GmbH Heating Solutions for the Marine Industry

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

THERMAL POWER PLANTS Vol. III - Gas Turbines For Electric Power Generation - H.I.H. Saravanamuttoo GAS TURBINES FOR ELECTRIC POWER GENERATION

TECHNICAL SPECIFICATION TYPE ATESO ALFA

Hitachi s Gas Turbine Product Range and Development Background

How To Power A Power Plant With Waste Heat

Siemens Steam Turbine SST-600

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS

Industrial Gas Turbines

Micro cogeneration. Affordable, efficient and innovative

Introduction of the Solar Turbines Titan 250 Gas Turbine System

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine

DE-TOP User s Manual. Version 2.0 Beta

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

White paper Combustion engine power plants

Offshore Platform Powered With New Electrical Motor Drive System

Solid Oxide Fuel Cell Gas Turbine Hybrid Power Plant. M. Henke, C. Willich, M. Steilen, J. Kallo, K. A. Friedrich

GE s TM2500+ solution offers fast, mobile and flexible power

COMBUSTION STUDIES OF NATURAL GAS AND SYN-GAS WITH HUMID AIR

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Vogt Power Emission Control Solutions

Sheet 5:Chapter 5 5 1C Name four physical quantities that are conserved and two quantities that are not conserved during a process.

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

912. The engine for construction equipment.

Balance of Fuel Cell Power Plant (BOP)

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Unit 1 Turbine Rotor 110 MW Replacement

CAT CG132. Series Gas Generator Sets

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

ROTARY SCREW COMPRESSOR. RMD kw

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

Indirect fired heaters

CENTAUR 40 Gas Turbine Generator Set

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012

Originators of the Flexible Water Tube design

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Turbine Generator Sets 101 Skinner Power Systems LLC September 2006 Rev 1 May 2009

Company Profile. New and overhauled Power Plants for sale

Half the cost Half the carbon

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines

MHI Air-Blown IGCC Technology & Application to Chinese Project

STEAM TURBINE 1 CONTENT. Chapter Description Page. V. Steam Process in Steam Turbine 6. VI. Exhaust Steam Conditions, Extraction and Admission 7

Low Load Operational Flexibility for Siemens G-class Gas Turbines

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units.

Portable Compressors MOBILAIR M 270 With the world-renowned SIGMA PROFILE Free air delivery 20.0 to 26.9 m³/min.

Application and Design of the ebooster from BorgWarner

ENERGY-SAVINg DRIVE PACKAGE DE ES FR IT. Overview

TEXAS A&M UNIVERSITY Utilities & Energy Services

October 8, WHP Waste Heat-to-Power Fuel and Emission Free Power

Zero Emission Engine. An Economic and Environmental Benefit

European Aviation Safety Agency

W. A. Liegois PE Stanley Consultants and Michael Duffy, PE, Esq., LEED AP BD+C McCarthy Building Companies, Inc.

WÄRTSILÄ GAS POWER PLANTS BENEFITS: Maintenance schedule independent of the number of starts, stops or trips. Net plant electrical efficiency over 52%

Committed to make a better world

US Heavy Duty Fleets - Fuel Economy

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Commercial Gas Heat Pump - VRF

Transcription:

The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate to natural gas. And with cogeneration or combined cycle plants, even higher efficiency will be achieved. Plus an excellent automation system will add ease and precision to your operations after a fast installation. Excellent engineering, superior quality control, and reliable service has earned Hitachi gas turbines a reputation for excellence and efficiency. With an output of 30MW class and, coupled with the latest in gas turbine technology, Hitachi s H-25 becomes a superior value. H-15 gas turbine is scale down model H-25 gas turbine. (17MW class) Features - 34.8% (LHV base) Gas Turbine Thermal Efficiency with Advanced Technology - High Reliability and Easy Maintenance with Heavy Duty Design - High Fuel Flexibility with Low Emission Level - Quick Delivery and Easy Installation - Fully Automated Digital Control - Applicable to Replacing Existing Old Gas Turbine with New H-25 - Suitable for Cogeneration, Combined Cycle Power Plant and Motor Driven Compressor Drive - Maintenance Support for Customer s Satisfaction 1

Performance Simple Cycle Performance ITEM UNIT ISO Condition (Ambient Temperature: 15 deg C) Conventional Combustor case H-25 H-25 H-15 Natural Gas Distillate Oil Natural Gas Output kw 32,000 31,000 16,900 Efficiency %(LHV) 34.8 33.9 34.3 Heat Rate kj/kwh 10,350 10,610 10,500 Btu/kWh 9,806 10,157 9,950 Exhaust Flow kg/s 96.6 96.6 52.9 Exhaust Temp deg C 561 561 564 Output (%) Correction Curve Effect of compressor inlet temperature on maximum output (Base load) 130 120 110 100 90 80 70-20 -10 0 10 20 30 40 50 Compressor Inlet Temperature (deg C) NOx Emission Combustor Fuel NOx Abatement Injection Flow (%* 1 ) NOx ppm (15% O2) 0 188 Natural Gas Steam 2.5 53 Conventional Combustor Water 3.0 25 0 264 Distillate Oil Steam 2.5 74 Water 3.0 42 LNC (Single Fuel Type) LNC (Dual Fuel Type) Natural Gas 0 25 Natural Gas 0 25 Distillate Oil Water 2.5 42 Note: *1 : Mass flow ratio to inlet air Ambient Temperature : 15 deg C Relative Humidity : 60% Operation Condition : Base Load LNC : Low NOx Combustor 2

Specification Major Components The control compartment, gas turbine package, generator package, and generator auxiliary compartment make up the H-25 gas turbine generator set for 50 and 60 Hz application. Compressor Combustor Turbine Specification Components Design Gas Turbine Type Heavy Duty Design Simple Cycle Single Shaft Horizontal Split Casing, Stacking Rotor Rotating Speed H-25 : 7,280rpm / H-15 : 9,710rpm Compressor Type 17 Stages Axial Type Turbine Combustor Type Cooling Type Liner Cooling 3 Stages Impulse Type Air Cooled 1st and 2nd Stage Nozzle and Bucket Reverse Flow Type Conventional Type or Low NOx Type (25ppm) Combustor H-25 : 10 Combustors / H-15 : 6 Combustors Slot Cooling 3

The Advantages of Replacement The H-25 Gas Turbine can be used, not only to create new, highly efficient power plants, but also to replace the Old Machine, gaining an immediate 20% reduction in fuel consumption. Transported separately, the combination with the re-utilized existing equipment is done at the installation site. And when replacing an existing Old Machine with the H-25, the replacement can be performed in a short period, because existing foundations, building works, and ancillary equipments are compatible. Replacement Experiences of Old Machines Country : Japan Number of unit : One(1) Operation date : Nov., 1988 Country : Bahamas Number of unit : Four(4) Operation date : 2002, 2003, 2005, 2007 Country : Nigeria Number of unit : Six(6), Six(6) Operation date : 2002, 2005 Country : Iraq Number of unit : Three(3) Operation date : 2007 Country : Iraq Number of unit : Two(2) Operation date : 2007 Typical Annual Fuel Savings by Replacing with H-25 Annual Fuel Savings (M$ US / Year ) 10 8 6 4 2 0 2 years to repay investment 20000 ( 17.1% ) 18000 ( 19.0% ) 0 1 2 3 4 5 6 7 8 Fuel Cost ( US$ / MBtu (LHV) ) Heat Rate(LHV) Btu/kWH (Efficiency %) 16000 ( 21.3% ) 14000 ( 24.4% ) 11975 ( 28.5% ) New Machine 15 Years Old Frame Machine ISO Base Load Condition, Continuous Operation 4

Modular Package Design The control compartment, gas turbine package, generator package, and generator auxiliary compartment make up the H-25 gas turbine generator set for 50 and 60 Hz application. H-25 Major Components with Compact Package Design - Minimizes Site Installation Work and Period - Flexible Site Layout - Easy Handling and Transportation No. Package Weight 1 Gas Turbine + Base Lube Oil Tank, Reduction Gear and Auxiliaries 47 t 82 t 2 Generator 85 t 3 Air Intake System 51 t 4 Exhaust System 7 t H-15 No. Package Weight 1 Gas Turbine + Base 30 t Auxiliary Equipment 49 t 2 Generator 37 t 3 Air Inlet System 33 t 4 Ventilation Fan 1 t 5 Exhaust System 5.6 t 6 Mist Separator 1.5 t 5

Application Cogeneration Plant The high efficiency H-25 gas turbine offers users very high thermal efficiency, high reliability, and easy maintenance. Applicable to various cogeneration systems, Hitachi provides system engineering to meet various heat and power requirements to optimize the design. H-25 Gas Turbine Cogeneration Plant (Oman) System Configuration Fuel Steam Air HRSG Generator H-25 Gas Turbine Water Typical Performance Power Output Heat Output Overall Efficiency 29,910 kw (6 MPa/300 deg C) 60 ton/hr More than 80% (LHV) UNFIRED Steam Production FIRED Steam Production 70 HRSG Inlet Temp. 560 deg C 100 HRSG Inlet Temp. 700 deg C Steam Flow (t/h) 60 50 250* Saturated Steam 300* 350* 400* 450* 500* Steam Flow (t/h) 90 80 70 250* Saturated Steam 300* 350* 400* 450* 500* 40 2 4 6 8 10 Steam Pressure (MPa) 60 *: Steam Temperature (deg C) 2 4 6 8 10 Steam Pressure (MPa) 6

Application Combined Cycle Plant The higher operating temperature of gas and steam cycles makes an H-25 combined cycle power plant achieve high efficiency generation. By creating a packaged type combined cycle plant, Hitachi makes installation, operation, and maintenance an easy part of your power generation. H-25 Gas Turbine Combined Cycle Plant (Japan) System Configuration 1025 (1-1-1) Fuel Air Steam Generator H-25 Gas Turbine HRSG Generator Condenser Water 2025 (2-2-1) Fuel Air Steam Turbine Fuel Generator Air Condenser H-25 Gas Turbine & Generator HRSG Combined Cycle Standard Performance Type Type Type (GTG-HRSG-STG) 1025(1-1-1) 2025(2-2-1) Total Output kw 43,760 87,800 Gas Turbine Output kw 29,730 1 29,730 2 Steam Turbine Output kw 14,030 28,340 Plant Efficiency %(LHV) 50.1 50.3 Natural Gas, ISO Base Load Operation 7

Application Motor Driven Compressor Drive Higher response & easy speed control with 50-105% control range Flexible selection of gas compressor sizing Less maintenance System Configuration Fuel Air C.B. C.B. Tr. Inverter H-25 Gas Turbine Circuit Breaker Motor C.B. Tr. Inverter Transformer Gas Compressor C.B. Tr. Inverter C.B. Tr. C.B. H-25 Gas Turbine Project (Indonesia) 8

Hitachi Turbine Global Service Periodical Shut-down Inspection 3 2 1 1 Inspection Type Combustion Inspection Interval 16,000 (Gas) 12,000 (Oil) Downtime 7 days 2 Hot Gas Path Inspection 32,000 (Gas) 24,000 (Oil) 16 days 3 Major Inspection 64,000 (Gas) 48,000 (Oil) 25 days Continuous Operation Case * Interval & downtime shall be subject to operating cycle and conditions, etc. * Cool downtime (1 days) and start-up (1~2 days) are not included in downtime. 9

H-25/H-15 gas turbine is manufactured by severe quality assurance and control in Hitachi Works, Hitachi City, Japan. Hitachi City Tokyo 10

http://www.power-hitachi.com 11 No. KPR-11-001