The CSOB Headquarters

Similar documents
Green House, Hungary

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

Preliminary Final Proposal

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

Energy Efficient HVAC-system and Building Design

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Optimism. The Foundation wanted a. Impatient

IES <Virtual Environment> training. Trainee notes. ASHRAE 90.1 Appendix G - PRM Navigator. Version

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

EnergyPro Building Energy Analysis. Assisted Living Building

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation The Building Regulations 2010

HEATING, VENTILATION & AIR CONDITIONING

Energy Savings in High-Rise Buildings Using High-Reflective Coatings

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

Mechanical Insulation. Hospitals and Schools

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name

Energy Efficiency HOSPITALITY.

Energy Use in Residential Housing: A Comparison of Insulating Concrete Form and Wood Frame Walls

Building Energy Systems. - HVAC: Heating, Distribution -

Restoring POWER. Gayle Babcock

Life cycle cost comparison of TAB vs. other HVAC (UK) TECHNICAL BROCHURE

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Sika Sarnafil World Class Roofing and Waterproofing

HVAC Systems: Overview

Mechanical Systems Proposal revised

Energy Audit Data Collection Form

KNX for building and room automation simple and efficient

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget

Energy Efficiency. Bars & RestauRants.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

HVAC Processes. Lecture 7

Each icon on this map represents the physical location of a station.

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

Comparing Energy Savings of Different VAV Systems

Village at 115. North Residential Village. North Residential Village. at Case Western Reserve University. Cleveland, Ohio

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

Glossary of HVAC Terms

LEED PRESENTATION OUTLINE

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

The Business Case Annual fuel cost savings of 26% worth more than 28,000 Annual fuel savings of 1.3million kwh Annual CO2 savings of over 245 tonnes

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee

for K-12 School Buildings

Creating Efficient HVAC Systems

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

Los Angeles Community College District

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances

Miami Science Museum DoE Modelling Grant. Light Planning. 19 December 2008 Concept Design

3-D Modeller Rendered Visualisations

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

250 St Georges Tce, Perth, WA (QV1)

High Performance School Buildings Resource and Strategy Guide

Klosterenga, Oslo, Norway, page - 1

Building Energy Analysis Report

Section 2: Estimating Energy Savings and Incentives

Engineering East Promoting Sustainability LEED Platinum Certified

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.

Deep Energy Savings in Existing Buildings

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

MECHANICAL PROJECT PROPOSAL

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Systems Selection Enclosure Systems Material Selection Assessment and Mitigation

BOMA BESt Assessment Overview

Venice Library Humidity Study. for Williams Building Diagnostics, LLC th Street West Bradenton, FL Report April 13, 2015

CHAPTER 3. BUILDING THERMAL LOAD ESTIMATION

HOURLY ANALYSIS PROGRAM QUICK REFERENCE GUIDE

ASHRAE Student System Selection Competition New Office Building - Nashville, Tennessee Spring 2009

Norwegian Tax Authority - Oslo Norway

Residential HVAC Load Sizing Training October 14, David Kaiser Green Code Plan Reviewer

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN

case Study Building At a Glance Building Team

Whistler Green: Project Checklist

GREEN FACTS. Marina Bay Sands

The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL

Deep Energy Savings in Existing Buildings

HVAC Simplified Approach Option

Building for the Future - Sustainable Construction for Professionals. A Case Study of a FE building Merton College

GREEN SCHOOLS CASE STUDY. West Wing Elementary

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Using Time-of-Day Scheduling To Save Energy

Our Triple Bottom Line...

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.

HVAC Checklist - Long Form

FIRST RADIANT COOLED COMMERCIAL BUILDING IN INDIA CRITICAL ANALYSIS OF ENERGY, COMFORT AND COST

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Transcription:

C A S E S T U D Y C S O B H E A D Q U A R T E R S B U I L D I N G A T A G L A N C E When the commercial bank CSOB decided to consolidate its Headquarters offices, which were scattered across several buildings in downtown Prague, it constructed one of the largest office buildings in the Czech Republic. The bank building, which houses approximately 2,400 employees, is notable not only for its size, but also for its energy-efficient design features and the sustainable strategies used during its construction. Prague s Gold The following article was published in High Performing Buildings, Summer 2009. Copyright 2009 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes only. This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. The green roof of the CSOB Headquarters in Prague reduces storm water runoff, heat loss and heat gain. B Y J U L I A N P A R S L E Y, M E M B E R A S H R A E ; A N D A N A S E R R A The CSOB Headquarters facility was designed and built to provide a work environment with good indoor air quality, natural light, and occupant comfort and control. Its energy performance of 52 kbtu/ft 2 year achieves 18.8% in energy cost savings compared to the ASHRAE Standard 90.1-2004 baseline. Standard The approximately 900,000 gross ft 2 building combines a host of passive energy design strategies, including extensive daylighting, east-west site orientation and shading, without sacrificing occupant comfort. Employees have local control of lighting, HVAC settings and operable windows. But the building control system ensures energy efficiency by automatically shutting off an area s heating or cooling when a window is opened and returning thermostat settings to automatic setpoints after business hours. In an effort to ensure that the building s energy-efficient features were used as designed, building managers provided employee Building Name CSOB Headquarters Location Prague, Czech Republic Size 886,860 ft 2 (237,732 ft 2 below grade including a parking garage and mechanical rooms) Started 2005 Completed March 2007 Use Bank headquarters with open plan office space, extensive data center, underground parking garage, cafés, cafeteria, doctor s offices and convenience store Total Project Cost $148 million (includes property) Construction Cost $107 million Distinctions LEED Gold B U I L D I N G T E A M 2 8 H I G H P E R F O R M I N G B U I L D I N G S S u m m e r 2 0 0 9 S u m m e r 2 0 0 9 H I G H P E R F O R M I N G B U I L D I N G S 2 9 Owner CSOB General Contractor Skanska Czech Republic Architect and Landscape Architect AP Atelier MEP and Structural Engineer VPU Deco Environmental Consultant and Energy Modeling Buro Happold, Zemlicka & Pruy (consultant), Czech Technical University (modeling) LEED Consultant Buro Happold P E R F O R M A N C E D A T A 0 6 / 2 0 0 7 T O 0 5 / 2 0 0 8 Total Energy Use 52 kbtu/ft 2 Electricity 44.1 kbtu/ft 2 Natural Gas 7.95 kbtu/ft 2 Energy Intensive Submeter Electrical Data Kitchen 2.5 kbtu/gross ft 2 Server Cooling 3.91 kbtu/gross ft 2 Computer Servers 9.94 kbtu/gross ft 2 Energy Costs $1.55/ft 2 ($1.41/ft 2 electric, $0.14/ft 2 gas) Energy Cost Savings 18.8% Compared to ASHRAE Standard 90.1-2004; 42% Compared to Typical U.S. Commercial Office (90 kbtu/ft 2 )

The building s main foyer, known as The Street, provides surrounding offices with circulation and daylight. training before the move to explain the building operation system and local controls. Employee surveys have helped ensure that the building operates as it is intended to perform. The building offers a variety of amenities such as an on-site doctor, cafés, a convenience store, a 30 HIGH cafeteria, breakout spaces for informal gatherings and meetings, interior and exterior gardens, and water features. Public/shared/nonwork spaces and amenities comprise approximately 36% of the net built area. Each floor has floor-to-ceiling glazing with direct views of the city, hills PERFORMING BUILDINGS and the planted green roofs, which are accessible to all employees and comprise 34% of the total roof area. Tanks in the basement store rainwater, which is used to irrigate the green roof, indoor gardens, plants covering façades and the surrounding landscaping. Summer 2009 HPB.hotims.com/25951-11

The external shading system is controlled based on solar position and solar intensity. M O N T H LY E N E R G Y U S E, J U N E 2 0 0 7 M AY 2 0 0 8 Electricity Data (kwh) Gas (therms) Peak Electric* (W/ft 2 ) June 959,945 388 3.13 July 985,165 134 3.45 August 1,031,078 0 3.04 September 850,178 26 3.01 October 904,535 772 2.88 November 954,953 6,458 2.60 December 924,500 13,948 2.64 January 1,021,608 17,645 2.77 February 953,578 12,950 3.12 March 987,292 11,698 2.83 April 947,067 5,305 3.06 May 945,825 1,180 3.32 Total 11,465,724 kwh 70,502 therms 3.45 W/ft 2 Peak S U B M E T E R D ATA *Based on gross building area. Submeter data is available for the energy-intensive data servers, server cooling, convenience store and kitchen facilities. Computer servers and server cooling consume 31% of the building energy. This equipment also provides services for other buildings within the Czech Republic, with 30% serving external needs. The servers provide basic computer services for the Headquarters along with meeting the needs of more energyintensive trading floors. The kitchen, servers and server cooling are atypical services for a commercial office and add significantly to the energy use intensity of the building. The total energy consumption should be considered in conjunction with the following data. Submeter 1, Kitchen Facilities: 648,708 kwh, 2.5 kbtu/gross ft 2 yr Submeter 2, Convenience Store: 50,079 kwh, 0.19 kbtu/gross ft 2 yr Submeter 3, Server Cooling: 1,014,923 kwh, 3.91 kbtu/gross ft 2 yr Submeter 4, Computer Servers: 2,583,980 kwh, 9.94 kbtu/gross ft 2 yr Energy consumption is quoted over the same time period (06/2007 to 05/2008), with energy intensity based on the total building gross square footage. drainage layers of the roofing and growing media. More than 40% of all construction materials were from within 500 miles of the site. Passive Design Strategies The climate in Prague is driven by heating (3,542 heating degree days), with moderate summertime temperatures (only 1,029 cooling degree days) and low humidity. The building s environmental strategy uses optimized orientation, high performance building fabric, natural ventilation via operable windows, advanced HVAC and lighting controls, and an automated external shading system. The building s long façades face north and south, minimizing east and west exposure. This reduces cooling loads and provides passive solar gains when beneficial during winter months. The 70% glazing ratio is significantly above the Standard 90.1-2004 baseline, but double-pane units are argon filled with a low-e coating to minimize heat loss. Specifications called for R-36 roof and R-23 spandrel panel insulation. The building also has an active external venetian blind shading system, automatically controlled on the east, south and west façades. This prevents glare and minimizes unwanted solar gains. The exposed This southeast corner view shows the active shading system, which prevents glare and minimizes unwanted solar gains. thermal mass provides additional buffering of temperatures during winter and summer peaks. Active Design Strategies Heating System The heating system uses three highefficiency gas condensing boilers, achieving an annual efficiency of approximately 92%, distributing hot water to the fresh air air-handling units (AHUs) and fan coils. The hot water distribution system is a variable speed, low-temperature hydronic system with 140 F flow and 104 F return. The building s long façades face north and south, minimizing east and west exposure. This reduces cooling loads and provides passive solar gains when beneficial. The building team incorporated sustainable principles throughout construction. The building was constructed on a previously contaminated site that was first remediated. Waste was separated and recycled during construction. Thirteen thousand cubic yards of concrete were salvaged from the previous development and reused in the new construction, while approximately 90% of the total waste was diverted from a landfill. Recycled materials were used for vibration insulation, Meeting room lighting and HVAC controls allow occupants to adjust conditions, but the central building management system automatically turns lighting, heating and cooling off when the rooms are vacant. 3 2 H I G H P E R F O R M I N G B U I L D I N G S S u m m e r 2 0 0 9 S u m m e r 2 0 0 9 H I G H P E R F O R M I N G B U I L D I N G S 3 3

Weather compensation drops the flow temperature in response to the external air temperature, improving the system efficiency. This provides significant savings in heating and pumping energy. The heating system has an installed capacity of 15 Btu/ft 2. HVAC System The HVAC system uses a combination displacement system with perimeter fan coils for space heating and cooling. The displacement system uses a year-round supply air temperature of 66.2 F. The air returns through the large atria with heat recovery in the AHUs. The displacement system air volume is varied between a minimum in winter and peak in summer, with increased volumes when free cooling is available. The fan coils provide the required heating and cooling, and local adjustable thermostats control 1,076 ft 2 zones. This hybrid system reduces installed fan power compared to a conventional fan coil or variableair-volume (VAV) solution, with the perimeter units cycling only when required for space conditioning. All meeting rooms have local fan coils for space conditioning and adjustable VAV boxes on the floor diffusers to provide a variable fresh air rate with manual speed control. Meeting room controls all default to off after two hours. Operable windows within the building are linked to the HVAC controls. This system provides free cooling when conditions permit and prevents heating or cooling when the windows are open. Light wells provide natural lighting to interior offices, while active shading systems prevent glare. Natural light from the atria allows surrounding offices to dim artificial lights or turn them off. The placement of plants throughout the CSOB Headquarters brings the natural environment indoors. HPB.hotims.com/25951-10 Cooling System The building uses air-cooled chillers, which supply chilled water to the AHUs and the perimeter fan coils. A separate circuit is provided for the servers with a free cooling chiller. The main chillers only operate when the air temperature rises above 64.4 F, while the displacement ventilation system and natural ventilation meet cooling needs below this temperature. Lighting and Controls The lighting strategy consists of task lights, which are combination up and downlights, and are programmed according to their location within the building. Every two desks share one set of task lights. An external weather station adjusts each light fixture 3 4 H I G H P E R F O R M I N G B U I L D I N G S S u m m e r 2 0 0 9 S u m m e r 2 0 0 9 H I G H P E R F O R M I N G B U I L D I N G S 3 5

Rooftop chillers are packaged aircooled units. While less efficient than water-cooled equipment, the impact on energy consumption is minimized by moderate summer conditions and the passive and active design strategies. according to its position in the building and the available natural light. Users also may vary the light level by ±15% at their computer stations. Circulation spaces have T8 fixtures with two light levels. The available natural daylight results in the use of few lights during the day in atria spaces, perimeter office zones and perimeter kitchenettes. Even in interior circulation zones, lighting is dimmed at 50%. A combination of automatic and manual controls made this reduction in artificial lighting possible. The office environment incorporates displacement swirl diffusers, individual task lighting and exposed concrete soffits, which help provide more stable internal temperatures. Zoning and Controls The control system, which is centrally monitored by building staff, gives local control to building occupants. Each meeting room and HVAC zone provides temperature, air flow and fan coil data, and operable window status back to the central control room to allow troubleshooting of complaints. The control system also monitors all boilers, chillers and AHUs to ensure optimum performance. The control system also gives users local control over their lighting and HVAC setpoints. The central controls typically operate on default setpoints, turning lights and the HVAC system off two hours after regular hours and within meeting rooms at all times. Cooling setpoints also increase from 74 F to 80 F as the external air temperature increases from 77 F to 89.6 F. Operable windows in meeting rooms are fitted with sensors, which turn off the displacement system and perimeter fan coils when opened. 3 6 H I G H P E R F O R M I N G B U I L D I N G S S u m m e r 2 0 0 9 HPB.hotims.com/25951-15

L E S S O N S L E A R N E D LEED Abroad We found that LEED, for the most part, is adaptable to international projects such as this one. The most challenging category is materials since an inherent conflict exists in selecting local versus selecting materials that are certified by U.S.-centric organizations, such as Green Label Plus Program. Attempts to request equivalency based on VOC concentrations were unsuccessful. Skanska s construction and environmental policies, the stringent local building environmental regulations and European Union directives on issues such as VOC limits resulted in the easy achievement of many LEED credits. Employee Feedback To prepare its employees, who were accustomed to individual offices, for a new open plan work environment, training sessions and meetings were held for a year prior to the move. Employee surveys helped the operations staff better understand how to operate and interact with the space and HVAC system controls. An ongoing employee feedback system records and addresses suggestions and complaints. Complaints such as others not turning computers and lights off highlight opportunities for improvement. This provides an effective means of communicating operation and maintenance issues. Lighting and HVAC System Controls The controls system monitors all of the thermostats zones, the status of fresh air, HVAC systems and operable windows. Building occupants have local control of lighting systems, HVAC system setpoints and fresh air control for meeting rooms. This setup has succeeded in troubleshooting complaints, improving occupant satisfaction and ensuring maximum energy efficiency and occupant satisfaction. Heating System Performance Compared to many U.S. buildings the heating energy consumption at 7.95 kbtu/ft 2 is particularly low given the high annual heating demand with 3,542 heating degree days. Incorporating heat recovery on outdoor air systems, low flow temperatures with high-efficiency gas condensing boilers, and weather compensation and effective controls has resulted in energy savings of 30% compared to the ASHRAE baseline (as defined by Standard 90.1 2004, Appendix G) of VAV with reheat and 80% efficient boilers. 3 8 H I G H P E R F O R M I N G B U I L D I N G S S u m m e r 2 0 0 9 Problems Reporting Energy Consumption When calculating the energy use intensity (EUI) it became apparent that one could consider that large unconditioned belowgrade areas distort the figures. A 237,732 ft 2 unconditioned area uses minimal electrical energy for lighting and ventilation and provides space for parking, bike storage and mechanical equipment rooms. The belowgrade areas are not separately submetered, so a building-only EUI cannot be calculated, although it has been estimated at approximately 69 to 71 kbtu/gross ft 2. A further consideration could be that the space within the main building, while providing an interior environment with extensive informal breakout spaces, is less efficient than it could be. The main building has approximately 260 ft 2 per person (excluding below grade) or 361 ft 2 per person based on the gross square footage, more space per person than some highrise commercial buildings, but in line with the U.S. average of 387 ft 2 per person, according to an Energy Information Administration study. This additional space further reduces the EUI due to areas with low service requirements compared to more densely packed offices. The nature of a bank headquarters calls for energy-intensive data servers. These represent a significant portion of the building energy consumption and push up the EUI by at least 10 kbtu/ft 2 compared to typical office buildings. These factors are reported to highlight that in comparing buildings, unique features are likely to increase energy consumption figures (due to specialized uses) or decrease them (due to large unconditioned areas) due to the inherent differences in the use between buildings. This further demonstrates the need for extensive submetering to really understand how energy is being used and to identify areas of inefficiency. With all these factors considered, the energy performance is still impressive compared to a standard office building. Submetering These issues highlight the importance of using submeters throughout the building. While some manual submeters were included, a greater number of pulsed output electric submeters throughout the building would make it easier to understand exactly where energy is consumed. Software can monitor the pulsed output from electric and gas submeters. This would help determine where energy is being used and identify opportunities for greater savings. Energy-Efficient Design Measures Passive cooling via natural ventilation. Displacement ventilation with perimeter fan coils for heating and cooling. Central AHUs include heat recovery and free cooling with outside air when conditions permit. Automatic external shading with venetian blinds. Central atria and light wells provide natural light deep into open plan offices. These zones are less closely controlled using return air from the offices for space conditioning. Low-power density lighting with daylight dimming is adjustable for every two people. Common area lighting has dual light levels and the atrium lighting is off during daylight hours. Controls turn lighting and HVAC systems off after 6 p.m. Small control zones of 1,076 ft 2 permit afterhours occupancy with unnecessary space conditioning. The perimeter fan coil meets perimeter heating and cooling loads with ducted fresh air. Other Green Features Transportation The building is located within the city limits and is accessible by buses and the subway. It is built over a subway line with a station entrance within 100 ft of the building entrance. Building users have access to 190 bike stalls and 37 showers. Twenty-six spaces have been reserved for fuel-efficient vehicles and 26 spaces for carpools. Indoor Air Quality Natural ventilation, low-voc paints and coatings, adhesives and sealants, and extensive placement of plants help promote the building s indoor air quality. Ventilation systems provide 30% more air than required under ASHRAE Standard 62.1-2004, with boosted ventilation rates possible in meeting rooms through local VAV boxes on the fresh air system. Daylighting reaches 95% of spaces and HVAC systems provide local control of thermostatic setpoints. Water Savings Use of dual-flush toilets and low-flow fittings resulted in water savings of 22% compared to U.S. buildings. In addition, native vegetation and a rainwater catchment system have minimized irrigation needs. Balancing Comfort, Efficiency The CSOB Headquarters is the first building in the Czech Republic to achieve LEED certification. Its incorporation of sustainable principles and designs demonstrates that even a building that houses a small city can achieve significant energy savings while maintaining occupant comfort. HPB.hotims.com/25951-5 Underfloor ductwork distributes air to the pressurized floor plenum in the open-plan office and to VAV boxes in meeting rooms. A B O U T T H E A U T H O R S Julian Parsley, LEED AP, is an engineer with Buro Happold s Los Angeles sustainability group. Ana Serra, LEED AP, is an associate with Buro Happold s New York sustainability group.