67 Years of Modular and Pre-fabricated Building Experience Backs Us Up



Similar documents
The peruvian mining sector an overview

2008 Minerals Yearbook

Somit Varma, Director IFC Oil, Gas, Mining and Chemicals Department

Project Development South America Region. Bob Drabik - EGM PDSA

Executive Summary. Water pollution in the influence area of Glencore in Espinar (Cusco, Peru)

Expansion in South America:

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

Dionisio Manlio Varga Director Contract Management, Project Engineer, Industrial Engineer.

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

Investment opportunities in Andean Region of Peru

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

HSEQ MANAGEMENT MANUAL

About us. Eugensa is an ISO 9001:2008 certified company. CERT

Chinese Investment in Peru s Mining Industry: Blessing or Curse?

BTG Pactual& CelfinSouthern Cone Andean Conference Santiago, June 5 and 6, 2013

MINING IN LATIN AMERICA: Juan Carlos Guajardo B. Executive Director

NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors)

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Emdad Services Intergulf General Contracting, Emdad

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

Movie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes

ASSOCIATION OF BUSINESSMEN IN EDUCATION. 1. Who are we?

University of Miami. Faculty Development in International Business - Latin America: Pacific Alliance. Lima & Cusco, Peru Bogota & Medellín, Colombia

GROWING ALONG WITH PERÚ

ALHO Space Factory at home with modular building

Current as of 11/10/08 1 of 1

Top Technology for Industry, Agriculture, Business and Communities

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Private Investment Promotion Plan

Guardian Telecom Systems. Telephone.

General Fire Code Requirements Within Commercial Tenant Spaces

FREEPORT-MCMORAN IN ARIZONA

PERUVIAN PRIVATE ENERGY MARKET

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLORADO

Notice to Property Owners

Peru s mining & metals investment guide 2015 / 2016

Programs of Study. Architecture and Construction

Corporate Presentation

COWENS RISK SOLUTIONS WATER DAMAGE PREVENTION

The Florida Building Code

HERNANDO COUNTY FIRE ALARM GUIDELINES

CUSTOMER SERVICE & SUPPORT. Customer oriented service optimum system utilization

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Dispelling the Solar Myth - Evacuated Tube versus Flat Plate Panels. W illiam Comerford Sales Manager Ireland Kingspan Renewables Ltd.

Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Power. a world of opportunities! Energy PROFILE. Required Components for the SHSM Energy

Mining.

Peruvian-Canadian Chamber of Commerce: Dual-Listings on the TSX and BVL

Historic Preservation Tax Incentive Program General information and instructions for applying for a historic tax exemption

City of Bettendorf Fire Alarm System Requirements

EMERGENCY EVACUATION SIGN / DIAGRAM

Peru s Energy Future. The non-renewable sources

El Desafío Solar de Chile

CONSTRUCTION SKILLS REGISTER HANDBOOK

IMPORTANT INFORMATION REGARDING COMPLETION OF THIS FORM

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Historic Preservation Tax Incentive Program Step 1 Application to the Landmark Commission

5. Financial requirements The relevant financial requirements in the board s policies.

Peru s mining & metals investment guide 2014 / 2015

Staron, a division of worldwide technology leader Samsung, offers a range of Staron

Q. Please provide resumes for Gary L. Murray, Sean LaCour, Glenn Samms, Trina L. Troke, Trina Cormier.

Saint Cloud Business Center

VEHICLE CONVERSION TO DUAL GASOLINE/CNG FROM 150 TO 100,000 IN 5 YEARS IN PERU

Fine-Tuning Regulation based on Access Indicators

CHARLOTTE COUNTY Community Development Department

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

Peru: Renewable Energy Industry

C-2 Construction, Inc. - NAICS Codes

kaneggroup Building Services LEISURE & COMMERCIAL

Agricultural Catastrophic Insurance for Poor Farmers in Perú. Lourdes del Carpio Manager, Agricultural Insurance Rio de Janeiro, November 2011

Free Examples of plant layout drawing

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

Substantial Improvement/Damage Notice to Property Owners

INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section Green Building Standards Code

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Annual Report Peruanos Haciendo Perú

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings

School of Engineering

CITY OF FERNDALE EAGLE Checklist

Product Catalogue. DynaFrame is the best way to light your banner!

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package

QDS Structural Steel Detailing

Transcription:

67 Years of Modular and Pre-fabricated Building Experience Backs Us Up

WHO ARE WE? EMSA is part of PMP Holding, a group of well-established Peruvian companies, focused on providing innovative construction solutions for the commercial, mining, agriculture, housing, hotel and office sectors. In 2007, our revenue exceeded $80 million US Dollars.

WHO ARE WE? Design, production and supply of construction oriented products. Retail and distribution of high quality construction materials (drywall, gypsum boards, etc.). Construction Management, Supervision, Assessment and Consulting services. Complete integrated services for modular and prefabricated construction.

WHO ARE WE? The EMSA organization focuses on providing Modular and Pre- Fabricated solutions. EMSA is supported by 65 years of domestic and international experience.

WHO ARE WE? Since 2005, EMSA has been a member of the Modular Building Institute (MBI), a non-profit organization that promotes modular construction worldwide. Assigned to the Silver Category and Founding Member of the Peru Green Building Council, an organization that leads the implementation of sustainable and effective construction in Peru.

QUALITY Since 2007, EMSA has been ISO 9001:2008 certified: Design Quality Management System, Development, Fabrication and Construction of Transportable Modules. This is an assurance of EMSA s products (quality and processes). Quality Plan certified by ISO 9001:2008 for shop processes and a QA/QC procedure manual for site mounting proceses.

OUR INFRASTRUCTURE THREE SHOPS: Two assembly shops and one fabrication shop. All 3 shops support our design and fabrication of all construction solutions providing unbeatable quality, resistance and durability of all our products. Fabrication Assembly

OUR HUMAN ASSETS EMSA s activities are supported by highly qualified personnel, certified under international standards which allows us to comply with challenging deadlines and safety requirements. This allows us to become a reliable option for our clients.

OUR VALUE OFFER MODULAR SYSTEM Integrated modules constructed with high quality structural components and carpentry exceeding traditional construction standards. 40 % time reduction on overall project schedule. Maximum utilization of space, from individual modules to complex modular buildings. Minimization of platform areas with 2 and 3 story high buildings Modules are easily transported. High recoverability (98%).

OUR VALUE OFFER PRE-FABRICATED SYSTEM Fast supply and easy site mounting process. Easy to transport, especially though remote and rural locations. All weather usage. High recoverability (85 90%). Alternatives: o o Timber structure and panel siding, Polystyrene insulation and fibro-cement cover boards (EMSA fabrication) Sandwich Panel siding with Polystyrene and/or Polyurethane insulation (PRECOR fabrication)

CLIENT PORTFOLIO MINING COMPANIES MINERA YANACOCHA SRL CIA MINERA CERRO VERDE FMI CIA MINERA ANTAMINA MINERA BARRICK MISQUICHILCA CIA MINERA MISKI MAYO VALE XSTRATA OIL / ENERGY COMPANIES PLUSPETROL PETROBRAS CIA OPERADORA DE LNG DEL PERU (COLP) BPZ EXPLORATION PETREX S.A. CONSULTING AND CONTRACTOR COMPANIES BECHTEL FLUOR AMEC C.N. ODEBRECHT

MAIN PROJECTS 2005 / PRESENT PERMANENT CAMPS: MINAS CONGA MINERA YANACOCHA SRL (2004) LAGUNAS NORTE - BARRICK MISQUICHILCA (2004-2005) CERRO CORONA GOLD FIELDS LA CIMA S.A. (2007) YANACANCHA CIA. MINERA ANTAMINA (2008-2009) CONSTRUCTION CAMPS: PAMPA MELCHORITA CB&I (2008-2009) BAYOVAR C.N. ODEBRECHT (2009) BAYOVAR VALE MISKI MAYO (2010) ANTAPACCAY (AMPLIACIÓN TINTAYA) XSTRATA (2010-2011) (*) MINAS CONGA MINERA YANACOCHA NEWMONT (2011-2012) (*) MOROCOCHA PASSAC ARGENTUM (2011) (*) TANTAHUATAY MINERA COIMOLACHE (2011) (*) CONSTRUCTION OFFICES: OFICINAS DEL PROYECTO TOROMOCHO AKER SOLUTIONS / MINERA CHINALCO (2011) (*) (*) UNDERGOING PROJECTS

ONGOING PROJECTS ANTAPACCAY (EXPANSION TINTAYA) XSTRATA (2010-2011) 3400 CAMAS 420 MÓDULOS PARA EDIFICIOS DE ALOJAMIENTO 24,650 M2 CONSTRUIDOS EDIFICIOS COMPLEMENTARIOS: OFICINAS COCINA COMEDOR SALAS DE RECREACIÓN POSTA MÉDICA ALMACENES PLANTAS DE TRATAMIENTO DE AGUA Y DESAGÜE REDES EXTERIORES VEREDAS Y PISTAS CANCHAS DEPORTIVAS MINAS CONGA MINERA YANACOCHA NEWMONT (2011-2012) 6400 CAMAS 752 MÓDULOS PARA EDIFICIOS DE ALOJAMIENTO 50,560 M2 CONSTRUIDOS EDIFICIOS COMPLEMENTARIOS: OFICINAS COCINA COMEDOR SALAS DE RECREACIÓN POSTA MÉDICA CAPILLA

ONGOING PROJECTS MOROCOCHA PASSAC ARGENTUM (2011) 280 CAMAS 95 MÓDULOS PARA EDIFICIOS DE ALOJAMIENTO 12,000 M2 CONSTRUIDOS EDIFICIOS COMPLEMENTARIOS: OFICINAS COCINA COMEDOR SALAS DE RECREACIÓN POSTA MÉDICA ÁREA DE SEGURIDAD Y SECADO ALMACENES TALLERES TANTAHUATAY MINERA COIMOLACHE (2011) 352 CAMAS 60 MÓDULOS PARA EDIFICIOS DE ALOJAMIENTO 4,250 M2 CONSTRUIDOS EDIFICIOS COMPLEMENTARIOS: OFICINAS COCINA COMEDOR SALAS DE RECREACIÓN POSTA MÉDICA ÁREA DE SEGURIDAD Y CONTROL DE ACCESO ALMACENES

ANTAPACCAY XSTRATA EXPANSION TINTAYA LOCATION: ESPINAR, CUSCO -- ELEVATION: 4250 m.s.n.m. - CAPACITY: 3400 PAX MAIN SYSTEM: MOD D-LUX / PRE-FABRICATED Nº MODULES: 420 DURATION: 10 MONTHS CONSTRUCTION CAMP - WILL BE USED PARTIALLY AS A PERMANENT RESIDENT. ONGOING HOUSING UNITS: MANAGERS, EMPLOYEES AND LABORERS SUPPORT BUILDINGS: MESSHALL/KITCHEN, CLINIC, RECREATION BUILDINGS OFFICES WORKSHOPS AND STORAGE FACILITIES

ANTAPACCAY XSTRATA EXPANSION TINTAYA

CBI PAMPA MELCHORITA, PERÚ LOCATION: CAÑETE, LIMA (COAST) -- ELEVATION: 150 msnm - CAPACITY: 3,725 people MAIN SYSTEM: MODULAR / PRE-FABRICATED Nº MODULES: 794 DURATION: 10 months

CBI PAMPA MELCHORITA, PERÚ Construction Offices Laborers Messhall Staff Messhall

CBI PAMPA MELCHORITA, PERÚ Interior Pictures Gym Recreation Center / Laborers Supervisors Housing Building corridor

YANACANCHA CAMP - ANTAMINA LOCATION: ANCASH (HIGH LANDS) -- ELEVATION: 4,200 msnm - CAPACITY: 1,792 people MAIN SYSTEM: MODULAR DLUX Nº MODULES: 399 DURATION: 8 months PERMANENT CAMP TEN 3-STORIES HIGH HOUSING BUILDINGS HIGH STANDARD BUILDINGS URBAN CIVIL WORKS

ANTAMINA, PERÚ

BAYOVAR CAMP VALE MISKI MAYO LOCATION: SECHURA, PIURA -- ELEVATION: 10 m.s.n.m. - CAPACITY: 3300 people MAIN SYSTEM: PRE-FABRICATED Nº MODULES: N/A DURATION: 13 MONTHS OPERATION CAMP PERMANENT HOSUSING, OFFICES AND SERVICES BUILDINGS

BAYOVAR CAMP VALE MISKI MAYO

CERRO VERDE FMI LOCATION: AREQUIPA -- ELEVATION: 2,700 msnm - CAPACITY: N/A MAIN SYSTEM: PRE-FABRICATED / MODULAR D-LUX Nº MODULES: 11 DURATION: 8 months AUXILARY SERVICES AND PROCESS BUILDINGS

CERRO VERDE FMI

CERRO VERDE FMI

LAGUNAS NORTE BARRICK MISQUICHILCA LOCATION: LA LIBERTAD -- ELEVATION: 4,100 msnm - CAPACITY: 1,100 people MAIN SYSTEM: MODULAR (DL&ST) Nº MODULES: 145 DURATION: 8.5 months PERMANENT CAMP CONTRACTORS CAMP URBAN CIVIL WORKS HIGH CONFORT AND SECURITY STANDARDS (CENTRAL HVAC SYSTEM, HEATED SWIMMING POOL, SPRINKLERS FIRES SYSTEM)

LAGUNAS NORTE BARRICK MISQUICHILCA

LAGUNAS NORTE BARRICK MISQUICHILCA

EXPANSION CAMP LA QUINUA YANACOCHA LOCATION: CAJAMARCA -- ELEVATION: 3,500 msnm - CAPACITY: 1,198 people MAIN SYSTEM: MODULAR DL / PRE-FABRICATED Nº MODULES: N/A DURATION: 9 months PERMANENT CAMP HOUSING BUILDINGS MANAGERS, SUPERVISORS AND LABORERS SERVICES BUILDINGS

EXPANSION CAMP LA QUINUA YANACOCHA

CAMP CH MACHU PICCHU GYM LOCATION: MACHU PICCHU, CUSCO -- ELEVATION: 1800 m.s.n.m. - CAPACITY: 600 people MAIN SYSTEM: PRE-FABRICATED Nº MODULES: N/A DURATION: 14 Months (incluidng rain season standb)y CONSTRUCTION CAMP HYDROELECTRIC PLANT MACHU PICCHU HOUSING BUILDINGS MANAGERS, SUPERVISORS AND LABORERS EDIFICIOS DE SERVICIOS COMPLEMENTARIOS

GALENO - LUMINA COPPER LOCATION: LA ENCAÑADA, CAJAMARCA -- ELEVATION: 3,400 m.s.n.m - CAPACITY: 96 people MAIN SYSTEM: MODULAR D-LUX Nº MODULES: 16 DURATION: 4 Months OPERATIONS CAMP PERMANENT HOUSING BUILDINGS