San Diego Citizen s Forum. USIBWC San Diego Field Office



Similar documents
REPORT COMPARING THE COST AND TIMELINES FOR CONSTRUCTION OF SECONDARY WASTEWATER TREATMENT FACILITIES IN THE UNITED STATES AND IN MEXICO FOR THE

5. Environmental Analysis

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Greater Los Angeles County Region

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

DRAFT Public Outreach Document for What s an SSMP?

Storm Drain System Operation and Maintenance

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

City of East Lansing CSO Control Facility Evaluation Demonstrative Approach to Meet WQS

Kansas City s Overflow Control Program

PERMITTEE/FACILITY NAME: City of Detroit Water and Sewerage Department / Detroit Wastewater Treatment Plant

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Toronto s Wet Weather Flow Master Plan

Southeast Arizona Citizens Forum. Nogales, Arizona. April 07, *Tentative Meeting Notes*

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

5.14 Floodplains and Drainage/Hydrology

Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

Flood Risk Management

Flood Risk Management

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

How To Recover From A Flood In Bundaberg

Otay Mesa - Mesa de Otay Binational Corridor Strategic Plan

3.1.8 Utilities and Service Systems

Addressing Declining Elevations in Lake Mead

Click to edit Master title style

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

City of Los Angeles Bureau of Sanitation Business Development Services

Post-Flood Assessment

The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone

California Wastewater

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

Foothill Municipal Water District Recycled Water Project

The Clean Water Project What Is The Stormwater Impact?

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Texas Commission on Environmental Quality Page 1 Chapter Design Criteria for Domestic Wastewater Systems

Asset Management Answering the 5 Core Questions

DRAFT FINAL MITIGATED NEGATIVE DECLARATION Pursuant to Section 21080(c) Public Resources Code

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

Characterization of water quality in the Los Angeles River

TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN

Proposed General Plan Update Goals, Policies, and Implementation Actions

Combined Sewer Overflows in the Milwaukee Metropolitan Sewerage District Conveyance and Treatment System

Building Resilient Infrastructure for the 21 st Century

Type of Sewer Systems. Solomon Seyoum

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

EPA Trends for wastewater Treatment in California

Prattsville Berm Removal Project. 1.0 Project Location

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

City of Mebane Wastewater Collection and Treatment Facility

Securing California s Water Future

Executive Summary Consent Decree

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

Storm Water Management Requirements for Construction Projects Less than One Acre

The City of Ottawa Flood Hazards

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

System Optimization: The First Step in CSO Control Alternatives Development

What is a CSO / SSO? Sewer Overflows. Prevalence of CSOs in the US. Magnitude of Problem (Local)

Swannanoa River Flood Risk Management Study

Standard Operating Procedures for Flood Preparation and Response

PRSENTATION ON DRAINAGE SYSTEM DELHI EAST DELHI MUNICIPAL CORPORATION

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

The 91 st Avenue Unified WWTP Targets 100 Percent Reuse

FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN

Transcription:

San Diego Office Update San Diego Citizen s Forum Steve Smullen, Area Operations Manager USIBWC San Diego Field Office August 25, 2011

SAN DIEGO OFFICE ACTIVITIES Flood Control Tijuana River Flood Control Project Water Quality South Bay International Wastewater Treatment Plant Boundary Demarcation Ports of Entry, San Diego County, Monuments 230-258 Tijuana Emergency Water Deliveries i Tijuana River Valley Recovery Team

Tijuana River Valley

TIJUANA RIVER WATERSHED 1,725 square miles, 2/3 in Mexico River flows north into ocean at Imperial Beach Morena and Barrett Dams in the U.S. operated by City of San Diego for water conservation Carrizo and Rodriguez Dams in Mexico operated by National Water Commission for water conservation and flood control

TIJUANA RIVER WATERSHED

TIJUANA RIVER WATERSHED Barrett Dam San Diego, California Rodriguez Dam Tijuana, Mexico

TIJUANA RIVER FLOOD CONTROL PROJECT International flood control project; constructed in 1970s per Minutes 225, 236, and 258 Design flood of 135,000 cfs, the maximum flood that can reasonably be expected Mexico has a 2.7-mile concrete-lined channel Original plan for 5.3 mile concrete-lined channel in U.S. scaled back at request of City of San Diego U.S. constructed a 1200-ft. concrete-lined channel connected to 3700-ft. long velocity reduction structure; levees extend to Dairy Mart Road U.S. levee height of 12-23 feet USIBWC responsible for maintenance of U.S. portion

TIJUANA RIVER FLOOD CONTROL PROJECT Channel at international boundary During Dec. 2008 storm. Flooding occurred downstream from IBWC project.

FLOOD WARNING SYSTEM Binational flood warning system for Tijuana River established per 2003 agreement System of rain gages and stream gages provides real-time data accessible to emergency managers in both countries Encompasses Morena Lake, points east to Tecate, and west to the coast Automatic Local Evaluation ation in Real Time (ALERT) system maintained by San Diego County in U.S. and IBWC in Mexico

FLOOD WARNING SYSTEM

Boundary Demarcation Boundary demarcation Demarcation at ports of entry Repair or replacement of monuments Address boundary encroachments Boundary Monument

Monument 258

Port of Entry Delineation Boundary Demarcation San Ysidro, CA Port-of-Entry Markings Otay Mesa, CA

Tijuana Emergency Connection Minute 314 (2008) Provides for emergency delivery of a portion of Mexico s allotment of Colorado River water through California conveyance system Various U.S. entities cooperated: SDCWA MWD Otay Water District Mexico pays all costs Connection at Otay Mesa

SANITATION - MINUTE NO. 283 (1990) To address flow of sewage into the U.S. via the Tijuana River Mexico to help fund a wastewater treatment plant in San Diego in lieu of a planned plant in Tijuana Secondary treatment level in accordance with more stringent U.S. standards Construction of an ocean outfall by the U.S.

SOUTH BAY INTERNATIONAL WASTEWATER TREATMENT PLANT Located on Clearwater Way, next to San Diego s South Bay Water Reclamation Plant. Plant capacity of 25 mgd advanced primary plant completed 1997 Construction of the secondary plant began Jan 2009 and was completed April 2011. Cost = $93M. Provides secondary treatment to sewage emanating from Tijuana Mexico paid a portion of capital costs, continues to contribute to O & M, approx $1.8M/ year + all solids disposal. O&M cost share is based on treated flow. Treated effluent discharged d 3.5 miles offshore via South Bay Ocean Outfall

SOUTH BAY OCEAN OUTFALL

SOUTH BAY INTERNATIONAL WWTP

Construction Status Contract Completion Date 8/31/11 Secondary Compliance Date 1/5/11 Award Amount: $87,637,816 Current Contract Amount: $92,984,692 Contract Obligation are complete except for warranty items

Plant Operations Bypassing flow around secondary has been resolved. Permit requirements generally met in Feb-May 2011 timeframe Upset in June 2011 may have been result of increased metals in influent (chromium, iron, nickel, copper)

Effluent Quality Effluent violations in July thought to be result of higher peak flows causing hydraulic issue and solids washout. Discovered to be result of low DO at peak flows. Since early Aug, TSS/CBOD averaging <20 mg/l. Permit is 30/25 Acute Toxicity all tests passing

Wastewater Infrastructure USIBWC, CESPTT (Tijuana Utility) Four WWTPs SBIWTP (US-25 mgd), Arturo Herrera (MX-10 mgd), La Morita (MX-6 mgd), San Antonio de los Buenos (MX-25 mgd) Pump Station No. 1, PS CILA, smaller lift stations (MX) Canyon collection facilities (US)

Mexican Wastewater Facilities San Antonio WWTP 25 mgd

San Antonio de los Buenos 75 1er. Trimestre 2do.. Trimestre 3er.. Trimestre 4to. Trimestre

Arturo Herrera WWTP 10.5 mgd (currently treating ti 5 mgd)

La Morita WWTP- (5.8 mgd currently treating ti 2 mgd)

Arturo Herrera La Morita 2011 2011

Canyon Collectors Canyons flowing north from Mexico to US (high risk due to passage/sheltering of illegals Stewarts Drain) Necessary in case of failure of Mexico lift stations may result in sewage spills in the US Small concrete weirs and diversion boxes with gravity flow to larger pump p stations (Smugglers Gulch above left ) Largest two recently rebuilt as part of Border Fence

Pump Station CILA Pump Station CILA diverts Tijuana River flows into 1) sewer system or 2) reclaimed water system TJ River flows are combination of 7 mgd of sec effluent, storm runoff and wastewater discharges Eliminates dry weather flow into the US, wet weather flows continue to plague US beaches

Tijuana River Flow Two sources - 1) runoff from the Tijuana River Watershed and 2) secondary effluent from Arturo Herrera and La Morita WWTPs. Runoff includes uncontrolled flow from a full Barrett Dam in the US or a full Rodriguez Dam in Mexico, and from undammed portions of the watershed during rainy periods. Effluent flow is continuous and steady and is not influenced by rainfall. In accordance with Mexican policy, when flows exceed 1000 lps (about 23 mgd), Pump Station CILA is shut down. US and Mexico are in discussions to increase this number.

Sistema actual de Alejamiento de Aguas Superficiales ` ` Agua proyecto morado Agua tratada Agua proyecto morado mezclada Agua negra

Reservoir Levels City Water Department is drafting Barrett and transferring water to Lower Otay Reservoir using Dulzura Flume As of 7/27/11, Barrett was being drafted at 5 mgd and by first week in Aug will increase to 20 mgd Continue to draft at that rate through 2012 to lower Barrett 50 feet. Rodriguez Dam was at 25% capacity in Feb 2011, now at 17%

Bi-national Challenges IBWC

Joint Operation of Pump Station ti No.1 and SBIWTP SBIWTP takes flow just upstream of PS No.1 wet well During maintenance periods, SBIWTP must take all flow from Mexico for short periods. Alternatively, during special operations at SBIWTP, Mexico is required to pump all flow. These periods usually occur during overnight hours. PS No.1 has no Emergency Generator Quarterly Operations Meetings- CESPTT, IBWC, Veolia to discuss/resolve issues

NPDES Permit Compliance Higher flows to SBIWTP must be accounted for within 30 days NTE 25 mgd in 30 day average Sampling in Mexico at 3 surf stations for US NPDES permit Dumping of concentrated t loads may cause plant upsets/violations monitoring sewer er overflows/ww spills draft NPDES permit expected end of 2011.

Sludge Hauling Mexico Responsible for Solids Disposal - Landfilled d at San Antonio de los Buenos Treatment Plant Special Gates in Border Fence to Expedite Passage Poses Security Risk, Drivers have Commission IDs

TIJUANA RIVER VALLEY RECOVERY TEAM Initiated by Regional Water Quality Control Board in 2008 to facilitate future issuance of Total Maximum Daily Load limits for solid waste and sediment Group of 20 agencies and stakeholder groups with policy oversight Focus is to implement a recovery plan for the TJ River Valley Tijuana River estuary is unique in Southern CA because it has not been bisected by urban corridors

Tijuana River Valley Recovery Team - Trash and Sediment

Trash and Sediment TJ River Flood Control Project Sediment/Trash Removal planned for FY12 404 Permit 401 Water Quality Cert Coastal Consistency Determination R l f di t f G t C Removal of sediment from Goat Canyon basins and invasives removal & restoration d/s of the basins SBIWTP construction mitigation planned for this fall.

Tijuana River Sediment Removal

Tijuana River Sediment Removal

INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO UNITED STATES SECTION www.ibwc.gov (619) 662-7600