Maintaining Indoor Air Quality During Construction and Renovation Projects

Similar documents
IEQ Management Plan. Denver Museum of Nature and Science ECF Addition

Radford University. Indoor Air Quality Management Plan

Building and Grounds Maintenance Checklist

Mould Mould A Basic Guide

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

Specification. Indoor Air Quality Management

Indoor Environmental Quality Management Plan

There are several types of air cleaning devices available, each designed to remove certain types of pollutants.

"An Office Building Occupant's Guide to Indoor Air Quality"

A Breath of Poor Air: Inspecting Indoor Air Quality in the Classroom Ashley Schopieray

INDOOR AIR QUALITY INTRODUCTION WHAT ARE THE SYMPTOMS OF SICK BUILDING SYNDROME? WHEN DID POOR INDOOR AIR QUALITY BECOME A PROBLEM?

Staff shall ensure that airflow is not obstructed by the blocking of ventilators with posters, furniture, books, or other obstacles.

NDSU TABLE OF CONTENTS

Guidelines for Mold Remediation (Removal)

WATER DAMAGE INVESTIGATION. Massachusetts Department of Public Utilities 1 South Station Boston, Massachusetts

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

Indoor Air Quality. 2. Test and identify sources that contribute to poor indoor air quality.

Wildfire Smoke and Your Health

Indoor Air Quality Issues for Hotels

ASTHMA REGIONAL COUNCIL

Asbestos Management. 2. Introduction. Contents

SMACNA s IAQ for Occupied Buildings Under Construction

Public Employees Occupational Safety and Health Program

EVERYONE'S RESPONSIBILITY

Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project

IAQ - indoor ventilation Air contaminants Molds Requirements for growth Health effects Mold prevention - moisture EH&S mold checks & removal

Guidelines for Cleaning Staff on Managing Mould Growth in State Buildings

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

School Renovation and Construction: What you Need to Know to Protect Child and Adult Environmental Health

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

Indoor Air Quality- What You Need to Know

University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE. Facilities Maintenance Services

Mold Response and Remediation Plan

MOLD RESPONSE AND REMEDIATION PLAN

LABOR. Renovation & Construction in Schools Controlling Health and Safety Hazards. Background

Mold Management Plan Operations & Maintenance

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part , Subpart Z Asbestos

Mold and Mildew Mold and mildew can be detected by sight, smell and touch.

CONSTRUCTION DESIGN GUIDELINES FOR WORKING WITHIN AND/OR NEAR OCCUPIED BUILDINGS TABLE OF CONTENTS

ASBESTOS SCIENCE TECHNOLOGIES, INC.

University of Vermont

Educational Performance, Environmental Management, and Cleaning Effectiveness in School Environments

Asbestos. from the Home. Removing. Read this booklet for:

PEOSH. Indoor Air Quality Training for Asthma-Friendly Schools Part I PEOSH Indoor Air Quality Standard Overview. Eric Weren, MSIH

INDOOR AIR QUALITY ASSESSMENT INCIDENT RESPONSE. Sgt. William H. Carney Memorial Academy 247 Elm Street New Bedford, Massachusetts

3M Personal Safety Division 3M Center, Building W-75 St. Paul, MN, USA

Characteristics/Applications

ASBESTOS MANAGEMENT PROGRAM

Slide 1. Slide 2. Slide 3 Indoor Air Quality in Schools. School Floor Coverings: Effects on Children's Well- Being and Learning. Floor Covering Issues

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards

Control Provisions under the Air Pollution Control Ordinance

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

CONSTRUCTION IAQ MANAGEMENT PLAN During Construction

IEQ-15 Air Distribution System

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

INDOOR AIR QUALITY ASSESSMENT

Mold Questions and Answers Questions and Answers on Stachybotrys chartarum and other molds

Genett Group, Inc. Genett Group, Inc. Anti Microbial Technology. Hospitality Schools Hospitals Construction Remediator Assessor

WATER DAMAGE/MOLD INVESTIGATION. Massachusetts Department of Developmental Services 68 North Main Street Carver, Massachusetts

Fungal Assessment. Smith Recreation Community Centre 1019 Hwy 2A, Smith, Alberta

How To Prevent And Manage A Flood And Mold

WATER DAMAGE INVESTIGATION. Massachusetts Gaming Commission 101 Federal Street Boston, Massachusetts

Draft Healthy Home Environmental Assessment Principles

Section 1: Identification. GLO GERM POWDER All colors

SOLVENT CLEANER MSDS Page 1 of 5 SAFETY DATA SHEET. (To comply with OSHA s Hazard Communication Standard 29CFR /ANSI z400.

HUD Healthy Homes Grantee Program Sample Program Evaluation Plan

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M

In addition, flammable solvents and thinners are often mixed with the above substances.

DUCT CLEANLINESS FOR NEW CONSTRUCTION GUIDELINES

Good ventilation is important

Water Incursion Standard Operating Procedure

Part 2: Drying Out Your Home

UNIVERSITY OF TOLEDO

North Carolina State University. Asbestos Management Plan

CSA Z Infection Control during Construction, Renovation and Maintenance of Health Care Facilities Overview and Case Studies

LEGAL REVIEW & UPDATE

Arbor Heights Indoor Air Quality Investigation Interim Report

DRAFT White Paper Asphalt (non-permitted) Strategy Evaluation Portland Air Toxics Solutions

Eco-Friendly Homes Presentation Asbestos, Mold, and Lead-Based Paint

Stachybotrys chartarum a mold that may be found in water-damaged homes

Particularly Hazardous Substances (PHS) Standard Operating Procedure (SOP)

The following standard practices, safety equipment, and facility requirements apply to BSL-1:

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Mold. Guidelines for New Jersey Residents. Understanding Mold Investigations & Remediation

Old Dominion University Mold Management Plan

ASBESTOS MANAGEMENT INTRODUCTION

Management Plan for Indoor Air Quality

MATERIAL SAFETY DATA SHEET

APPENDIX B. EPA s Investigating, Evaluating, and Remediating Moisture and Mold Problems (see EPA website for complete details)

Asbestos: Guidelines for Managing Asbestos in Buildings

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

Managing Water Infiltration into Buildings. Water Damage Check List

Now that Your Building Experienced Water Damage What Must You and Your Water Damage Restoration Contractor Agree On?

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

Safety Data Sheet. SECTION 1: Identification. SECTION 2: Hazard identification

Walkthrough Inspection Checklist

Infection Control Risk Assessment : the Infection Preventionist s Role in Construction

Washington University Asbestos Operations and Maintenance Plan

34 ASBESTOS. Where is it?

ASBESTOS CONTROL PLAN

Transcription:

Maintaining Indoor Air Quality During Construction and Renovation Projects I. Introduction Construction and renovation projects present a variety of situations which may release contaminants and pollutants that can impact the indoor air quality (IAQ) of a building. These contaminants may be transported to other areas via the heating, ventilation and air conditioning systems and subsequently affect populations beyond the immediate project area. Advance planning by Project Managers, appropriate contract language, material review and selection processes, and effective control strategies combined with proactive communication efforts can successfully control pollutant levels, allay concerns, and maintain occupant comfort during and after construction activities. Most building occupants expect to work in a building free of pollutants. While there are currently no enforceable IAQ standards, workers are certain to consider exposure to nuisance dusts and odors from a construction site unacceptable. Indoor air pollutants are typically complex mixtures of low level contaminants which are difficult to measure. Rather than attempting to quantify levels of contamination which may be present in indoor air, it is more realistic to subjectively approach the issue and attempt to maintain an environment which is perceived to be clean, well ventilated, odor free, and comfortable in terms of temperature. The Environmental Health and Safety Office staff is available to work with Project Managers during the planning phases to design strategies to control potential hazards and eliminate common concerns associated with construction projects. The following information and recommendations are presented as an overview of the issues to consider in an effort to maintain acceptable indoor air quality. The intent of this guidance document is to increase awareness and to encourage the practice of utilizing the least toxic material suitable for the application. II. Contaminants / Sources / Hazards Volatile Organic Compounds (VOCs) Volatile organic compounds (VOCs) are compounds that are readily released in the form of a gas from building materials. Construction projects may introduce a variety of VOC emitters into a space. These compounds are associated with a variety of health symptoms. At high enough levels, exposure can cause central nervous system effects (headaches, drowsiness). At lower levels, they are reported to be irritants to the eyes, nose and throat. Specification of low VOC emitting products is always recommended, but is critical if the material to be installed has a high surface area to room volume ratio (for example, covering a large surface in the room, such as floors and walls, will introduce more material and have a more significant impact on the air quality). Use of the following categories of VOC emitters should initiate control strategies to minimize occupant exposures: Coatings Stains/Varnishes Resilient Flooring Caulks Fuels, Cleaners Wall Coverings Sealants Adhesives Composite Wood Products Paints Carpeting Fabrics, Draperies 1

Particulates (Dusts and Fibers) Nuisance Construction activities may also introduce particulate matter such as dusts and fibers into an environment. Non toxic or nuisance dusts will be created by cutting, sanding, disturbing dirty areas or the installation of Portland cement, gypsum, limestone, and Plaster of Paris. These dusts will cause no long term health effects, but can increase occupant discomfort and can be mistaken for more hazardous materials such as asbestos. Fiberglas and mineral wool can be irritating to the skin, eyes, and respiratory tract. While long term health effects are still being studied, environmental controls and appropriate personal protective equipment should be implemented. Hazardous Particulates which are subject to special regulation include lead paint dust which is toxic to the nervous system, and asbestos which is a carcinogen. Projects which may disturb lead painted surfaces or asbestos containing materials warrant close supervision to ensure compliance with all applicable laws. Consult the EH&S Office to determine if a building survey has been completed. Licensed and certified contractors will be required to conduct these types of activities. Combustion Products Combustion sources ( vehicles, generators, and space heaters) may introduce carbon monoxide, carbon dioxide, nitrogen oxides, and sulfur dioxide into a space. Welding can produce these contaminants as well as ozone. These gases may cause eye, nose, throat, and respiratory system irritation. Some individuals, such as those with asthma, may experience more serious reactions. Carbon monoxide exposure may cause headache, dizziness, rapid heartbeat, and at high levels can be fatal. Biological Materials Demolition of materials and disturbance of previously sealed areas may contribute to the release of biological pollutants. Fungi, dust mites, insect parts, and microorganisms can become airborne when renovations are undertaken, stagnant water is encountered, and bird or animal droppings are disturbed. Chronically wet or damp areas may be reservoirs of gross contamination. Exposed individuals may develop allergic reactions or infections. Engineering controls to minimize worker and occupant exposure, personal protective equipment, and proper decontamination techniques must be considered when biological contamination may be present. Physical Agents Lastly, physical agents such as noise, vibration, and uncomfortable temperatures can generate complaints from building occupants working adjacent to a renovation. Construction activities may interrupt heating, ventilating, and air conditioning services. Vibration can also contribute to more serious hazards such as the delamination of asbestos material in another space, or the creation of a chemical spill when containers fall from shelves. 2

III. IAQ Control Strategies Early identification of existing building hazards is the first step toward eliminating the development of an IAQ problem. Inspect the area to be renovated during the project planning stage. Look for possible asbestos and lead containing materials which may be disturbed. Attempt to identify sources of dust and microbial contamination. Consult EH&S documentation and arrange for surveys and analyses when appropriate. Implement a strategy of source management by choosing one or more of the following: Source Removal Identify a source of contamination and relocate it so that it will not impact the IAQ. For example, do not locate a diesel generator or a roofing kettle near a building air intake. Source Substitution Identify a material likely to impact the IAQ and select a similar but less toxic substitute. Review MSDS s, manufacturer specifications, and consult with EH&S. For example, choose latex over oil based paint, hardwood over pressed wood, water based over solvent based adhesives, low formaldehyde emitting fabrics, and continuous filament carpet. Consult Boston College Standards for materials which have been reviewed and determined to be acceptable. Source Encapsulation Create a barrier around the source and isolate it from other areas of the building so that there is no recirculation of air from the work area into occupied spaces. This may include physically isolating a section of the building with polyethylene sheeting or other barriers, as well as isolating the space from the general ventilation system by blocking return air grilles. Keep doors closed and seal stairwells so that they do not act as conduits for contaminants. Ventilation Utilize either dilution ventilation or local exhaust ventilation in conjunction with isolation techniques to reduce contaminant levels. Dilution ventilation increases the amount of outside air passing through an area to dilute and flush out low levels of contaminants. If the building ventilation system will be in contact with the work area, consider installing additional filters to keep particulates out of the ductwork. Change all filters at the conclusion of the project. When strong odors and higher contaminant levels are expected, the area should be encapsulated and placed under negative pressure. This technique isolates the work area from the building ventilation system and uses exhaust fans to directly remove contaminants to the outside. Explosion proof fans must be used while there are flammable chemicals being used in the work area. Positively pressurizing non-work areas and running ventilation systems overnight will minimize contaminant migration into occupied spaces. 3

Exposure Control It may be unrealistic to attempt to completely eliminate airborne contaminants during a construction project, but it is possible to minimize occupant exposure to those contaminants by carefully scheduling the work during periods of low occupancy such as holidays, evenings and weekends. In addition, allow for a flush out period of ventilation prior to reoccupying the work area. It is recommended that the area be flushed out with maximum outside air at normal temperatures for 72 hours prior to reoccupancy. Increased ventilation may also be warranted for 2 weeks to 2 months post occupancy to remove low level off gassing. Finally, be sensitive to the fact that some individuals are more susceptible to low level contaminants than most, and these people may need to be temporarily relocated. Health Services and occupational health specialists may need to be involved in these determinations. Housekeeping Good housekeeping practices will go a long way toward containing dusts and construction debris, and allowing building occupants to feel confident that the project is well managed. Consider using a HEPA filtered vacuum cleaner to minimize recirculation of contaminants. Suppress dust with wet methods. Quickly clean up spilled materials. Protect porous materials such as insulation from exposure to moisture and contaminants. IV. Notification / Communication Proactive communication and advance notification of all affected parties can prevent IAQ issues from developing and escalating. Develop a list of building or departmental contacts who can disseminate project details and schedules to all building occupants. Classroom work should include notification of the Registrar s Office. Signage might be posted to provide a phone number for concerned visitors seeking information. Request that building occupants first contact these representatives, who will then communicate concerns to the Project Manager for resolution. Provide accurate information about chemical products which will be used, noises, dusts, odors, and disruptions to the normal routine well in advance of the project start date. Explain that the least toxic materials available have been selected, and provide Material Safety Data Sheets for review. Listen to occupant concerns, discuss control strategies which will be implemented to minimize contaminants, and allow the end user to have input into the scheduling process. Make allowances for individuals with special concerns or sensitivities. Keep actual health risks in proper perspective. Temporary relocation and referral to Health Services may occasionally be warranted. V. Example Projects Flooring During flooring operations, existing building materials ( sheet & tile flooring and mastic) which must be removed or prepared must first be examined to see if they are asbestos containing materials (ACM). Consult EH&S or the building survey for this information. Grinding, surfacing, sanding, abrading, breaking or removing ACM flooring may only be done by a licensed asbestos contractor according to all pertinent regulations. 4

Review the manufacturers specifications on replacement carpet and vinyl flooring and select those with low emission data. New products which are opened and unrolled at the contractors facility will emit fewer VOCs upon installation. More importantly, consult the approved products listing and select a low emitting adhesive for flooring installation. Always follow the manufacturers recommendations for use and ventilation. Maintain a copy of the MSDS on site. Minimize the amount of chemical product stored at the construction site, and ensure that containers not in use are kept sealed. Select the most appropriate flooring material for the space. Carpeting used in areas subject to moisture will promote microbial growth contributing to IAQ problems in the future. Implement some combination of the source management techniques to control contaminant levels generated during and after construction. Painting Painting operations should begin with the confirmation that the painted surface to be prepared is lead free. Consult EH&S and building surveys for this information. Sanding of lead paint is prohibited and removal may only be done by a licensed deleading contractor according to all pertinent regulations. Select a low VOC emitting paint that is free of lead and mercury. Minimize occupant exposure to interior painting by scheduling it during off hours, isolating the space, and ventilating the area well both during and after the painting is completed. Refer to the source management techniques referred to previously. Roofing Outdoor work, such as roofing, can also have a significant impact on indoor air quality. Hot tar and hot asphalt materials are intensely odorous, and will generate many complaints if the emissions are drawn into the building. Locate these sources away from air intakes when feasible, and consider wind patterns. Instruct occupants to keep doors and windows closed. Indoor air intakes may need to be temporarily shut down. Whenever possible, schedule this work during low occupancy periods and provide good communication to all impacted parties which may include neighboring buildings. Roofing materials may also contain asbestos. Consult EH&S and the building survey to ensure that all pertinent regulations are being implemented when handling asbestos containing materials. 7/98 Boston College Office of Environmental Health and Safety 5