BGE Service Application Guidelines Commercial & Industrial Projects



Similar documents
BGE Service Application Guidelines Residential Modification/Relocation Projects

REQUEST FOR ELECTRIC SERVICE Commercial

Please Refer to Attached Sample Form

How To Get A Power Line Extension

Applying For New or Revised Electric Service

Please Refer to Attached Sample Form

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Natural gas and electric service guide

Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) or call (800) Date Faxed: 1

We look forward to serving you!

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information

MLGW Contact Numbers. Memphis Light, Gas and Water Division P.O. Box 430. Memphis, TN

Application for. Commercial New Service

Temporary Electric Service

Step 1: Application Instructions

Building Permits Permit Counter

Electric Service Conversion Overhead-to-Underground. Minnesota

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

Electric Service Guide for Commercial Construction

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

Contents. Section 1 General Information 2. 1.A Introduction 3 1.B Overview 3 1.C Pricing, Billing, and Payment Policies 6

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

How To Get A Building Permit In Florida

New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID (208)

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Considering UNDERGROUND. tampaelectric.com

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Application for electricity connections Business premises

Guidelines for Fiber Optic Cable Permits

City of Douglas Commercial Building Permit Site Application

COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No.

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

ELECTRIC SERVICE GUIDELINES (For Indiana)

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

Approved Meter Sockets and Cabinets

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE

LADWP CITY OF LOS ANGELES DEPARTMENT OF WATER AND POWER ELECTRIC SERVICE REQUIREMENTS 2010 EDITION NOTICE

your electric service: from overhead to underground

PV (photovoltaic) Basics There are generally two types of PV systems. The first and easiest (though the least flexible) is a grid tie system where

APPLICATION FOR AN ELECTRICITY CONNECTION (PROJECTS)

This Facilities Extension Agreement is entered into by and between Fmt B«nd Onmrt,

New Commercial Service Application

2015 Service Guide XCEL ENERGY. Minnesota North Dakota South Dakota Natural Gas and Electric Installation Information for Residential Contractors

APPLICATION FOR NEW CONSTRUCTION

BASIC NEC CODE RULES AND DESIGN PRACTICE

Builder/developer gas service application

STATE OF FLORIDA DEPARTMENT OF HEALTH APPLICATION FOR CONSTRUCTION PERMIT Permit Application Number

Does your new building

Building Code Inspections and Fees

Moving a House in Pasadena

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

Building Permit Application

NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1

Policy and Guidelines for Electric Service

SCOPE OF WORK PROVISIONS FOR ELECTRICIAN: MAINTENANCE ELECTRICIAN ORANGE COUNTY

GENERAL ELECTRICAL REQUIREMENTS

Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs.

NORTHERN LIGHTS, INC. SINGLE PHASE APPLICATION CHECKLIST

Connecticut Standardized Municipal Instructions for Solar Photovoltaic (PV) Permitting Process Town of Pomfret

IRRIGATION PUMPING Table of Contents - Section 900

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

Austin Energy Design Criteria

Electric Service Guide for Residential Construction

City of Hilshire Village Pine Creek Ln Reconstruction

Utility Department City/ Province. State, ZIP, Country

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

Property Condition Disclosure Statement

NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps

New Residential Service Requiring Construction

We thank you again for your invaluable contribution to the World Bank s work.

Please check with your local inspection authority for any additional requirements before installation.

PRE APPLICATION CONFERENCE - INTRODUCTION

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

Load Management Wiring Guide

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

Floodplain Development Land Use Review

Electric Service Guide. Residential Subdivision

Fixed Assets Inventory General Information

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: Uptime Racks:

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

BUILDING PERMITS. Santa Rosa County Building Inspection

DOUGLAS COUNTY, WASHINGTON. APPLICATION FOR SMALL WORKS ROSTER and VENDOR LIST

BUILDERS HANDBOOK NEW RESIDENTIAL CONSTRUCTION

TOWN OF OHIO BUILDING PERMIT APPLICATION

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

Transcription:

BGE Service Application Guidelines Commercial & Industrial Projects To the Customer Following is important information to assist you in applying for BGE gas and/or electric service and in completing the BGE Service Application for Commercial & Industrial Projects for service to the following types of facilities: New commercial or non-residential buildings Apartments or condominiums Barns and garages Service increases to existing commercial or non-residential buildings Relocation of existing BGE non-residential facilities Traffic signals and cameras, CATV power supplies, cell sites, wireless antenna sites Completing the Service Application In order for BGE to meet your requested service date, we strongly recommend that you submit the service application as early as possible in your planning process. It is very important that you complete all the requested information on the service application. Do not skip or omit any of the items. This may cause unnecessary delay of your project. Jobs are subject to cancellation if you do not respond to requests for information or if initial site work does not progress. In addition, it is essential that you enter your company s name accurately on the service application. When you are asked for the Legal Name of Company, please provide the official name of your company as it appears on file with the State of Maryland Attorney General s Office. Your company s legal name will also appear on your Charter or Articles of Incorporation. See the chart below to determine the number of load information sheets you will need. If your project includes the following: A single meter A single temporary meter and a single permanent meter Multiple meters with different loads on each meter Multiple meter with identical loads on each meter Complete the number of load information sheets listed. One load sheet Two load sheets: one for temporary service one for permanent service Separate load sheet for each meter One load sheet showing loads for a single meter, clearly indicating the number of meters and the addresses of each one More important information is continued on the next page. REV. 4/2015

Submitting Other Important Information To ensure the proper processing of your service application, it is necessary for BGE to receive the following information: A completed copy of the BGE Service Application for Commercial & Industrial Projects. A Site Plan to scale (1" = 100' at a minimum) showing the following: All on-site utilities (water, sewer, septic area, storm drain, etc.) Existing BGE poles and pole numbers, meters and/or pad mounted transformer location Driveway and property lines Street names (For small jobs such as barns, garages, and snowball stands, use the sketch area provided at the end of the service application.) You may submit a hard copy of the Site Plan, an electronic file on diskette, or a CD-ROM in one of four BGE approved formats: Microstation (.dgn) (all releases) AutoCAD (.dwg) (releases prior to Version 14).dxf format.pdf format Relocation/Removal Only If the job involves only the relocation/removal of BGE gas and/or electric facilities, and does not include the addition of any new gas or electric load, you only need to complete the Project Information section and the Relocation/Removal section of the application. You are required to submit a site plan as described in the Site Plan requirement above. Customer-owned Switchgear Prior to manufacture of the switchgear, please submit a minimum of 3 sets of switchgear drawings with your service application for BGE approval. Include in the drawing the front elevation, one line diagram, and details of the metering/termination compartment. For more information about customer-owned switchgear requirements, see the BGE Gas & Electric Metering Manual available online at www.bge.com. More important information is continued on the next page. REV. 4/2015 2

BGE s Outdoor Lighting Program If street lighting is required or you are interested in BGE s private area lighting program, visit www.bge.com/outdoorlighting. Please complete and submit the application. Small Generator Connection If your project entails small generator interconnection (solar panels, wind turbines, interconnected generators, etc.) visit www.bge.com/energychoices - Small Generator Interconnection. Please complete and submit the Interconnection Request Application in addition to this application. Working Near Power Lines The law requires that before anyone begins work that may bring people, equipment, or other objects within 10 feet of overhead power lines, they must notify BGE at 410-685-0123. Please refer to www.bge.com under the heading of <Business> and <New Construction Services> then <Additional Resources> for information on the Maryland High Voltage Line Act. In order to prevent any scheduling delays once you submit your service request, please submit a complete set of site plans with your service application as soon as possible. If you would like additional information about applying for BGE Service, visit New Construction Services at www.bge.com. Also available online are the BGE Gas & Electric Metering Manual and the Customer Information Booklet. REV. 4/2015 3

BGE Service Application for Commercial & Industrial Projects Today s Date: Service Request # (mm/dd/yy) (For BGE internal use) Lead time for an individual job will vary depending on the scope of the work and weather conditions. Within 10 days of receipt of this application, the BGE representative assigned to your job will contact you to discuss the project. Please print or type. 1. Project Information (check all that apply): q New Construction q Existing Facility q Apt/Condo q Gas q Electric Date Permanent Service Required: / / Is Temporary Service Required? q No q Yes Date Required: / / Note: You are required to submit a separate load sheet and site plan for temporary service in addition to your permanent service. Is Gas and/or Electric Relocation/Removal Required? q No q Yes Date Required: / / Note: You are required to submit a separate site plan for relocation/removal in addition to your permanent service. Project Name: Description of Project: A. Project Address: County: ADC Map Page: ADC Grid: Temporary Service Address, if applicable: County: ADC Map Page: ADC Grid: B. Person BGE will contact to set up site meeting and send communications regarding changes affecting the status of the job: Name: First MI Last Company: Phone: Fax: Email: Cell Phone: C. Owner Information: Name: First MI Last _ Address: Phone: Fax: Email: Cell Phone: D. Other Contacts: Architect/Engineer Firm: Contact: Phone: Email: Cell Phone: Electrical Contractor Firm: Contact: Phone: Email: Cell Phone: Mechanical Contractor Firm: Contact: Phone: Email: Cell Phone: REV. 4/2015

2. Load Information: You must fill out the following for each meter. Multiple Meters: q Yes q No If yes, number of Electric Meters required: Gas Meters required: Suite/Unit Designation (e.g. Bldg. 123, Suite 100, rear of, side of, etc.): Type of Business (e.g. Welding Shop, Clothes Store, Temporary Service Only, etc.): Size of Main Disconnect/Panel(s) in Amps: Connected Loads Electric Type of Load Proposed New or Additional Electric Load (Do not include existing loads) Existing Electric Load Total Electric Load (Proposed new or additional plus existing electric loads) 1. Indoor Lighting kw kva kw kva kw kva 2. Outdoor Lighting kw kva kw kva kw kva 3. Comfort Heat kw kva kw kva kw kva 4. Heat Pump kw ton kw ton kw ton 5. Heat Pump Backup kw kva kw kva kw kva 6. Air Conditioning kw ton kw ton kw ton 7. Process Heat kw kva kw kva kw kva 8. Welding kw kva kw kva kw kva 9. Cooking kw kva kw kva kw kva 10. Refrigeration kw ton kw ton kw ton 11. Water Heating kw kva kw kva kw kva 12. Air Compressor kw Hp kw Hp kw Hp 13. Motors kw Hp kw Hp kw Hp 14. Receptacles kw kva kw kva kw kva 15. Computers/PCs kw kva kw kva kw kva 16. Computer/Mainframe kw kva kw kva kw kva 17. Elevator kw Hp kw Hp kw Hp 18. Fire Pump kw Hp kw Hp kw Hp 19. Other (Specify): kw kva kw kva kw kva Gas Type of Load Proposed New or Additional Gas Load (Do not include existing loads) Existing Gas Load Total Gas Load (Proposed new or additional plus existing gas loads) 1. Comfort Heat cfh cfh cfh 2. Heat Pump Backup cfh cfh cfh 3. Process Heat cfh cfh cfh 4. Cooking cfh cfh cfh 5. Water Heating cfh cfh cfh 6. Generator cfh cfh cfh 7. Other (specify): cfh cfh cfh REV. 4/2015 2

A. Electric Services (check with electrical contractor): q 120/240V 1φ, 3 wire q 480V Delta 3φ, 3 wire (limited availability) q 120/208V 3φ, 4 wire q 240V Delta 3φ, 3 wire (limited availability ) q 277/480V 3φ, 4 wire q Primary Service (availability based upon system configuration) B. Flicker Consideration: Largest Load: Motor/Welder/X-ray HP # of Units Largest Single Locked Rotor Current How many times per hour/day will the equipment be started? During what hours of operation will equipment be used? C. What is your gas equipment s minimum required operating pressure? Inches of Water Column D. Requested Gas Delivery Pressure (pressure required for your gas equipment to properly operate) This will have a significant impact to your facility if incorrect. Please check with your mechanical contractor. q 1/4 PSIG q 2 PSIG q 5 PSIG q Other: (Standard) NOTE: Requested delivery pressure may or may not correlate with existing system capabilities. E. Other Considerations: Do you require street lighting or are you interested in private area lighting (roadway, parking lot, common area etc.) through BGE s Outdoor Lighting Program? q Yes q No If yes, visit www.bge.com/outdoorlighting. Please complete and submit the application. Does your project entail small generator interconnection? (Solar panels, wind turbines, interconnected generators, etc.) q Yes q No If yes, visit www.bge.com/energychoices - Small Generator Interconnection. Please complete and submit the Interconnection Request Application in addition to this application. Will you be installing your own switchgear? q Yes q No If yes, refer to page 2 of the BGE Service Application Guidelines. F. Facility Information: Building Type (office, manufacturing, warehouse, etc.): Sq. Ft.: Hours of Operation: Weekdays Weekends 3. Billing Information: A. Customer Account History: Do you currently have a commercial account with BGE? q Yes: Account # q No If yes, please update your information: Service Address: City: State: Zip: REV. 4/2015 3

B. Permanent Service: Person responsible for Construction Charges: Address: Person responsible for electric and/or gas monthly Consumption Service Billing: Address: C. Temporary Service: q Not Applicable Person responsible for Construction Charges: q Check here if Temporary and Permanent Service Construction billing is the same. If not, complete the following: Address: Person responsible for electric and/or gas monthly Consumption Service Billing: q Check here if Temporary and Permanent Service Consumption billing is the same. If not, complete the following: Address: D. Relocation/Remove Service: q Not Applicable Person responsible for payment of Relocation/Remove Charges: q Check here if Relocation and Permanent Service Construction billing is the same. If not, complete the following: Address: Service Request # (For BGE internal use) Service Request # (For BGE internal use) Service Request # (For BGE internal use) REV. 4/2015 4

4. Sketch Area Only: This sketch area is to be used for small jobs only (i.e., barns, garages, snowball stands, etc.) REV. 4/2015 5

5. If there is any other information that BGE needs to know about your project, please note below: 6. Before you submit your application: To ensure that BGE can quickly and easily process your service application, please refer to the information checklist below: q Project Address - Your complete U.S. Postal address of where the work is to be performed. q Site Contact - Person BGE will contact to discuss the project, and send communications to regarding changes affecting the status of the job. q Electric Load Requirements - If you do not know your electrical load requirements, you will need to consult with an electrician. q Gas Load Requirements - If you do not know your gas load requirements, you will need to consult with a plumber and/or mechanical contractor. q Billing Information - As it pertains to construction and consumption charges. q Site Plan - (An electronic site plan is preferred, if available. See page 2 of instructions for approved formats.) q A site Plan to scale (1 = 100 at a minimum) showing the following: q Existing and proposed utilities (water, sewer, septic area, storm drain, underground fiber optic cables, underground cable TV, gas and electric mains, etc.) q Existing BGE poles and pole numbers, meters and/or pad mounted transformer locations q Driveway, sidewalk, and property lines q Street names and lot numbers q Buildings/houses q Fences q Easement designations, wetland boundaries and designations q Wells and drain fields q Woods, trees, rivers and streams Mail service application and complete set of plans to: Have questions? BGE - Customer Planning Department Call the BGE New Business Department Service Application Unit 800-233-1854 1068 N. Front Street, Room 501 Or visit the BGE website at www.bge.com PO Box 1475 Baltimore, MD 21203-1475 REV. 4/2015 6