Environment, Health and Safety Technical Guideline TG-08 Noise Management

Similar documents
Environmental Management System

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Pollution & Noise from Demolition & Construction Sites

UC Santa Barbara Hearing Conservation Program Manual

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

Approval Services Unit

PLANNING POLICY 3.3.5

1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS

Excavation & Trenching Procedure

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

VIII. Noise A. INTRODUCTION B. BACKGROUND

Traffic Management Plan - Depot Procedure

Hearing Conservation Program

Noise at work a guide for health and safety representatives

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

UCSC HEARING CONSERVATION PROGRAM Environment, Health & Safety (EH&S) August 2007

ADMINISTRATIVE INSTRUCTION

Noise at work. Introduction. What harm can noise cause? A brief guide to controlling the risks. What is this leaflet about?

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

Cultural Heritage Management Plan - Commissioning and Operations Phase. Pluto LNG. June Approved

Construction and Civil Work Management

Safety and Radiation Protection Office Working with X-Ray Equipment

INTRODUCTION Purpose Policy Exception for Short-Term Workplace Visits Relevant Legislation and Regulations...

WORKING IN CONFINED SPACES GUIDELINES

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Construction Management Plan Template

Traffic Management Issue 1.0 Revision: v2 October 2014

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

HSE information sheet Industrial radiography - managing radiation risks Ionising Radiation Protection Series No. 1(rev 1)

Table of Contents. 1. Applicability. No. T-O&M X115 Title: Hearing Conservation Revised: TERMINALS O&M PROCEDURE

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

FLAMMABLE LIQUIDS COMPLIANCE NOTE

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

Demolition & Construction Management Plan

Stanford University. Hearing Conservation Program

OSHA Scripts. Hearing Protection CBT Script

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

Safety Systems Review Facilities Management Guidance and specification Version

Workshop Self Inspection Checklist WORK01

SOUTHERN UTAH UNIVERSITY S WRITTEN HEARING CONSERVATION PROGRAM September 24, 2015

Contractor Environment, Health and Safety Management Plan

TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads

Sample Written Program. For HEARING CONSERVATION

SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT. Installing and Maintaining Air Conditioning Units

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

19-27 Young Street Development Kensington

Occupational Noise Exposure Requirements

OAK GROVE SCHOOL DISTRICT. Hearing Conservation Program

NZDF Temporary Military Training Activities. Palmerston North City Council

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

Traffic Management Plan

What are the risks for employees exposed to high levels of noise?

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

SAMPSON COMMUNITY COLLEGE

ACOUSTICAL CONSIDERATIONS FOR EFFECTIVE EMERGENCY ALARM SYSTEMS IN AN INDUSTRIAL SETTING

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Occupational health and safety specification for construction works contracts

SITE CONTRACTOR PROCEDURES

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

noise induced Working Together to Prevent Hearing Loss

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)

MANAGING NOISE AND PREVENTING HEARING LOSS AT WORK

OSHA Training Guidelines (An Unofficial Summary)

REQUIREMENTS RESPECTING THE SECURITY OF OFFSHORE FACILITIES

Exposure to high noise levels from your own and others work activities can cause incurable damage to your hearing

Guide Document for Development of WHS Management Plans

NOISE CONTROL AND HEARING CONSERVATION PROGRAM. University of Toronto

TRAFFIC MANAGEMENT PLAN

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

HEARING CONSERVATION PROGRAM Prince Edward Island Government Departments

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

WORKING AT HEIGHT GUIDELINES. Version II

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Pollution Incident Response Management Plan

MANAGING NOISE AT WORKPLACES

City of Valdosta Land Development Regulations. Table of Contents

VEHICLE CROSSOVER INFORMATION PACK

CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

Risk Assessment for visits by schools and other groups including children.

HOT WORK PERMIT PROGRAM TRAINING. John Braun

Communication of Health and Safety Policy and Information

Environmental Health and Safety* 2809 Daley Drive * Ames, Iowa * (515) *

ANNEX 2 Emergency / Pollution Incident Response Plan

TMP reference: Contractor: Principal (Client): RCA:

CSC-DIVISION 1-MASTER SECTIONS Description

Definition of Tower from the Bradley County Zoning Resolution

Division of Public Health Administrative Manual

Activity risk assessment Assessment title: New Generic Office environment

Information Sheet. What is a Workplace Transport Risk Assessment?

Transcription:

Environment, Health and Safety Technical Guideline TG-08 Noise Management Produced by Environment & Safety Office Campus Facilities Department

Table of Contents 1 Purpose... 2 2 Scope... 2 3 Responsibilities... 2 3.1.1 Top Management... 2 3.1.2 Environment and Safety Office (ESO)... 3 3.1.3 Employees and Contractors... 3 4 Procedure... 3 4.1.1 Noise Emission Standards... 3 4.1.2 Noise Monitoring... 4 4.1.3 Noise Control... 5 4.1.4 Noise Hazard Signage... 5 4.1.5 Training Requirements... 5 4.1.6 Contractor Conformance... 6 5 Document Control... 6 6 Appendices... 6 Table index Table 1 Allowable Noise Limits in Qatar... 3 Table 2 Maximum Allowable Noise Limits for Closed Places of Work... 4 Appendices Appendix A Noise Control Guidance

1 Purpose 1.1.1 It is the policy of Qatar University (QU) to put in place safety measures to protect employees, students, visitors, contractors and others who may be exposed to noise levels that may cause harm or the risks of hearing loss. 1.1.2 This Technical Guidance document has been established to comply with the Qatar State Environmental Protection Law (2002): Executive By-law for the Protection of the Environment, issued vide Law No. 30 of 2002 that outlines allowable environmental and occupational noise levels. 1.1.3 This Technical Guidance document establishes noise management requirements in order to manage potential noise risks associated with QU activities, whether undertaken by QU employees or contractors, where employees, students, visitors, contractors and others who may be exposed to noise levels in excess of those stipulated in the Qatar State Environmental Protection Law (2002). 2 Scope 2.1.1 This Technical Guidance also applies to activities undertaken at QU by employees, students or contractors that may produce in excess of those stipulated in the Qatar State Environmental Protection Law (2002). 3 Responsibilities 3.1.1 Top Management 3.1.1.1 The QU Top Management shall allocate sufficient resources for the effective implementation of this Technical Guidance document ensure that QU employees, students, contractors and visitors are aware of their responsibilities through appropriate regulation, delegation and communication. 3.1.1.2 The QU Top Management is also accountable for monitoring and reporting EHS performance and appropriate programs and actions to ensure compliance with this Technical Guidance document. 3.1.1.3 The QU Top Management may delegate responsibilities to the Senior Managers (i.e. Senior Vice Presidents and Associate Vice Presidents), Department Heads and Directors, and Project Managers or Environment and Safety Office (ESO), as appropriate, for the fulfilment of the requirements under the QU EHS Policy and associated procedures. 3.1.1.4 The QU Top Management shall ensure that protection is provided to employees and visitors against the effects of noise exposure when the sound levels exceed those stipulated in the Qatar State Environmental Protection Law (2002). 2

3.1.2 Environment and Safety Office (ESO) 3.1.2.1 Ensure that staff, faculty, students, visitors and contractors are not exposed to persistent or instantaneous noise that would be detrimental to hearing. 3.1.2.2 Ensure that noise risk assessments and reviews for relevant activities are conducted. 3.1.2.3 Carry out or arrange a noise survey of all relevant areas periodically and keep records of all noise surveys undertaken. 3.1.2.4 Ensure that control measures identified in the noise risk assessment are implemented, monitored and reviewed as necessary. 3.1.2.5 Communicate noise risk assessment findings to the relevant personnel. 3.1.2.6 Ensure when employees, students, visitors, contractors and others are subjected levels exceeding those listed in stipulated in the Qatar State Environmental Protection Law (2002), then the ESO shall implement reasonably practicable administrative or engineering control measures. If such control measures fail to reduce sound levels within acceptable levels, personal protective equipment shall be provided and used to reduce sound levels within acceptable levels. 3.1.3 Employees and Contractors 3.1.3.1 Employees and Contractors shall undertake their roles and responsibilities in accordance with the QU EHSMS Section 3.0 Roles and Responsibilities Procedure and QU EHSMS Section 7.0 Contractor Management Procedure. 3.1.3.2 Employees and Contractors shall report any activity or equipment defect relating to noise exposures which they believe is reasonably practicable to cause and overexposure to themselves or another person. 3.1.3.3 Employees shall use appropriate hearing protection, equipment or safety devices provided by QU in accordance with any training or instruction received. 4 Procedure 4.1.1 Noise Emission Standards 4.1.1.1 The Qatar State Environmental Protection Law (2002), Annex (3/ 5th), provides maximum allowable ambient noise limits in Qatar, as presented in Table 1. QU is classified as a residential area. Table 1 Allowable Noise Limits in Qatar The area The maximum limits of noise ( average 20 minutes) Day time Night time Residential areas & public corporations 55 45 Commercial areas 65 55 Industrial facilities 75 75 3

Residential Areas is the area in which homes or buildings for residence are more than 50% of the buildings, including schools, hospitals and mosques. Commercial Areas is the area in which department stores, business offices, garages and places of work are more that 50% of the buildings. Industrial Areas is the area in which industrial facilities are more than 50% of the buildings. 4.1.1.2 The Qatar State Environmental Protection Law (2002), Annex (3/ 6th), provides maximum allowable noise limits for closed places of work, as presented in Table 2. The Law states that no person is to be exposed to more than (85) decibels except in cases of necessity, taking into consideration the time of exposure as given in Table 2. Table 2 Maximum Allowable Noise Limits for Closed Places of Work The intensity of noise in Decibels (A) Exposure per hour 85 8 90 4 95 2 100 1 105 0.5 110 0.25 115 0.125 4.1.2 Noise Monitoring 4.1.2.1 The Contractor Environmental Representatives shall carry out noise assessment as stipulated by QU s contract with the appointed Contractor. A threshold limit of 55 db in the daytime and 45 db in the nighttime shall be adopted within the QU Project Site and the contractor shall take immediate remedial action if these noise levels are exceeded. All such incidents and the remedial action taken shall be documented in the Corrective Action Request Form and submitted to ESO as outlined in the QU EHSMS Section 14.0 Inspection and Audit Procedure. 4.1.2.2 QU shall use a competent person to develop and implement a noise exposure monitoring program and sampling strategy to assess employee s exposure to noise in areas of concern. 4.1.2.3 Instruments used to undertake noise monitoring shall be calibrated as per manufacturer s recommendations to ensure measurement accuracy. 4

4.1.3 Noise Control 4.1.3.1 In order to avoid ambient noise exceeding levels stipulated in the Qatar State Environmental Protection Law (2002), Annex (3/5th), QU has developed guidance for noise control. These noise control measures are provided in appendix A of this Technical Guidance Document. 4.1.3.2 Where occupational noise levels exceed the limits stipulated in the Qatar State Environmental Protection Law (2002), Annex (3/6th), QU shall develop and implement a hearing conservation program. At a minimum, the Hearing Conservation Program shall outline the following requirements: exposure monitoring; employee notification; audiometric testing program; and hearing protectors. 4.1.4 Noise Hazard Signage 4.1.4.1 Where noise levels, whether ambient noise or occupational noise, exceed limits stipulated in the Qatar State Environmental Protection Law (2002), QU shall ensure that appropriate hazard signage is posted in order to inform employees, students, visitors, contractors and others who may be exposed to these noise levels. 4.1.4.2 Clear warning signs shall be posted in languages understood by all. 4.1.4.3 These signs shall also notify employees, students, visitors, contractors and others of the requirement for hearing protection, where necessary, when entering the specific work area at QU. 4.1.5 Training Requirements 4.1.5.1 Training shall be provided to all employees, students and contractors exposed to noise at or above the limits stipulated in the Qatar State Environmental Protection Law (2002). 4.1.5.2 Training shall be conducted during induction for employees, students and contractors. 4.1.5.3 At a minimum, training shall cover the following topics: The requirements of this Technical Guidance; The health hazards associated with exposure to noise above the limits stipulated in the Qatar State Environmental Protection Law (2002); Signs and symptoms of noise exposure and hearing loss; types of hearing loss that can be experienced; information on QU s hearing conservation program, if available; requirement for the use of hearing protectors, how to use them and advantages and disadvantages of hearing protectors; and locations within QU where noise hazards exists and the hearing protection required for these areas 5

4.1.6 Contractor Conformance 4.1.6.1 The contractor shall ensure that noise limits are adhered to during the works being conducted at QU 4.1.6.2 The contractor s project manager is responsible for ensuring that arrangements are in place to close out all non-conformance raised with respect to noise limit exceedances 4.1.6.3 The ESO may undertake periodical inspections of the contractors work areas and review project EHS documentation to ensure compliance with this Technical Guidance document. 4.1.6.4 All non-conformances shall be managed as outlined in the QU EHSMS Section 14.0 Inspection and Audit Procedure. 5 Document Control 5.1.1 This Procedure is a controlled document. The controlled version of this guideline is located on the QU Electronic Documentation Management System. 5.1.2 Any printed copies of this controlled document are reference copies only. It is the responsibility of all of those with printed copies to ensure their copy is kept up to date. 5.1.3 Refer to QU EHSMS Section 16.0 Document Control and Record Retention. 6 Appendices Appendix A: Noise Control Guidance 6

Appendix A Noise Control Guidance 7

Qatar University Contractors Noise Guidelines 6.1.1 Reduce noise exposure levels as reasonably practicable, by reducing the production of noise or by reducing people s exposure to it, or a mixture of the two. 6.1.2 Consider alternative processes, equipment and/or working methods which will make the work quieter or mean people are exposed for shorter times. 6.1.3 Consider noise levels when purchasing new equipment, and where possible specify and purchase quieter equipment. 6.1.4 Consider noise levels when installing or relocating equipment or activities, and where possible make adjustments to minimise noise production. 6.1.5 Have maintenance arrangements that ensure equipment continues to operate properly and does not become noisier over time. 6.1.6 Request a noise survey if there are concerns about noise levels in between scheduled of monthly surveys. 6.1.7 Provide suitable hearing protection to workers where the personal noise exposure is between the lower and upper exposure action values. 6.1.8 Designate and provide signage for hearing protection zones, where necessary, where exposure to workers is equal to or exceeds the upper exposure action value. 6.1.9 Keep a record of all workers exposed to noise levels exceeding the upper exposure action value. 6.1.10 Inform workers where the personal noise exposure is above the upper exposure action value and provide relevant information. 6.1.11 Where hearing protection is provided, provide suitable training and instruction on correct fitting, maintenance and suitable storage. 6.1.12 Where hearing protection is mandatory, provide suitable supervision to ensure rules are followed and hearing protection is being used properly. 6.1.13 Refer employees to a Hearing Conservation Program if they are likely to be regularly exposed above the upper exposure action values, or are at risk for any reason e.g. they already suffer from hearing loss or are particularly sensitive to damage. 6.1.14 Submit monthly noise monitoring report to ESO relevant to the project. 8

General Noise Control Requirements Noise is inherent and generally unavoidable in most construction activities, with the most prominent noise emissions typically coming from heavy equipment, earthworks, vehicles or tasks (such as jack hammering). This elevates ambient noise levels in areas within a project site for certain periods (especially as noises travelling further at night), which can affect wildlife and the public. Permissible noise levels are outlined in Qatar State Environmental Protection Law (2002) complied with across QU. A number of mitigation and management measures can be initiated to reduce noise quality impacts. Engineering controls that eliminate noise at the source or establish a permanent barrier to noise are the preferred method of control. These control measures include: 6.1.15 Where practical, noise generating activities will be scheduled to avoid impacts on Noise Sensitive Receivers (NSR). Schedule work carefully to: All works and ancillary activities (such as heavy vehicle movement and material deliveries) that are audible at the site boundary will be carried out during designated daytime hours only unless approval has been granted by the client and/or regulatory authority. Noisy activities will be restricted to daytime and evening periods only, with no night time working permitted unless approval has been granted by the client and/or regulatory authority (e.g. 24-hour concrete pours). Construction activities (such as piling and material deposition) to be minimised on windy days, particularly when blowing in the direction of sensitive receptors. Phase construction activities to take into account potential impacts on visitors and employees in adjoining properties and adjacent areas. Avoid simultaneous use/operation of noisy equipment, if possible. Require operators to shut down all plants and equipment in intermittent use between work periods or throttled down to minimum idling speed. Retain existing features such as site office that act as noise barrier until the last phase of the project. Erect noise source screening structures such as stores as early as possible to shield the noise sensitive receivers. Remove stockpiles and perform excavation works at the side that is furthest away from the NSR to allow earth materials to shield NSRs from noise sources. 6.1.16 Equipment and plant layout will be as far as practical located away from noise sensitive areas and the use of physical barriers, such as hoardings, stockpiles or site buildings will be employed to deflect or disperse noise. Locate facilities such that: 9

Plant and equipment known to emit noise strongly in more than one direction is oriented to direct noise away from the noise sensitive receptors. Noisy equipment and plant (generators and water pumps, etc) be sited as far away from noise sensitive receptors as practically possible. Nearby objects such as water cooling tanks, stockpiles, etc. can be used to shield noise source against noise sensitive receptors as practically possible. Access roads to the site shall be positioned such that vehicular movements cause minimum disturbance to residential buildings. Access to the site is designed so that the need for vehicles to reverse (and thus use their reversing alarm) is minimized. Layout of site grounds ensures minimum noise impacts for conflicting activities (especially between residential, commercial and recreational activities). Consideration will be given to reducing noise by undertaking noisy assembly practices offsite where practicable. 6.1.17 Erect appropriate buffers (such as fencing, material stockpiles, site accommodation, building walls or a stand of trees or other suitable vegetation) between the source and receptor to absorb the noise. 6.1.18 Establish acoustic barriers to minimize noise impacts to on-site and off-site land uses, if required. 6.1.19 Use portable noise barriers/enclosures with skid footing and a small cantilevered upper portion for noisy stationary/mobile plants. 6.1.20 Use at-source noise controls, so that any noisy equipment is suitably enclosed with an acoustic barrier or other noise reducing method, such as an exhaust muffler: 6.1.21 Select quiet equipment that produces the lowest noise level whenever possible. 6.1.22 Ensure communication with nearby sensitive receptors prior to and during works: Public billboards shall be erected at the construction sites, listing construction activities, contact persons and telephone numbers. Prior to conducting any unavoidable noisy activities near to noise sensitive receptors, notification should be made to the receptors of the plans to keep them informed and updated with the work that is to be undertaken including expected duration. Ensure contingency plans are in place to deal with any noise complaints during construction and operation of the Project site. Investigate noise complaints and excesses of any agreed maximum acceptable levels immediately. 10

6.1.23 Managing traffic can sometimes reduce noise problems, including: Trucks can be prohibited from certain streets and roads around the site, or they can be permitted to use certain streets and roads only during daylight or night hours. Speeds will be regulated on all internal QU roads, as appropriate. 6.1.24 Maintenance and servicing of equipment and vehicles in accordance to manufacturers recommendations, especially for noise mitigation components (e.g. retaining silencers / mufflers supplied with construction equipment and closing generator doors). Records shall be kept. 6.1.25 Tyres and tyre pressures must be maintained to reduce friction between the wheel and surface. This will also ensure that the vehicle runs at optimum efficiency. 6.1.26 Make sure all plant, machinery and vehicles are regularly maintained and broken parts (such as mufflers) are replaced immediately. 6.1.27 Make sure all plant, machinery and vehicles are operated efficiently and according to the manufacturers specifications, by trained and qualified operators. 6.1.28 Practice extra caution in materials delivery particularly when dropping from a height. Construction materials should be properly handled so that the minimum noise is generated. Materials should be handled gently and, if possible, cushions should be provided to reduce impact of noise. 6.1.29 Loading and unloading of vehicles, dismantling of site equipment such as scaffolding or moving equipment or materials around site will be conducted in a manner as to minimize noise generation and where possible will be conducted away from noise sensitive areas. 6.1.30 The Contractor shall submit a plan of activities with numbers of noise generating machines stating projected noise levels. 6.1.31 The normal operating noise levels for all vehicles, plant and machinery shall be ascertained and communicated to the users. 6.1.32 Discourage raised voices or radios/music at high volumes, particularly at the start of shift or after normal business hours. 6.1.33 Site roads should be designed and constructed as level as possible. The elimination of steep inclines helps to reduce traffic noise because motor vehicle engines, especially multi-geared truck engines, do not have to work as hard. 6.1.34 Incorporate the use of noise barriers (such as boards, walls, earth mounds and landscaping) along the road side of the Project site to mitigate noise from roads. Other options may include the incorporation of local noise barriers into the Project landscape designed to shield particularly sensitive areas in the Project site. 11