DEVELOPMENT INCENTIVE PROGRAM APPLICATION REQUIREMENTS

Similar documents
Development Variance Permit Application Package

Minor Accommodation Planning Review Application

DISASTER RECOVERY PROGRAM HANDBOOK NOT-FOR-PROFIT ORGANIZATIONS, INSTITUTIONS AND CONDO ASSOCIATIONS

Eligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD)

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

DISASTER RECOVERY PROGRAM HANDBOOK SMALL BUSINESSES AND LANDLORDS

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

New Home Construction Packet

DISASTER RECOVERY PROGRAM HANDBOOK AGRICULTURAL OPERATIONS

Buying and Owning a Condominium

Preliminary Plan Application and Checklist

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

City of Douglas Commercial Building Permit Site Application

City of Quesnel Business Façade improvement Program Guidelines for 2016 year

APPLICATION FOR HISTORIC MIRAMAR COMMERCIAL REHABILITATION PROGRAM (TARGET AREA)

OCFRD TENT STANDARD This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

CITY COUNCIL PACKET MEMORANDUM

I. Project Initiation Sheet (if any information changed since Concept Plan submittal)

How To Install An Overhead Sewer

APPLICANT / CONTACT:_

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

DIRECTOR S INTERPRETATION

MINIMUM PARKING STANDARDS DRIVEWAY WIDTH AND SLOPE TABLES

Walsall Council Validation Guide for submitting a Householder Planning Application

Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit. Downtown Amarillo 17 December 2013

17 East Main Street Cuba,NewYork Code Enforcement

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

The variety of brokerage business models in today s real estate industry affords the homeowner a greater range of options than ever before.

SDAB-D Application No

HERITAGE BUILDING REHABILITATION PROGRAM

CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES

D3 April 8, 2015 Public Hearing

CHAPTER 5 - "R1" SINGLE-FAMILY RESIDENTIAL DISTRICT

Local Government Requirements: A Handbook for CHILD CARE PROVIDERS

5. Specific Use Regulations

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA:

CBD s Fascia Improvement Loan Program

Metropolitan Toronto Condominium Corporation No House Rules

City of Surrey PLANNING & DEVELOPMENT REPORT File:

BUSINESS USE PERMIT APPLICATION

R 1 Design Review Application

COMMENCEMENT OF WARRANTY COVERAGE

NEW HOME BUYER PROTECTION (GENERAL) REGULATION

What do REALTORS do for me?

City of Vernon REVITALIZATION TAX EXEMPTION BYLAW (CITY CENTRE DISTRICT) BYLAW #5362

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

A Guide for the Homeowner/Builder

CITY OF UMATILLA CRA CRA COMMERCIAL IMPROVEMENT MATCHING GRANT PROGRAM. Criteria

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

28.0 Development Permit Area #2 (Neighbourhood District)

Early Learning and Child Care Initiative

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

Council Policy for New Telecommunication Facilities

Historic Preservation Tax Incentive Program General information and instructions for applying for a historic tax exemption

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM

Job Roles and Responsibilities in Canada

Residential Building Permit Process

Business Utility Assistance Grant (BUAG) Overview

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Town of Creston. Bylaw No. 1813

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar Change of use of shop to residential flat (first floor) and shop alterations

City of Cincinnati Pamphlet Residential Lease Option Contract

DEVELOPMENT PERMIT APPLICATION for Commercial/Industrial/Multi-Dwelling Residential Developments

SITE OVERALL CONDITION COMMENTS

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

Request for Proposal. Retail Consulting Services Date issued: Monday November 24, 2014 Close date: Wednesday December 10, 2014 at 12:00 pm MST

ZONING ORDINANCE CHANGE PETITION REVIEW REPORT

CITY OF SURREY BY-LAW NO A by-law to amend Surrey Zoning By-law, 1993, No , as amended

VILLAGE OF ARLINGTON HEIGHTS

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

CHANGES TO HOME INSURANCE

COUNTY BUSINESS ASSISTANCE CENTER GUIDE FOR OPENING, EXPANDING, OR RELOCATING A BUSINESS

T170 Interior Design Technology MTCU Code Program Learning Outcomes

LONDON ROAD SEVENOAKS

Construction of 86 Dummer Street: Questions and Answers for Trustman Residents

Life isn t just how you feel about your home. It s how you feel about yourself when you are home.

Capital Improvement Grant Program

How to complete the Application for Planning Permit form

Heritage Incentive Program Guidelines

Building Up Business Loan Program Overview

Building Up Business Loan Program Overview

ALCOHOL LICENSING AT LAX

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Town of Ajax Heritage Property Tax Rebate Program Information Brochure

COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES

Historic Preservation Tax Incentive Program Step 1 Application to the Landmark Commission

REAL ESTATE DUE DILIGENCE CHECKLIST

Your guide to the residential architectural process. A step-by-step guide from Context Architects

City of Valdosta Land Development Regulations. Table of Contents

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

Design Development Quality Management Phase Checklist Project Phase Checklist Series

College of North West London, Priory Park Road, London NW6 7UJ Freehold for sale with vacant possession

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

WEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution R)

CONVERT-TO-RENT/ REHABILITATION ASSISTANCE PROGRAM (2015)

Transcription:

DEVELOPMENT INCENTIVE PROGRAM APPLICATION REQUIREMENTS This document serves as a basic framework for submitting an application package which may be further enhanced through additional discussion and information. Some applications will require greater levels of detail than others. Before you begin, have you consulted with the Program Manager? Do not submit an application package until you have discussed the project with the Program Manager first. Have you started construction? Projects that have already begun construction prior to approval by the Program Manager are no longer eligible. Other considerations: All applicants are required to meet these minimum application requirements. Incomplete application packages will not be processed. Please submit your application package in a binder or other method of professional presentation. Additional information may be requested depending on the specifics of each application and program. It is the applicant s responsibility to prove where property lines are located. All application packages become public documents and may be used in publications at a future date. If you have any further questions about the Development Incentive Program application requirements, please contact the Program Manager at: Phone: 780 495 0977 Email: development.incentive@edmonton.ca Website: www.edmonton.ca/developmentincentiveprogram City of Edmonton Planning and Development Department 12 th Floor, 10250 101 Street NW Edmonton, Alberta T5J 3P4 1

I. NEW RETAIL AND COMMERCIAL BUSINESS INTERIOR IMPROVEMENT PROGRAM 1. TITLE PAGE Project Title Municipal Address Name of Applicant 2. APPLICATION FORM Please submit a complete application form. 3. COPY OF REGISTERED LAND TITLE FOR THE PROPERTY This can be obtained from any authorized agent for Alberta registries for a nominal fee. The copy cannot be more than 30 days old. 4. CITY OF EDMONTON PROPERTY TAX NOTICE A copy of the City of Edmonton property tax notice showing that all taxes and levies have been paid for the year prior to this application is required. 5. PROJECT SUMMARY DESCRIPTION A brief written description of the project must be provided that includes the following: An overall description of the project including an explanation of how your project proposal seeks to improve the building storefront(s) aesthetics and/or functionality (e.g., increasing storefront transparency, improving storefront layout, improving energy efficiency); and Explain how the objectives of the New Retail and Commercial Business Interior Improvement Program will be fulfilled by your proposed project. 6. EXISTING STOREFRONT INTERIOR CONDITIONS Provide photos of all four perspectives and a brief written description of the vacant storefront interior space. Where applicable, include close up photos and a brief description of problem areas within the building to be improved. Ensure that all photos are identified by a title and date. 7. PROJECT DESIGN DETAILS Before you begin, please contact a representative at our Customer Information Centre at 780 496 3100 regarding Development and Building Permit application requirements and details. Provide design details for the project that include the following. Please refer to the Development Incentive Program Guidelines for the Design Guidelines applicable to your project. You are encouraged to hire a design consultant to complete the design concept (design fees are eligible for reimbursement as part of the grant). 2

1) Site Plan (preferably scaled to include the following details): A north arrow; The corresponding Street and Avenue; The dimensions of the site (property lines); and The size and location of existing building(s) and identify other key areas (e.g., parking). 2) Floor Plans (to include the following details): If there is more than one storefront on the ground floor of the building where the applicable storefront(s) is located, provide a dimensioned floor plan that identifies the applicable ground floor storefront(s); and Dimensioned room layout of the applicable storefront(s) indicating all uses, activities, structures, fixtures, seating layouts (e.g., restaurant, specialty food service), etc. 3) Building Construction Details (where applicable, to include the following details): Cross sections showing all materials used for the structure; Wall/floor/roof assembly details; Specific structural details; and Mechanical and electrical floor plans detailing all new or revised work, equipment, etc. 4) Supporting Illustrations (where applicable, to include the following details): Detailed drawings, photos, or samples of brochures of key features (e.g., lighting, materials, and colour schemes); and Other drawings and/or enhanced photos (i.e., Photoshop) as deemed appropriate (e.g., storefront interior one point perspective). 5) Sustainable Building Design Practices (where applicable, to include the following details): Identify and describe each of the sustainable building design practices and technologies that are proposed to be incorporated into the project. 8. BUDGET Provide a detailed line item budget for the entire project. This should outline on an item by item basis how much each component of your proposed project is to cost based on the quotes obtained. 9. CONTRACTOR QUOTES A minimum of three independent sets of contractor quotes for the projected total costs of the proposed eligible building interior improvements of the project are required. Please indicate which contractor(s) you have selected to do the work. Quotes MUST be from Province of Alberta licensed contractors and MUST be written or typed on business letterhead that provides a company name and phone number for the company representative. All subcontractors and trades must be licensed to work in the Province of Alberta. Applicants can act as their own general contractor but will be reimbursed for materials only, not their time. 3

10. PROJECT SCHEDULE This should be a tentative timeline for construction progress. At the minimum it should provide the start date and the end date of construction. Remember, only 365 days are permitted for project completion (unless otherwise agreed to in the Reimbursement Agreement). 11. COPIES OF DESIGNATED TENANT LEASES AND BUSINESS LICENSES City funds will be disbursed once copies of applicable lease agreements and City issued business licenses as well as the post construction inspection provide evidence that at least 50% of the Retail and Commercial Use Storefront units are occupied by New Retail and Commercial Businesses. II. MULTI UNIT RESIDENTIAL AND RETAIL AND COMMERCIAL DEVELOPMENT GRANT PROGRAMS If the property is located with the Edmonton Design Committee Geographic Jurisdiction, the application must also comply with the Edmonton Design Committee protocol and application requirements during the Development Permit application process. The North Edge, Chinatown and Little Italy, and a portion of Old Strathcona Enterprise Areas are located within the Edmonton Design Committee Geographic Jurisdiction. For further information on the Edmonton Design Committee, please contact: Edmonton Design Committee Administration Planning & Development Department City of Edmonton 5th Floor, 10250 101 Street NW Edmonton, AB T5J 3P4 Telephone: 780 944 0076 Fax: 780 496 6054 Email: EdmontonDesignCommittee@edmonton.ca 1. TITLE PAGE Project Title Municipal Address Name of Applicant 4

2. APPLICATION FORM Please submit a complete application form. 3. COPY OF REGISTERED LAND TITLE FOR THE PROPERTY This can be obtained from any authorized agent for Alberta registries for a nominal fee. The copy cannot be more than 30 days old. 4. CITY OF EDMONTON PROPERTY TAX NOTICE A copy of the City of Edmonton property tax notice showing that all taxes and levies have been paid for the year prior to this application is required. 5. PROJECT SUMMARY DESCRIPTION A brief written description of the project must be provided that includes the following: An overall description of the project including an explanation of how your project proposal seeks to improve the existing development site; and Explain how the objectives of the Multi unit Residential or Retail and Commercial Development Grant Programs will be fulfilled by your proposed project. 6. EXISTING DEVELOPMENT SITE CONDITIONS Provide photos of all four perspectives of the property and a brief description of the existing development site. Also, provide photos and a brief description of the surrounding neighbourhood context. Where appropriate, include close up photos and a brief description of problem areas to be addressed. Ensure that all photos are identified by a title and date. 7. PROJECT DESIGN DETAILS Before you begin, please contact a representative at our Customer Information Centre at 780 496 3100 regarding Development and Building Permit application requirements and details. Provide the following design details for the project that are consistent with the Development Permit application requirements. Please refer to the Development Incentive Program Guidelines for the Design Guidelines applicable to your project. 1) Site Plan (preferably scaled to include the following details): A north arrow; The corresponding Street and Avenue; The dimensions of the site (property lines); The size and location of existing and proposed accesses to the site; The size and location of existing and proposed buildings; Dimensioned layout of all vehicle parking, bicycle parking, maneuvering aisles, and loading/unloading spaces; 5

Identification of all outdoor activity areas (e.g. display areas, storage areas, servicing areas, trash collection); Identification of all caveats, covenants, easements, or other instrument affecting the building or land; and For new buildings and major additions, the applicant must submit an up to date registered survey prepared and signed by a Land Survey or registered in the Province of Alberta. 2) Landscaping Plan (to include the following details): (Note: The Landscaping Plan may be combined with the Site Plan); All physical features existing and proposed, including trees, shrubs, flower beds, planters, berms, walls, fences, outdoor furniture, and decorative paving; A schedule of the number of existing and proposed plant material required (trees and shrubs), indicating the sizes, and common and botanical names; The location of overhead and underground utilities and related easements and right of ways, parking structures, fire hydrants, and City boulevard trees; and The value (cost) of landscaping to be used in establishing the required landscaping security. 3) Floor Plans (to include the following details): The size (dimensions) of the building; The number of floors; The number of dwelling units and bedrooms per dwelling unit (if applicable); Dimensioned room layouts indicating all uses, activities, and occupancies; and A seating layout and/or occupancy capacity where applicable (e.g. restaurants, clubs, schools, churches, and other assembly uses). 4) Building Elevations (to include the following details): Showing all sides of the building; The building height; and The exterior finishing materials. 5) Building Construction Details (to include the following details): Cross sections showing all materials used for the structure; Wall/floor/roof assembly details; Specific structural details; and Mechanical and electrical floor plans detailing all new or revised work, equipment, etc. 6) Sustainable Building Design Plan (to include the following details): Provide a sustainable building design plan identifying and describing each of the sustainable building design concepts, development practices and technologies that are proposed to be incorporated into the project. i. Letters of Commitment (where applicable, to include the following details): Provide letters of commitment from the applicable professionals (e.g., architect, engineer) verifying the proposed incorporation of sustainable building design concepts, development practices and technologies into the development. 6

8. BUDGET Provide a detailed line item budget for the entire project. This should outline on an item by item basis the construction value of your proposed project based on the quotes obtained. 9. GENERAL CONTRACTOR QUOTES Only applicable for the Retail and Commercial Development Grant Program. A minimum of three independent sets of general contractor quotes for the projected total construction value of the project are required. Please indicate which general contractor you have selected to do the work. Quotes MUST be from Province of Alberta licensed contractors and MUST be written or typed on business letterhead that provides a company name and phone number for the company representative. All subcontractors and trades must be licensed to work in the Province of Alberta. Applicants can act as their own general contractor but will be reimbursed for materials only, not their time. 10. PROJECT SCHEDULE This should be a tentative timeline for construction progress. At the minimum it should provide the start date and the end date of construction. Remember, only 2 years are permitted for project completion (unless otherwise agreed to in the Reimbursement Agreement). 11. COPIES OF DESIGNATED TENANT BUSINESS LEASES AND BUSINESS LICENSES For Mixed use and Retail and Commercial Development applications, City funds will be disbursed once copies of the applicable lease agreements and City issued business licenses as well as the postconstruction inspection provide evidence that at least 50% of the ground floor Retail and Commercial Use Storefront units are occupied by an eligible Retail and Commercial Use. 7