BTC & SCP Pipeline Projects Azerbaijan

Similar documents
1. Introduction. Contents. List of Figures. List of Tables

A reliable gas supplier FACTS

COMPANY PRESENTATION

Liquid Applied Internal Flow Coatings for Oil Transmission Lines

TURKISH GAS NETWORK & PIPELINES RECENT DEVELOPMENTS

OIL AND GAS PIPELINES: Yesterday and Today 1. by Phil Hopkins. Chairman (2006-7), Pipeline Systems Division (PSD),

MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG. Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU

Ichthys Lng Securing the Future

THE BALTIC SEA OFFSHORE PROJECTS

The Engineering Science of Oil Pipelines

The Pipelines Regulations, 2000

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES

High Capacity Helical Piles Limited Access Projects

BONATTI: COMPANY OVERVIEW

a natural gas partner

PROjEcT NORD STREAM. Two pipelines linking Russia and Germany.

Gas markets and supplies from the former I Soviet Union area. IEA 2013 Energy Training Week Marc-Antoine Eyl-Mazzega Russia Programme Manager

hs2 Ground A non-technical guide

ENGINEERING REPORT FOR PAIES WATER SUPPLY SYSTEM KlTTl MUNICIPALITY, SECTION I, POHNPEI FEDERATED STATES OF MICRONESIA

Selim BORA President

GAO Peng PetroChina Planning & Engineering Institute September 24th - 26th, 2013 Xi An

Analysis of Azerbaijan Oil and Gas Sector

Natural Gas in Turkey Today and Tomorrow

Water hammering in fire fighting installation

BLADDER SURGE CONTROL SYSTEM

INTERNATIONAL. Technical journal for piping system integrity and efficiency

Frequently Asked Transmission Pipeline Questions

PIPELINE FUNDAMENTALS. texaspipelines.com

Australia The Future for Oil and Gas

Kazakhstan Oil Supply Chain: Despite Upstream Synergy, the Republic Faces Downstream Challenges in Global Markets

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

Oil and Gas Steve Oliver

SMALL DIAMETER, MULTIPLE DATASET INSPECTION IN LOW FLOW AND LOW PRESSURE ENVIRONMENTS

Major Projects Pipelines (U.S. & Canada)

Pipe handling projects for the offshore industry

For personal use only

Teesside GasPort. World s first dockside high pressure gas offloading facility for Energy Bridge Regasification Vessels (EBRV)

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events)

Policy Brief # 15 May 2009

Frequently Asked Questions About PennEast Pipeline Project

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39

ARCTIC OIL & GAS CHALLENGES AND OPPORTUNITIES UNIS, LONGYEARBYEN, APRIL 12TH, 2016

GAS PIPELINE: FROM OPERA TO REALITY. Policy Brief SETA. The Nabucco Natural Gas Pipeline: From Opera to Reality. Bülent Aras & Emre İşeri

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

SECTOR ANALYSIS. Egypt: Energy Sector. The Embassy of Denmark in Cairo

OFFSHORE FIELD DEVELOPMENT

Fossil Energy Study Guide: Oil

Provided by TryEngineering -

PETROLEUM SECTOR DEVELOPMENTS IN EGYPT

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

DOING BUSINESS IN AZERBAIJAN

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

GUIDELINES AND PROCEDURE FOR THE CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINES AND THEIR ANCILLARY FACILITIES.

Force Main Condition Assessment: New Technologies & Case Studies

LNG A Different Approach The Teesside GasPort Project

SECTION 22 LIGHTNING PROTECTION SYSTEM

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

Appendix A: Acceptable pipe and fitting materials

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

Comanche Trail Pipeline Project. September 2015

METHANE EMISSIONS MITIGATION OPTIONS IN THE GLOBAL OIL AND NATURAL GAS INDUSTRIES

Greenfields Petroleum Corporation

Pipeline Basics Prince Rupert

4 Water supply description

Module No. # 02. Impact of oil and gas industry on marine environment

CASPIAN DEVELOPMENT ADVISORY PANEL REPORT ON TURKEY AND PROJECT-RELATED SECURITY (DECEMBER 2003)

HV Submarine Cable Systems Design, Testing and Installation

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Wastewater Collection Practice Test #3 Page 1 of 15

OVERLAND PIPELINE OPTIONS

Brazil exploration assets Rui Baptista Head of Exploration Brazil. 1 Capital Markets Day - March 14th 2011

FIELDS UNDER DEVELOPMENT. Ga p fr FACTS 111

OVERVIEW ABOUT WBI ENERGY

Gas Marketplace Work? July 9-13, 2007

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Statoil, Venezuela and Plataforma Deltana. Marcel Kramer President, Statoil Venezuela Venezuela Energy Symposium Washington, D.C.

Chemical Accidents. Dr. Omid Kalatpour CEOH

Pipeline Basics & Specifics About Natural Gas Pipelines

Algeria-Europe gas pipeline via Spain. Haga clic para cambiar el estilo de título

Air Eliminators and Combination Air Eliminators Strainers

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

Enhancing Nitrification in an Oil Refinery WWTP with IFAS

Challenges and Opportunities for Small Businesses Engaged in Energy Development and Energy Intensive Manufacturing

UNECE Energy Week Geneva. in Energy Security

Stark State College Oil & Gas Programs Industry Overview. S. Kathleen Steere BS, BSPE Coordinator Oil & Gas Programs

CHINA OIL AND GAS PIPELINE STANDARD SYSTEM

Classification: Internal Status: Draft. Peon discovery. Unlocking unconventional resources in the North Sea

March 2015 MEGATRENDS IN THE OIL AND GAS INDUSTRY

Design Criteria & Service Goals

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Pipeline Systems- Designing, Construction, Maintenance and Asset Management

Mapping The Digital Silk Road

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

SECTION 3 SANITARY SEWER DESIGN

Transcription:

BTC & SCP Pipeline Projects Azerbaijan

Azerbaijan Where is it?

Maps

AZERBAIJAN Some Facts: 86,600 square kilometres (WA 2,500,00 sq km) Of Azerbaijan's 8.3 million people, approximately 90 per cent are Azeri-Turkic Turkic speaking Shi'ite Muslims. The capital city of Baku has almost 2 million people Once part of Persian and acquired by Russia in 1813 Oil discovered in 1873 Supplied 50% of worlds oil at the turn of the last century The Baku oil rigs were there before the rigs in Texas. Azerbaijan's offshore oil fields were first developed by the Americans and then taken over by the Soviets in the 1920 s. Azerbaijan became independent in 1991 In 2003 and 2004 GDP growth surged to about 10% p.a. then about 20% in 2005. Growth is expected to exceed 20 per cent in 2006 due to increased oil and gas exports. Azerbaijan produces about 90% of the world's caviar Oil now accounts for 80 per cent of Azerbaijan's exports

BTC PIPELINE Some Facts: Baku-Tbilisi Tbilisi-Ceyhan (BTC) Pipeline: Crude oil BTC is the 2 nd Longest Pipeline in the World at 1,760 km Oil sourced from the Caspian Sea Azeri-Chirag Chirag-Gunashli oil fields 188 kilometres of undersea pipe laid at depths up to 180 meters deep to transport the extracted oil from an offshore drilling platform m to Sangachal terminal near Baku. The route of the pipeline crosses Azerbaijan and skirts Armenia to pass through Georgia and Turkey. Of its total length of 1,760 km, 440 km lies in Azerbaijan, 244.5 km in Georgia and 1,070 km in Turkey. It crosses several mountain ranges at altitudes of up to 2,830 m. It also has to traverse 3,000 roads, railways and utility lines, both overground and underground, as well as 1,500 watercourses of up to 500 m wide. By 2010 the BTC pipeline is expected reach a peak volume of 1 million barrels per day.

SPC PIPELINE Some Facts: Shah Deniz South Caucas Pipeline (SCP) Pipeline: Natural Gas Caspian Sea which has recoverable reserves of 700 BCM of gas and 300 M tons of condensate Shah Deniz offshore three 90 km pipelines a 26 gas pipeline and a 12 pipeline for condensate, and a 4 4 piggy-backed mono ethylene glycol pipeline SCP is a 685 km 42" diameter lined coated pipeline constructed parallel p to the BTC from Azerbaijan through Georgia to the Turkish-Georgian border, where it connects with the Turkish domestic gas network. 440 km lies in Azerbaijan, 244.5 km in Georgia Capacity of SCP is 160 billion cubic metres of gas per year BOTAS, the Turkish State pipeline company, is constructing a connector pipeline from Erzurum to the Turkish-Georgian border Total SCP project cost estimate is US$ 1.2 Billion

Pipeline Route: BTC

Pipeline Route: SCP

PIPELINE ROUTE MAP

BTC Construction The Sangchal Terminal in Baku has two crude storage tanks, a central control station, metering facilities and a pumping station. Pipeline is 1,070 mm (42 inches) diameter for most of its length,, narrowing to 865 mm (34 inches) diameter as it nears Ceyhan. The Pipeline includes 8 pumping stations, 2 intermediate pigging stations and 101 block valve stations. The Ceyhan Marine terminal has seven crude oil storage tanks, a metering station, wastewater treatment, a vapour incineration facility and d a jetty capable of loading two 300,000dwt tankers simultaneously Total Project Constructed from 150,000 individual joints of line pipe, each measuring 12 m. Total weight of approximately 594,000 Tonnes of steel Construction Started September 2002, Crude filling commenced in May 2005. Total Pipeline completed in July 2006 Employed over 10,000 personnel. Maintenance will require 1,000 personnel. p

BTC Construction: Contracts Azerbaijan: The Greek-based Consolidated Contractors International (CCIC) were awarded a contract for pipelay in Azerbaijan and the construction of the scraper stations ($US229 million), Georgia: The Franco-British Spie Capag / US Petrofac for pipelay in Georgia and also the construction of pumping stations ($US248 million). Additional contracts worth about $1.25 billion were later awarded d in Turkey by BOTAS to 3 pipeline contractors.

BTC ECONOMICS Azeri-Chirag Chirag-Gunashli oil fields estimated to hold over 5 billion barrels of recoverable oil BTC Project value: $US 4 billion Pipeline is Owned: 30%BP, 25% State Oil Co. of Azerbaijan, Unocal, Statoil, Total, Itoshu, remainder. BTC pipeline throughput capacity is about 1 million barrels day of oil. BTC pipeline fill capacity is 10 million barells of oil. BTC pipeline can supply approximately 1% of global demand. Australia consumes about 0.65 million barrels day of oil products s (produces 0.45mbd). million barrels of oil The pipeline will Oil will flow through the pipeline at 2 m per second The cost of transporting oil down the pipeline has been estimated d at $US3.2 per barrel Azerbaijan will earn about $??29 billion per year in oil revenues, while Georgia and Turkey will collect transit fees of $600 million and $1.5 billion respectively per year. the US military's Special Forces trained 1,500 to 2,000 Georgian soldiers in anti-terrorism terrorism techniques under a $64 million program aimed at protecting ting the pipeline against saboteurs

HYDRAULIC PROFILE

Pipelines Design BTC Pipeline: BP Specifications and ASME B31.4 Hydrocarbon Liquids Pipelines SCP Pipeline: BP Specifications and ASME B31.8 Gas Transmission Pipelines Stations and Facilities: BP Specifications and ASME B31.3 Station Piping

Pipelines Design High strength steel: 482 minimum yield strength Wall thickness: 12.7, 14.3, 16.8, 19.1mm Az 12m joints manufactured in Japan (for Az and Georgia). Design pressure 10.0MPa (1,450psi) Internally lined with epoxy Externally coated with a epoxy/hdpe system Buried to a minimum 750mm cover Special design for seismic fault crossings

HYDRAULIC PROFILE

PIPELINE CLEARING

PIPELINE WELDING

CONCRETE COATING TO PIPE

PIPELINE THROUGH RIDGES

TRENCHES

PIPELINE THROUGH WADI s

RIVER CROSSING: EARTHWORKS

PIPE INSTALLATION

PIPE INSTALLATION

ROLLER INSTALLATION: STRING PREPARATION

RIVER CROSSING: PIPE INSTALLATION: BY ROLLER

ROLLER INSTALLATION: FLOAT AND SINK INSTALLATION

PIPE INSTALLATION

HDD CROSSING DESIGN

HDD CROSSING m

HDD RIVER CROSSINGS

CROSSING BY TUNNELLING

TUNNEL CONFIGURATION

WINCH and ANCHOR CONFIGURATION

TUNNEL SHAFT CONFIGURATION

KURRA RIVER CROSSING

RIVER BED EROSION

CROSSING OTHER PIPELINES

PIPELINE TIE-IN IN

PIPELINE TIE-IN IN

STATIONS

MAINLINE VALVE COMPOUND

MAINLINE VALVE RPG PROOF WALLS

Local Accommodation

LOCAL HAZARDS

LOCAL HAULAGE

LOCAL TREATS