WORLD CLASS CONSULTANCY ENERGY FROM WASTE

Similar documents
Developments and trends shaping the future for Waste-to- Energy technology suppliers

Good Practice Form

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

INTEGRATED WASTE MANAGEMENT SERVICES

Weiss A/S Presentation. by Bo Johansen

How To Run A Power Plant In Celje

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...

Bioenergy. A sustainable energy source.

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential

February 9, 2011 Peter Kling, ÅF Consult Ltd Vice President, Bio and WtE Consulting

6 CONSIDERATION OF ALTERNATIVES

Waste to Energy. Anders Damgaard. Thanks to Jiri Hyks and Thomas H Christensen DTU for some slides

Stora Enso Fors Ltd Sweden

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

of 11,000 households Steam temperature, boiler 400 C Steam pressure, boiler Incineration temperature 1,100 C

Power Plant Operations and Maintenance. Maximize Your Plant s Bottom-Line Results

Biomass Supply Chains in South Hampshire

New Bio Solutions. DONG Energy. Pyroneer November May 2013

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation

Introduction to our Business in Valmet. Marita Niemelä VP, Strategy Pulp & Energy 20 August 2014

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS

Gasification as means of Waste-to-Energy - Main Parameters and application -

BIOMASS RESEARCH at ECN. Bram van der Drift

Technologies for small scale Biomass CHP-Plants an actual survey

From forest to gas in the transmission system. Ulf Molén,

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

Integrating renewable energy sources and thermal storage

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

Renewable Energy from Biomass. Opportunities in London and Area? Eric Rosen

The heat plant Future biorefinery. Panndagarna 2015 Västerås, April

Nordic Baltic Bioenergy Conference, Riga April 2015

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

Landfill Gas In Ireland - The Facts

A New CHP Concept for tons of SRF

ENERGY EFFICIENCY IN POWER PLANTS

Top Technology for Industry, Agriculture, Business and Communities

Innovation with CFD. Solutions and Equipment

Energy from digester gas. Optimised biogas utilisation

London Pollution Study Group

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility

Source: EIA Natural Gas Issues and Trends 1998

Arecibo Resource Recovery Project

Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, Garching, Germany

Biofuels and Renewable Energy

DEVELOPMENT AND STATUS OF THE USE OF AGRICULTURAL RESIDUES FOR ENERGY IN DENMARK HISTORY AND POLICY DRIVERS

GENERATION TECHNOLOGY ASSESSMENT

ERK Eckrohrkessel GmbH (2016) 1. Powerful First-Class Boiler and Combustion Systems & Complete Engineering Services

Company Profile. New and overhauled Power Plants for sale

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN Lahti Finland Tel matti.kivela@lahtienergia.

Power and heating plants, environmental studies

Waste to Energy in Düsseldorf. for a clean city.

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

Energy From Waste or Waste-to-Energy. Pyromex. The Solution to Multiple Energy & Environmental Issues James Pfeiffer, CEM

Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien. INTEC Engineering GmbH Berlin,

Green Energy in Europe - Potentials and Prospects

FAS Training Course on Energy Efficiency / Renewable Energy

Layout Planning of Waste-to-Energy Plants

Well Positioned for the Future

FREMTIDENS BIORAFFINADERI

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

High-performance steam boiler and hot water boiler plants for industry

Large-scale Power Plants. taking your energy projects to the next level

Last update: January 2009 Doc.: 08A05203_e

WASTES INCINERATION PLANTS

Creating clean energy from waste Power and automation solutions for waste-to-energy plants

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

Energy Efficiency and Renewable Energy Sources in Sweden

Low grade thermal energy sources and uses from the process industry in the UK

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility

Business Plan: Wood chip gasifier (Deliverable 5.2)

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

University of Linköping

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

Active Roofs and Facades in Sustainable Renovation

How To Build A Swebo Biotherm

Assignment 8: Comparison of gasification, pyrolysis and combustion

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry

District Heating & Cooling in Helsinki

Integrated. for Steam Power Plants

Making Coal Use Compatible with Measures to Counter Global Warming

Smart Energy Systems Energy Efficient Buildings and the Design of future Sustainable Energy Systems

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Data and Trends. Environmental protection and Safety

Power Island. Industrial Power Plants. / energy

Best Practice Guide BPGCS007

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

Waste-to-Energy in Europe. Ella Stengler

Ligentoplant - The biomass cogeneration. Ligento green power GmbH

Factors influencing the development of Small Scale Energy from Waste

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

Transcription:

WORLD CLASS CONSULTANCY ENERGY FROM WASTE

15 TON/H WTE PLANT IN NORWAY Municipal Solid Waste generation in the Bergen Region had been increasing for years and the capacity of the existing waste-toenergy plant serving the Region had reached its limits. The waste management company BIR in Bergen consequently decided to build 15 ton/h new plant capacity to meet the needs of the future. The new plant started operation in 2010; it meets the latest environmental standards (BAT) and is furthermore prepared for future technical standards. COWI assisted the Client as main consultant, from initial planning through design, procurement, construction, commissioning, guarantee tests, hand-over, and warranty period supervision. A LEADING CONSULTANT IN ENERGY FROM WASTE The increasing focus on climate change calls for new sustainable solutions. Energy from Waste is one of them. Energy from Municipal Solid Waste (MSW) substitutes fossil fuels and thus reduces CO 2 -emission to the atmosphere. COWI is a large international multidisciplinary consultancy with a worldwide staff of more than 6,000, with headquarters in Denmark and offices and operations in several countries worldwide. COWI is among the largest global waste management consultants, with complete expertise in Energy from Waste. COWI has implemented a substantial number of successful energy projects over the years. COWI Thermal Power is a team of experts ready to assist our clients during the whole project, from planning to implementation, and throughout the entire plant life. COWI has comprehensive experience in thermal conversion of waste. This includes combustion in traditional boilers and the most advanced systems for gasification. We have assisted Clients in numerous projects for combined heat and power plants, but also for boiler units producing steam for industrial purposes. All these plants use Municipal Solid Waste for fuel and some also burn Refuse Derived Fuels (RDF) or biomass. COWI specialists have wide international background including working experience from a number of countries and regions in Europe, Asia, Africa and the Americas.

ENERGY FROM WASTE 3 Architects: Friis & Moltke PROJECT DEVELOPMENT The development of a Waste to Energy (WtE) project is complex and requires careful preparation. The development of the project including all necessary planning and environmental permits from the Authorities may take as much as 1-3 years depending on location, financing and procurement, so the initial costs can be quite high. It is therefore of utmost importance to know the route to follow and the barriers and constraints that need to be managed so the final result both meets all technical requirements and is financially viable. A conceptual plant design and a bankable feasibility study are usually the first steps before beginning the procurement. The conceptual design identifies the technical feasibility of the project and stipulates a budget for capital (CAPEX) and operational (OPEX) expenditures. CAPEX and OPEX form the basis for preparation of the bankable feasibility study. This study evaluates the project financially and serves as the foundation for securing internal and external financing. 2 X 35 TON/H PPP PROJECT IN IRELAND COWI, in a J.V. with an Irish consultant was Dublin City Council s Transaction Advisor for the development of this WtE project into a Public-Private-Partnership between the City and a major international operator. The plant will have a capacity of 550,000 TPA to be incinerated in two lines; each of 35 ton/h. Process optimisation enables a net electrical output over 60 MW with an electrical efficiency of approx. 29%, which is among the highest in the world for WtE. The Transaction Advisor assessed alternative technologies and carried out PPP procurement, contracting, complete Authority applications, and close monitoring of operator s choice of technology, acceptance of the basic design, etc. In late 2014, all statutory permits were confirmed and finance secured, allowing construction to start. Operation will commence in 2017. Projects procured under a PPP-contract (Public-Private-Partnership) require special services from your Transaction Advisor. Detailed knowledge of the market and the potential service providers must be combined with technical design and operating experience, and complemented with legal and financial acumen. COWI offers advice based on hands-on PPP experience in energy projects, e.g. from the Dublin Waste to Energy Project, a major PPP-project in the waste management sector.

8 TON/H WTE PLANT IN NORWAY COWI assisted the Client, FORUS ENERGIGJENVINNING 2 in Stavanger, in the detailed planning and procurement, follow-up and supervision during construction, commissioning, and hand-over of a new unit at the FORUS facility. The plant has a nominal capacity of 8 ton/h at a lower heating value (LHV) of 11 GJ/ton, corresponding to an annual capacity of approximately 65,000 tons. It started operation in 2013 and generates approx. 4.3 MW of electricity and up to 16 MW district heaating. DESIGN AND PROCUREMENT COWI will lead the design and procurement process for your new Waste to Energy project, including initial planning and design, followed by technical and commercial tender specifications. The procurement may start with a prequalification phase followed by invitation to tender, evaluation of the bids received, and negotiations and contract finishing with the preferred bidder. We will then supervise the design and construction, start-up and commissioning, followed by trial run and guarantee tests. COWI is experienced in international standards such as FIDIC. In most cases, turnkey or EPC (Engineer-Procure-Construct) type contracts have been developed and concluded successfully. In other situations, our customers have entrusted us with carrying out the detailed design and split-package procurement for the complete plant and the attached infrastructure, such as district heating and/or cooling systems. Following the appointment of a turnkey contractor or split-package suppliers, COWI will conduct design reviews to ensure that the supplier fulfils his contractual obligations in terms of quality, time and costs. During the manufacturer s design phase, COWI s operation and maintenance experience is a very important factor in detecting specific problems, e.g. by reviewing the supplier s layout drawings and P&I diagrams. Factory and site tests /inspections are other integral parts of our QA-system when planning new facilities. COWI uses the well-known design tool THERMOFLEX in the plant design, establishing heat and mass balances and conducting control of suppliers guarantee information

ENERGY FROM WASTE 5 EXECUTION AND COMMISSIONING Plant commissioning, including training the staff and giving it ownership of the project, are very important factors for the future success of the plant. It is COWI s experience that energy plants need special consideration during this phase. One of COWI s unique services is to provide experienced engineers for planning and supervision of the plant commissioning and to work hand-in-hand with the future staff and the original equipment suppliers during training and commissioning. In this way, the project benefits from lessons learned in other projects. Furthermore, the temporary employment of one or more experienced operating engineers from COWI can mitigate the need for increased staff during the plant s early operation. REFURBISHMENT OF VESTFORBRÆNDING WTE PLANT IN COPENHAGEN Vestforbrænding in Copenhagen is Denmark s largest WtE plant, treating annually 600,000 tons of MSW. In 2013, COWI as general consultant, assisted Vestforbrænding in the planning and procurement for a major overhaul and upgrading of the 32 ton/h Line 5, commissioned in 1998. This included new Inconel membrane walls, new water-cooled wear zone above the grate, new bottom ash system and fly ash conveying system, and new bag-house filter system. In 2014, COWI again assisted Vestforbrænding in the planning and procurement for a major boiler repair and improvement for Line 6, commissioned in 2004. This included replacement of a large part of the first boiler pass with new Inconel membrane walls.

167 MW RDF AND BIOMASS CFB PLANT IN SWEDEN The MälarEnergi Utility in Västerås near Stockholm has installed the world s largest circulating fluidised bed (CFB) boiler for waste to burn approx. 400,000 TPA. The main fuel is RDF (refuse derived fuel), supplemented with biomass (peat and wood chips) as necessary. The new boiler produces approx. 135 MW energy as 75 bar/470 C high-pressure steam that drives a 48 MW turbine/generator. Low-pressure steam is extracted to supply hot water district heating. COWI assisted MälarEnergi as overall project manager and carried out detailed design for buildings, boiler plant, turbine/ generator plant, fuel preparation, and storage and handling systems. The new unit started operation in late 2014. OPERATION, MAINTENANCE AND OPTIMISATION COWI staff has extensive experience in the commissioning and operation of energy plants and we are able to assist you in planning of maintenance and in the improvement of existing facilities with new flue gas cleaning or heat recovery systems. Flue gases from a Waste to Energy plant contain substantial heat in the form of hot vapours. COWI has realised additional heat recovery based on flue gas condensation and heat pumps in several plants. This extra energy substantially increases the district heating output of the facility. Based on this experience, we can assist you in selecting the most suitable solution for your plant configuration. Integrating a heat recovery system may improve the thermal efficiency to nearly 100% based on the lower heating value (LHV) of the fuel. When environmental standards are intensified, COWI can assist the plant owners in meeting the new demands. We are very experienced in refurbishing existing facilities with new Air Pollution Control equipment and we have handson experience with all major flue gas cleaning technologies, heat recovery and emission measuring systems.

ENERGY FROM WASTE 7 ADVANCED TECHNOLOGIES In addition to our experience in mass burning of waste, COWI offers a unique experience in other waste-to-energy technologies, such as gasification. We show a few examples below. COWI assists the Danish Maabjerg Energy Concept Consortium (MEC) in developing its integrated energy system. This project comprises 2nd generation bioethanol production, based on 250,000 TPA wheat straw, production of biogas based on molasses from the ethanol production, and energy production in a refurbished CHP plant. The CHP plant will burn lignin pellets, also a byproduct from the ethanol production. The project finally includes gasification of municipal solid waste using the DONG Energy REnescience technology. 300,000 TPA WTE PROJECT IN SOUTH AFRICA COWI is providing consulting services for the establishment of the first Waste to Energy plant in South Africa. The plant will treat up to 300,000 tons per annum of Municipal Solid Waste and generate electric power to the grid. COWI prepared the feasibility study and is now involved in the definition of the company structure, procurement strategy, and technical requirements in addition to general project management assistance. MEC is a consortium of five partners: Two local utilities (Vestforsyning and Struer Forsyning), a waste handling company (NOMI), Novozymes (provider of enzymes), and DONG Energy (national energy utility). COWI assisted MälarEnergi in Sweden in the implementation of the world s largest fluidised boiler for Refuse Derived Fuel (RDF). The boiler has a thermal capacity of 167 MW and started operation in 2014. Furthermore, COWI has been involved in the gasification of biomass, e.g. a 20 MW project in Denmark with gasification of wood pellets and a project in South Africa involving small scale gasification.

OUR SERVICES COVER: PROJECT DEVELOPMENT Pre-feasibility study Conceptual design and specification Bankable feasibility study Environmental Impact Assessment (EIA) Technology evaluation BAT (Best Available Technology) assessment Procurement plan Technical, environmental and economic due diligence Statutory process Economy, finance and organisational set-up Transaction Advisor for PPP projects COWI OFFERS YOU STATE-OF-THE-ART EXPERTISE IN ALL ASPECTS OF WASTE TO ENERGY DESIGN AND IMPLEMENTATION Design of mechanical, electrical, and civil works at turnkey or detail level Pre-qualification Procurement, including technical specification to FIDIC and other international standards Bid evaluation and contract negotiation Progress monitoring Quality control, including shop inspections Construction management and supervision Commissioning, including start-up, performance testing and handover OPERATION AND MAINTENANCE Support during the guarantee period Optimisation of existing plants Operation and maintenance support Education and training of operation and maintenance staff Planning of scheduled maintenance NIELS JAKOBSEN Mobile +45 2960 6341 Direct +45 5640 4562 E-mail nija@cowi.com SPECIAL CONSULTING SERVICES Handling, treatment and disposal of residual products Optimisation of monitoring and control instruments and systems (DCS/SCADA) Environmental management including Green Reports Life cycle and climate analyses Energy planning District heating and cooling systems Waste Management Health, Safety and Environment (HSE) THOMAS JENSEN Mobil +45 2615 0616 Direct +45 5640 1159 E-mail tsjn@cowi.com ADDRESS COWI A/S Parallelvej 2 DK-2800 Kongens Lyngby Denmark PHONE +45 56 40 00 00 WWW cowi.com Visit our website for more detailed information and our references.