High-Grade Drilling Results to Support Resource Upgrade at Wa Gold Project, Ghana

Similar documents
Punching Above Its Weight

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

For personal use only

ALCYONE REPORTS JORC SILVER RESOURCES

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

For personal use only

Barkly Phosphate Project Tenement Granted

For personal use only

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

Discovery at Manwe. Infill and Extension Drilling Commenced. Duri Aircore Programme Completed Results Awaited

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

How To Mine And Treat Ore From Castle Hill Stage 1

INVESTOR PRESENTATION DECEMBER 2011

For personal use only

INVESTOR PRESENTATION

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

Cummins Range Rare Earths Project

HORSE WELL GOLD PROJECT W.A

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

For personal use only

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Pathway to Production

INVESTOR PRESENTATION JULY 2013

QUARTERLY ACTIVITIES REPORT

Update on Heap Leach potential of the Murchison gold project

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target

Positioned for Production: Exploring for Growth

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS

For personal use only

New technology and new approach uncovers new opportunities in WA s Fraser Range

Exploration and Development Activity

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015

JUNE 2015 QUARTERLY REPORT

NEW GOLD DISCOVERY IN GHANA WEST AFRICA

FOCUS MINERALS LIMITED

HALF-YEAR REPORT TO 30 JUNE 2003

Press Release 30 th October 2015

Financial Report for the Half Year ended 31 December 2014

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

For personal use only

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015

For personal use only

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Interim Financial Report for the half-year ended 31 December 2011

Exploration Update - Corunna

ANNUAL GENERAL MEETING November 2015

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Cannon Big Pit Given the Green Light

COMPANY PRESENTATION. Cape Town 2016

Five targets advanced to drill-ready stage ahead of drilling anticipated to commence during the September 2013 Quarter.

g/t Au (BAGC00504) g/t Au (BAGC00516) A$11.4 M cash at hand as at December 31, 2015

FORWARD LOOKING STATEMENTS

Mineralisation remains open in all directions with an untested downhole EM conductor at depth

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA

HARTE GOLD CORP. Gold Exploration and Mine Development in White River, Ontario, Canada APRIL 2016 TSX : HRT

September 2015 Quarterly Activities Report

Resources Rising Stars

Quarterly Activities Report

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development 8 February 2016 Alecto Minerals plc ( Alecto or the Company )

MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015

Falcon Minerals Ltd ACN Company Announcement

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

OUTSTANDING NEW RESULTS AT WESTRALIA UNDERGROUND CONFIRM POTENTIAL FOR MINE DEVELOPMENT

Press Release 29 th January 2016

MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011

EXPLORATION TONY HOUSTON Head of Exploration

For personal use only

BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey.

For personal use only

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

Quarterly Activities Report - for the period ended 31 December 2015

December 2015 Quarterly Activities Report

Savannah North Scoping Study Looking into the future 3 February 2016

For personal use only

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT

FINANCIAL REPORT. Information should be read in conjunction with the 30 June 2015 Annual Report

West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling

For personal use only

For personal use only

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216

For personal use only

BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008

Transcription:

High- Drilling Results to Support Resource Upgrade at Wa Project, Ghana ASX / Media Release ASX Code AZM Wednesday 27 th January 2010 www.azumahresources.com.au Investment Highlights: 75,300oz gold JORC Code-compliant Mineral Resource at Wa Project, NW Ghana Project development studies underway 100% of 3,100km 2 licences hosting over 150km of prospective Birimian greenstone belt Pipeline of priority drill-ready targets $8.0M cash to fund aggressive exploration and development programmes Board and management team of successful explorers, developers, mining, finance and corporate professionals Issued Capital: 175.30M ord. shares 13.25M unlisted options Directors & Management: Chairman: Michael Atkins Managing Director: Stephen Stone Non-Executive Director: Geoff M Jones General Manager: Bernard Aylward Company Secretary: Dennis Wilkins Contact: Stephen Stone Mb: +61 (0) 18 80 56 stone@azumahresources.com.au Suite 1, 2 Richardson St, West Perth, WA 6005 Tel: +61 (0)8 986 7911 Fax: +61 (0)8 981 17 High-grade intersections confirm continuity of near-surface gold mineralisation at Julie prospect. Best results include*: o 15m at 6.6 gold from 1m (AJRC039) Incl. 3m at 23.10 gold from 1m; o 16m at.18 gold from surface (AJRC065) Incl. 8m at 7.72 gold from m o 16m at 3.80 gold from 8m (AJRC070) Incl. m at 13.20 gold from 56m; and o m at 9.7 gold from surface (AJRC061) *Note intersections based on composite sampling to a maximum of m Maiden Julie resource estimation to be completed in March Quarter ~ to add to Azumah s existing 75,000 ounce Indicated and Inferred gold resource Rock chip samples grading up to 186 gold confirm new mineralised quartz reef to the south of known Julie mineralisation West African gold explorer Azumah Resources (ASX:AZM) is pleased to announce that recent drilling at its Julie prospect has produced a host of bumper results ahead of a maiden resource estimation that will undoubtedly see an increase in the Company s Wa Project s existing 75,000-ounce Indicated and Inferred mineral resource base (see Tables 1 and 2. Figures 1, 2 and 3). In addition, the very recent discovery of an as yet undrilled mineralised quartz reef south of Julie, where rock chip sampling returned up to 186 gold, infers that there is excellent scope to increase resources in the broader Julie prospect area. The recently completed Reverse Circulation (RC) drilling programme at Julie successfully extended and confirmed the continuity of three zones of high-grade, near-surface gold mineralisation within the open-ended 6km east-west Julie shear zone. The Julie mineralisation remains open at depth and along strike. Preliminary assay results, based on m composited samples, returned mineralised intersections including: 15m at 6.6 gold from 1m AJRC039 (Incl. 3m at 23.10 gold from 1m); 16m at.18 gold from surface AJRC06 (Incl. 8m at 7.72 gold from m); 16m at 3.80 gold from 8m AJRC070 (Incl. m at 13.20 gold from 56m); and m at 9.7 gold from surface AJRC061. Azumah will immediately commission an independent mineral resource estimation for the Julie prospect with completion expected during the March 2010 Quarter. The Julie prospect lies 75km east of the Company s main Kunche-Bepkong resources within its largely under-explored 3,100km 2 Wa Project in Ghana s emerging north west gold province. Page 1 of 6

Rock Chip Sampling Returns High- Results Azumah s continuing rock chip sampling and field reconnaissance programmes within the Wa Project have most recently focussed on the Julie prospect area. Some excellent results have been returned including the discovery of a new high-grade but poorly exposed mineralised quartz vein, parallel to and south of the main Julie structure, with rock chip sampling assay results of up to 186 gold obtained. This presents an immediate target for drilling in the March Quarter. Many other rock chip samples taken in the Julie area returned over 50 gold. 1,000m Drilling Campaign Continuing Azumah has completed approximately half of the planned 19,000 RC component of its combined 1,000 RC, diamond and aircore drilling campaign with final assay results from RC drilling recently completed at the Collette prospect expected in the next two weeks. An eight hole, 1,000m large diameter diamond drilling programme to obtain samples for geotechnical and metallurgical studies is half completed at the Kunche and Bepkong resource areas and approximately one third of the planned 21,000m, 20 hole aircore drilling programme that is testing a number of new high-priority targets, is now completed. These excellent high-grade results from Julie and the announcement last week of new discoveries at Aduane and Sabili provide a great start to 2010, and we are still only part way through our current 1,000m combined RC, diamond and aircore drilling campaign, said Azumah s Managing Director, Stephen Stone. We will immediately commence the estimation of a maiden mineral resource for the open-ended Julie mineralisation that lies on a well defined 6km structure. This, along with the discovery of a parallel but as yet undrilled mineralised quartz vein where we obtained rock-chip sampling results up to 186 gold, provides strong encouragement that we will continue to build-up resources in this area, he said. A continuing flow of drilling results combined with project development studies moving forward on several fronts will ensure that shareholders can look forward to some very interesting developments as we move steadily towards our key objective of developing the first commercial-scale gold mining operation in the emerging north-west Ghana gold province, he added. - ENDS - Contact: Stephen Stone Managing Director Tel: +61 (0)18 8056 stone@azumahresources.com.au Inspecting Julie mineralisation at artisinal workings Field geologists logging Julie RC drill holes Page 2 of 6

Figure 1: Ghana s Emerging North West Province Page 3 of 6

Figure 2: Julie Prospect: Western Zone Latest Drilling Results Figure 3: Julie Prospect: Eastern Zone Latest Drilling Results Page of 6

Table 1: Julie RC Drilling (Nov-Dec 09) Preliminary Mineralised Intersections Hole_ID East North RL Dip Azi Hole Depth From (m) To (m) Intersected metres AJRC 03 59110 1115998 290-50 180 30 0 8 8 1.38 AJRC 035 59150 1116006 286-50 180 30 2 20 0.68 AJRC 037 5939 1115901 290-50 180 36 1 2 23 1.22 incl. 8 3.75 AJRC 039 59397 1115899 290-50 180 30 1 16 15 6.6 incl. 1 3 23.10 AJRC 00 5900 1115985 291-50 180 90 0 0.67 20 2 1.05 AJRC 01 5950 1115900 288-50 180 36 16 12 0.93 AJRC 02 591 1115998 292-50 180 60 8 16 8 2.77 AJRC 06 5970 1115989 282-50 180 60 28 36 8 1.30 AJRC 08 59752 1116030 282-50 180 8 8 56 8 0.5 AJRC 09 59800 1115951 28-50 180 2 20 2 3.55 AJRC 050 59800 1115990 28-50 180 60 20 28 8 0.66 AJRC 052 5996 1115953 283-50 180 2 8 12 1.2 AJRC 053 5997 1116001 281-50 180 5 36 0 1.7 AJRC 05 59598 111601 282-50 180 90 8 52 0.96 AJRC 055 595000 1116057 286-50 180 90 60 6 2.31 AJRC 056 595102 1115975 282-50 180 36 8 16 8 0.75 AJRC 057 595101 1115998 282-50 180 8 8 12 1.99 2 28 3.19 AJRC 058 595106 1116057 281-50 180 90 8 52 5.71 AJRC 059 596751 1115969 305-50 180 36 12 2 12 2.5 AJRC 060 59678 1116009 306-50 180 60 28 32 7.76 AJRC 061 596797 1115985 308-50 180 5 0 9.7 20 32 12 1.83 AJRC 062 59689 1115967 306-50 180 30 0 1.0 16 20 2.36 AJRC 063 59686 1115996 30-50 180 5 8 6.20 28 32 8.96 AJRC 06 596852 1116038 302-50 180 72 8 2.0 AJRC 065 59700 1115976 300-50 180 5 0 16 16.18 incl. 12 8 7.72 2 36 12 0.85 AJRC 066 597001 1116001 301-50 180 66 16 20 2.07 28 0 12 1.17 AJRC 067 597108 1116012 300-50 180 78 8 0 52 68 12 56 72 0.8 0.78 0.53 0.81 AJRC 070 59737 1115822 29-50 180 78 8 6 16 3.80 incl. 56 60 13.20 AJRC 071 59737 1115863 29-50 180 8 56 60 0.82 AJRC 072 59789 1115732 292-50 180 2 8 1.25 Page 5 of 6

Notes: All intersections based on maximum m composite RC samples. Intersections selected are based on a 0.50 gold lower cut-off, no upper-cut applied and maximum m internal dilution. Sample analysed by 50gm Fire Assay method, SGS Tarkwa. Eoh end of hole intersection. Drill hole collars are located by GPS with accuracy + 5m. RC drill holes are down hole surveyed on a 30m interval. Table 2: Wa Project - Statement of Combined Mineral Resource Estimates Prospect Indicated Inferred Total Tonnes Contained Ounces Tonnes Contained Ounces Tonnes Contained Ounces Kunche (1),900,000 2.0 318,000 3,600,000 1.7 198,000 8,500,000 1.9 516,000 Bepkong (2) 1,00,000 2.5 82,000 1,930,000 2.1 130,000 2,970,000 2.2 212,000 Atikpi (2) 350,000 1. 15,500 350,000 1. 15,500 Yagha (2) 270,000 1.2 10,800 270,000 1.2 10,800 Total 5,900,000 2.1 00,000 6,100,000 1.8 35,300 12,090,000 1.9 75,300 1. Kunche Mineral Resource estimation quoted for blocks with a grade greater than 1.0 gold. Differences may occur due to rounding errors. Refer ASX release September 2006 and details on Azumah website. Estimation completed by Resource Evaluations Pty Ltd in September 2006. 2. Bepkong, Atikpi and Yagha Mineral Resource estimations quoted for blocks with a grade of greater than 0.8 gold. Differences may occur due to rounding errors. Estimation completed by CSA Global Pty Ltd in August 2008. 3. Details of the Bepkong Mineral Resource estimation appear in ASX release dated th September 2008.. Details of the Atikpi and Yagha Mineral Resource estimation appear in ASX release dated th September 2008. Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Mr Bernard Aylward. Mr Aylward is the General Manager of Azumah Resources Limited. Mr Aylward is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 200 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Aylward consents to the inclusion in the report of the matters based on information in the form and context in which it appears. The information in this report that relates to in-situ Mineral Resource estimates for Bepkong, Yagha and Atikpi is based on information compiled by Mr David Williams, an employee of CSA Global Pty Ltd, geological consultants. Mr Williams is the competent person for the Bepkong, Yagha and Atikpi estimates and takes overall responsibility for these. Mr Williams is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 200 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Williams consents to the inclusion in the report of the matters based on information in the form and context in which it appears. The information in this presentation that relates to Mineral Resources at the Kunche Project is based on a resource estimate that has been audited by Mr Paul Payne, who is the Principal and full time employee of Resource Evaluations Pty Ltd. Mr Payne is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 200 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Payne consents to the inclusion in the presentation of the matters based on information in the form and context in which it appears. Statements regarding plans with respect to the Company s mineral properties are forward-looking statements. There can be no assurance that the Company s plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that the Company will be able to confirm the presence of additional mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of the Company s mineral properties. All notes pertaining to the Kunche Mineral Resource estimation of September 2006, the Bepkong Mineral Resource estimation of September 2008 and the Atikpi and Yagha Mineral Resource estimation of September 2008 can be found at www.azumahresources.com.au Page 6 of 6