MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND
|
|
|
- Dorothy Jennings
- 10 years ago
- Views:
Transcription
1 Assets, Experience, Growth ASX ANNOUNCEMENT 7 July 2015 MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND DEEP DIAMOND DRILLING COMMENCING AT BARBARA THIS WEEK, AIRBORNE VTEM UNDERWAY AND NEW REGIONAL TARGETS TO BE DRILL TESTED IN COMING WEEKS HIGHLIGHTS Airborne EM program well underway with surveying complete and results pending for both the recently defined Blockade and Ballara Saddle prospects. Drilling to commence during the week commencing 6 July, initially targeting a strong DHEM target at the Barbara deposit before moving to Blockade and Ballara Saddle following completion of analysis of Airborne VTEM program results. Extensive soil sampling continues to advance at the Mt Remarkable prospects, with additional encouraging copper-in-soil anomalies highlighted. The new exploration programs are consistent with Syndicated s strategic objective of growing its copper inventory around the Barbara Project, where a Feasibility Study is being progressed by its JV partner, CopperChem Limited. Syndicated Metals Limited (ASX: SMD Syndicated or the Company ) is pleased to advise that a major new near-mine and regional exploration program is underway across its key copper-gold projects in North Queensland designed to grow its copper inventory around its flagship Barbara Copper-Gold Project. Programs already underway, or about to commence shortly, include an extensive regional airborne VTEM survey designed to confirm drill targets across its 100%-owned Mt Remarkable Project in North Queensland (Figure 1), deep diamond drilling to strengthen the future underground potential at the Barbara Joint Venture Copper-Gold Project, and initial drill testing of targets flowing from the VTEM survey and soil sampling program. The overall objective of these multi-pronged regional exploration programs is to delineate additional copper resources within a 10-25km radius of the Barbara Copper-Gold Project, where a Feasibility Study is being progressed by the Company s joint venture partner, CopperChem Limited. Syndicated believes that its broader regional tenement holding in the Mt Isa-Cloncurry region is highly prospective for additional Barbara-style copper-gold discoveries as well as larger, IOCG style deposits.
2 VTEM Surveys An extensive airborne VTEM survey has recently been completed over the Ballara Saddle, Drought Master and Blockade prospects, located 10-15km south-east of the Barbara Project. See Figure 1. This survey is designed to firm up drilling targets following the completion of soil sampling programs which yielded multiple copper-in-soil anomalies comprises: Blockade 430 line kilometres of airborne VTEM at 200m line spacings flown in a NE-SW orientation Ballara Saddle 125 line kilometres of airborne VTEM at 200m line spacing flown in a NE-SW orientation. All data has now been received and interpretation is currently underway, with results anticipated by mid-july. A VTEM survey comprising 655 line kilometres at 200m line spacing flown in a NW-SE orientation perpendicular to the Mt Remarkable Fault orientation has also recently commenced over the tenements located to the north of Barbara. Figure 1 Northern Hub VTEM program locations
3 Drilling Programs A multi-purpose RC/Diamond rig has been mobilised to the Barbara Project and will initially commence drilling at the Barbara deposit later this week. This drilling is designed to target a previously identified strong down-hole electro-magnetic (DHEM) conductor located to the north of the known resources. See Figure 2. Three holes were previously drilled in the heart of the South Lode Underground which returned excellent results including: 1.76% Cu including 4.03% Cu (BADD052); and 1.9% Cu including 2.73% Cu (BADD053). These results indicate that the high-grade mineralisation at Barbara potentially continues at depth for up to 200m below the current open pit design. The new phase of drilling will target an extension of the mineralisation in this area, with the results expected to provide valuable information which will assist in strengthening the future underground mining proposition at Barbara. The Company plans to drill a single deep diamond drill hole (with an RC pre-collar) to a depth of approximately 350 metres targeting this position. The hole is expected to take approximately ten days to complete. Once completed, the rig will be relocated to test the newly identified regional targets at Blockade and Ballara Saddle once drill targets have been refined following interpretation of the VTEM data, as well as to test other targets generated by ongoing soil sampling. Figure 2 Barbara Long Section showing DHEM generated conductive plates (blue dotted rectangles) and proposed RC/diamond drilling (white dots).
4 Soil Sampling Extensive regional soil sampling programs are continuing across the Mt Remarkable Project to the north of the Barbara deposit following the successful programs which have defined the Ballara Saddle and Blockade prospects. The Mt Remarkable program consists of approximately 7,000 soil samples taken at 50m intervals and 400m line spacings and covers an area approximately 4km east-west by 40 km north-south. See Figure 3. The soil sampling program is targeted over the corridor of mineralisation which is believed to flank, and originate from, the Mt Remarkable Fault. Located along the fault are numerous old workings and mapped prospective locations for both Barbara-style high grade copper vein mineralisation and larger IOCG style alteration zones. The soil sampling program at Mt Remarkable is expected to take approximately three months to complete. Figure 3 Northern Hub soil sampling program
5 Management Comment Syndicated s Managing Director, Andrew Munckton, said he was pleased to see exploration activity accelerating across its North Queensland tenements as part of a concerted effort to expand its copper inventory and strengthen the future of the Barbara Project. The focus this year has been to apply low-cost exploration techniques to identify new exploration opportunities within our broader tenement package, he said. This work has been extremely successful, resulting in the identification of multiple new exploration targets which are now being subjected to airborne geophysics. The resulting data will help us to refine drill targets for the coming weeks. In the meantime, drilling will kick off later this week at Barbara to firm up the potential to augment the open pit in the future with a robust underground mining operation, Mr Munckton added. A single deep diamond hole will be completed to test this potential before the rig moves on to test regional targets. Investor Presentations Mr Munckton will be presenting at the following Resources Rising Stars Twilight Investor Forums in Sydney and Melbourne this week: SYDNEY Tuesday 7 th July 2015, 4.15pm 6.30pm Intercontinental Hotel 117 Macquarie Street, Sydney MELBOURNE Wednesday 8 th July 2015, 4.15pm 6.30pm RACV Club, Level Bourke Street, Melbourne Shareholders, brokers, investors and fund managers are invited to attend these functions for an update on the progress of the Feasibility Study on the Barbara Copper-Gold Project as well as the exploration programs outlined in this announcement. To register, please contact Read Corporate on or [email protected]. For further information: Investors Andrew Munckton Syndicated Metals Mobile: Media Nicholas Read Read Corporate Mobile: ENDS
6 Competent Person s Statement The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Andrew Munckton who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code ). Mr Munckton is a full-time employee of Syndicated Metals Limited and consents to the inclusion in the report of the Exploration Targets and Exploration Results in the form and context in which they appear. Exploration Targets This report comments on and discusses Syndicated Metals Limited s exploration in terms of target size and type. The information relating to Exploration Targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. The potential quantity and quality of material discussed as Exploration Targets is conceptual in nature since there has been insufficient work completed to define them as Mineral Resources or Ore Reserves. It is uncertain if further exploration work will result in the determination of a Mineral Resource or Ore Reserve.
For personal use only
ASX ANNOUNCEMENT 7 MARCH 2012 Phoenix Copper Limited ABN 67 127 446 271 Level 1, 135 Fullarton Road Rose Park, SA 5067 Australia Telephone +61 (0)8 8364 3188 Facsimile +61 (0)8 8364 4288 [email protected]
Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000
6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill
For personal use only
Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015
Core : CXO and Uranium Session SAREIC Conference Adelaide 13th April 2015 Disclaimer The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled
For personal use only
Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional
Barkly Phosphate Project Tenement Granted
MANTLE MINING ASX: MNM DIRECTORS Mr Martin Blakeman Non-Executive Chairman Mr Ian Kraemer Managing Director Mr Peter Anderton Non-Executive Director Mr Stephen de Belle Non-Executive Director ASX Release
Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government
CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company Secretary Joshua Ward Patrick Holywell Registered office Level
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015
ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
QUARTERLY ACTIVITIES REPORT
ASX Announcement 30 January 2008 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 31 DECEMBER 2007 OVERVIEW Electromagnetic (EM) geophysical surveys were conducted during the quarter within the Nagambie
New technology and new approach uncovers new opportunities in WA s Fraser Range
ASX Code: WIN New technology and new approach uncovers new opportunities in WA s Fraser Range Investor Update May 2016 Bronwyn Barnes, Executive Chair Important Information The information contained in
For personal use only
January, 202 Silver Swan Group Limited December 20 Quarterly Activities Report HIGHLIGHTS STAKEWELL Gold Project: Drilling intersected high and low grade gold mineralisation at Kohinoor, including surface
GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER
GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce that it has completed a major geological review and reinterpretation
ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT
ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD
For personal use only
DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
For personal use only
23 August 2013 Technical data supports copper porphyry potential Highlights: Data room initiated following unsolicited approaches from major copper resource companies Technical data supports intact high
JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.
ASX Announcement 15 January 2013 JACQUES GOLD PROSPECT RETURNS 37.7g/t Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.7g/t Second phase drilling program
f or the P ROJECT Agreement with copper-gold Bluebird. comprises a 1.6 mineralisation are often discordant to the Proterozoic deposits found in HIG
ASX ANNOUNCEMENT 30 April 2015 QUARTERLY ACTIVITIES f or the quarterr ended REPORT 31 Mar ch 2015 BARKLY COPPER-GOLD Limited is in a Farm-In Joint Venture P ROJECT Blaze International Agreement with Meteoric
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
Fraser Range Acquisition
Fraser Range Acquisition Nickel, Copper and Gold Exploration in Western Australia October 2013 DISCLAIMER Disclaimer This presentation has been prepared by Segue Resources Limited (Segue or the Company).
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT PERIOD ENDING 31 December 2015 SUMMARY CORPORATE Private share placement to sophisticated Investors was completed with $200,000 received A Share Purchase Plan
De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY
Mineralisation remains open in all directions with an untested downhole EM conductor at depth
Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
AIM Ticker ZRL ASX Ticker - ZRL. Investor Briefing - Melbourne May 10 th 2008. Africa s most active exploration company
AIM Ticker ZRL ASX Ticker - ZRL Investor Briefing - Melbourne May 10 th 2008 Africa s most active exploration company Disclaimer The information contained in this presentation is subject to updating, completion,
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia
Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,
Highlights. Quarterly Report For the quarter ended 30 June 2014. Horizon Healthcare Solutions Pty Ltd
Quarterly Report For the quarter ended 30 June 2014 Highlights Horizon Healthcare Solutions Pty Ltd During the quarter negotiations commenced with Horizon to see if there was an opportunity to purchase
EXPLORING WORLD CLASS MINERAL FRONTIERS
EXPLORING WORLD CLASS MINERAL FRONTIERS February 2015 1 Disclaimer This presentation has been prepared by Apollo Minerals Limited ( Apollo or the Company ). It should not be considered as an offer or invitation
Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).
ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from
Cannon Big Pit Given the Green Light
ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE
22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper
Press Release 29 th January 2016
Press Release 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso,
For personal use only. MRV Metals Launch February 2016
MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to
For personal use only
SEPTEMBER 2011 QUARTERLY REPORT AND STATEMENT OF CASHFLOWS About TriAusMin (ASX:TRO) (TSX:TOR) TriAusMin Limited ( TriAusMin ) is an Australian development stage base and precious metals company focused
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
How To Mine And Treat Ore From Castle Hill Stage 1
` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a
NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT
8 October 2015 ASX: AOH, FSE: A2O NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT Excellent results from previously un-assayed drill core. Best intersection of 29.1 metres at 1.41% copper, 0.11g/t gold.
Falcon Minerals Ltd ACN 009 256 535 Company Announcement
Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing
ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company
FOCUS MINERALS LIMITED
FOCUS MINERALS LIMITED Aggressively Expanding into a Rising Gold Price Campbell Baird, Chief Executive Officer ASX: FML www.focusminerals.com.au 2 Disclaimer and Competent Person s Statement This presentation
BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO
BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash
Cummins Range Rare Earths Project
Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general
DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS
29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
PNG Mining & Petroleum Investment Conference December 2010. Geoff Day Executive General Manager PNG and Indonesia
PNG Mining & Petroleum Investment Conference December 2010 Geoff Day Executive General Manager PNG and Indonesia Disclaimer Competent Persons Statement The information in this presentation that relates
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT
July 7 th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT RC Drilling has returned shallow high grades at the Gaffney
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared
JUNE 2015 QUARTERLY REPORT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter
COPPER DISCOVERY GROWS AT TURKEY CREEK
28 October 2014 ASX: AOH, FSE: A2O COPPER DISCOVERY GROWS AT TURKEY CREEK HIGHLIGHTS RC drilling highlights prospectivity of Cloncurry Copper Project Infill and Extension RC drilling about to recommence
BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008
JUNE 2007 QUARTERLY REPORT BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008 HIGHLIGHTS FOR THE QUARTER OPERATIONAL BEACONSFIELD GOLD MINE The site had operated for 216 days
ASX ANNOUNCEMENT 2 December 2014 PRESENTATION
ASX ANNOUNCEMENT 2 December 2014 PRESENTATION Red Mountain Mining is pleased to release the latest corporate presentation for December 2014, including a summary of key milestones to production and discovery;
Pathway to Production
Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or
EXPLORATION 1.0 2.0 3.0. 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0
EXPLORATION 1.0 2.0 3.0 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0 OZ MINERALS NOVEMBER 2009 PAGE 54 STRATEGY SUPERIOR TOTAL SHAREHOLDER RETURNS ZERO HARM FOCUS ON COPPER MAXIMISE POTENTIAL
AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE
KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: [email protected] AIM:
QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:
QUARTERLY REPORT Three Months Ending: 30 September 2012 ASX CODE: MZM ISSUED SHARES: 67.66M 52 WEEK HIGH: $0.80 52 WEEK LOW: $0.16 CASH ON HAND: $6.13M CONTACT: JUSTIN BROWN Managing Director +61 8 6315
Press Release 30 th October 2015
Press Release 30 th October 2015 SEPTEMBER 2015 QUARTERLY ACTIVITIES REPORT Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-gold projects
Quarterly Activities Report - for the period ended 31 December 2015
ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M
CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT
3 APRIL 2009 CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT Key Points Chalice Gold Mines and Sub Sahara Resources agree to merge by
INVESTOR PRESENTATION JULY 2013
INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology
HORSE WELL GOLD PROJECT W.A
December 2015 Quarterly Activities Report ABN 20 109 361 195 ASX Release 29 January 2016 Alloy Resources Ltd Suite 6, 7 The Esplanade Mount Pleasant WA 6153 Tel: +61 8 9316 9100 Fax: +61 8 9315 5475 Email:
Aurvista Gold Plans Significant Exploration Program at Douay
NEWS RELEASE For Immediate Issue June 14, 2016 Aurvista Gold Plans Significant Exploration Program at Douay Ø The main gold target is the largely untested northwestern section of the Porphyry Zone; the
Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.
Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained
RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target
ASX Announcement 29 January 2016 Quarterly Report For the period ending 31 December 2015 ASX Code GOR ABN 13 109 289 527 Highlights Solid progress on Gruyere Pre Feasibility Study Gruyere PFS remains on
ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS
ASX / MEDIA RELEASE 18 September 2015 HIGHLIGHTS: ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS St George acquires 100% of the Hawaii and Mt Alexander North nickel sulphide exploration projects from BHP
December 8, 2008. Visit www.ivanhoemines.com for pictures of the drill core and maps and sections of the new discovery.
December 8, 2008 Ivanhoe Mines Makes Another High-Grade Discovery of Gold and Copper at the Oyu Tolgoi Project in Mongolia Discovery Remains Open to Expansion in All Directions ULAANBAATAR, MONGOLIA John
December 2015 Quarterly Report
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE December 2015 Quarterly Report The Board of OreCorp Limited (OreCorp or the Company) is pleased to present its quarterly report for the period ended 31
QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015
29 October 2015 QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 Scoping Study Highlights Mt Morgans Gold Project (MMGP) Scoping Study was released during the quarter. Key outcomes include: An estimated
Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016
Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion
QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015
STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights
THE MBALAM-NABEBA IRON ORE PROJECT. Mr Giulio Casello Managing Director and CEO Sundance Resources Ltd
THE MBALAM-NABEBA IRON ORE PROJECT Mr Giulio Casello Managing Director and CEO Sundance Resources Ltd Cameroon s Premier Port, Rail and Mine Project 510km railway for transport of iron ore with 70km spur
Shaw River Manganese Ltd January 2012 Update. Vincent Algar - Managing Director
Shaw River Manganese Ltd January 2012 Update Vincent Algar - Managing Director Disclaimer This presentation has been prepared by Shaw River Manganese Limited ( Shaw River or the Company ). It should not
ASX Announcement (ASX: HMX)
ASX Announcement (ASX: HMX) 18 th March 2015 Drilling at Hammertime and Overlander to commence 3D-IP enhances gravity and magnetic target at Overlander North IOCG Hammer Metals Limited (ASX: HMX) ( Hammer
FINANCIAL REPORT. Information should be read in conjunction with the 30 June 2015 Annual Report
FINANCIAL REPORT HELIX RESOURCES LTD ACN 009 138 738 HALF YEAR ENDED 31 DECEMBER 2015 Information should be read in conjunction with the 30 June 2015 Annual Report Table of Contents Corporate Directory...
Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015
Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest
BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey.
ASX Announcement- 17th June 2014 ASX Code: BOA BOADICEA RESOURCES Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey. Highlights The final interpretation of the 2013
Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development 8 February 2016 Alecto Minerals plc ( Alecto or the Company )
Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development 8 February 2016 Alecto Minerals plc ( Alecto or the Company ) Joint Venture with Randgold Resources for the Advancement
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )
ANNUAL GENERAL MEETING 2015. 30 November 2015
ANNUAL GENERAL MEETING 2015 30 November 2015 Disclaimer Competent Person Statement This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking statements.
REPORT FOR THE QUARTER ENDED
REPORT FOR THE QUARTER ENDED 30 March 2013 ASX ANNOUNCEMENT 22 April 2013 ASX Code: DTM Investment Data Shares on issue 198.54M Unlisted options 14.55M Shareholders Top 20 Hold 38% Key Projects / Metals
GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL
FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012
Aspire Mining Limited
Aspire Mining Limited Investor Presentation March 2011 Forward Looking Statements & Disclaimer Forward Looking Statements Certain statements in the presentation are or may be forward looking statements
