1 DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation plant. Key construction, mining, environmental and project management team appointed. On track for completion of phase one plant commissioning in 1Q 2012 and first iron ore sales in 1H QUEENSLAND THERMAL COAL PROJECTS New technical modelling and interpretation reinforces strong project potential for the Company s four world class thermal coal assets in south Queensland. Further progress on advertising and grant process for Exploration Permits for Coal (EPC Applications) 2198, 2336, 2337 & Q 2012 OUTLOOK Kurnool phase one processing infrastructure and commissioning completion. Formal advertising of Exploration Permits for Coal (EPC Applications) 2336, 2337 & Grant of Exploration Permit for Coal EPC Page 1
2 IRON ORE - INDIA CONSTRUCTION OF US$2.3 MILLION KURNOOL IRON ORE BENEFICIATION PLANT During the quarter, site works and erection of a phase one conventional three stage crushing and dry separation plant progressed at the Company s wholly-owned 12-acre Kurnool stockyard site in the southeast Indian state of Andhra Pradesh where NSL is establishing a US$2.3 million, 200,000 tonne per annum capacity iron ore beneficiation operation. Major phase one plant components are on site and being installed and commissioned as planned, with steady state ore production targeted to be 200,000 tonnes per annum. There is potential for saleable product to be produced during the first quarter commissioning cycle which would generate the first of anticipated wider sales and maiden revenue. As part of the phase two beneficiation process, the wet beneficiation plant will continue to be constructed and commissioned through the first half of Work is underway to determine the potential to increase the production over and above the targeted rate of 200,000 tonnes per annum with the incorporation of phase one & two production. The following pictorial sequence shows the increasing construction activity on site at the Kurnool stockyard. For further pictures please refer to Appendix One. Commencement of site works Page 2
3 Commencement of equipment arriving on site Commencement of primary crushing area retaining wall Commencement of primary crushing area equipment footings Page 3
4 Commencement of secondary crushing area retaining wall INDIAN IRON ORE MANAGEMENT TEAM During the December quarter, NSL completed the appointment of its senior Indian-based iron ore project team. The appointments covered the key leadership roles of Construction Manager, Environmental Manager, Mines Manager, Project Controller, General Manager of Human Resources, Administration and Safety, and support staff. KUJA AND MANGAL IRON ORE DEPOSITS - ANDHRA PRADESH No mining activities were undertaken during the quarter at the two iron ore projects, Kuja and Mangal. Kuja is located adjacent the Kurnool stockyard site with Mangal only five kilometres distant. Work continues on finalising mine design, start-up planning and production scheduling work for the two iron ore projects in readiness for the March quarter plant start-up. Commissioning iron ore will be provided from current site stockpiles and third parties. NSL remains the only foreign company to own and operate iron ore mines in India, the world s third largest iron ore exporter and also boasting a strong domestic steel market. Page 4
5 INDIAN IRON ORE MARKETING NSL continued during the December quarter to maintain product offtake dialogue with potential partners overseas, and with domestic Indian metal manufacturers. Given the strength in both demand and pricing of the domestic iron ore market, it is likely the Company may prioritise domestic ex-gate sales ahead of export opportunities. The current domestic ex-gate sales price for 58% Fe material is 4500INR/t (approx US$90/t). THERMAL COAL - QUEENSLAND NEW ASSESSMENT ENHANCES DEVELOPMENT POTENTIAL During the quarter, NSL completed an updated technical modelling and interpretation schedule over the Company s highly prospective thermal coal Exploration Permit Coal (EPC) applications 2198, 2336, 2337 & 2338 in the Eromanga Basin in southwest Queensland. The application areas host a combined total exploration target of between billion tonnes of thermal ¹ coal and are adjacent to similar projects held by East Energy Resources (ASX: EER) and International Coal Limited (ASX: ICX). NSL is intending to schedule an exploration drilling program on the tenement package this year once the applications have been formally granted. A maiden nine hole scoping drill campaign is being considered as a precursor to a full exploration drilling schedule. Key findings (Refer ASX announcement 20 December, 2011 for full details) included that: The four tenement package offers economies of scale and a substantial exploration target of between billion tonnes of thermal ¹ coal. Historical petroleum drilling results have reinforced the proof of the existence of the coal seams. New analysis of historical boreholes supports the presence of a quality thermal coal product. Coal seams in the area are generally 7-15 metres cumulative thickness. The uppermost coal seams are as shallow as 50 metres or less from surface. Commercialisation of the region s coal is being propelled by substantial new investment in export infrastructure, including rail and port. (¹ It should be noted that the tonnages quoted above are conceptual in nature and there has been insufficient exploration to define a coal resource. No coal quality data for the project area was uncovered in previous reports. Although a preliminary analysis was undertaken, insufficient data exists to confidently correlate coal seams and generate a grid mesh model. Unexpected Geological loss is designed to account for seam splitting and thinning. It is uncertain whether further exploration may lead to the reporting of a JORC- standard resources, however there is considerable evidence to support the current Exploration Tonnage calculations, and the sufficient coal thicknesses interpreted from historical drilling warrant further investigation). APPLICATIONS PROCEEDING THROUGH GRANT PROCESS NSL was advised during the period by the Queensland Government of continued progress in assessment of the Company s application for granting to it its four thermal coal tenements, covering 2,585 km² in the Eromanga Basin. The Company understands that granting is now pending on the first application, coal exploration permit EPCA 2198, an area totalling 232 km² over 75 sub-blocks located 75 kilometres west of Augathella. It also understands that the remaining three applications are shortly to be advertised under the formal NOTICE OF PROPOSED GRANT OF EXPLORATION PERMIT FOR COAL protocols. Page 5
6 These three applications cover EPCA s 2336, 2337 & 2338, all located in the same general locality as EPCA Native title discussion with relevant parties progressed significantly, with completion expected in the near term. CORPORATE POTENTIAL ACQUISITIONS During the quarter, NSL continued to assess complimentary new bulk commodity mining opportunities to expand our potential production base in Andhra Pradesh. These assessments remain ongoing. The Company continued to progress several opportunities for either outright acquisition and/or joint venture structured agreements over multiple projects across India, together with additional Australian coal tenements. CASH FLOW APPENDIX 5B At the commencement of the December quarter, the Company had an opening cash balance of $4.709 million. The closing cash balance for the quarter ended 31 December 2011 was $3.186 million, boosted by proceeds from the successful $4.3 million capital raising completed in July and September last year via a placement to sophisticated investors and an underwritten renounceable entitlements issue. Regards NSL Consolidated Limited Cedric Goode Managing Director/CEO For more information: Cedric Goode Kevin Skinner NSL Consolidated Field Public Relations Managing Director/CEO / Competent Person s Statement Technical information relating to the coal projects in this announcement has been compiled by Mr Mark Biggs, Principal Geologist of Moultrie Database and Modelling. Mr Biggs is a member of the Australasian Institute of Mining and Metallurgy and has over 24 years of experience relevant to the style and type of coal mineralisation under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined by the Australasian Code for Reporting of Minerals Resources and Reserves (JORC) The estimates of the Coal Exploration Target presented in this Report are considered to be a true reflection of the Coal Exploration Target as at 20 th January 2012 and have been carried out in accordance with the principles and guidelines of the Australian Code for Reporting of Coal Resources and Coal Reserves published in September 2004 (JORC Code). Mr Mark Biggs consents to the inclusion in this announcement of the matters based on this information in the form and context in which it appears. Page 6
7 APPENDIX ONE Page 7
8 Page 8
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013
HIGHLIGHTS QUARTERLY ACTIVITIES REPORT For the period ending 31 December 2013 MOORLANDS PROJECT Moorlands Mine Scoping Study completed by Xenith Mining Consultancy in November 2013, confirming robust project
DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS
29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval
Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million
Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT
ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD
BAUXITE RESOURCES LIMITED
BAUXITE RESOURCES LIMITED POSITIVE EXPORT DSO BAUXITE SCOPING STUDY RESULTS RECEIVED FOR 100% BRL FORTUNA PROJECT Highlights Existing Mineral Resource and rail logistic chain can support a Direct Shipping
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
Investing in an Underground Coal Mine in Indonesia
Coal Supplying Key Resources into expanding Asian markets Investing in an Underground Coal Mine in Indonesia Disclaimer Forward Looking Statements This presentation includes certain forward looking Statements.
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing
ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company
For personal use only
1 QUARTERLY REPORT Atlantic Limited (ASX: ATI; Atlantic or the Company) is pleased to present its report for the ended 31 December 2010. HIGHLIGHTS WINDIMURRA Major sales agreement signed for 100% of ferrovanadium
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 Metals Finance Limited (ASX: MFC) is pleased to provide its Quarterly Activities Report for the three month period ending 31 May 2012. HIGHLIGHTS Separate
ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 27 JANUARY 2010 ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD Highlights: Acquisition of rights to an advanced
Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015
Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects
MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND
Assets, Experience, Growth ASX ANNOUNCEMENT 7 July 2015 MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND DEEP DIAMOND DRILLING COMMENCING AT BARBARA THIS WEEK, AIRBORNE VTEM UNDERWAY AND
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015
ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming
Aspire Mining Limited
Aspire Mining Limited Investor Presentation March 2011 Forward Looking Statements & Disclaimer Forward Looking Statements Certain statements in the presentation are or may be forward looking statements
For personal use only
29 January 2016 ASX Announcement December 2015 Quarterly Activities Report Summary New Satimola Limited Sale and Purchase Agreement Signed Financing to Acquire Satimola Limited Secured Revised Consulting
JUNE 2015 QUARTERLY REPORT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter
ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015
ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
ANNUAL GENERAL MEETING 2015. 30 November 2015
ANNUAL GENERAL MEETING 2015 30 November 2015 Disclaimer Competent Person Statement This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking statements.
For personal use only
Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional
Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016
Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000
6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared
Interim Financial Report for the half-year ended 31 December 2011
Interim Financial Report for the half-year ended 31 December 2011 Note: The information contained herein should be read in conjunction with the most recent annual report. Aura Energy Limited Level 4, 66
AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE
KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: [email protected] AIM:
Botswana Power Development! March 2015!
Botswana Power Development! March 2015! Power development business overview! Strong regional power demand underpinning business strategy " Independent power producers (IPPʼs) required to build new capacity"
Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review
Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted
C R A D L E / T R E M O N T J V A C Q U I R E S 1 0 0 % O F P A N D A H I L L L I C E N C E S
10 November 2015 ASX Release ASX Code: CXX C R A D L E / T R E M O N T J V A C Q U I R E S 1 0 0 % O F P A N D A H I L L L I C E N C E S Cradle Resources Limited is pleased to announce that Panda Hill
Barkly Phosphate Project Tenement Granted
MANTLE MINING ASX: MNM DIRECTORS Mr Martin Blakeman Non-Executive Chairman Mr Ian Kraemer Managing Director Mr Peter Anderton Non-Executive Director Mr Stephen de Belle Non-Executive Director ASX Release
GVK acquires Hancock Coal and Infrastructure Projects in Australia
GVK acquires Hancock Coal and Infrastructure Projects in Australia Hyderabad, 16th September 2011: GVK group, India s leading infrastructure developer, today confirmed arrangements for the acquisition
INVESTOR PRESENTATION JULY 2013
INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology
Quarterly Report December 2015
Quarterly Report December 2015 Highlights Major Asset Acquisition In October TGN announced that it had agreed terms for the acquisition of the Australian tungsten exploration assets of Hazelwood Resources
For personal use only
Mawson Iron Project PERTH 21 ST NOVEMBER 2015 Dr Gavin England General Manager DISCLAIMER AND COMPETENT PERSONS STATEMENT Slogan XXXX URBANISATION & INDUSTRIALISATION Chinese urbanisation and industrialisation
For personal use only
Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning
Merlin Diamonds Limited
Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited
Quarterly Overview. Quarterly Report for the period ended 30 June 2012
Quarterly Overview The June quarter saw Stanmore Coal make significant progress towards its goal of becoming a major coal producer with the allocation of 5Mtpa of port capacity for The Range project and
Cannon Big Pit Given the Green Light
ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
Mines and Money Presentation
ASX:BCI 24 Mar 15 Mines and Money Presentation Morgan Ball Managing Director 2 DISCLAIMER This document has been prepared by BC Iron Limited ( BC Iron ) to provide an update regarding the companies to
QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015
FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending
For personal use only
23 August 2013 Technical data supports copper porphyry potential Highlights: Data room initiated following unsolicited approaches from major copper resource companies Technical data supports intact high
Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015
Core : CXO and Uranium Session SAREIC Conference Adelaide 13th April 2015 Disclaimer The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled
QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015
STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights
GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER
GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce that it has completed a major geological review and reinterpretation
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
Ironbark Zinc Limited
Research Note Ironbark Zinc Limited Suite 5, Level 8, 99 York Street, Sydney NSW 2000 29 th August 2013 Ironbark Zinc to up the ante at Citronen Zinc Project with higher zinc prices Recommendation: Speculative
Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).
ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from
How To Mine And Treat Ore From Castle Hill Stage 1
` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a
ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014
Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: [email protected]
New technology and new approach uncovers new opportunities in WA s Fraser Range
ASX Code: WIN New technology and new approach uncovers new opportunities in WA s Fraser Range Investor Update May 2016 Bronwyn Barnes, Executive Chair Important Information The information contained in
Pathway to Production
Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or
NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9
NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 A G U I D E T O A I M U K TA X B E N E F I T S 2 AIM Note for Mining, Oil and Gas Companies Contents Introduction 1 Companies to which this Note
Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia
Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,
QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:
QUARTERLY REPORT Three Months Ending: 30 September 2012 ASX CODE: MZM ISSUED SHARES: 67.66M 52 WEEK HIGH: $0.80 52 WEEK LOW: $0.16 CASH ON HAND: $6.13M CONTACT: JUSTIN BROWN Managing Director +61 8 6315
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015
ASX ANNOUNCEMENT 31 JULY 2015 JUNE 2015 QUARTERLY REPORT The Directors of Odyssey Energy Limited ( Odyssey or Company ) are pleased to present the June 2015 ly report. Highlights during, and subsequent
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT PERIOD ENDING 31 December 2015 SUMMARY CORPORATE Private share placement to sophisticated Investors was completed with $200,000 received A Share Purchase Plan
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
The Unparalleled Opportunity of Colluli the Colluli Potash Project presented by Danakali
The Unparalleled Opportunity of Colluli the Colluli Potash Project presented by Danakali James Durrant Colluli Project Manager September 2015 Formerly South Boulder Mines ASX:DNK The growing world needs
DECEMBER 2015 QUARTERLY REPORT
NEWS RELEASE 29 JANUARY 2016 DECEMBER 2015 QUARTERLY REPORT Prairie Mining Limited is pleased to present its quarterly report for the period ending 31 December 2015. Highlights during, and subsequent to,
CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT
3 APRIL 2009 CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT Key Points Chalice Gold Mines and Sub Sahara Resources agree to merge by
THE MBALAM-NABEBA IRON ORE PROJECT. Mr Giulio Casello Managing Director and CEO Sundance Resources Ltd
THE MBALAM-NABEBA IRON ORE PROJECT Mr Giulio Casello Managing Director and CEO Sundance Resources Ltd Cameroon s Premier Port, Rail and Mine Project 510km railway for transport of iron ore with 70km spur
QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015
29 October 2015 QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 Scoping Study Highlights Mt Morgans Gold Project (MMGP) Scoping Study was released during the quarter. Key outcomes include: An estimated
De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY
Highlights. Quarterly Report For the quarter ended 30 June 2014. Horizon Healthcare Solutions Pty Ltd
Quarterly Report For the quarter ended 30 June 2014 Highlights Horizon Healthcare Solutions Pty Ltd During the quarter negotiations commenced with Horizon to see if there was an opportunity to purchase
QUARTERLY APPENDIX 4C. Please find attached the Appendix 4C for Atlantic Ltd for the quarter ended 31 March 2009.
30 April 2009 Centralised Company Announcements Platform Australian Stock Exchange 10 th floor, 20 Bond Street Sydney NSW 2000 QUARTERLY APPENDIX 4C Please find attached the Appendix 4C for Atlantic Ltd
QUARTERLY ACTIVITIES REPORT
ASX Announcement 30 January 2008 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 31 DECEMBER 2007 OVERVIEW Electromagnetic (EM) geophysical surveys were conducted during the quarter within the Nagambie
For personal use only
SEPTEMBER 2011 QUARTERLY REPORT AND STATEMENT OF CASHFLOWS About TriAusMin (ASX:TRO) (TSX:TOR) TriAusMin Limited ( TriAusMin ) is an Australian development stage base and precious metals company focused
Quarterly Activities Report - for the period ended 31 December 2015
ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M
Quarterly Activities Report For the quarter to 31 December 2015
Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW ISIN: AU000000TAW7 Share code on the Australian Stock Exchange Limited: TAW ISIN:
FOCUS MINERALS LIMITED
FOCUS MINERALS LIMITED Aggressively Expanding into a Rising Gold Price Campbell Baird, Chief Executive Officer ASX: FML www.focusminerals.com.au 2 Disclaimer and Competent Person s Statement This presentation
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
Sorby Hills Silver Lead Project
ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills
Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back
Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired
Press Release 29 th January 2016
Press Release 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso,
Report for the Quarter Ended 30 September 2015
Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann
For personal use only. South Burnett Project Update January 2016
South Burnett Project Update January 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ), the parent company for the purpose of providing a company
TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION
B-1 APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION 1.0 INTRODUCTION The disclosure of the results of exploration and development activity on mineral
Mineralisation remains open in all directions with an untested downhole EM conductor at depth
Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides
MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT
QUARTERLY REPORT December 2015 December Quarterly Report Exploration Activities Report Quarter ended 31 st December 2015 During the December, MGT Resources Limited (MGT, ASX:MGS) worked towards finalising
JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.
ASX Announcement 15 January 2013 JACQUES GOLD PROSPECT RETURNS 37.7g/t Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.7g/t Second phase drilling program
WARWICK AND ATLAS IRON ANNOUNCE MERGER TO CONSOLIDATE PILBARA IRON PROJECTS
ASX and Media Release 8 September 2009 WARWICK AND ATLAS IRON ANNOUNCE MERGER TO CONSOLIDATE PILBARA IRON PROJECTS KEY POINTS Warwick and Atlas Iron (ASX:AGO) have today announced their intention to merge
Carpentaria Exploration Ltd Investment Update
Carpentaria Exploration Ltd Investment Update June 19 th 2013 We find it. We prove it. We make it possible. Disclaimer This presentation has been prepared by the management of Carpentaria Exploration Limited