Falcon Minerals Ltd ACN Company Announcement
|
|
|
- Hilary Sparks
- 9 years ago
- Views:
Transcription
1 Falcon Minerals Ltd ACN Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: PO Box 913 West Perth WA 6872 Facsimile: Date: 30 April 2004 To: Electronic Lodgement: Number of pages: 11 Companies Announcement Office, ASX THIRD QUARTER ACTIVITY REPORT TO 31 MARCH 2004 HIGHLIGHTS Assay results from second round air core drilling programme at Collurabbie confirms anomalous Ni-Cu-PGE (nickel, copper and platinum group elements) mineralisation considered to be derived from sulphides. Drilling on Voisey s Bay or Norilsk style nickel targets identified within the Saxby Project Qld commenced on 21 st April Second drill program at Black Hill S.A. to detect anomalous nickel, copper and PGEs commenced 20 th April Collurabbie Joint Venture, WA Nickel, Copper and PGE s (FCN 30%, WMC 70%) The joint venture completed 129 air core holes (CLAC102 to 231) in November and December 2003 and assayed approximately 5,200 samples for nickel, copper and platinum group elements; platinum and palladium. Table 1 lists the significant intersections made in these drill-holes where it has been interpreted that anomalism is derived from nickel sulphides. Table 1 November to December Aircore Drilling. Hole No Width Ni% Cu% Pt+Pd g/t From Sulphide Source MGA Coordinates CLAC Yes N E CLAC Yes N E CLAC Yes N E CLAC Yes N E CLAC Yes N E CLAC Yes N E 1
2 The November to December aircore drilling program and the previous drilling program completed in 2003 identified at least 3 ultramafic horizons. It was reported that geochemical anomalism associated with nickel sulphides was intersected in the two western ultramafic units. From the recent drilling program there are 6 significant drill holes (Table 1) including CLAC 196 with 0.9% Ni and 0.95 g/t PGEs. Tables 1 and 2 show the western ultramafic units intersected nickel anomalism over several lines of drilling. Whilst these are weathered zone results, the continuity of anomalous results on successive lines over distances of up to 1.6km indicates the presence of nickel sulphides over long strike lengths. Table 2 shows which anomalies have been interpreted to be derived from nickel sulphides from the earlier air core drilling program in July and August Table 2 July to August Aircore Drilling Significant Intersections Hole No Width Ni% Cu% Pt+Pd g/t From Sulphide Source MGA Coordinates CLAC Yes N E CLAC Yes N E CLAC Yes N E CLAC Yes N E CLAC Yes N E CLAC Yes N E Both units are modified by cross-cutting structures, with CLAC196 to the west of the magnetic high close to a significant northeast trending fault. The mobility of nickel sulphides are commonly influenced by faulting and folding that can effect the distribution of massive sulphides and EM assists in targeting those. The project will be explored for nickel, copper and PGE bearing sulphides in both primary magmatic and structurally remobilised positions. Planned Work Q The planned schedule of work for the next period includes: Helimag Detailed heli-mag delayed by inclement weather is scheduled to commence next week. The heli-mag will enable a better structural interpretation to assist with drill-hole planning and TEM work. Fixed Loop Ground Electromagnetics (EM) Ground EM is required to establish the potential for massive nickel sulphides associated the prospective ultramafic units identified by aircore drilling. It s planned to survey approximately 3 to 4 strike km of ultramafic over the anomalies in CLAC169 and CLAC196. An airborne EM anomaly coincident with a magnetic anomaly in the eastern portion of the lease on another magnetic horizon also requires surface EM to determine its significance. 2
3 RC / Diamond Drilling Once the geophysics is complete, a drill program will be conducted to test the aircore anomalies and any EM anomalies generated. Saxby, QLD Nickel, Copper and PGE s (FCN 100%) Deep drilling by mud rotary/diamond drilling of two targets commenced 21 st April 2004, with target M1. Past drilling of three deep diamond holes near target M5 established the presence of magmatic nickel and copper sulphides. The tenement contains some large Voisey s Bay and Norilsk style targets. Target M1 is 4km east of the known nickel sulphide bearing zones. The other targets were reviewed and targets M3 and/or M5 to follow M1. Figure 2 3
4 Black Hills, SA Nickel, Copper, Platinum and Palladium (FCN 100%) The Black Hill project in South Australia was drill tested last with the first six very widely spaced RC percussion holes to an average depth of 52m to test the Black Hill and the Cambrai norite intrusive bodies. Currently another 14 percussion holes are underway to further test both areas. In the previously reported program, assays of a combination of composite and single metre samples returned anomalous copper, PGEs and gold from hole BH11-2 within the Black Hill norite just beneath the base of sedimentary cover at 36m to end of hole at 48m. Previously reported results included: BH11-2 Local Grid coordinates 56650E, N Significant results Depth metres Copper ppm Nickel ppm 37-38m m m m Palladium ppb Platinum ppb Gold ppb 36-40m composite Two other holes in the adjacent sediment covered Cambrai complex returned some weaker anomalous copper, with nickel peaking at 464 ppm. The current drilling will follow up on these intersections to similar depths to further test the local magnetic and electromagnetic anomalies for evidence of copper nickel PGE sulphide distribution in a grid pattern. Figure 3 4
5 Duketon and North Duketon Joint Ventures, WA Gold, and Nickel (FCN 20% free carried, Newmont 80% contributing) It was previously reported that Duketon Project and North Duketon Project are located 50km s and adjacently south respectively of the Collurabbie Project. Given the recent discovery of nickel sulphides further to the north by WMC, the twenty kilometres of ultramafics interpreted by Falcon to exist in this ground is regarded as having potential for nickel sulphides and PGE s. No work was reported by Newmont for the. Cargo Project, NSW Gold, and Copper (FCN earning 70%, Golden Cross 100%) The Cargo project and Belubula tenement to its south have been the subject of geophysical and geological modelling to identify Ridgeway style gold/copper porphyry intrusions. Three Ridgeway style targets in the Belubula area south of Cargo were tested prior to the more highly rated Cargo targets due to agricultural crop timing at Belubula. Each was tested with one hole to depths between 375m to 435m. The Belubula targets used widely spaced magnetic data whereas Cargo has a fivefold closer spaced data set. No Ridgeway style intrusions were encountered in this initial Belubula program. Down hole magnetic data were collected in the drilling. The data are being re-assessed and some more detailed ground geophysical surveys are planned over these targets. The first percussion drilling program completed by Falcon in April 2003 at the Cargo area returned a number of significant but sub economic low grade gold intercepts and a few but narrow higher grade gold intercepts. New targets at Cargo are being worked on to follow the Belubula drilling. Mulgarrie, WA Nickel (FCN 100%, Discovery Nickel earning 51%) The Mulgarrie Joint Venture comprises a tenement application covering prospective komatiite stratigraphy, north and along strike from the Silver Swan nickel deposit. Discovery Nickel has formed a Joint Venture with Falcon Minerals Limited to explore the Mulgarrie Project and has the right to earn a 51% interest in the project. Interpretation of ground EM data previously collected by Falcon Minerals had identified an untested EM conductor at the base of komatiite stratigraphy. Aeromagnetic data suggests the conductor is also associated with a thermal erosion feature at the base of the komatiite flow, in a similar geological setting to much of the nickel mineralisation at Kambalda, hence enhancing the prospectivity of this target. Falcon Minerals, on behalf of the Joint Venture has recently signed a Heritage Protection Agreement with the Goldfields Land Council which will expedite the granting of tenement ahead of active field work to commence following the grant of the tenement expected in May
6 OLYMPIC DAM STYLE EXPLORATION PROJECTS While drilling programs at Belubula NSW, Black Hill SA, and Saxby Qld were prepared, only geophysical planning work progressed on the Olympic Dam style and other copper gold projects discussed in some detail in the last ly report. The information in this report as it relates to mineralisation is based on information compiled by Mr R Muskett who is a geologist of the company and a Competent Person as described in Appendix 5A to the ASX Listing Rules. The report accurately reflects the information compiled by Mr R Muskett. Yours faithfully Richard Diermajer Director 6
7 Appendix 5B Mining exploration entity ly report Rule 5.3 Appendix 5B Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97. Name of entity Falcon Minerals Limited ACN or ARBN Quarter ended ( current ) March 2004 Consolidated statement of cash flows Cash flows related to operating activities Current Year to date (9 months) 1.1 Sales 1.2 Payments for (a) exploration and evaluation (b) development (c) production (d) administration (154) (51) (355) (281) 1.3 Refunds received EL applications & other 1.4 Interest and other items of a similar nature received Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Aggregate cashflows from disposals of entities net of cash received Net Operating Cash Flows (83) (483) Cash flows related to investing activities 1.8 Payment for purchases of: (a)prospects (b)equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a)prospects (b)equity investments (c)other fixed assets (40) (69) (40) (71) 1.10 Loans to other entities 1.11 Loans from other entities 1.12 Other (provide details if material) Net Investing cash flows (109) (111) 1.13 Total operating and investing cash flows (carried forward) (192) (594) O:\COMPANIES\FALCON MINERALS\Reports\Quarterly Reports\2004\March Third Quarterly Report.doc 7
8 Appendix 5B Mining exploration entity ly report 1.13 Total operating and investing cash flows (carried (192) (594) forward) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. - 3, Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other - capital raising costs - (188) Net financing cash flows - 3,291 Net increase (decrease) in cash held (192) 2, Cash at beginning of /year to date 4,245 1, Exchange rate adjustments to item Cash at end of 4,053 4,053 Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current $A' Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Payments for management and technical services Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Nil 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Nil O:\COMPANIES\FALCON MINERALS\Reports\Quarterly Reports\2004\March Third Quarterly Report.doc 8
9 Appendix 5B Mining exploration entity ly report Financing facilities available Add notes as necessary for an understanding of the position. Amount available Amount used 3.1 Loan facilities 3.2 Credit standby arrangements Estimated cash outflows for next 4.1 Exploration and evaluation Development Total Reconciliation of cash Reconciliation of cash at the end of the (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current 150 Previous 5.1 Cash on hand and at bank Deposits at call 3,939 4, Bank overdraft 5.4 Other (provide details) Total: cash at end of (item 1.22) 4,053 4,245 Changes in interests in mining tenements 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased Tenement reference Nature of interest (note (2)) Interest at beginning of Interest at end of No change E 70/ % 30% No change O:\COMPANIES\FALCON MINERALS\Reports\Quarterly Reports\2004\March Third Quarterly Report.doc 9
10 Appendix 5B Mining exploration entity ly report Issued and quoted securities at end of current Description includes rate of interest and any redemption or conversion rights together with prices and dates. 7.1 Preference + securities (description) Number issued Number quoted Par value (cents) Paid-up value (cents) 7.2 Issued during Ordinary securities 124,161, ,161,673 Fully paid 7.4 Issued during 1,000,000 1,000,000 Fully paid Convertible debt securities (description and conversion factor) 7.6 Issued during 7.7 Options (description and conversion factor) 18,284,630 Exercise price 20 cents Expiry Date 30 June Issued during 7.9 Exercised during 7.10 Expired during 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) O:\COMPANIES\FALCON MINERALS\Reports\Quarterly Reports\2004\March Third Quarterly Report.doc 10
11 Appendix 5B Mining exploration entity ly report Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Law or other standards acceptable to ASX (see note 4). 2 This statement does give a true and fair view of the matters disclosed. Sign here:... Date: 30 April 2004 (Company Secretary) Print name: Paul Fromson Notes 1 The ly report provides a basis for informing the market how the entity s activities have been financed for the past and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be compiled with == == == == O:\COMPANIES\FALCON MINERALS\Reports\Quarterly Reports\2004\March Third Quarterly Report.doc 11
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 44 009 163 919 31 December 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 108 476 384 30 September 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Aurelia Metals
Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 38 119 047 693 30 September 2011
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity COPPER RANGE LIMITED ABN Quarter ended ( current quarter ) 38 119 047 693 30 September
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 126 379 646 31 December 2015
Appendix 5B.Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity AVANCO RESOURCES LIMITED ABN Quarter ended ( current ) 85 126 379 646 31 December 2015 Consolidated
Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. 94 106 641 963 30 Sept 2015
Appendix 5B Mining exploration entity ly report Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Crusader Resources Limited ABN
Appendix 5B. Quarter ended ( current quarter ) 51 153 918 257 31 December 2013
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity HIGHFIELD RESOURCES LIMITED ABN Quarter ended ( current quarter ) 51 153 918 257
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 65 094 206 292 30 June 2013
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 68 073 914 191 31 December 2015
Appendix 5B Rule 5.3 Name of entity AUSTRALIAN MINES LIMITED AUZ ABN Quarter ended (current quarter ) 68 073 914 191 31 December 2015 Consolidated statement of cash flows Cash flows related to operating
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014
Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: [email protected]
Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 December 2015. Net Operating Cash Flows (568) (1,210)
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN Quarter ended ( current ) 68 064 120 896
Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 March 2015. Net Operating Cash Flows (512) (2,380)
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN 68 064 120 896 31 March 2015 Quarter ended
Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10. Quarter ended ( current quarter )
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Johnnycake (EPM 18986) - background
Forte Consolidated Limited QUARTERLY REPORT 1 October 2015 to 31 December 2015 ASX: FRC Forte Consolidated Limited ABN 37 148 168 825 Board of Directors Chairman Executive Director John Terpu Non-Executive
Appendix 5B. Mining exploration entity quarterly report LACONIA RESOURCES LIMITED 29 137 984 297 31 DECEMBER 2015
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity LACONIA RESOURCES LIMITED ABN Quarter ended ( current quarter ) 29 137
Appendix 5B. Mining exploration entity and oil and gas exploration
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 46 168 910 978 31 December 2015
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity TIAN POH RESOURCES LIMITED ABN Quarter ended ( current ) 46 168 910 978
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,
Appendix 5B Mining exploration entity quarterly report
Name of entity Appendix 5B SEGUE RESOURCES LTD Rule 5.3 ABN Quarter ended ("current quarter") 49 112 609 846 31 December 2015 Consolidated statement of cash flows Cash flows related to operating activities
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 December 2013
The Waterberg Coal Company Limited (formerly Range River Gold Limited) (Incorporated in Australia) (Registration number ABN 64 065 480 453) ASX: WCC JSE: WCC ISIN: AU000000WCC9 ( WCC or the Company ) Appendix
APPENDIX 5B Mining exploration entity quarterly report
1 of 5 APPENDIX 5B Mining exploration entity quarterly report TORO ENERGY LTD Quarter ended ABN. 48 117 127 590 June 2015 Consolidated statement of cash flows (Note 6.0) Cash flows related to operating
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 March 2014
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity THE WATERBERG COAL COMPANY LIMITED ABN Quarter ended ( current ) 64 065 480 453 31 March 2014
JUNE 2015 QUARTERLY REPORT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Rule
Quarterly Report. For the Quarter Ended 30 June 2004. Vulcan is maintaining its low cost exposure to West Australian gold exploration.
Quarterly Report For the Quarter Ended 30 June 2004 Vulcan is maintaining its low cost exposure to West Australian gold exploration. Yerilla Joint Venture (Sons of Gwalia earning 75%) Sons of Gwalia are
Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. Quarter ended ( current quarter ) 94 106 641 963 31 Dec 2015
Mining exploration entity ly report Appendix 5B Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/05/2013 Name of entity Crusader Resources
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 003 257 556 30 September 2013
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity MILLENNIUM MINERALS LIMITED ABN Quarter ended ( current ) 85 003 257 556 30 September
HORSE WELL GOLD PROJECT W.A
December 2015 Quarterly Activities Report ABN 20 109 361 195 ASX Release 29 January 2016 Alloy Resources Ltd Suite 6, 7 The Esplanade Mount Pleasant WA 6153 Tel: +61 8 9316 9100 Fax: +61 8 9315 5475 Email:
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 70 121 539 375 31 DECEMBER 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,
ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015
ASX ANNOUNCEMENT 31 JULY 2015 JUNE 2015 QUARTERLY REPORT The Directors of Odyssey Energy Limited ( Odyssey or Company ) are pleased to present the June 2015 ly report. Highlights during, and subsequent
Appendix 5B. Mining exploration entity quarterly report
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian Bauxite Limited ABN Quarter ended ( current ) 14 139 494 885
Mineralisation remains open in all directions with an untested downhole EM conductor at depth
Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
Appendix 5B. RNI NL and its controlled entities. Quarter ended ( current quarter ) 77 085 806 284 30 Jun 2016
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity RNI NL and its controlled entities ABN Quarter ended ( current quarter ) 77 085 806
Appendix 5B. Quarter ended ( current quarter )
Appendix 5B Rule 5.5 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity WPG Resources Ltd ABN Quarter ended ( current quarter ) 51
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
For personal use only
December 2015 Quarterly Activities Report Rumble Resources Ltd (ASX: RTR) ( Rumble or the Company ) is pleased to provide an update of the Company s activities during the December 2015. Rumble Resources
QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015
QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 KIHABE ZINC LEAD SILVER PROJECT BOTSWANA On 11 November 2015, the Company received an email from the Assistant Permanent Secretary, Ministry of Minerals
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT PERIOD ENDING 31 December 2015 SUMMARY CORPORATE Private share placement to sophisticated Investors was completed with $200,000 received A Share Purchase Plan
DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS
29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015
ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming
March 2015 Quarterly Activity Report and Appendix 5B
ABN 90 118 710 508 Ground Floor 1 Havelock Street West Perth WA 6000 t: +61 8 9488 5220 f: +61 8 324 2400 www.citation.net.au [email protected] 30 April 2015 ASX Announcement March 2015 Quarterly Activity
QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015
ASX ANNOUNCEMENT MEDIA RELEASE 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS RC drilling identified wide mineralised gold zones north of original Namdini
September 2010 Quarterly Report
September 2010 Quarterly Report 25th October 2010 Corporate Details ASX Code: RCO Issued Capital: 52,714,183 Shares 2,950,000 Options @ 40c, 31/3/2011 (Unlisted) 510,000 Options @ 42c, 31/3/2011 (Unlisted)
QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015
FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending
Appendix 5B Mining exploration entity quarterly report
Appendix 5B Rule 5.3 Name of entity YILGARN GOLD LIMITED ABN Quarter ended ("current quarter") 34 002 527 906 31 December 2004 Consolidated statement of cash flows Cash flows related to operating activities
Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned
FOR THE QUARTER ENDED 31 December 2015 Swala Energy Limited ACN 161 989 546 Level 4, 21 Kintail Road Applecross WA 6153 Australia TEL +61 (0) 8 6270 4700 FAX +61 (0) 8 6314 4675 EML [email protected]
MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT
QUARTERLY REPORT December 2015 December Quarterly Report Exploration Activities Report Quarter ended 31 st December 2015 During the December, MGT Resources Limited (MGT, ASX:MGS) worked towards finalising
Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing
ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company
Report for the Quarter Ended 31 December 2015
Report for the Quarter Ended 31 December 2015 ASX: KIS Market Capitalisation $13.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 7.5 cents Share Price Board of Directors Johann
RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target
ASX Announcement 29 January 2016 Quarterly Report For the period ending 31 December 2015 ASX Code GOR ABN 13 109 289 527 Highlights Solid progress on Gruyere Pre Feasibility Study Gruyere PFS remains on
Quarterly Activities Report
ASX Release Thursday 28 January 215 Quarterly Activities Report ASX Code: SAU Issued Shares: 36.53M Directors Greg Boulton AM (Chair) Simon Mitchell (MD) Michael Billing David Turvey Head Office Southern
Quarterly Activities Report - for the period ended 31 December 2015
ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M
Quarterly Activities Report
ASX Release Friday 3 October 215 Quarterly Activities Report 3 September 215 Highlights ASX Code: SAU* *Deferred settlement: SAUDA Issued Shares: 35.17M ABN: 3 17 424 519 Directors Greg Boulton AM (Chair)
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015
STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights
QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED
21 st January 2016 QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED 31 st DECEMBER 2015 CONTACTS: Collin Vost Telephone: 08 6436 2350 ISSUED CAPITAL: 2,225,337,344 Ordinary Shares Directors: Collin
For personal use only
1 QUARTERLY REPORT Atlantic Limited (ASX: ATI; Atlantic or the Company) is pleased to present its report for the ended 31 December 2010. HIGHLIGHTS WINDIMURRA Major sales agreement signed for 100% of ferrovanadium
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 Metals Finance Limited (ASX: MFC) is pleased to provide its Quarterly Activities Report for the three month period ending 31 May 2012. HIGHLIGHTS Separate
QUARTERLY ACTIVITIES AND CASH FLOW REPORT. PERIOD ENDED 31 March 2015
30 April 2015 QUARTERLY ACTIVITIES AND CASH FLOW REPORT PERIOD ENDED 31 March 2015 Baraka Energy & Resources Limited Contacts: Collin Vost Issued Capital: 2,225,337,344 Ordinary Shares Telephone: 08 6436
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
How To Find Iron Ore In Australia
PROJECTS- AUSTRALIA ROBINSON RANGE IRON ORE ABOUT MUSGRAVES QUEENSLAND QUARTERLY ACTIVITIES AND CASH FLOW REPORT JUNE 2015 PepinNini Minerals Limited is a diversified ASX listed Exploration Company focused
DECEMBER 2015 QUARTERLY ACTIVITIES REPORT
29 January 2016 DECEMBER 2015 QUARTERLY ACTIVITIES REPORT CORPORATE On the 14 December 2015, Namibian Copper NL (ASX Code: NCO) (Namibian Copper or the Company) announced that the Company had entered into
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
Quarterly Report for the Quarter Ended 30 September 2015
ASX Market Announcements Office via electronic lodgment 29 October 2015 Quarterly Report for the Quarter Ended 30 September 2015 HIGHLIGHTS: Drilling at Prospect GC11 intersected 2m @ 2,354ppm U 3O 8 from
Report for the Quarter Ended 30 September 2015
Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann
Quarterly Report for the Quarter Ended 31 December 2015
ASX Market Announcements Office via electronic lodgment 28 January 2016 Quarterly Report for the Quarter Ended 31 December 2015 HIGHLIGHTS: Modelling of Nabarlek Offset target indicates that the prospective
Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million
Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take
QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011
Level 6 122 Walker St North Sydney NSW 2060, Australia T +61 (0)2 9460 1856 F +61 (0)2 9460 1857 31 October 2011 ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011 HIGHLIGHTS
Quarterly Activities Report For the quarter to 31 December 2015
Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW ISIN: AU000000TAW7 Share code on the Australian Stock Exchange Limited: TAW ISIN:
December 2015 Quarterly Report
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE December 2015 Quarterly Report The Board of OreCorp Limited (OreCorp or the Company) is pleased to present its quarterly report for the period ended 31
Merlin Diamonds Limited
Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter )
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity 1Page Limited ABN Quarter ended ( current
September 2015 Quarterly Report
September 2015 Quarterly Report 30 October 2015 The effects of industrial action on the Weeks Royalty in Bass Strait diminished through the with petroleum production moving back to more normal levels.
For personal use only
SEPTEMBER 2011 QUARTERLY REPORT AND STATEMENT OF CASHFLOWS About TriAusMin (ASX:TRO) (TSX:TOR) TriAusMin Limited ( TriAusMin ) is an Australian development stage base and precious metals company focused
QUARTERLY CASH FLOW REPORT. Please find attached Sterling Plantations Limited s quarterly cash flow report for the quarter ended 30 September 2015.
23 October 2015 The Manager Company Announcements Office Australian Securities Exchange Exchange Plaza 2 The Esplanade PERTH WA 6000 By: elodgement (ASX code SBI) QUARTERLY CASH FLOW REPORT Please find
December 2015 Quarterly Report
December 2015 Quarterly Report 29 January 2016 The downward spiral in oil prices coupled with ongoing industrial action in Bass Strait continues to impact receipts from the Weeks Royalty interest. Income
Quarterly report for entities admitted on the basis of commitments
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity Papyrus Australia Limited ABN Quarter ended
June 2013 Quarterly Activities Report
June 2013 Quarterly Activities Report Musgrave Minerals Limited is a dedicated exploration company focused on base metals, silver and gold in the highly prospective Musgrave Province and Gawler Craton
Five targets advanced to drill-ready stage ahead of drilling anticipated to commence during the September 2013 Quarter.
Quarterly Report For the Period Ending 30 June 2013 Highlights Copper Exploration Northern Territory Five targets advanced to drillready stage ahead of drilling anticipated to commence during the September
ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015
ASX ANNOUNCEMENT 29 th January 2016 ASX: PML QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015 HIGHLIGHTS Parmelia Resources entered into conditional agreement to acquire Veriluma Pty Ltd. Parmelia and Veriluma
