1 STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights from the December Quarter include: Updated global resource for Big Vein South of 10.24Mt at 2.03 g/t, containing 667,000 oz. gold at a 0.75g/t cut-off. For full details of these results, please refer to Resource Update for Big Vein South issued on 8th December 2015, available at Table 1 Global Resource Summary Category Mt Au g/t Au Kozs Density t/m³ Measured Indicated Inferred Total Completed a reconnaissance mapping program to help plan and prioritise exploration for 2016 and beyond. This focussed on areas identified from recent field and data studies as being prospective targets to roll-out the successful exploration strategies that discovered BVS, including Caledonia (western Lower Camp), Belle Brandon and Union. Preparations for the 2016 field program, including: Detailed compilation and analysis of the 2015 results in light of the recent project review. Commencement of detailed planning for the 2016 exploration program, likely to include: Continued advancement of the BVS deposit with further drilling, engineering and environmental studies: Target generation and definition programs over multiple prospective targets; and Reconnaissance drilling of selected targets throughout the Woolgar Project. Strategic Minerals Corporation N.L. 58 Jersey Street, Jolimont ASX Code: SMC Western Australia, 6014 [email protected] ACN: P.O. Box 66 (08) ABN: Floreat Forum. WA 6014 (08)
2 Resource Update for Big Vein South On June 9 th, 2015, the company announced a substantial update to the resource at Big Vein South. This update, see Table 1, follows the earlier release of the Resource Update for Big Vein South and Central prepared in May Both updates have been prepared by H&S Consultants Pty Ltd (H&SC), an independent consultancy, on behalf of Strategic and are reported according to the 2012 JORC Code & Guidelines. Resource update incorporates the recent drilling that successfully tested the previously announced exploration targets between the two existing resources, see Figure 1. Down dip extension of the Flat zone Southern zone Northern zone Flat zone Central zone Figure 1: Geological Interpretation of the Mineral Zones at B, showing drillhole locations and the focus of the recent drilling = black circle. Substantial exploration potential exists to delineate further resources, with an Exploration Target at a 0.75g/t Au cut-off of 10 to 20Mt at 1.8 to 2.1g/t for 0.75 to 1.25Moz. The potential quantity and grade of the Exploration Target is conceptual in nature, that there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the estimation of a Mineral Resource. The BVS mineralisation comprises deformed, auriferous, quartz-sulphide veins with pervasive silica alteration. Host rocks consist of Proterozoic-aged, amphibolite grade quartz-feldspar-biotite-mica schists within a ductile deformation zone. The type of mineralisation is a mesothermal vein style. Structurally the deposit appears to be controlled by an upright sigmoidal development during ductile deformation with subsequent brittle offset faulting producing three main zones. A fourth zone appears as a splay structure to the Northern zone of the main sigmoidal structure. Resource classification is based primarily on the drillhole spacing (and hence the data point density), grade continuity (variography), the geological model and the QAQC data. The resource estimates are reported for a 0.75g/t Au cut off with a partial percent volume adjustment generated by the constraining mineral wireframes. Less than 2.6% of the deposit tonnage is in the oxide zone with just under 2% of the ounces. The block grade distribution is shown below. ASX:SMC 2 of 8
3 Southern Central Northern Northern Central Southern Flat Figure 2: December 2015 BVS Resource Estimate: - Gold Block Grade Distribution. Upper figure: View looking down to grid northwest. Lower figure: View looking down to grid south east. The new resources estimates represent a 65% increase in tonnes with a 5% drop in grade and a 57% increase in the number of ounces. The vast majority of this has come from the newly defined Central zone which was the prime target for the recent drilling. The May 2015 modelled figures for the Central zone Passes 5-8 were 1.76g/t for 238,500ozs, the new drilling has partly tested the Exploration Target yielding an estimate figure of 2.08g/t for 189,750ozs. Additions to the new resource estimates have come from the other three zones. The number of gold ounces in the Northern zone has been increased by 36,000 (approximately 82% increase) due to higher grades associated with a substantial thickening in the deposit at its southern end. There is a 40% increase in ounces for the Flat zone (9,400) mainly due to the newly interpreted steeper down dip extension, whilst the Southern zone has increased by 5,500 ozs (a 1.5% increase). The majority of the resource seems to occur as a flattish east dipping zone at depths of 100 to 150m below surface as noted in the above figure. Figure 3 below shows the new resource estimates relative to the May 2015 figures. The newly defined Central zone is clear to see along with the substantial thickness increase associated with the southern end of the Northern zone. ASX:SMC 3 of 8
4 Central zone Southern end of Northern zone Figure 3: Additional resource blocks shown within the interpreted geological wireframes (Upper looking down to grid northwest, Lower looking down to grid southeast.) Exploration Potential Substantial exploration potential exists in the immediate vicinity of the mineral zones within the interpreted mineral wireframes but generally at depth i.e. down dip (see Figure 4 below). An Exploration Target at a 0.75g/t Au cut-off of 10 to 20Mt at 1.8 to 2.1g/t for 0.75 to 1.25Moz is defined by using the estimation results from passes 5 to 8 and the unfilled blocks within the mineral wireframes. The potential quantity and grade of the Exploration Target is conceptual in nature, that there has been insufficient ASX:SMC 4 of 8
5 exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the estimation of a Mineral Resource. Figure 4: Exploration Potential shown within the geological model wireframe. Future Work Based on the Exploration Potential, additional infill drill programs are required to upgrade the resource estimates. However H&SC anticipates that only a modest amount of drilling is needed for a substantial expansion of the mineral resource albeit in the Inferred Category and generally at greater depths Additional Resource Estimates (2004 JORC Code & Guidelines) Epithermal and Intrusive Style Mineralisation Zones. The Woolgar Project also hosts further resource estimates published under the 2004 version of the JORC Code. These include resource estimates over epithermal and intrusion related styles of mineralisation, which differ in their characteristics from the mesothermal style mineralisation reported in this updated resource statement. There is insufficient information currently to determine whether these varying styles of mineralisation have compatible metallurgy, nor that further studies will determine this to be so and the Company makes no representation to this effect. The additional global resource estimates, excluding the previous and new resource estimates for the BVS area, are 25.4 M Tonnes at 1.09 g/t gold for 795,400oz. of gold for a range of cut-offs between 0.4 and 1.0 g/t gold. For the complete JORC 2004 resource statement, please refer to QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31st MARCH 2013 published 30th April 2013, available at This information was prepared and first disclosed under the JORC Code It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. ASX:SMC 5 of 8
6 Project-wide Exploration During 2015, Strategic conducted a project-wide review of all available data on the Woolgar district, returning wherever possible to the original data in order to reappraise the whole of the project in the context of the recent successful programs, improved geological understanding and with the benefit of all available data. The first phase of this, in the first half of the year, successfully assessed and prioritised targets based on the data from previous exploration. Figure 5 below highlights existing resources and new priority targets priority new targets Existing Resources BVS Resource Figure 5: Simplified geological map of the Woolgar Project, highlighting the five main sectors (camps) and the Big Vein South prospect, the principle exploration focus since The new prioritised targets for exploration during 2016 are: Union, Lost World Extension, Belle Brandon, Ironclad and Caledonia. The existing resources are BVS, Sandy Creek epithermal veins and Soapspar intrusive related gold. ASX:SMC 6 of 8
7 The limitation of this program is that the different prospects were explored at different times, using varying methods such that direct comparisons rely on large assumptions and can be affected by the relative amounts of data or opinions of the previous workers. During the second half of the year, the most prospective of these targets were reconnaissance mapped in the field in order to better compare and prioritise these targets. This included rapid field traverses, reconnaissance mapping, outcrop sampling and limited IP surveys. This has effectively delineated multiple programs to run concurrently. These are, in order of priority: 1. Continued expansion, upgrading and advancement of the recently discovered resource at BVS; 2. Widening of the exploration focus to further similar prospects in the Lower Camp; 3. Reappraisal and renewed exploration of the epithermal vein system at Sandy Creek; and 4. Target generation and preliminary drilling of several IRGS, epithermal and mesothermal targets in the Upper Camp, around Union in particular. These programs are already underway and will be expanded into Reconnaissance Mapping During the December Quarter, a limited program of reconnaissance mapping was undertaken to further advance the prioritisation of multiple prospects and aid planning of exploration programs for The work targeted the Lower Camp in order to maintain a focus around the current main resource, and also to the north around Union. Initial Results from Fieldwork Detailed mapping of the Mowbray NE and Ironclad targets has confirmed their high priority status along with the exploration targets at Belle Brandon and in the west of the Lower Camp at Caledonia. At Belle Brandon previous minor drilling is seen to improve progressively to the south where the drilling cuts off at the limit of basement exposure. Fieldwork identified that this actually apparently aligns with the significant historic working at Ada, 600 metres to the south, and that the aeromagnetic survey suggests a continuous structure. This concept will be tested with further IP and drilling in At Caledonia, extensive old workings were mapped to demonstrate a series of en-echelon sigmoidal trends bracketed by the main Mowbray trends, then clusters of workings around the intersections of these with granitic dykes. These are considered to be highly-prospective structural and rheologicaly controlled targets and follow-up mapping and sampling in 2016 will be followed by further field work. Wally Martin MANAGING DIRECTOR COMPETENT PERSON STATEMENT The information in the report to which this statement is attached that relates to Exploration Results is based on information compiled by Alistair Grahame, a Competent Person who is a Member of The Australian Institute of Geoscientists. Mr Grahame is a full-time employee of Strategic Mineral Corporation NL. Mr Grahame has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Grahame consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. ASX:SMC 7 of 8
8 Appendix One: Project Location, Overview and Geological Setting Figure 6: Geological location map of the Woolgar Project showing principle road and rail infrastructure, and the regional geological provinces. The deposits shown are existing epithermal, mesothermal and IRGS gold deposits greater than 1Moz throughout Northeast Queensland, which are considered to be of comparable ages, styles and occurrences to the known mineralisation at Woolgar. As can be seen, the Woolgar Goldfield corresponds to an inlier (erosional window) of the highly prospective and historically productive Etheridge Province exposed within the overlying generally unprospective sedimentary cover sequences. The Woolgar Project consists of exploration permits and mining leases, in central north Queensland over a window of basement rocks within younger sedimentary cover. Initial exploration work targeted widespread historic workings from alluvial and reef mining from a gold rush in the 1880 s, see Figure 5. Strategic has identified three styles of mineralisation at Woolgar: epithermal vein deposits at Sandy Creek, mesothermal veins along the WFZ and intrusive related mineralisation (IRGS) in the Upper Camp, as well as the alluvial gold associated with these. The Company has published resources from all three styles of mineralisation, see The Company s recent focus has been on the mesothermal veins in the Lower Camp area, but is now expanding its activities to reappraise the epithermal and IRGS, as well as further mesothermal veining. ASX:SMC Page 8 of 8
9 Appendix 5B Mining exploration entity quarterly report Appendix 5B Rule 5.3 Mining exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity STRATEGIC MINERALS CORPORATION NL (SMC) ABN Quarter ended ( current quarter ) December 2015 Consolidated statement of cash flows Cash flows related to operating activities Current quarter Year to date (12 Months) 1.1 Receipts from product sales and related debtors 1.2 Payments for: (a) exploration & evaluation (201) (1,132) (b) development (c) production (d) administration (147) (620) (e) project development costs 1.3 Dividends received 1.4 Interest and other items of a similar nature received Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other Net Operating Cash Flows (347) (1,725) Cash flows related to investing activities 1.8 Payment for purchases of: (a)prospects (b)equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net Investing Cash Flows 1.13 Total operating and investing cash flows (carried forward) (347) (1,725) Appendix 5B Page 1
10 Appendix 5B Mining exploration entity quarterly report 1.13 Total operating and investing cash flows (brought forward) (347) (1,725) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. net of costs Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) Net financing cash flows Net increase (decrease) in cash held 412 (966) 1.20 Cash at beginning of quarter/year to date 402 1, Exchange rate adjustments to item Cash at end of quarter Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current quarter $A' Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Directors payments, corporate management fees paid to associated company Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Nil 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Nil Financing facilities available Add notes as necessary for an understanding of the position. Amount available Amount used 3.1 Loan facilities 3.2 Credit standby arrangements Appendix 5B Page 2
11 Appendix 5B Mining exploration entity quarterly report Estimated cash outflows for next quarter 4.1 Exploration and evaluation Development Production Administration 100 Total 300 Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current quarter Previous quarter 5.1 Cash on hand and at bank Deposits at call Bank overdraft 5.4 Other: Refundable Guarantees Total: cash at end of quarter (item 1.22) Interests in Mining Tenements Disclosure in accordance with ASX Listing Rule Project / Tenements Woolgar Gold Project EPM Woolgar W EPM 9599 Woolgar C EPM Woolgar S EPM Woolgar E EPM Steam Engine ML 2642 Soapspar 1 ML 2793 Soapspar 2 ML 2729 Mowbray 3 ML 2739 Mowbray Woolgar Uranium Project ML 2728 Perseverance ML Sandy Creek Dam ML Sandy Creek Plant Location Held at end of quarter Acquired during the quarter Disposed during the quarter Australia 100% 0% 0% Australia 100% (1) 0% 0% (1) Owned through control of Alpha Uranium Limited (wholly owned subsidiary of Strategic) Farm-in Agreements / Tenements Location Held at end of quarter Acquired during the quarter Disposed during the quarter Nil Appendix 5B Page 3
12 Appendix 5B Mining exploration entity quarterly report Farm-out Agreements / Tenements Location Held at end of quarter Acquired during the quarter Disposed during the quarter Nil Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. Total number Number quoted 7.1 Preference + securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions Ordinary securities 860,621, ,621,428 Issue price per security (see note 3) (cents) Amount paid up per security (see note 3) (cents) 7.4 Changes during quarter (a) Increases through 35,448,100 35,448, cents 2.1 cents issues (b) Decreases through returns of capital, buy-backs Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options (description Exercise price $ Expiry date and conversion factor) Nil 7.8 Issued during quarter Nil 7.9 Exercised during quarter 7.10 Expired during quarter 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) Appendix 5B Page 4
13 Appendix 5B Mining exploration entity quarterly report Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5). 2 This statement does give a true and fair view of the matters disclosed. Signed: Dated: Friday, 29 January 2016 Company Secretary Print name: JAY STEPHENSON Notes 1 The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities. The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == = Appendix 5B Page 5
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 68 073 914 191 31 December 2015
Appendix 5B Rule 5.3 Name of entity AUSTRALIAN MINES LIMITED AUZ ABN Quarter ended (current quarter ) 68 073 914 191 31 December 2015 Consolidated statement of cash flows Cash flows related to operating
Appendix 5B. Quarter ended ( current quarter ) 51 153 918 257 31 December 2013
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity HIGHFIELD RESOURCES LIMITED ABN Quarter ended ( current quarter ) 51 153 918 257
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 38 119 047 693 30 September 2011
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity COPPER RANGE LIMITED ABN Quarter ended ( current quarter ) 38 119 047 693 30 September
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 44 009 163 919 31 December 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED
Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
Appendix 5B. Mining exploration entity quarterly report LACONIA RESOURCES LIMITED 29 137 984 297 31 DECEMBER 2015
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity LACONIA RESOURCES LIMITED ABN Quarter ended ( current quarter ) 29 137
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 65 094 206 292 30 June 2013
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B Mining exploration entity quarterly report
Name of entity Appendix 5B SEGUE RESOURCES LTD Rule 5.3 ABN Quarter ended ("current quarter") 49 112 609 846 31 December 2015 Consolidated statement of cash flows Cash flows related to operating activities
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 108 476 384 30 September 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Aurelia Metals
Appendix 5B. Mining exploration entity and oil and gas exploration
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
Johnnycake (EPM 18986) - background
Forte Consolidated Limited QUARTERLY REPORT 1 October 2015 to 31 December 2015 ASX: FRC Forte Consolidated Limited ABN 37 148 168 825 Board of Directors Chairman Executive Director John Terpu Non-Executive
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Rule
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 December 2015. Net Operating Cash Flows (568) (1,210)
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN Quarter ended ( current ) 68 064 120 896
Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 March 2015. Net Operating Cash Flows (512) (2,380)
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN 68 064 120 896 31 March 2015 Quarter ended
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10. Quarter ended ( current quarter )
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 46 168 910 978 31 December 2015
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity TIAN POH RESOURCES LIMITED ABN Quarter ended ( current ) 46 168 910 978
Quarterly Activities Report - for the period ended 31 December 2015
ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,
APPENDIX 5B Mining exploration entity quarterly report
1 of 5 APPENDIX 5B Mining exploration entity quarterly report TORO ENERGY LTD Quarter ended ABN. 48 117 127 590 June 2015 Consolidated statement of cash flows (Note 6.0) Cash flows related to operating
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 126 379 646 31 December 2015
Appendix 5B.Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity AVANCO RESOURCES LIMITED ABN Quarter ended ( current ) 85 126 379 646 31 December 2015 Consolidated
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing
ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company
JUNE 2015 QUARTERLY REPORT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,
Appendix 5B. Quarter ended ( current quarter )
Appendix 5B Rule 5.5 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity WPG Resources Ltd ABN Quarter ended ( current quarter ) 51
Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. 94 106 641 963 30 Sept 2015
Appendix 5B Mining exploration entity ly report Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Crusader Resources Limited ABN
Appendix 5B. RNI NL and its controlled entities. Quarter ended ( current quarter ) 77 085 806 284 30 Jun 2016
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity RNI NL and its controlled entities ABN Quarter ended ( current quarter ) 77 085 806
ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014
Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: [email protected]
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 70 121 539 375 31 DECEMBER 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 003 257 556 30 September 2013
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity MILLENNIUM MINERALS LIMITED ABN Quarter ended ( current ) 85 003 257 556 30 September
DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS
29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
Appendix 5B Mining exploration entity quarterly report
Appendix 5B Rule 5.3 Name of entity YILGARN GOLD LIMITED ABN Quarter ended ("current quarter") 34 002 527 906 31 December 2004 Consolidated statement of cash flows Cash flows related to operating activities
MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT
QUARTERLY REPORT December 2015 December Quarterly Report Exploration Activities Report Quarter ended 31 st December 2015 During the December, MGT Resources Limited (MGT, ASX:MGS) worked towards finalising
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 December 2013
The Waterberg Coal Company Limited (formerly Range River Gold Limited) (Incorporated in Australia) (Registration number ABN 64 065 480 453) ASX: WCC JSE: WCC ISIN: AU000000WCC9 ( WCC or the Company ) Appendix
Merlin Diamonds Limited
Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited
Appendix 5B. Mining exploration entity quarterly report
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian Bauxite Limited ABN Quarter ended ( current ) 14 139 494 885
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 March 2014
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity THE WATERBERG COAL COMPANY LIMITED ABN Quarter ended ( current ) 64 065 480 453 31 March 2014
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015
ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming
QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015
QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 KIHABE ZINC LEAD SILVER PROJECT BOTSWANA On 11 November 2015, the Company received an email from the Assistant Permanent Secretary, Ministry of Minerals
ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015
ASX ANNOUNCEMENT 31 JULY 2015 JUNE 2015 QUARTERLY REPORT The Directors of Odyssey Energy Limited ( Odyssey or Company ) are pleased to present the June 2015 ly report. Highlights during, and subsequent
HORSE WELL GOLD PROJECT W.A
December 2015 Quarterly Activities Report ABN 20 109 361 195 ASX Release 29 January 2016 Alloy Resources Ltd Suite 6, 7 The Esplanade Mount Pleasant WA 6153 Tel: +61 8 9316 9100 Fax: +61 8 9315 5475 Email:
Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. Quarter ended ( current quarter ) 94 106 641 963 31 Dec 2015
Mining exploration entity ly report Appendix 5B Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/05/2013 Name of entity Crusader Resources
Report for the Quarter Ended 30 September 2015
Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann
Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million
Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take
Quarterly Report. For the Quarter Ended 30 June 2004. Vulcan is maintaining its low cost exposure to West Australian gold exploration.
Quarterly Report For the Quarter Ended 30 June 2004 Vulcan is maintaining its low cost exposure to West Australian gold exploration. Yerilla Joint Venture (Sons of Gwalia earning 75%) Sons of Gwalia are
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
September 2010 Quarterly Report
September 2010 Quarterly Report 25th October 2010 Corporate Details ASX Code: RCO Issued Capital: 52,714,183 Shares 2,950,000 Options @ 40c, 31/3/2011 (Unlisted) 510,000 Options @ 42c, 31/3/2011 (Unlisted)
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 Metals Finance Limited (ASX: MFC) is pleased to provide its Quarterly Activities Report for the three month period ending 31 May 2012. HIGHLIGHTS Separate
DECEMBER 2015 QUARTERLY ACTIVITIES REPORT
29 January 2016 DECEMBER 2015 QUARTERLY ACTIVITIES REPORT CORPORATE On the 14 December 2015, Namibian Copper NL (ASX Code: NCO) (Namibian Copper or the Company) announced that the Company had entered into
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned
FOR THE QUARTER ENDED 31 December 2015 Swala Energy Limited ACN 161 989 546 Level 4, 21 Kintail Road Applecross WA 6153 Australia TEL +61 (0) 8 6270 4700 FAX +61 (0) 8 6314 4675 EML [email protected]
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
QUARTERLY ACTIVITIES AND CASH FLOW REPORT. PERIOD ENDED 31 March 2015
30 April 2015 QUARTERLY ACTIVITIES AND CASH FLOW REPORT PERIOD ENDED 31 March 2015 Baraka Energy & Resources Limited Contacts: Collin Vost Issued Capital: 2,225,337,344 Ordinary Shares Telephone: 08 6436
QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED
21 st January 2016 QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED 31 st DECEMBER 2015 CONTACTS: Collin Vost Telephone: 08 6436 2350 ISSUED CAPITAL: 2,225,337,344 Ordinary Shares Directors: Collin
QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015
FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending
Report for the Quarter Ended 31 December 2015
Report for the Quarter Ended 31 December 2015 ASX: KIS Market Capitalisation $13.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 7.5 cents Share Price Board of Directors Johann
Quarterly Activities Report
ASX Release Thursday 28 January 215 Quarterly Activities Report ASX Code: SAU Issued Shares: 36.53M Directors Greg Boulton AM (Chair) Simon Mitchell (MD) Michael Billing David Turvey Head Office Southern
Falcon Minerals Ltd ACN 009 256 535 Company Announcement
Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April
Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter )
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity 1Page Limited ABN Quarter ended ( current
Quarterly Activities Report
ASX Release Friday 3 October 215 Quarterly Activities Report 3 September 215 Highlights ASX Code: SAU* *Deferred settlement: SAUDA Issued Shares: 35.17M ABN: 3 17 424 519 Directors Greg Boulton AM (Chair)
For personal use only
December 2015 Quarterly Activities Report Rumble Resources Ltd (ASX: RTR) ( Rumble or the Company ) is pleased to provide an update of the Company s activities during the December 2015. Rumble Resources
March 2015 Quarterly Activity Report and Appendix 5B
ABN 90 118 710 508 Ground Floor 1 Havelock Street West Perth WA 6000 t: +61 8 9488 5220 f: +61 8 324 2400 www.citation.net.au [email protected] 30 April 2015 ASX Announcement March 2015 Quarterly Activity
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
Quarterly report for entities admitted on the basis of commitments
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity Papyrus Australia Limited ABN Quarter ended
For personal use only
1 QUARTERLY REPORT Atlantic Limited (ASX: ATI; Atlantic or the Company) is pleased to present its report for the ended 31 December 2010. HIGHLIGHTS WINDIMURRA Major sales agreement signed for 100% of ferrovanadium
Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter ) 58 009 213 754 31 DECEMBER 2015
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity AGENIX LIMITED ABN Quarter ended ( current
Quarterly Report for the Quarter Ended 31 December 2015
ASX Market Announcements Office via electronic lodgment 28 January 2016 Quarterly Report for the Quarter Ended 31 December 2015 HIGHLIGHTS: Modelling of Nabarlek Offset target indicates that the prospective
Quarterly Activities Report For the quarter to 31 December 2015
Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW ISIN: AU000000TAW7 Share code on the Australian Stock Exchange Limited: TAW ISIN:
Mineralisation remains open in all directions with an untested downhole EM conductor at depth
Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides
QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015
ASX ANNOUNCEMENT MEDIA RELEASE 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS RC drilling identified wide mineralised gold zones north of original Namdini
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
September 2015 Quarterly Report
September 2015 Quarterly Report 30 October 2015 The effects of industrial action on the Weeks Royalty in Bass Strait diminished through the with petroleum production moving back to more normal levels.
Appendix 4C. Quarterly report for entities admitted on the basis of commitments BIOTRON LIMITED. Quarter ended ( current quarter )
Appendix 4C Rule 4.7B Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Quarterly report for entities admitted on the basis of commitments Name of entity BIOTRON LIMITED ABN Quarter ended ( current
December 2015 Quarterly Report
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE December 2015 Quarterly Report The Board of OreCorp Limited (OreCorp or the Company) is pleased to present its quarterly report for the period ended 31
QUARTERLY CASH FLOW REPORT. Please find attached Sterling Plantations Limited s quarterly cash flow report for the quarter ended 30 September 2015.
23 October 2015 The Manager Company Announcements Office Australian Securities Exchange Exchange Plaza 2 The Esplanade PERTH WA 6000 By: elodgement (ASX code SBI) QUARTERLY CASH FLOW REPORT Please find
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT PERIOD ENDING 31 December 2015 SUMMARY CORPORATE Private share placement to sophisticated Investors was completed with $200,000 received A Share Purchase Plan
QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015
29 October 2015 QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 Scoping Study Highlights Mt Morgans Gold Project (MMGP) Scoping Study was released during the quarter. Key outcomes include: An estimated
ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015
ASX ANNOUNCEMENT 29 th January 2016 ASX: PML QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015 HIGHLIGHTS Parmelia Resources entered into conditional agreement to acquire Veriluma Pty Ltd. Parmelia and Veriluma