Multi Family, West Haven, CT

Similar documents
Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

IMPROVEMENT COST ESTIMATE powered by HomeFixers

S t e p h e n A l e x a n d e r

Building Condition Assessment Report

Building Condition Assessment Report

Estimating Database Checklist

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

SUMMARY OF WORK FOR GENERAL CONTRACTOR

The UPLANDS at ORO VALLEY Sterling Features

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile)

RUSS L. ROBINSON ATLANTA COMMUNITIES (770)

2015 Beaver Run Refurbishment Department Flip Packet for Homeowners

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Summit Series Single Section and Double Section Homes

Open House and Home Tour Checklist

The Carriage Homes at Woodland Pond Phase III & IV

Vari Inspection Services

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

STERLING SPRINGS. Irrigation System Front & 2 Sides Yard 9 Ceiling First Floor

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Chelton. Lower Level. Crescendo Builders. Chelton. Bethesda, Maryland. Elevation A. Elevation A. an award winning homebuilder

PROPERTY INSPECTION REPORT

Estimated Cost of Repair

Inspecton Report. Property Address:

Stanley Neighborhood Series

New Home Walk-Through Package

Your Basement Remodeling Specialist LLC

5000 Series House Plans & Pricing

The Peaks Features List

Welcome To Mallard Park

GENERAL WIRING RULES FOR HOUSES

Georgia Home Inspection Services

Cost of Repair Worksheet

MANUFACTURER WARRANTY LIST

Cascade Remodeling Inc. PO Box Portland, OR Catalyzing Euphoria Phone (503) , FAX (503) CCB # 67007

CONDITION OF QUALITY ITEMS

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood.

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri $428,500

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

47 Levencourt Way London SW8 1HR. Tenant: Eric Stevenson Prepared for: Elizabeth Collins

VILLAGEBUILDERS.COM. 550 Greens Pkwy, Ste. 200, Houston, TX Designer Tile Flooring

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department

Spring Valley Trails Quick Move In & Inventory Towns Colours have been selected for some of these unit. See Agent for details.

A.C.E. Home Inspection Service St. Peters, MO (636)

Crawford Inspection Services C.C.B. #

Does Wall Township require an inspection by the building department on resale of a home?

CITY OF SHAKER HEIGHTS HOUSING INSPECTION DEPARTMENT 3450 LEE ROAD SHAKER HEIGHTS, OHIO (216) POINT OF SALE CERTIFICATE OF INSPECTION

Home Inspection Report

Exterior Condition Report

*PLEASE RETURN THIS FORM TO THE RENTAL OFFICE*

COMPREHENSIVE PROPERTY INSPECTIONS

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

The Verona 4 BEDROOMS I 3 ½ BATHS I 3,220 SF I PLAN 4628

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Schedule of Maintenance Fees

Sample Rehabilitation Proposal: Narrative

Borges Construction Company A limited liability Corporation Page1 of 1

Home Inspection Report

Inspection Tech. (330) Inspected By: Aaron Westerburg

YOUR COMPANY NAME HERE

Grace Lane, Arroyo Grande

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Every Home Offers Special Features

Rehab Inspection Report Page 1

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Inspection Report. Prepared For: Sampath Sample. Property Address: Waterside Drive. Alpharetta, GA Atlanta Home Inspections

HOMEOWNER S PERMIT GUIDE

Orlando Home Inspection Services

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

Holz Choices & Specifications

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

KITCHENS REMODELED Before and After

Building Permits: When are they required?

Proudly Presenting Twinflower Crescent

GeorgiaHomePros.com Yellow Creek Road Ball Ground, GA Inspected By: Scott Webb

Beautiful kitchens and bathrooms to meet your budget! KITCHEN REMODELING BATHROOM REMODELING COUNTERTOPS AND MORE!

Substantial Improvement/ Damage Review

Classic Collection Features

Silvercrest Introduces the All New S E R I E S. Shown with Optional Dormer Treatment

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

2. Complete the appropriate sections of the Auto/Home Quote form. 4. Return all materials to Paul Goebel Group. or your local Citizens Agent.

Virginia Maintenance Code Requirements

Final Walk-Through Checklist

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

ROCK-SOLID Inspections

Stanley Martin Custom Homes

Self-Home Inspection Checklist

NMLS ID: AmeriFirst Home Mortgage

Transcription:

Multi Family, West Haven, CT Scope of Work: Two Family Home, West Haven, CT Project Introduction and Overview Description Two family home, 1900 sq/ft, 1 st floor apartment has 3 bedrooms and 1 bathroom with a large great room combination. The 2 nd floor apartment has 2 large bedrooms and 1 bathroom with a large living room and kitchen. The building had been vacant for almost 2 years and had been vandalized numerous times. The home is located in working class neighborhood near the local hospital for veterans. Rehab Overview The property was in need of extensive interior and exterior renovations. Exterior work included a new composition shingle roof, vinyl siding and all new vinyl replacement windows. Interior work included new plumbing and heating through the entire building and extensive electrical upgrades including new main panels. Both kitchens and bathroom were completely renovated and skylight were added to the 2 nd floor living room. All rooms have new paint and flooring as well Contractor Overview Multiple contractors were used to complete this project. A licensed general contractor was used for all framing, windows, siding, flooring, painting and kitchen and bathroom remodels. A licensed plumber was used for new plumbing and heating systems. A licensed electrician was used for all electrical upgrades and additions. EXTERIOR: 1. Install vinyl siding over the existing exterior (Timber Select, color Granite) 2. Repair damaged wood on front and rear porches where needed 3. Paint front and rear decks white 4. Paint entire foundation 5. Replace all exterior doors, replace all hardware and paint accent color o Front Doors (Lowes item # 21689) o Rear Doors (Lowes item # 21683) o Hardware (Lowes item # 68499) 6. Install new house numbers, mailboxes and doorbells 7. Replace all windows except those specified by owner (new vinyl double hung) o First floor kitchen window Board up one of the windows with pressure treated wood and cover with siding o First floor bathroom window Board up the window with pressure treated wood and cover with vinyl siding. o Basement widows Board up all windows except for center one, put siding over the others 8. Replace iron railings on the front steps with wood railing and paint white ROOF: 1. Rip existing roof and remove all debris 2. Install new plywood on entire roof, new roofing felt, drip edge and ice and water shield. 3. Install new 30 year comp architectural shingles with ridge vent - (black) 4. Install 2 skylights in living room area on 2 nd floor (Velux 21 Wx47 L)

Sco p e o f W o rk : T w o F am i l y H o m e, W es t H av e n, C T INTERIOR GENERAL Paint scheme: Navajo eggshell walls, semi gloss white trim, flat white ceilings, white closets, white doors Remove all trash and debris o All Paint from Valspar Paints Color Name Product Code Cliveden Leather Cliveden Leather Eggshell Wall 3004-10A Honeymilk Honeymilk Flat 7003-4 Honeymilk Honeymilk Semi Gloss 7003-4 Paint all rooms in house with above color scheme Repair all stairs as needed, front and rear Remove all carpeting, sand and refinish floors as defined by owner Repair/Replace all interior doors as needed (all doors must open and close properly and lock) Replace all hardware (brushed nickel finish) Replace any damaged plaster and sheetrock on walls or ceiling www.fortunebuilders.com or (203)624-0444

FIRST (1 st ) FLOOR APARTMENT: 1. Replace all windows w/ vinyl double hung 2. Prep and paint all rooms according to the interior color scheme 3. Sand and refinish floors in living room and kitchen 4. Carpet in all bedrooms 5. Repair plaster/sheetrock as needed in all rooms 6. Existing kitchen area will become the master bedroom 7. Frame in closet for new master bedroom as per diagrams 8. Remove the drop ceiling in the existing kitchen (new master bedroom) 9. Existing dining room (between the bathroom and living room) will become the kitchen 10. Closet space by front door will now be open to living room (see diagram) 11. The bedroom closest to the entry way of house will be extended out about 16 into the living room area. (owner will provide more detailed layouts) KITCHEN: 1. Remove the inside wall separating the living room and kitchen to create and opened counter separation with view of the living room (see attached diagram) 2. Prep and paint according to interior scheme and smooth out any textured areas 3. Sand and refinish floors in the new kitchen 4. Install new cabinets with (maple finish) 5. Install new countertop, black marble laminate with 7 sink (Lowes color Labrador Granite) 6. Install new white appliances (Frig., stove and microwave see attached sheet for item numbers)

BATHROOM: 1. Demo existing bathroom 2. Prep and paint walls according to interior scheme and smooth out any textured areas 3. Install tub with new shower and tub trim kit (Plumber will supply and install) 4. New ceramic tile surround (with 4 subway style with accent strip ¾ way up) 5. Replace toilet (Plumber) 6. Replace sink base, sink top and faucet. (Plumber) 7. Install new medicine cabinet 8. Install new flooring (12 beige ceramic from Lowes) BEDROOMS: 1. Remove any wallpaper on the existing wall 2. Prep and paint according to scheme 3. Smooth out any textured areas 4. Repair doors as needed and replace all hardware 5. Carpet all floors in master bedroom SECOND (2 nd ) FLOOR APARTMENT: 1. Prep and paint all rooms as interior color scheme

2. Smooth out any textured areas 3. Replace damaged hardwood in living room and carpet 4. Replace any damaged sheetrock on walls or ceiling 5. Repair/replace all doors and replace hardware (brushed nickel) KITCHEN: (2 nd Floor) 1. Paint according to interior scheme 2. Smooth out any textured areas 3. Install new maple cabinets layout to remain the same 4. Install new countertop, black marble looking laminate w/7 sink (same as first floor) 5. Install new white appliances (Frig., stove and microwave see attached sheet for item numbers) 6. New flooring (ceramic tile 12 beige from Lowes) 7. Replace back door and replace hardware (Lowes item #21683) BATHROOM: (2 nd Floor) 1. Replace tub 2. Replace tub diverter 3. Install new tile surround (4 white subway style w/ accent ¾ way up wall) 4. Replace toilet, sink base, sink top and all faucets 5. Replace medicine cabinet and all lighting 6. New flooring (ceramic tile- 12 beige from Lowes)

BEDROOMS 1. Prep and paint as per house color scheme 2. Replace/repair interior doors as needed and replace hardware 3. Replace overhead lights (dome with brushes nickel finish 4. Sand and refinish all hardwood floors

BASEMENT 1. Clean entire basement and prep for paint 2. Paint floors beige and walls white with oil base paint. ELECTRICAL 1. Replace all outlets and switches 2. Install all new exterior lighting (motion sensor were needed) 3. Install all new interior lighting (dome with brushes nickel trim and vanity bars in bathrooms) 4. Install electrical whip for dishwasher and above stove microwave 5. Wire both kitchens for under cabinet lighting 6. Install GFCI were needed 7. Update panel as needed and install new breakers 8. Install overhead lights in all rooms were needed

HVAC & PLUMBING 1. Install 2 new gas fired boilers 2. Install 2 new gas fired hot water heaters 3. Replace all baseboards in all rooms Completion of Final Punch List

Cost Breakdown Carpenter - $32,200.00 All framing material and labor Sheetrock, Insulation and Interior Painting Window Replacement Kitchen Remodel including cabinets, countertop, appliances All Flooring hardwood, carpet and ceramic tile All finish work coordinate all inspections Exterior Siding Electrical - $4,000.00 New 100amp breakers panels to replace old style panels Electrical upgrades including smoke and CO2 detectors to code All fixtures coordinate all inspections Plumber - $4,000.00 All rough plumbing, fixtures and finish work Coordinate all inspections HVAC - $5,800.00 2 new gas fired boilers with all baseboards Coordinate all inspection Roof - $5,000.00 MISC -$2,500.00 Permits - $1000.00 TOTAL - $54,500.00