Supplier Quality Requirements

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11

Integrated Supplier Quality Requirements

INTRODUCTION. The Quality Challenge

VELUX General Quality Requirements

Supplier Quality Manual Program Requirements. Table of Contents

Quality Assurance Agreement

APQP information to suppliers. Volvo Construction Equipment 2012

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

General Motors Global Purchasing and Supply Chain Global Supplier Quality

Production Part Approval Process AIAG PPAP 4 th Edition

Supplier Quality System Requirements

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS)

Johnson Controls Automotive Experience Global Supplier Standards Manual Chapter 4 Quality October, 2015

Comparison ISO/TS (1999) to VDA 6.1 (1998)

Valued Supplier: This Manual represents STRATTEC s commitment to quality and supplier partnerships.

Global Supplier Quality Manual February 2014

General Motors Global Purchasing and Supply Chain Global Supplier Quality

Production Part Approval Process 4 th Edition

General Motors Global Purchasing and Supply Chain Global Supplier Quality

Supplier Quality Assurance

Supplier Handbook. March 2014

Ege Fren Ege Fren San. ve Tic. A.Ş.

CUSTOMER SPECIFIC REQUIREMENTS

Quality Management System

GE Power Electronics Business Total Quality Management for Suppliers

HELLA Quality. Guidelines for Suppliers (HP-C-509)

Supplier Quality Agreement EK 25

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2

Supplier Quality Management Production Part Approval Process (PPAP) Manual

Supplier Quality Manual

Supplier Quality Assurance Manual

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

Supplier Quality Requirements Manual

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

0. 0 TABLE OF CONTENTS

ENERGY BUSINESS QUALITY REQUIREMENTS (EBQR)

SUPPLIER ASSESSMENT. Supplier Contact Phone:

FMP SUPPLIER QUALITY MANAGEMENT PROGRAM

THIS DOCUMENT IS UNCONTROLLED IF PRINTED ON PAPER.

ISO/IEC QUALITY MANUAL

CORPORATE QUALITY MANUAL

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

Supplier Guide. Suppliers for production material or services may be qualified for the list in one or more of the following ways:

Leveraging Enterprise Systems for Efficient Quality Management and Regulatory Compliance

Supplier Quality Requirements F16 Program

Ford Motor Company Customer-Specific Requirements

PERFORMANCE EXCELLENCE Procurement Standards

Supplier Quality Requirements Manual

Document Owner : Nicoleta Birta APPROVALS

Supplier Quality Assurance Requirements Manual

Guideline for. General Automotive Quality Agreement for Electronic Components

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers.

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

Auditing HACCP Programs

Parker Hannifin Corporation

Quality Management System Manual

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

Agreement on Quality, Occupational Health and Safety, Environmental Protection and Social Responsibility (Quality Assurance Agreement)

SABRe. Supplier Management System Requirements. Revision 1 1 July 2012 Edition 2. Rolls-Royce plc 2012 Page 1 of 40

production part approval process

Welcome! Frank Teleso. Quality Manager

Generic CMMS Quality Assurance Plan

UNCONTROLLED COPY FOR REFERENCE ONLY

AS9100 Quality Manual

Ford Motor Company Customer-Specific Requirements

ITT Motion Technologies Supplier Quality Manual

Delphi Customer Specific Requirements. For Use with ISO/TS16949

INTRODUCTION: PURPOSE:

Quality Manual MAR 03 Rev P EC

Quality Management System Manual

3.1 It is the responsibility of the Supplier to obtain current copies of non UTC documents noted below at

Smarter Solutions for a Clean Energy Future

Supplier Requirements Manual M M 0 3

TOOLING DEFINITIONS, COST AND AUDIT GUIDELINES

PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE Supplier Performance Manual REVISION L December 7, 2015

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

Supplier Quality Requirements Manual August 1, 2014

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

Quality Assurance Agreement with Production Material Suppliers. History of revisions

QP-740. Supplier Management Handbook

Presentation by BSI on the main changes to the IATF ISO/TS certification scheme

KEBA 2014 We reserve the right to make technical modifications. No liability accepted for information provided. All rights reserved.

PPG SUPPLIER DEVELOPMENT ASSESSMENT

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Inteva Products, LLC. Supplier Requirements Manual

Engineering Procurement Construction Quality Plan

Helical Products Co., Inc.

ISO 9001 Quality Systems Manual

SC21 Manufacturing Excellence. Process Overview

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

GLOBAL AEROSPACE PROCEDURE

Quality & Safety Manual

Statistical Process Control (SPC) Training Guide

Transcription:

NSK Europe Ltd. SUPPLIER QUALITY ASSURANCE MANUAL SUPPLEMENTARY to NSK Q001 and Q002 Revision 1 March 2016 NSK Europe Ltd. Belmont Place Belmont Road Maidenhead Berkshire SL6 6TB UK Tel. +44 (0) 1628 509800 Fax +44 (0) 1628 509808 www.nskeurope.co.uk Registered Office: Belmont Place, Belmont Road, Maidenhead, Berkshire, SL6 6TB, UK Co. Reg No. 2223191 VAT No. GB 613 8153 56

NSK Vision We strive for Customer Satisfaction, continual improvement and No.1 in Total Quality. Our approved supplier partnerships are an inherent element to achieving and maintaining success. NSK Globally and NSK Europe Ltd adheres to the strictest policies of corporate responsibility, care for the environment and customer quality requirements. NSK expects that suppliers to NSK shall observe the same ethos and ethical approaches. Quality Policy Statement Operating within a culture of continual improvement, NSK Europe Ltd is committed to the development of its Management System in order to satisfy the needs of our Customers and those of the Business. The NSK Quality Management system is based upon the requirements of ISO 9001, ISO TS 16949, VDA, and references ISO 14001, OHSAS 18001 standards and Customer Specific requirements. References This supplier manual provides the framework for satisfying NSK Europe Ltd; quality requirements and references the NSK Q001, NSK Q002, the NSK Green Procurement Standard, and NSK format documents and engineering standards including purchase specifications. Guidance for APQP, SPC, MSA, FMEA, PPAP, can be found in the latest versions of the AIAG (Automotive Industry Action Group) manuals also referenced is VDA. (Verband Der Automobilindustry) Supplier Quality Management System Requirements NSK mandates approved suppliers must maintain a quality management system that meets as a minimum ISO 9001 and encourages ISO TS 16949 certification, ISO 14001 and NSK specific requirements referenced in this manual. NSK strives to ensure that it provides quality products to specification maintaining quality, cost and delivery performance at the highest level. The supplier quality management system shall include recognition of and supporting records of new product introductions, APQP activity, project management systems and records. Supplier Manufacturing Feasibility The Supplier shall investigate, confirm and document the manufacturing feasibility of the proposed products in the contract review process, including risk analysis and assessment of capacity. (Run at Rate and manufacturing capacity studies) Page 2

Work Instructions The Supplier shall prepare documented work instructions for all employees having responsibility for the operations that impact quality and these should be available at the point of use. Verification of Job Set-ups Job set-ups shall be verified whenever performed, such as initial run of job, material changeover or job change. Work instructions shall be available for set-up personnel. The Supplier shall use statistical methods of verification when applicable. Production Scheduling The Supplier shall have the capability to accept orders via EDI, email or Purchase order unless otherwise approved by NSK Procurement. Production shall be scheduled in order to meet NSK requirements. NSK will work with Suppliers on shipping methods and carriers. Supplier Approval Suppliers to NSK are selected and approved by the NSK supplier approval process. Supplier approval is typically based on proven technical ability to supply products and services to the agreed quality, cost and delivery requirements. The following steps define the approval process. Steps to Approval: Confidentiality (Non-Disclosure Agreement) signed and agreed. Supplier assessment and initial quality questionnaire (self-assessment) completed and reviewed. Audit of the quality management system observing the requirements of ISO 9001, ISO TS16949. VDA 6.3 as appropriate. Complete NES Q6102 assessment and / or Complete potential analysis VDA 6.3 (P1) standard and / or Complete a process audit VDA 6.3 (P5~P7) standard. Review results and any improvement actions defined. Addition to the NSK Europe approved supplier list and communication to supplier s their status and scope of approval, subject to product approval. Page 3

Special, Safety and Critical Characteristics Customer specific and NSK safety critical and critical / special characteristics will be managed by the Suppliers and process capability assured or 100% inspection by effective measurement systems and associated records retained. The Supplier is responsible for developing the necessary controls to ensure process capability for all key features and special characteristics to be manufactured and measured. Process development, controls and measurements systems will demonstrate full capability by submitting SPC data, gauge R&R studies to meet NSK and customer specific requirements. Please note the NSK and customer characteristics are displayed on drawings and must link to Control Plans; SPC data must be a suitable sample size to meet plant and or customer specific requirements. Process Capability Capability studies are required on those dimensions identified as special characteristics with a minimum sample size of 125 or as otherwise stated by NSK. The proposed production methods and route should be used for parts verified as part of an ISIR (Initial Sample Inspection Report) submission. Material certification for bearing rings and rolling elements should also be submitted. Process Capability Study Machine capability index Short term study Process capability index Long term study, stable process For SC and CC Process performance index Long term study of non-stable process Capability Indices Cmk > 1.67 Cpk > 1.33 Cpk > 1.67 Ppk > 1.33 All dimensions identified on the drawing should be verified with a minimum sample size of 10 pieces. NSK Supplier Documentation Requirements Process FMEA A Process FMEA shall be completed on the process route for all bearing components and this must be made available to NSK on request. Page 4

Control Plan Quality assurance process flow chart and control plan. Process control plans shall be developed and defined for each product and state as a minimum the following details: Prototype, pre-production, production (Mass production) phase. This process flow and control plan documentation is an output from APQP activities, project management and new product development. The process design should be established by a cross functional team as an output of quality planning, APQP and new project / product introductions. General Control Plan Elements Control plan number, issue date and revision number, company name and site, process step numbers, process / operation description. Product control: Product related special characteristics, and safety critical characteristics, and specification / tolerance shall be clearly identified and controls defined on the plan Process control: Process parameters, process related special characteristics, and defined machines, jigs fixtures and tools for manufacturing. Measurement Systems Analysis Evidence of measurement systems capability for all agreed significant characteristics listed on the design drawing and control plan, associated records shall be maintained. Initial Sample Inspection Reports (ISIR) Where processes are being used for the first time to produce any particular NSK product / component or bearing size, then ISIR is required at pre-production stage. When a bearing size is being produced for the first time for NSK using existing processes then ISIR is required at the production stage. Part Submission Warrant (PSW) and PPAP requirements PPAP documentation and part submission warrants may be requested by NSK for some products for OEM customers. This will be requested by NSK at the time of ordering and a default level 3 PPAP applies and must include IMDS submission on the PSW. (Ref: AIAG PPAP manual latest revision) Page 5

Process Change Documents A Process Change Request (PCR) shall be submitted by the supplier for any proposed changes to the agreed process flow, control plans, Material source changes and manufacturing location changes. Types of Process Change Level of Application 1. Major changes of material (such as changes in material NSK Approval manufacturer or raw material procurement) 2. Changes in critical control processes such as casting, forging, heat treatment, welding, plating, rubber vulcanizing, surface NSK Approval treatment, etc.(including renewal of seal dies and plastics) 3. Changes in production place or subcontractor 2nd tier supplier NSK Approval 4. Major changes in equipment, control items, control standards, etc. as specified on the Production Process Control List NSK Approval (machining, assembling, etc.) 5. Changes in inspection methods for finished products NSK Approval Traceability Traceability of components / product back to raw material (lot, cast/heat number) is required. Relevant documentation and records should be maintained as evidence. NSK reserve the right to request, review and audit these records at any time. Supply of Initial Production Samples (Safe Launch Process) Initial samples are used to verify the production process; and shall be produced at the intended production site using the production control plan, tooling, processes, materials, operators, feeds/speed, cycle times and other parameters that affect product quality. Submitted samples must be clearly identified and labelled as Samples. following criteria would result in the need for samples to be submitted: Any of the New product (ISIR must be submitted with samples provided for all prototype, pre-production builds and at the start of main production). Following a drawing, specification, or material change, including a change of material or sub-contractor source. New tools (e.g. dies, moulds). Single cavity tools must be re-evaluated when combined with additional cavities. Following a major tooling or equipment refurbishment or re-arrangement. Change in manufacturing location utilising either new or relocated tooling or equipment. Following a Stop shipment order. Page 6

It is mandatory for capability information to be provided with the first three shipments on significant characteristics. Non-Conforming Product Containment & Segregation If following shipment the supplier discovers that non-conforming product may have been sent, the supplier will notify the receiving plant s Quality Representative immediately. Corrective and preventive actions will be required. Note: Cost of Poor Quality (COPQ) NSK will endeavour to recover any consequential costs of poor quality products supplied to NSK by their suppliers. Root Cause & Corrective Actions The Supplier shall undertake suitable investigations to identify the root cause. The Quality Representative of the receiving plant will send a corrective action workflow to the supplier for completion. Other appropriate documentation contained within the supplier s quality system may be used if agreed. NSK Europe requires suppliers to have a disciplined approach to Quality / Delivery concern management. The use of 'Quality Tools' such as: Fish-bone diagrams (Ishikawa), Capability Studies, Designs of Experiments and PFMEA/DFMEA review, is encouraged. Countermeasure corrective actions should be reviewed across similar products/processes to prevent similar concerns arising. Use of the NSK standard 8 discipline approach and document format is required from suppliers. This document and supporting guidelines are available from the NSK supplier web portal and / or your NSK quality representative. Preventive Action / Mistake Proofing NSK Europe encourages suppliers to employ preventive techniques such as SPC and Poka Yoke / Mistake Proofing in their processes. Concessions In principle, NSK does not accept products that do not meet the specified quality levels. Where there is a possibility that the non-conformance does not preclude its use in production and the feature does not affect our customer expectations of quality, the supplier shall contact the relevant Quality Representative and declare the deviation prior to shipment. Page 7

The non-conformance shall be evaluated and where suitable, a numbered concession permit shall be raised. If sanctioned, the concession reference number must be cited on all documentation and packaging used in the shipment the NSK receiving location. A corrective action report (CAR), describing cause and countermeasure for the circumstance is required with all requests for concession. The Supplier shall also be responsible for informing the relevant NSK Quality Representative whenever there is reason to suspect that parts previously supplied, may not be in accordance with the order / contract. NSK concession cards are available on request from NSK Quality Representative (NSK Europe IMS ID number 44069). NSK will not provide a concession for SC or CC features. Supplier Quality Representative NSK Europe requires the suppliers to nominate a Quality Representative and deputy to be identified. Any subsequent changes made should be reported to the Quality Representative of the NSK receiving plant. Green Procurement Standard NSK adheres to the highest standards of corporate responsibility and environmental care. NSK expects that their suppliers make every effort to manage business in line with all legal and regulatory requirements and adopt the ethos of NSK. NSK Globally publishes and maintains a Green Procurement Standard; this is normally highlighted in purchase specifications and will be made available to Suppliers and 2 nd tier suppliers as necessary. The content of the NSK Green Procurement Standard should be recognised by Suppliers and any responses and declarations requested from the supplier as defined in purchase specifications and on drawings provided to NSK in timely fashion. NSK Europe adheres to legal and regulatory compliance inclusive of REACH, ROHS and environmental legislation and supports the IMDS data base. Note: NSK Plant Specific Requirements may be additional to this supplement and will be communicated separately. i.e. Typical identifiers for special characteristics HO Safety Critical Characteristic Important Special Characteristic!! Page 8