QUALITY ASSURANCE AGREEMENT DEALER FUNCTION

Similar documents
Supplier quality guideline. VOSS Automotive Group Issue Rev00

Quality Assurance Agreement (QAA)

Quality Assurance Agreement

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

Agreement on Quality, Occupational Health and Safety, Environmental Protection and Social Responsibility (Quality Assurance Agreement)

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

ISO/TS 16949:2002 Guidance Document

Quality Assurance Agreement (QAA)

Supplier Quality Agreement EK 25

VDA Structure Component Requirement Specification. Module I CRS Universal Requirements. <Title> <Number> Version 1.0

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

COMMISSION REGULATION (EU)

Guideline for. General Automotive Quality Agreement for Electronic Components

Ege Fren Ege Fren San. ve Tic. A.Ş.

VELUX General Quality Requirements

Management System Procedure N 4/01/ of 14

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Certification Procedure of RSPO Supply Chain Audit

KOSTAL TERMS AND CONDITIONS OF PURCHASE

Generic CMMS Quality Assurance Plan

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

Supplier Quality Manual

Supplier Quality Requirements

Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria

Warranty Agreement. the following agreement is concluded relating to the reimbursement of warranty costs:

Supplier Manual. Version 2013_1.4

Purchase Order Clauses and Conditions

HELLA Quality. Guidelines for Suppliers (HP-C-509)

CUSTOMER SPECIFIC REQUIREMENTS

Network Certification Body

Presentation by BSI on the main changes to the IATF ISO/TS certification scheme

Comparison ISO/TS (1999) to VDA 6.1 (1998)

Surgi Manufacturing Quality Manual

Supplier Guide. Suppliers for production material or services may be qualified for the list in one or more of the following ways:

General Terms and Conditions

PUBLICATIONS. Introduction

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL

PRODUCT CERTIFICATION REQUIREMENTS

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TERMS AND CONDITIONS OF PURCHASING Europe Version as of July 2009

Johnson Controls Automotive Experience Global Supplier Standards Manual Chapter 4 Quality October, 2015

Supplier Quality System Requirements

EXTENSION OF PERIODIC INSPECTION INTERVAL FOR LPG CYLINDERS

QUALITY MANUAL REVISION RECORD

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

File:Quality-Management Manual-V2

INTRODUCTION: PURPOSE:

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

VDA6.3 Process Audit Webinar 1 st April Paul Hardiman Qualified VDA6.3 trainer

PREFACE. The Contract for the Supply and Delivery of Goods has been prepared for use in supplies contracts which have the following characteristics:

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

Self-Audit Checklist

ASV výrobní družstvo, Školní 71, CZ Solnice. General Commercial Terms and Conditions No. 1.1

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

BASE CONSTRUCTION INC

ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System

ISO-9001:2000 Quality Management Systems

AS9100 Quality Manual

UNCONTROLLED COPY FOR REFERENCE ONLY

ISO/IEC QUALITY MANUAL

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

INTRODUCTION. The Quality Challenge

Procedure for Equipment Calibration and Maintenance

QSS 0: Products and Services without Bespoke Contracts.

ITT Motion Technologies Supplier Quality Manual

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

GE Power Electronics Business Total Quality Management for Suppliers

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

ISO 9001:2008 Quality Management System Requirements (Third Revision)

Manual for the daily cooperation related to the supply of

Valued Supplier: This Manual represents STRATTEC s commitment to quality and supplier partnerships.

GUIDE TO IMPLEMENTING A REGULATORY FOOD SAFETY AUDITOR SYSTEM

CORPORATE QUALITY MANUAL

Measuring instruments in industry.

AVNET Logistics & EM Americas. Quality Manual

Quality Assurance Agreement with Production Material Suppliers. History of revisions

itac solutions for the medical industry Quality assurance of the highest standard FDA-compliant. Reliable. Productive.

Example of a food company quality

MEDICAL DEVICES SECTOR

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11

ISO 9001:2008 Clause PR018 Internal Audit Procedure

ISO 9001:2000 Gap Analysis Checklist

KEBA 2014 We reserve the right to make technical modifications. No liability accepted for information provided. All rights reserved.

Site visit inspection report on compliance with HTA minimum standards. London School of Hygiene & Tropical Medicine. HTA licensing number 12066

The certification process

General Rules for the certification of Management Systems

DAIMLER GROUP NORTH AMERICAN COMPANIES

ISO 9001:2000 AUDIT CHECKLIST

Contents. Management Policy Manual SEM USA Page 2 of 12

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Transcription:

1. Preamble 1.1 General Principles This quality assurance agreement (QAA) defines the quality control requirements of REHAU suppliers. Thus the REHAU QAA is a set of rules for assuring the quality of bought-in materials. By way of applying the zero-fault principle to the supply chain, the fundamental interfaces, specifications, resulting tasks as well as reflection of standards, laws and end customers requirements are stipulated. Case-specific changes or additions to the REHAU QAA are possible on agreement between REHAU and the supplier (e.g. in the REHAU Technical Delivery Specifications Purchasing TDS). 1.2 Interface Dealer Function The supplier as a dealer is liable to pass on the defined requirements of this agreement regarding to quality assurance in suitable manner to its sub-suppliers (including manufacturers, service providers, forwarders) and to verifiably satisfy himself that the requirements are met. It is the responsibility of the supplier to make suitable contracts with the sub supplier. This includes producing a supplier list and conveying customer-specific requirements (REHAU and end customer), continuous traceability of data and documentation as well as any other specifications the supplier deems necessary to convey. If the supplier intends to change sub-contractors he must notify REHAU of this in good time in order to agree the required assess- ment and release processes. 2. Quality Management System 2.1 General Requirements The requirements of the latest version of ISO 9001 are part of this agreement. The supplier undertakes to maintain a quality management system in accordance with ISO 9001. In the event of mergers, acquisitions or affiliations and similar activities that might affect the structure of the company or its organisations / plants, the supplier shall verify the QM system and inform REHAU without delay of the circumstances and the result of the verification. 2.2 Extended Requirements If products and / or services are used in areas with extended requirements (e.g. risk of consequential loss), this will be accordingly communicated by REHAU (e.g. Technical delivery specification purchasing TDS). 2.3 Automotive Sector If products and/or services are used in the automotive sector, a certified quality management system in accordance with ISO 9001 latest version is required for the supply chain. The requirements of ISO / TS 16949 latest version also need to be considered in the supply chain. The supplier informs REHAU without delay in case of non-compliance or loss of the ISO 9001 certificate in the supply chain. Other automotive requirements will be stated in this quality assurance agreement below. 3. Auditing / Assessment of the QM System The supplier shall allow REHAU to carry out audits following a timely advance announcement. REHAU reserves the right to carry out audits even in cases where certification has already been obtained from third parties. The supplier provides all necessary documentation / data and allows access to all areas that are relevant to REHAU. The supplier must ensure that equivalent audit rights exist with the sub-suppliers. 6835EN 07.15 Page 1 of 5

Audit procedures and evaluation shall preferably be based on VDA specifications (e.g. process audit VDA 6.3) as well as in connection with ISO / TS 16949 in the automotive sectors. If required, improvement measures will be agreed with the supplier, indicating the responsibilities and the dates by which completion is required. The effectiveness of the corrective measures may be monitored in a follow-up audit. 4. Supplier Evaluation / Target Agreements The supplier is obligated to deliver fault-free products and services (target: zero-fault). If no specific targets are agreed (e.g. in the TDS, framework contract, agreements for ramp-up management) the target is understood to be zero ppm. A specific agreement relating to ppm values does not imply a quality level that is accepted by REHAU. The agreement on quality targets and measures does not limit the supplier s liability for warranty claims and claims for damages by the customer as a result of defective deliveries. Defective deliveries / services will not be accepted by REHAU and will be charged to the supplier. Ongoing supplier performance is one of the factors considered in the REHAU supplier evaluation process. When placing and extending orders, REHAU will give preference to suppliers that are assessed as efficient under the REHAU supplier evaluation scheme. If quality targets have been agreed between REHAU and the supplier (e.g. ppm targets), the supplier is responsible for appropriate agreement with and implementation by the respective sub-suppliers. If the target is not met, escalation by REHAU against the supplier ensues. In this case the supplier is obligated to present REHAU with an action plan setting out corrective measures for stabilising the supply and for sustainable improvement of performance, and is also to agree further steps with REHAU. 5. Sustainability, Environment and Safety The supplier ensures compliance with all the relevant statutory regulations relating to industrial safety and environmental protection during the production and handling of the products to be supplied. This applies to required materials machinery, equipment, workplaces and transport. Responsible handling of natural resources must also be ensured. Health-promoting measures in the workplace are to be supported. 6. Development/inspection planning In the case of product development orders, the supplier shall employ on its own established methods (as appointing the project management, milestone plans and associated monitoring mechanisms). REHAU is to be kept informed of the development progress made. REHAU reserves the right to check / inspect the development work also on-site at the supplier as well as sub-suppliers. The supplier is responsible for determining the scope of the tests (characteristics, number of random samples, capability parame- ters etc.) on his own initiative. In individual cases (e.g. in the case of high-risk products), the scope of inspections can be stipulated by REHAU (e.g. in the TDS). The series production accompanying inspections must be suitable for verifying the conformity of the products with the specifications at any time. If needed the supplier may put REHAU directly in contact with the sub-supplier. Upon REHAU s request, the supplier shall provide evidence proofing test to REHAU on a case-by- case basis. 6835EN 07.15 Page 2 of 5

7. End of Life Vehicle Directive / IMDS In the case of products intended for EU member states the supplier shall confirm compliance with Directive 2000/53/EG (EU End- of- Life Vehicle Directive) as well as with other relevant EU Directives, in particular 67/548/EWG, 2002/525EG, as well as R76/769EWG and 2003/11/EG. All data on the composition of the supplied products is to be entered into the IMDS (www.mdsystem.com) under REHAU AG + Co, company ID 210. Target for an approved IMDS entry by REHAU is at least 4 weeks prior to the agreed sampling date. In case that national directives and stipulations are applicable additional to EU directives the supplier has to consider these regulations and shall agree a way of necessary data-exchange with REHAU. 8. Packaging/Identification Containers / packaging units and the associated labelling needed for proper delivery, processing and traceability shall be proposed to REHAU by the supplier if not specifically stipulated by REHAU. Agreements on and approval of product and packaging labelling takes place during the quality planning and sampling process. If the supplier considers that further information is needed for the purposes of tracing or limiting any defective production batches and consignments, this must be agreed with REHAU. Any changes the supplier plans to make to the agreed specifications require consultation with and approval of REHAU at an early stage (also see sampling). In case of products with limited shelf lives / periods of storage care must be taken to ensure that a max. of 20% (guideline) of the shelf life period is required between the production date and the date of dispatch to REHAU. If needed the REHAU purchasing department consults with the supplier on a case-by-case basis. 9. Sampling The formal sampling process serves for technical verification of degrees of readiness and as proof of suitability for bought-in products / provided services. Before the start of serial delivery, initial samples based on the product and process specifications must be submitted to REHAU. Sampling is based on the specifications of VDA 2 or PPAP process. Any alternative sampling processes or changes to the sampling procedure will be announced by REHAU and agreed between REHAU and the supplier. In the automotive sector, parts, semi-finished goods and their packaging are to be labelled with their change level in accordance with the REHAU part-history-tracking-sheet (REHAU print no. 7600). Until the final release of the sample (note 1) by REHAU a printout of the current part-history-tracking-sheet is to be added to each delivery. If needed, the correct form might be requested from REHAU by the supplier. Every type of change made to components, manufacturing process or manufacturing place which might affect the agreed specification or the product quality is to be communicated with a sampling process. The execution and scope of new sampling is to be agreed with REHAU at an early stage. Serial delivery may only take place once approval has been issued by REHAU in writing. 6835EN 07.15 Page 3 of 5

10. Ensuring the quality performance during the series The supplier ensures the needed integration of sub-suppliers in order to assure the requirements stated below are met throughout the whole supply chain. If needed the supplier may involve REHAU for support. The supplier is obligated to record the quality assessments required for the implementation of and the compliance with the agreed specification in an agreed format and to verifiably safeguard it by means of suitable documentation / data control (e.g. inspection plan, inspection protocols). The entire production process is to be monitored. If REHAU does not specify any special characteristics requiring statistical process control and associated capability limit values (e.g. in the drawings, TDS), then the supplier shall be responsible for selection and assessment of special and for the intended use essential product characteristics and process parameters. Upon request the supplier shall provide inspection plans and used statistical methods such as capability analysis to REHAU and shall agree these with REHAU if necessary (see as well sampling procedure ). The product quality is to be certified on request. Requested characteristics, required level of proof and way of providing the data (e.g. attachment of the certificates / inspection certificates for each lot / delivery) will be stipulated by REHAU in the TDS. If the supplier notices any quality deviations in products / services or suspects any quality deviations in products / services that have already been delivered / supplied, REHAU must be informed immediately and further actions will be agreed between the Supplier and REHAU in order to minimise potential subsequent losses. 11. Requalification Furthermore, in case of products with a REHAU risk classification (according to TDS), the supplier agrees to perform a layoutinspection and functional testing / requalification test (complete measurement of all product dimensions shown on related specifications) at regular intervals, annually unless specified otherwise in the TDS. In the automotive sector this applies to all products. The result of the requalification inspection will be communicated by the supplier to REHAU in the same way as with the presenta- tion of initial samples. 12. Traceability, Documentation, Archiving The supplier is responsible for ensuring suitable archiving and traceability of the relevant documentation (production and quality records) on his own initiative. The basic filing period is at least 5 years. In the case of products with a REHAU risk classification (in accordance with the TDS) the minimum filing period is 15 years after the last order by REHAU. 13. Goods inwards inspections at REHAU The supplier is liable to provide REHAU with defect-free deliveries. REHAU therefore strives to minimize goods-inwards inspection. Unless agreed otherwise, REHAU goods-inwards inspections are designed merely to check identity and quantity as well as to identify any obvious transport or packaging defects. REHAU has no obligation to carry out more detailed inspections. The results of goods-inwards inspections and delivery performance are factored into the REHAU supplier evaluation process (see above). 6835EN 07.15 Page 4 of 5

14. Complaints 14.1. General Requirements If REHAU makes a complaint about products delivered / services supplied, the supplier shall provide REHAU with an initial written interim report within three working days. Unless agreed otherwise in particular cases, the supplier provides a supplemental / final report to REHAU latest two weeks following receipt of the complaint. The supplier assesses the effectiveness of the corrective measures in order to avoid the possibility of repeat complaints and provides REHAU with a formal final report. In individual cases REHAU reserves the right to verify the effectiveness of the communicated corrective measures on-site at the supplier. 14.2 Automotive Sector If REHAU makes a complaint about products delivered / services provided, the supplier shall provide REHAU with an initial written response without delay, at the latest within 24 hours following the notification by REHAU. The supplier shall provide REHAU with a written interim report at the latest after three working days in the form of an 8D report. Unless agreed otherwise in particular cases, the supplier provides a supplemental / final 8D report to REHAU latest two weeks following receipt of the complaint. In case of deadlines for written responses not being met by the supplier, REHAU reserves the right to undertake immediate actions (e.g. sorting or return of complained goods) even without the explicit agreement of the supplier in order to minimise potential consequential losses (e.g. line stoppage / production interruption at the OEM or REHAU). 15. Quality Level of the Supplier If delivery performance, quality level or doubts concerning the supplier s quality assurance measures result in extra costs to REHAU in the form of goods inwards inspections, further processing and market service, these costs can be charged to the supplier, once the supplier has been notified of this and has been given opportunity to respond. If an end customer (OEM) in the automotive industry revokes a quality commendation or official supplier status or in respect of a subsupplier employed by him, in accordance with the OEM s directives, the supplier is obligated to inform REHAU of this without delay (e.g. Ford Q1 revoked, Daimler Q-Help 3) 6835EN 07.15 Page 5 of 5