1 Supplier Manual Version 2013_1.4 I
2 Content COVER SHEET...I CONTENT II I. Introduction... 1 II. Basic requirements... 2 III. Qualification process Selection and qualification process Supplier disclosure Initial audit & Potential Supplier Audit (PSA) Process Sign Off (PSO) Sampling Additional requirements Advanced Product Quality Planning (APQP) [optional] Parts Handling Review (PHR) [optional] IV. Series monitoring Process Change Notification (PCN) Supplier assessment Complaint management Product and process audit V. Further agreements Documents and exchange of information Traceability Packaging Quality agreements VI. Appendices Version 2013_1.4 II
3 Passing on and reproduction of this document and use and disclosure of its contents are prohibited unless expressly permitted. Violations will be liable to claims for damages. All rights reserved for the event of a patent award or utility model registration. Main changes to previous edition: Chapter 5 reworked Chapter 10 reworked Chapter 13 reworked Shifting chapter APQP Renaming VQ_L008 Introduction VQ_L015 (PSA) Previous editions: 2011_1.3 DEUTZ AG Version 2013_1.4 III
4 I. Introduction Constantly changing customer expectations and worldwide competition require continuous improvement in all products and services and also all processes and company procedures. Customer satisfaction due to quality in all aspects is a decisive factor for success for DEUTZ AG (hereinafter referred to as "DEUTZ") as an independent engine manufacturer and thus for you as our contractor (hereinafter referred to as the Supplier) whose products are incorporated in DEUTZ engines. For this "Zero Defect Quality" of all deliveries is an imperative requirement which can only be achieved and assured by the joint efforts of DEUTZ and its suppliers. Avoiding defects instead of detecting defects and continuous improvement in the whole process chain - customer inquiry, quotation, order, product creation, start of production, series delivery and use in the field - are indispensable requirements which we must and will fulfill with the active help of our suppliers. These guidelines point out to our suppliers the requirements, methods and implementation advice which are necessary for achieving the joint goals. Version 2013_1.4 1
5 II. Basic requirements a. Quality management system The supplier has effectively introduced a QM System into his company and with it proves his quality capability. This system complies at least with the requirements of the standard DIN EN ISO 9001: As proof the supplier generally has to submit the valid certificate from an accredited certification company (third party audit). Additional requirements by the automobile industry and also by DEUTZ must be known to the supplier and must be fulfilled where requested with regard to the products supplied. The additional requirements are for example specified in: VDA 6.1 and VDA 6.3, APQP, MSA, SPC, H 0758, or generally in: ISO / TS A third party certification (ISO / TS 16949) in accordance with the standards / publications is recommended by DEUTZ. The environmental standard DIN EN ISO is to be taken into account. b. Continuous improvement process The supplier has introduced in his company a structured process for continuous improvement of all products, processes (also applies to out-sourced processes), operating procedures and services and demonstrably applies it to the products delivered to DEUTZ and activities associated with the business relationship. He demonstrates the effectiveness by a continual improvement of his quality performance, delivery performance, flexibility and collaboration. The relevant programs and measures for continuous improvement will be submitted to DEUTZ on request. Version 2013_1.4 2
6 III. Qualification process Version 2013_1.4 3
7 1. Selection and qualification process In order to enter into a business relationship with DEUTZ as a supplier, first of all a process defined by DEUTZ must be passed. All the information collected is checked and evaluated by DEUTZ. Using this evaluation the supplier receives a corresponding grading. On achieving a positive grading this process ends with the supplier being cleared for a business relationship with DEUTZ. The grading is valid without time limitation. The supplier is obligated to announce changes that have impact on the first grading in advance to renew the grading. The individual process stages are described more exactly in the following chapters. Version 2013_1.4 4
8 2. Supplier disclosure The supplier applies to DEUTZ with a detailed supplier self-disclosure filled in by him. The self-disclosure allows DEUTZ to assess the supplier organizationally, economically and also qualitatively and forms the basis for all further activities. The supplier self-disclosure consists of the following documents: Supplier Information Quality Questionnaire Feasibility study* Confidentiality agreement (if necessary) Exclusivity agreement (if necessary) * if a specific product is already requested Only after receiving and assessing this information, further steps in the supplier qualification and release process are initiated or the business relationship will be terminated. a. Supplier Information The supplier disclosure contains the organizational and economic details of the supplier. It identifies who the supplier's contact people are, how the organization is structured, how the supplier is technically equipped and which certificates he has achieved. Applicable documents: VQ-L003 Selbstauskunft_Supplier Information b. Quality Questionnaire With the self-assessment the supplier evaluates his Quality System in the form of a self-grading. Applicable documents: VQ-L004 Quality questionnaire Version 2013_1.4 5
9 c. Feasibility study With the Feasibility study the supplier certifies that he has comprehended the task company wide and that he has proved and rated all specification requirements (each characteristic). The supplier must be able to manufacture the parts under consideration of all requirements and specifications of the DEUTZ AG in the quality and quantity required. This is confirmed by signing the Feasibility study. Applicable documents: VQ-L008 Feasibility study d. Confidentiality agreement The supplier must ensure confidentiality in the development of products and projects on behalf of DEUTZ and also safeguard the applicable product information. Information received from DEUTZ is to be kept secret and must only be passed on to third parties when prior consent is agreed with DEUTZ in writing. Applicable documents: VQ-L009 Confidentiality and Exclusivity agreement e. Exclusivity agreement Products which the supplier manufactures using DEUTZ know how must be supplied exclusively to DEUTZ and not disposed of to third parties. Applicable documents: VQ-L009 Confidentiality and Exclusivity agreement Confidentiality and Exclusivity agreements expire if a long time contract is signed containing these regulations. Version 2013_1.4 6
10 3. Initial audit & Potential Supplier Audit (PSA) In preparation for a decision to place an order with an unknown supplier, particularly when placing orders for technically demanding products, the quality capability and the development know how of the applicant has to be assessed. The purpose of the first audit is the successful introduction of a new supplier. This means an assessment of the quality of the supplier focusing on the product and the process as well as the implementation of robust processes. Activities before the visit by DEUTZ: DEUTZ Purchasing: As a first step all necessary documents are sent to the supplier. The dispatch of these documents is done the by DEUTZ Purchasing (see chapter 2 and 0 as well as drawings and specifications specific to the product). Supplier: The supplier submits a quotation with regard to the part price, a capacity assessment, the tooling costs and also packaging (see also chapter 15) and dispatch costs. DEUTZ quality management: To analyze the potential of the supplier depending on the parts' criticality audits are mostly carried out in accordance with the VDA standard. If required an audit question catalogue will be made available to the supplier in advance for the purpose of preparation. Execution of the first audit: The first audit is carried out by an auditor from DEUTZ Supplier Qualification. In addition to this DEUTZ retains the right to commission external auditors. In addition specialists from other areas (e.g. Purchasing, Development, Material Testing or Test departments) can be involved in a supporting role. Version 2013_1.4 7
11 Elements for carrying out the audit in accordance with VDA are: VDA 6.1 Element U Responsibility of the management VDA 6.3 Element P2 Project management Element P3 Planning the product and process development Element P4 Carrying out the product and process development Element P5 Supplier management Element P6 Process analysis / production Element P7 Customer support, satisfaction, service The awarding of points or respectively the assessment is done in accordance with a defined system: Awarding of points - individual assessment of the questions (to VDA standard): No. of points Assessment of the fulfillment of individual requirements 10 Full compliance with the requirements 8 Requirements mainly* satisfied; minor deviations 6 Requirements partially satisfied; significant deviations 4 Requirements inadequately satisfied; major deviations 0 Requirements not satisfied *) The term "mainly" means that all relevant requirements have been shown as achieved in more than ¾ of all relevant cases and there are no special risks. Version 2013_1.4 8
12 Process audit assessment scheme: Overall fulfillment level as a percentage 90 to to under to under 80 under 75 Assessment of the processes Qualitycapable Conditionally qualitycapable not yet quality-capable not qualitycapable Grading of the assessment in accordance with VDA standard A B Grading of the supplier in accordance with DEUTZ standard A B C C+ C C unrestricted approval for a specific range of parts, requirements fully fulfilled limited approval for a specific range of parts, requirements mostly fulfilled with conditions (independent implementation of an improvement program) with the opportunity of requalification by DEUTZ, requirements partially not fulfilled supplier not approved, requirements not fulfilled, process ended The supplier will only get delivery approval above an audit result 80%. Is the fulfillment level between 80% and 90% the supplier is expected to improve > 90% until serial release. Beyond the initial audit suppliers can be assessed with the help of the Potential Supplier Audit (PSA). This document, based on the potential analysis of VDA, is used for the first rating/ assessment of suppliers. It is not comparable to the initial audit and is only used for the first selection of suppliers. Applicable documents: VQ-L012 Process audit VDA 6.3 VQ-L015 Potential_Supplier_Audit PSA Version 2013_1.4 9
13 4. Process Sign Off (PSO) The Process Sign Off (PSO) is only carried out by DEUTZ for selected parts. The aim of a PSO is to check the capability of a supplier's manufacturing process concerning DEUTZ products. It has to be ensured that the customer's requirements have been completely understood by the supplier. A PSO is a systematic and sequential check on the series manufacturing process at the supplier's. This check is carried out at the planned manufacturing speed, with the designated manufacturing personnel, the series manufacturing facilities and also series equipment, processes, materials, methods and production tooling. Activities before the visit by DEUTZ: The requirements and contents of the PSO are explained to the supplier and agreed with him. Checking the documentation: The supplier must support DEUTZ with suitable documentation. This takes place in accordance with the PSO checklist (Examples of documents). Applicable documents: VQ-L013 Prozessfreigabe_process sign-off This documentation must include a product start up plan, which must contain a planned throughput yield rate and also the accepted failure rates.. Participants during the PSO. An auditor from DEUTZ Supplier Qualification takes on the management of the PSO. Optionally other specialists from other areas (such as e.g. from Purchasing, Development, Material Testing or Test Department) can participate in a supporting role. Version 2013_1.4 10
14 Execution of the PSO: The duration of production during the PSO must be agreed between DEUTZ and the supplier. Both DEUTZ and also the supplier must accept this agreement. The minimum requirement is for a representative quantity to be produced. The aim is to establish that a robust and capable series process has been established. During the PSO the criteria are questioned and documented in accordance with the PSO checklist. Data which document the readiness for series production of the process, i.e. for example the manufacturing speed, cycle times, process capabilities etc., are to be determined and analyzed during the PSO. For this defined critical characteristics are to be checked in advance at a suitable frequency and assessed with regard to their capability. Functioning tests are to be carried out where they are sensible and appropriate. The initial sample documentation must be complete and available for cross checking. Is the initial sample documentation not available at deadline, parts are taken out the process and defined as initial samples. A unique and agreed labeling has to be defined. Version 2013_1.4 11
15 5. Sampling The aim of sampling is to prove the capabilities with regard to quality required from the supplier and to check whether the requirements of the drawings or specifications are being fulfilled. All standards drawn on for these documents are not rescinded by the Supplier Manual. The DEUTZ company standard H defines and specifies procedures and rules for the character, manufacture, testing and approval of samples. These procedures and rules are applied to all sample parts which are purchased for the further manufacture of DEUTZ products. The supplier has to document all characteristics and their tolerances marked in drawings, specifications and other belonging documents in the initial sample inspection report (ISIR) in a traceable way. Traceability means attaching copies of drawings etc. at the ISIR which contain the continuous numbers of the characteristics according to the ISIR. In CAD drawings the numbers are defined in the characteristics list. For serial deliveries the supplier has to take the execution time of the initial sample inspection for his time schedule into consideration. The initial sample inspection is product dependent so the supplier has to request the estimate execution time of the initial sample inspection at the purchasing department. Serial production shipments without any initial sample release remains to the risk of the supplier. EA EF EL EV EZ VC VD Initial sample release with conditions Initial sample release No Initial sample release - scrap at the expense of the supplier No Initial sample release - using exceptionally No Initial sample release - Retour to the supplier Pre series release for C samples Pre series release for D samples Applicable documents: H Regulations for samples and sample process Version 2013_1.4 12
16 6. Additional requirements a. Special and critical characteristics Special and critical characteristics are specially highlighted in the drawings and specification. Manufacturing discrepancies from specified dimensions, tolerances and other characteristics are not permissible in principle. The function-related Characteristic Grading on the design documentation takes place at DEUTZ by unmarked normal characteristics, special characteristics identified with a symbol and critical characteristics identified with a symbol. These take into account the level of the consequences (see also DEUTZ company standard H 0759). If drawings from suppliers are transferred into DEUTZ specifications other symbols can also come into use. For all identified characteristics (DEUTZ as well as Supplier) DEUTZ requires verification of the process capability. Applicable documents: H 0759 Classification of Characteristics According to Function b. Product and Process FMEA A FMEA is a systematic approach to assessing the risk of defects. Potential errors and their causes are to be assessed with regard to their error potential. In the event of a critical assessment, e.g. high Risk Priority Number, suitable measures must be defined to preclude these errors. This assessment has to be carried out for all products delivered to DEUTZ by the supplier and the documentation has to be shown on inquiry. This applies to newly provided products and also for alterations to ongoing products or to the process. Details are laid down in VDA Volume 4, chapter "product and process FMEA". Version 2013_1.4 13
17 c. Capabilities By using suitable statistical processes the supplier ensures that the machinery, tools, measurement and testing equipment used and also the processes are capable of complying with the DEUTZ quality requirements. Inspection equipment capability In the analysis of the measurement system it is assessed whether the measurement system is capable of monitoring the process repeatable and reproducibly. The minimum requirement is that the supplier must have established a suitable inspection equipment monitoring system in order to monitor and document all measurement and test equipment in an appropriate manner. The following standards apply: DIN EN ISO Decision rules DIN EN V Instruction for determining the measurement uncertainty Measuring equipment counts as capable when GR&R 10%. Measuring equipment counts as limited capable when GR&R 30%. Improvement actions have to be implemented and documented. Measuring equipment counts as not capable when GR&R > 30%. Using this equipment is not permitted. Machine and Process capability Temporary process capability index: P pk 2.00 Minimum scope 100 parts or scope right for the process. At least 20 individual spot checks are required for maintaining the necessary control card. Long-term process capability index: C pk 1.67 A suitably long period under normal series production conditions in which it is ensured that all influential factors can become effective. Guideline: min. 20 production days. Version 2013_1.4 14
18 Details of the procedure are specified in VDA Volume 4, chapter Economical Process Design and Process Control. If the minimum requirements are temporarily not achieved, then 100 % tests are to be carried out until the capability is achieved by corrective measures. d. Product and Process Approval (at the supplier) For product approval the supplier has to present initial samples to DEUTZ before the start of series delivery, and these must comply with all agreed specifications and properties. The initial samples (see also chapter 5) and all individual components and materials used in their manufacture must be completely produced with series operating equipment and under series conditions and released by the supplier; if necessary by a PSO (see chapter 0). If DEUTZ wishes it can check or request the results of the internal process approval at the supplier's. e. Regulation (EC) 1907/2006 (REACH) The supplier has to know and fulfill the requirements defined in the Regulation (EC) 1907/2006 regarding registration, evaluation, authorization and restriction of chemical substances (REACH) (in force since June 2007). Additional information can be found on the website of the European Chemicals Agency (ECHA): Version 2013_1.4 15
19 7. Advanced Product Quality Planning (APQP) [optional] Advanced Product Quality Planning (APQP) is a structured method of continuous project management to track the product and process quality of a component over all phases of the development process. The aim is to ensure that the DEUTZ requirements for product and process are processed by the supplier in time in terms of quality and quantity. The DEUTZ AG is doing APQP via the supplier portal SupplyOn (see chapter 13). APQP projects are initiated and leaded by the quality management in purchasing according to the criticality of the component. APQP improves the communication between all involved persons by standardized procedures to ensure that all necessary steps are implemented in a timely manner. Some advantages of APQP are: Target-orientated capacity planning Early identification of problems to initiate changes in a timely manner Avoiding changes in late project phases Delivering a high quality product in time at lowest costs Increased delivery reliability and customer satisfaction Version 2013_1.4 16
20 8. Parts Handling Review (PHR) [optional] Aim of the assessment is to ensure that components in the whole process chain (packaging, internal transport, logistics and assembly) are handled in a product compliant manner. For this, the DEUTZ processes have to be examined. The objective is to avoid error costs by joint preventive measures. Depending on the criticality of the parts / components a PHR is done at DEUTZ jointly with the supplier as part of the PHR. This includes an appraisal / auditing of all assembly and handling conditions within DEUTZ. The PHR is carried out by the supplier and DEUTZ. The supplier takes a leading role in this. A joint summary is then drawn up from the knowledge gained. A joint working out of action plans follows. Any weak points identified are to be remedied by suitable measures. The PHR counts as concluded as soon as the supplier has confirmed a declaration of consent to the assembly and handling processes, in writing. By mutual consent this can also take place in conjunction with a jointly agreed action plan. Version 2013_1.4 17
21 IV. Series monitoring Version 2013_1.4 18
22 9. Changes at the supplier Changes influencing the quality of the parts delivered to DEUTZ have to be announced to DEUTZ in advance. These rules are prescribed compulsorily for new and altered products and also after substantial changes at the supplier. This includes: Relocation of production to a new / other production site Changing of important sub suppliers Changes within the company's ownership structure Substantial changes within the production process Substantial changes within the manufacturing technology (incl. tools) Changes within the quality assurance Significant re-organizations Any alterations must be disclosed by the supplier and approved by DEUTZ. Alterations have to be processed according to the DEUTZ company standard H Alterations claiming a request for approval of nonconformity have to consider the DEUTZ company standard H Applicable documents: H 0753 Procedure for Approvals of Nonconformity H Procedure for assuring the quality of DEUTZ products at changes Version 2013_1.4 19
23 10. Supplier assessment The main aspect of the supplier assessment at DEUTZ AG is monitoring the quality performance of the suppliers for serial products and differentiating suppliers by its quality performances. The assessment is based on the DEUTZ supplier cockpit. In the cockpit the suppliers are rated with the help of 4 key performance indicators (KPI): Purchasing Logistics Quality Research & Development Those 4 KPI are aggregated in an overall KPI for each supplier. This overall KPI is used by the DEUTZ AG for rating and classification its suppliers. Version 2013_1.4 20
24 11. Complaint management Complaint management at DEUTZ is done using the web portal SupplyOn (see chapter 13). Each supplier receives a Test Report with rating for each complaint. It is thus possible for the supplier to judge his quality performance for himself at any time. a. 8D-Report The procedure has to be executes as described in the following. The supplier is obliged, as far as possible, to react without delay to the complaint sent to him with a Test Report by means of an 8D report. In any case a statement of the supplier regarding the implemented improvement measures is expected. The execution of the 8D report respectively the statement is done by using the web portal SupplyOn. Further information about the execution can be received in this portal. b. Firewall Immediately after the occurrence of the failures the supplier must ensure that all stocks at the suppliers, in transit, at DEUTZ (e.g. stores, assembly, service, consignment stock etc.) are checked 100% for the characteristics noticed. The aim is that no defective component shall get into the DEUTZ assembly process. If systematic or repetition failures are identified, the supplier will be invited to DEUTZ and suitable measures are established jointly. The supplier has to report about the progress of the measures at set intervals. Version 2013_1.4 21
25 12. Product and process audit At suitable stages within his area of responsibility the supplier must carry out product audits at regularly intervals in order to verify the fulfillment of all specified requirements, such as e.g. product dimensions, functionality, packaging and labeling. The supplier has to validate each production process to assess its efficiency. The supplier will regularly carry out planned internal process audits (e.g. to VDA Volume 6.3) in advance for all products supplied to DEUTZ and the processes associated with their development and manufacture. The basis for this is the specified product specifications and properties plus further agreements concerning the deliveries, e.g. on logistics and packaging. If there are any discrepancies the supplier will immediately introduce all necessary corrective measures and ensure their effective longterm implementation. In addition to this DEUTZ is entitled at any time, even at short notice after advance notification, to check by a product, process or system audit whether the supplier's quality assurance measures comply with the DEUTZ requirements. If quality problems crop up caused by services and / or supplies from sub-contractors to the supplier, the latter has to carry out an audit at the sub-contractor by request of DEUTZ and disclose the results to DEUTZ. Version 2013_1.4 22
26 V. Further agreements Version 2013_1.4 23
27 13. Documents and exchange of information a. Communication platform - Supplier and DEUTZ AG More complex products with a higher number of variants, increasing added-value content by the supplier and higher quality requirements under growing cost pressure require a modern communication platform. DEUTZ meets these challenges and uses the automotive portal SupplyOn for process optimization in quality management. The objective is to significantly increase the transparency and traceability in communications between our companies. The use of the SupplyOn supplier portal opens up new possibilities for us to structure even better the procedures and methods of quality management and to standardize them worldwide. Based on internet technology we can exchange information more easily, more quickly and more error-free than previously. As supplier to DEUTZ AG you have to register your company with SupplyOn. DEUTZ concentrates on the following core processes in quality management: Complaints Management (8 D) - SupplyOn Problem Solver. Supplier assessment and development - SupplyOn Performance Monitor. Product quality planning (APQP) - SupplyOn Project Management. Certificate Management - SupplyOn Business Directory. You can find detailed information for the individual services in the broschure Supplier Portal SupplyOn at: To be able to use the SupplyOn services your company must meet two requirements: 1. Non-recurring PID registration of the company in the SupplyOn portal. (not necessary if your company is already a SupplyOn customer). 2. Entry of the SupplyOn services offered by DEUTZ. For this you receive an invitation the from SupplyOn for each service, which contains the link for online registration. Version 2013_1.4 24
28 For questions on SupplyOn or on the online registration please contact the SupplyOn registration team under the free telephone number: Germany: International: USA / Canada: Mexico: or by [email protected] Your contact at DEUTZ is Purchasing. b. DEUTZ database for standards and norms To ensure a better exchange of documents and information between DEUTZ and the supplier, the DEUTZ company standards and technical specifications are distributed over the internet. This procedure gives advantages in the quality and timely preparation of the documents and alteration information and also a reduction in the processing time of document administration at DEUTZ and at the supplier. The supplier undertakes to check at regular intervals that he is using the current version of all documents in each case. Furthermore the supplier must ensure that he demonstrably utilizes the information made available by DEUTZ and applies it to all activities associated with the business relationship. The access and operation of the system are explained in the DEUTZ company standards H and H (available on the DEUTZ website). The supplier must nominate at least one responsible person in his company who receives the access authorization from DEUTZ. To do this the full name and the address of the responsible person at the supplier has to be provided to the DEUTZ contact at [email protected]. Applicable documents: H Supplier obligations and procedures H Instructions for changing access data to the DEUTZ Internet portal Version 2013_1.4 25
29 14. Traceability The supplier is obliged to ensure the traceability of the parts supplied by him. By identification marking and traceability of the products, or alternatively other suitable measures, the supplier ensures that in the event of a defective product all further possible defective products can be identified without delay in order to keep the subsequent damage as low as possible and if necessary to be able to call back the affected products. Beyond that these products are put on stop until follow up actions are agreed between the supplier and DEUTZ. The identification marking of the products is done for example by applying a barcode or similar marking. For this identification all quality relevant data for the product are to be recorded and assigned. With the aid of the recorded data for example the following must be ensured: All manufacturing data, inspection and test results (actual values) must be able to be assigned to the product. All defective products must be able to be isolated. The data which must be recorded to ensure the requirements are to be specified by the supplier on the basis of his know-how with regard to his product and his processes. Applicable documents: Delivery Specification LV Version 2013_1.4 26
30 15. Packaging The DEUTZ packaging department develops for each individual part packaging regulations with container type, filling levels and if necessary special instructions on part protection. These packaging instructions are a component part of the DEUTZ purchase order and thus binding on the supplier. Detailed explanations (photos, specifications etc.) are to be requested if necessary from DEUTZ Packaging Planning. Adherence to the packaging instructions is continually checked in the goods inwards departments. Non-compliance with the packaging instructions will lead to repackaging work whose costs will be passed on to the supplier. There are differences between the packaging regulations for transport inside and outside Europe. This is to be taken into account in purchasing negotiations and for purchase orders. The Packaging Manual and the Logistics Manual the procedures and regulations regarding packaging and transport of parts and products are defined and explained. Applicable documents: Packaging Manual Logistics Manual Version 2013_1.4 27
31 16. Quality agreements a. dppm agreement For implementation of the "Zero Defect Quality", DEUTZ and the supplier agree measurable goals for the quality supplied. The contractually fixed dppm agreements are to be regarded as supplementary agreements to the delivery contract and serve as the basis for achieving the "Zero Defect Quality" as part of the continual improvement process (CIP). The main objective is to completely negotiate and conclude the dppm agreement before the start of serial production. Definitions: dppm: defect parts per million = Number of defective parts per million parts supplied Penalty: The penalty designates a contractual fine. The supplier undertakes to pay the contractually agreed penalty to DEUTZ upon falling above the agreed dppm target figures. Applicable documents: VQ-L005 dppm agreement b. Market sector procedure (TMV) Defective parts, e.g. from very distant regions, will not be sent back to DEUTZ due to cost aspects (transport, customs duty etc.). Only defective parts from specific markets and market sectors, agreed between supplier and DEUTZ will be examined. With the examination of the defective parts it will be established what and possibly who caused the failure. Remedial measures will be derived from the findings. If the cause of the origin of the failure can be unequivocally clarified, financial measures will be calculated from this. If for instance the failures can be clearly traced back to the supplier, he must, in accordance with a specific agreement (quota), accept the quality costs incurred. From the analysis of the parts provided (approximately 30%) a quota will be calculated related it to all defective parts. This happens as not all defective parts can be analyzed. See Delivery Contract and TM Agreement. Version 2013_1.4 28
32 1. Warranty data base: all data is recorded here; it is the basis for all analyses. 2. In the requirements list defective parts will be ascertained according to region and customer by the Service Department (customer service) and the Quality Management. 3. Agreements with the supplier in question Delivery Contract TM agreement Quotas in accordance with the parts examined - target 30% Per case of damage Version 2013_1.4 29
33 VI. Appendices a. Documents Company Standard H Company Standard H Company Standard H 0753 Company Standard H Company Standard H Company Standard H 0759 Delivery Specification LV DIN EN ISO 9001 DIN EN ISO DIN EN ISO DIN EN V Global MMOG/LE ISO/TS Logistics Manual Packaging Manual VDA Band 4 VDA 6.1 VDA 6.3 VQ-L003 Selbstauskunft_Supplier Information VQ-L004 Quality Questionnaire VQ-L005 dppm agreement VQ-L008 Feasibility study VQ-L009 Confidentiality and Exclusivity agreement VQ-L012 Process audit VDA 6.3 VQ-L013 Prozessfreigabe_process sign-off VQ-L015 Potential_Supplier_Audit PSA Version 2013_1.4 30
34 b. Abbreviations APQP DPPM FMEA MSA PHR PSO SPC TMV Advanced Product Quality Planning Defective Parts Per Million Failure Mode and Effects Analysis Measurement System Analysis Parts Handling Review Process Sign Off Statistical Process Control Market Sector Procedure (Teilmarktverfahren) Version 2013_1.4 31
Supplier quality guideline. VOSS Automotive Group Issue 02.06.2014 Rev00
Supplier quality guideline VOSS Automotive Group Issue 02.06.2014 Rev00 Table of Contents 1. General requirements 1.1 Scope of application 1.2 Quality objectives 1.3 Quality management system 1.4 Supplier
Agreement on Quality, Occupational Health and Safety, Environmental Protection and Social Responsibility (Quality Assurance Agreement)
Agreement on Quality, Occupational Health and Safety, Environmental Protection and Social Responsibility (Quality Assurance Agreement) between Robert Bosch GmbH Robert-Bosch-Platz 1, 70839 Gerlingen, Germany
SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13
SQM-H Supplier Quality Management Handbook MAHLE Behr - global This Handbook is a summary of the processes and documents of the supplier quality management 1/13 Scope of Application The Supplier Quality
Supplier Quality Manual
Trnkova 111 628 00 BRNO Supplier Quality Manual Zetor Tractors approved by/date Koláček Jiří Design Mng. Vavroušek Milan QA Mng. Hodovanec Petr Logistic Mng. Shimoyama Yasuhiro Procurement Mng. Tichý Luděk
Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)
1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission
KEBA 2014 We reserve the right to make technical modifications. No liability accepted for information provided. All rights reserved.
Supplier Handbook Contact address KEBA AG Headquarters, Gewerbepark Urfahr, A-4041 Linz phone: +43 732 7090-0, fax: +43 732 730910, e-mail: [email protected], www.keba.com KEBA Group worldwide Austria Germany
Quality Assurance Agreement
QUALITY ASSURANCE AGREEMENT APPENDIX 2 To the Development Framework Agreement To the Manufacturing und Supply Agreement Quality Assurance Agreement between Willi Elbe Gelenkwellen GmbH & Co. KG Hofäckerstraße
BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL
130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical
Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification
Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Protocol] is maintained on the Bonsucro website: www.bonsucro.com.
GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page
7/11/12 Supplier Quality 1 of 18 7/11/12 Supplier Quality 2 of 18 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management
Quality Assurance Agreement with Production Material Suppliers. History of revisions
Modifications S 296001 Part 1 revision 2008/11 to 2015/04 Editorial changes (displayed in green letters) Project Classification PE changed to "Risk Level RL" also in Appendices 2 to 5 Chapter 4: SupplyOn
VDA Structure Component Requirement Specification. Module I CRS Universal Requirements. <Title> <Number> Version 1.0
VDA Structure Component Requirement Specification Module I CRS Universal Requirements Version 1.0 Technical department/function Release Name Date Signature CRS author Technical department
General Terms and Conditions of Irlbacher Blickpunkt Glas GmbH
General Terms and Conditions of 1. Scope 1.1 All supplies and services by (in the following: Irlbacher) are subject exclusively to the following terms and conditions: 1.2 Terms and conditions of commercial
Supplier Guide. Suppliers for production material or services may be qualified for the list in one or more of the following ways:
Supplier Guide Purpose The purpose of this guide is to inform potential and current Suppliers to Jay Industries, Inc. of our policies as well as quality and performance requirements. Application This guide
GE Power Electronics Business Total Quality Management for Suppliers
GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
ISO 9001:2015 Overview of the Revised International Standard
ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements
ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES
TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:
Logistics Agreement. between. SMA Solar Technology AG Sonnenallee 1 34266 Niestetal Germany. hereinafter referred to as SMA. and.
between SMA Solar Technology AG Sonnenallee 1 34266 Niestetal Germany hereinafter referred to as SMA and Supplier hereinafter referred to as Supplier jointly referred to as Parties Version 2 2014-09-18
Quality Assurance Agreement with Production Material Suppliers. History of revisions
Modifications S 296001 revision 2012/05 to 2016/02 Editorial changes (displayed in green letters) Archiving period increased to 10 years Logistics index LZ3 and traceability added Adjustment to ISO 9001:2015
The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ
The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1
2015-04-15. HELLA Quality. Guidelines for Suppliers (HP-C-509)
AD-PS1-30-03 2015-04-15 HELLA Quality Management Guidelines for Suppliers (HP-C-509) Status: April 2015 1 Contents 1 Introduction 2 HELLA s quality and environmental policies 3 Quality management 3.1 Quality
COMMISSION REGULATION (EU)
L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and
KOSTAL TERMS AND CONDITIONS OF PURCHASE
KOSTAL TERMS AND CONDITIONS OF PURCHASE The legal basis between the Supplier on the one part and KOSTAL Kontakt Systeme GmbH and/or its affiliated companies (go to www.kostal.com/kks) on the other part,
CUSTOMER SPECIFIC REQUIREMENTS
CUSTOMER SPECIFIC REQUIREMENTS For Use With ISO 9001:2008 & ISO/TS 16949:2009 Page 1 SYSTEMS POLICY MANUAL CONTENTS Revision History Approval Document Distribution and Control General Application Background
ISO/TS 16949:2002 Guidance Document
ISO/TS 16949:2002 Guidance Document Introduction ISO/TS 16949:2009 emphasizes the development of a process oriented quality management system that provides for continual improvement, defect prevention,
Terms and Conditions for Embedded Software Products and Embedded Software Services
1 Terms and Conditions for Embedded Software Products and Embedded Software Services I. Delivery of Embedded Software Products of Vector (Standard Software) 1 Scope of Delivery 1.1 Vector shall deliver
Certification Procedure of RSPO Supply Chain Audit
: 1 of 19 Table of Contents 1. Purpose 2. Scope 3. Unit of Certification 3.1 Identity Preserved, Segregation, Mass Balance, 3.2. Book and Claim 4. Definitions 5. Responsibilities 5.1 Head of the Certification
Quality Assurance Agreement (QAA)
Quality Assurance Agreement (QAA) History and Release Notes: Version Date Acronym 0.1 15.04.2010 AB Draft 0.2 10.06.2010 AB Revision in the core team 1.0 28.03.2011 AB,RK, RH Release Status of revision;
Quality Assurance Agreement (QAA)
Quality Assurance Agreement (QAA) between W. GESSMANN GmbH Eppinger Str. 221, D-74211 Leingarten - hereafter "W. GESSMANN" - and Company Road, house number Postal code and city - hereafter called "Supplier"
Compliance Management Systems
Certification Scheme Y03 Compliance Management Systems ISO 19600 ONR 192050 Issue V2.1:2015-01-08 Austrian Standards plus GmbH Dr. Peter Jonas Heinestraße 38 A-1020 Vienna, Austria E-Mail: [email protected]
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Supplier Manual. for Hutchinson GmbH, Mannheim
Supplier Manual for Hutchinson GmbH, Mannheim Prepared by Elke Stelz Version V. 1.0. Last change made on 14.05.2013 Print date from 14.05.2013 roxtra Q Hutchinson - Purchasing Page 1 of 15 Contents 1.
Supplier Quality Requirements
Key Elements Procedures # 2 Supplier Quality Requirements Section List of content Page 1.0 Foreword 2 2.0 Definitions and acronyms 2 3.0 Basic Quality Requirements 3 4.0 Part Specific Quality Requirements
Terms of Purchasing Conditions (GPC) of Amazonen-Werke H. Dreyer GmbH & Co. KG and BBG Bodenbearbeitungsgeräte Leipzig GmbH & Co.
Terms of Purchasing Conditions (GPC) of Amazonen-Werke H. Dreyer GmbH & Co. KG and BBG Bodenbearbeitungsgeräte Leipzig GmbH & Co. KG Version: 10/07/2014 1. Validity of the GPC, Realisation of Order, Changes
General Rules for the certification of Management Systems
General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules
Ege Fren Ege Fren San. ve Tic. A.Ş.
Page : 1 / 8 1. Purpose: This manual is formed in order to create a business environment based on a partnership understanding with our suppliers, determine and develop our relationships in this context
TERMS AND CONDITIONS OF PURCHASING Europe Version as of July 2009
TERMS AND CONDITIONS OF PURCHASING Europe Version as of July 2009 Unless otherwise agreed in writing in framework contracts, orders and individual contracts, the following TERMS AND CONDITIONS OF PURCHASING
Terms and Conditions of Purchase
of the firm of Hella KGaA Hueck & Co., Rixbecker Strasse 75, 59552 Lippstadt, Germany, hereinafter called "Hella", and applicable to the supply of all goods and services by the Supplier to Hella, hereinafter
CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems
Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: [email protected] CP14 ISSUE 5 DATED 1 st OCTOBER
General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0
General Regulations Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0 VALID FROM: 1 JULY 2015 OBLIGATORY FROM: 1 JULY 2016 TABLE OF CONTENTS 1. LEGALITY, ADMINISTRATION AND STRUCTURE... 3 1.1
CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems
Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field
QUALITY MANUAL ISO 9001:2015
Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to
Regulations for certification of quality management systems
Regulations for certification of quality management systems 00 24/04/2013 Annulla e sostituisce il documento Regulations for certification of quality management systems in rev. 14 SG DIR AD Rev. Data Descrizione
Recommendations for companies planning to use Cloud computing services
Recommendations for companies planning to use Cloud computing services From a legal standpoint, CNIL finds that Cloud computing raises a number of difficulties with regard to compliance with the legislation
NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008
WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,
IKM-I-K-01E Standard conditions of purchase IKM Gruppen Side 1 av 6
IKM-I-K-01E Standard conditions of purchase IKM Gruppen Side 1 av 6 Løvås Svein Firma/Company: IKM Gruppen AS 1. GENERAL 1.1 These conditions of purchase shall apply unless otherwise agreed in writing.
General Terms and Conditions
1zu1 Prototypen GmbH & Co KG, Färbergasse 15, A-6850 Dornbirn T +43 (0)5572 52946-0, F -15, [email protected], www.1zu1.eu General Terms and Conditions Färbergasse 15, 6850 Dornbirn, Austria -- in the following
a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).
FAT MEDIA QUALITY ASSURANCE STATEMENT NOTE 1: This is a CONTROLLED Document as are all quality system files on this server. Any documents appearing in paper form are not controlled and should be checked
PSA Peugeot Citroën Customer-Specific Requirements for use with ISO/TS 16949:2009
PSA Peugeot Citroën Customer-Specific Requirements for use with ISO/TS 16949:2009 First issue: February 2011 Revised: November 2013 1 Purpose of the document The purpose of this document is to describe
AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?
1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme
Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme
Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme ISO/TS 16949 IATF Scheme rules 4 th edition areas that impact BSI Clients Copyright 2014 BSI. All rights reserved.
Terms and Conditions. 3012436v2 12285.01010
Terms and Conditions ACCEPTANCE. Except as otherwise agreed in a written agreement signed by both parties, these Terms and Conditions will govern Buyer s purchase order. BI Technologies acceptance of Buyer
Generic CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
Preparing for Unannounced Inspections from Notified Bodies
Preparing for Unannounced Inspections from Notified Bodies Europe has introduced further measures for unannounced audits of manufacturers by notified bodies. With this in mind, James Pink, VP Europe-Health
ISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
Corporate Governance in D/S NORDEN
Corporate Governance in D/S NORDEN Contents: 1. The role of the shareholders and their interaction with the management of the company... 2 2. The role of the stakeholders and their importance to the company...
VDA6.3 Process Audit Webinar 1 st April 2014. Paul Hardiman Qualified VDA6.3 trainer
VDA6.3 Process Audit Webinar 1 st April 2014 Paul Hardiman Qualified VDA6.3 trainer During presentations (11:00 11:30) everyone will be muted so that only the presenter will be heard. The presentation
General Contractual Terms and Conditions of KRÁLOVOPOLSKÁ SLÉVÁRNA, s.r.o.
General Contractual Terms and Conditions of KRÁLOVOPOLSKÁ SLÉVÁRNA, s.r.o. 1. General provisions 1.1. These terms and conditions (TC) govern the sale of products and services (hereinafter as goods ) of
Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004
Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004 00 24/04/2013 Annulla e sostituisce il documento Regulations for the certification of environmental
Supplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
Federal Institute for Materials Research and Testing (BAM) Pyrotechnics Division 2.3 Explosives D -12200 Berlin Berlin, 2013-12-10
Federal Institute for Materials Research and Testing (BAM) Pyrotechnics Division 2.3 Explosives D -12200 Berlin Berlin, 2013-12-10 Pyrotechnic Articles Directive 2007/23/EC Information on the Conformity
PUBLICATIONS. Introduction
Page: 1 of 10 Introduction 1. The requirements of this document supplement the Factory Production Control requirements given in Table 1 of PN111 by giving the specific requirements for Factory Production
FSSC 22000. Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I
FSSC 22000 Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I REQUIREMENTS FOR ORGANIZATIONS THAT REQUIRE CERTIFICATION
DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL
L 218/82 EN Official Journal of the European Union 13.8.2008 DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL DECISION No 768/2008/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System
1-2 3 4 5 6 9 9 29 37 44 57 64 67 70 77 85 90 93 97 101 110 112 113 122 125 127 135 139 146 150 157 161 165 168 172 175 180 187 190 193 201 206 209 212 216 227 233 235 247 251 258 264 272 274 286 1 of
Trelleborg Sealing Solutions Germany GmbH Handwerkstr. 5-7, 70565 Stuttgart. General Conditions of Purchase for Components
Trelleborg Sealing Solutions Germany GmbH Handwerkstr. 5-7, 70565 Stuttgart General Conditions of Purchase for Components 1. Basic Provisions 1.1 The General Conditions of Purchase of Trelleborg Sealing
ASV výrobní družstvo, Školní 71, CZ - 517 01 Solnice. General Commercial Terms and Conditions No. 1.1
1 2 ASV výrobní družstvo, Školní 71, CZ - 517 01 Solnice General Commercial Terms and Conditions No. 1.1 issued in accordance with Sec. 273 of the Commercial Code No. 513/1991 Coll. as amended Introductory
DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
29.3.2014 Official Journal of the European Union L 96/149 DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on the harmonisation of the laws of the Member States relating
Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)
Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic
MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS
MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS CONTENTS 1. CONTROL PLANS 2. PROCESS APPROACH 3. PERFORMANCE 4. INTERNAL AUDITING 5. CONTROL OF NON-CONFORMING PRODUCT 6.
GUIDE TO IMPLEMENTING A REGULATORY FOOD SAFETY AUDITOR SYSTEM
GUIDE TO IMPLEMENTING A REGULATORY FOOD SAFETY AUDITOR SYSTEM FEBRUARY 2016 2 Contents Introduction... 4 Scope and objectives... 5 Scope... 5 Objectives... 5 Responsibilities... 5 The role of the licensee
EA Document on. Accreditation. For Notification Purposes
Publication Reference EA-2/17 INF: 2014 EA Document on Accreditation For Notification Purposes PURPOSE The document presents the policy agreed by EA Members for accreditation of Conformity Assessment Bodies
General Description of The CMC- Services
STANDARD FOR CERTIFICATION No.1.1 General Description of The CMC- Services JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
Service Schedule for CLOUD SERVICES
Service Schedule for CLOUD SERVICES This Service Schedule is effective for Cloud Services provided on or after 1 September 2013. Terms and Conditions applicable to Cloud Services provided prior to this
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY
GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management
QUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS 29001 and MS OHSAS 18001 and MS ISO 50001
The certification of a management system based on standard ISO 9001 or ISO 14001 or ISO TS 29001, OHSAS 18001 and ISO 50001 respectively, consists of the offer and contract phase, the audit preparation,
FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements
GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization
INTRODUCTION. The Quality Challenge
Third Edition January 2014 INTRODUCTION The Quality Challenge Every day at VOLVO, we are working to improve our organization, our processes and the skill of our employees to be the best in class. We are
DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS
DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS 1. Certification and Assessment Services 1.1 Scope and Applicability These DQS UL Certification and Assessment Regulations apply to all certification and
Quality Management System Manual
Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:
DNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
General Purchasing Conditions. R e v i s i o n 02 dated August 24, 2 0 0 7
General Purchasing Conditions 1 1. Scope 1.1 These general purchasing conditions apply to all business transactions of the Trierenberg Holding AG and all its associated companies (from now on TBG ) with
3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes
3 Terms and definitions 3.4 third-party certification audit audit carried out by an auditing organization independent of the client and the user, for the purpose of certifying the client's management system
Quality Management System Manual ISO9001:2008
Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1
QUALITY MANAGEMENT SYSTEM REQUIREMENTS
QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR BUILDERS 2014 400 Prince George s Blvd. Upper Marlboro, MD 20774 800.638.8556 HomeInnovation.com TABLE OF CONTENTS Introduction... iii Notes... iii 1 General...1