Ring Rail Line a connecting urban railway line

Similar documents
Case Marja-Vantaa: Introduction of a new housing area

City of Vantaa New Plans and Projects

The Follo Line Project

Road tolls to pay for the Metro construction in Athens possible way towards free public transport

Project TALSINKIFIX. Pre-Feasibility study of Helsinki-Tallinn fixed link project. Part-financed by European Union

AN ECO-EFFICIENT OFFICE BUILDING IN KEILANIEMI

Transport planning in the Stockholm Region

ROSTHERNE TO MANCHESTER PICCADILLY

City of Helsinki City Planning Department. Light rail. Public transport for the future Helsinki.

Road Traffic Management Strategy STRATEGIES OF THE FINNISH TRANSPORT AGENCY

Helsinki-Vantaa Airport. Kamppi

Guidelines for Attractive Public Transport with a Focus on BRT

Latest anf Future Development Plans in Helsinki

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

Application Form Part A

Transport Demand Management

Penalty points and fixed charge offences

Interim report 1 Jan -31 Mar Kari Inkinen CEO

Approved by the Representative Council on 27 Aug 2014

BY-LAW NUMBER

Informal meeting of EU ministers for Transport Luxembourg, October 7th, Declaration on Cycling as a climate friendly Transport Mode

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

STATISTICS OF FATAL AND INJURY ROAD ACCIDENTS IN LITHUANIA,

Eliminating Gridlock Through Effective Travel Demand Management and Urban Mobility Strategies

Traffic in Helsinki 2002

MELBOURNE METRO RAIL NEWSLETTER

Climate Change Adaptation for London s Transport System

Intermodality and ITS in Frankfurt Rhein-Main SUMMARY

Policies and progress on transport access, including access for the rural population and low-income households

The Gotthard Base Tunnel

11. Monitoring Performance monitoring in LTP2

Major Improvement Schemes in Basingstoke

Cathkin Relief Road Planning Statement

Aviapolis Frame Plan. Starting Point and Objectives City Planning Board 18 August Aviapolis Frame Plan Starting Point and Objectives 1

Automated underground transportation of cargo

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

An integrated approach to develop the transport system of Metropolitan Helsinki

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

The Helsinki-Tallinn rail tunnel SHORT CUT TO CENTRAL EUROPE. Summary of the preliminary project plan

The Danish Transport System. Facts and Figures

CROSSRAIL MOVING LONDON FORWARD. Simon Bennett

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Capturing Value Uplift Benefiting from the Private Sector

BaltMet Network. Mayors of major metropolises in the Baltic Sea Region unified for the competitiveness and innovation of the Region

We would be pleased to discuss these issues with you at your convenience.

Guide to using public transport in the Helsinki region

The risk of derailment and collision, and safety systems to prevent the risk

Experimental-demonstration route of a high-speed overhead STY

Development of the Railway Station Area in Sopot. 2 February 2010

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.

Railway Business Strategy and R&D in Europe

High speed railway principles

E6 Trondheim-Stjørdal, the Trondheim section.

Connecticut s Bold Vision for a Transportation Future

Development of Shanghai Integrated Transport ( ) XIAO Hui and GU Yu

Cleantech. Lahti Finland. Gateway to Russia

Lower emissions, lower fuel consumption.

and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland , 2006

DLA THESIS HIGH-SPEED INTERCITY PASSENGER RAIL CARRIAGES FOR MÁV BALÁZS LENKEI SUPESRVISOR: PROF. JÓZSEF SCHERER

CITY MEETS CENTRE. Be part of the Cardiff Exciting Hotel Development Opportunity

Alphington sewer replacement

Passenger Transport Statistic

Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

PLANNING RAIL BASED TRANSIT FOR BETTER LIVING. S.K.GUPTA DIRECTOR(PROJECTS), Mumbai Metro Rail Corp. Ltd Mumbai

VIII. TRANSPORTATION

ONLINE DATABASE ON GOOD PRACTICES.

Growth of Addis Ababa

Spatially Enabling an Asset Management Database

Why build the Silvertown Tunnel?

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Transcription:

Ring Rail Line a connecting urban railway line 28.5.2013

Welcome to the Ring Rail Line! 2

Ring Rail Line in brief The Ring Rail Line runs from Vantaankoski station via the airport to Tikkurila. It will unify public transport in the metropolitan area and make it a functional whole. The building was commenced in 2009. The project will be completed in July 2015. The Ring Rail Line is an important railway line crossing the metropolitan area. It is both a railway connection to the airport and an urban railway line, which provides an opportunity for 200,000 potential residents and 200,000 potential commuters to work to use public transport. The realisation of the Ring Rail Line entails: the railway and stations in connection with the railway, including arrangements for park-and-ride facilities and bus terminals; Tikkurila office and retail centre/station bridge; Road arrangements required for the Ring Rail Line, the largest of which is the development of the Hämeenlinna motorway in Kivistö 3

Five new stations During the first phase of Ring Rail Line project (2009 2015) builds five new stations Surface stations at Vehkala, Kivistö and Leinelä and the tunnel stations at Aviapolis and Airport. In addition to the stations, the project includes three reservations for stations, which makes it possible to build a station at the location later on. There are reservations for tunnel stations at Ruskeasanta and Viinikkala and for a surface station at Petas. 4

Joint project 5

The Ring Rail Line in figures length of railway line 18 kilometres, 8 kilometres of which in tunnel new stations: Kivistö, Aviapolis, Airport, Leinelä and Vehkala. There are reservations for tunnel railway stations at Ruskeasanta and Viinikkala and for a surface station at Petas. 45 bridges will be built SM5 low-floor trains, i.e. Flirt trains, new rolling stock, running at 10-minute intervals in both directions design speed 120 km/h park-and-ride facilities in the initial phase: 700 cars and 840 bicycles car parking spaces: Vantaankoski 220, Kivistö 250 (500), Leinelä 120 At present about 850 persons are working on the Ring Rail Line project. The costs, 675 million euros, are divided between the Finnish Transport Agency, the city of Vantaa and Finavia. The project receives TENT-T funding from the EU. 6

The Ring Rail Line will be completed in summer 2015 The Ring Rail Line will go into operation in July 2015. According to the original schedule, the Ring Rail Line was to be opened for traffic in 2014. The schedule had to be revised due to the additional work caused by disintegration products of glycol found in the bedrock of the Helsinki Airport. Microbial growth and glycol were first observed under the eastern runway in autumn 2010. Since the disintegration products of glycol shorten the life of construction materials, more durable materials than normally had to be used in the tunnel constructions. The solution to the problem was to build an airtight twin tunnel inside the rock tunnel for a stretch of about 1,000 metres. Similar insulation structures will also be built in the station facilities, vertical shafts and pedestrian walkways. The smell caused by the disintegration products will be eliminated by creating a vacuum in the space between the rock and the insulation structure. 7

The Ring Rail Line connects the traffic in the metropolitan area The new stations of the Ring Rail Line and well-planned park-and-ride facilities will improve the traffic flow in the metropolitan area. The Ring Rail Line provides an option to take the train to new areas and connections. Daytime trains will run at 10-minute intervals in both directions reduces motor vehicle traffic within Vantaa City The starting point of the station arrangements is easy mobility, smooth feeder traffic and short changing times. park-and-ride facilities in the immediate vicinity of the stations bus terminals at the stations in Vantaankoski and Kivistö The Ring Rail Line provides a direct railway connection to the airport urban railway line to the international airport, the travel time to the airport is 30 minutes from the centre of Helsinki 8

The Ring Rail Line creates something new The Ring Rail Line is an urban railway line creating opportunities for new residential and job areas. The Ring Rail creates opportunities for new residential areas in its area of influence. In the initial phase 5 new stations will be built along the railway. It also creates thousands of new job opportunities. At present about 850 persons are working on the Ring Rail Line project. The first underground railway stations in Finland are built on the Ring Rail Line and its 8- kilometre twin tunnel for passenger traffic is unique. 9

The Ring Rail Line takes the environment into account The Ring Rail Line the environment into account and enlivens the cityscape. The Ring Rail Line offers an ecological way of travelling. In the planning and construction phases of the Ring Rail Line, all negative impact on the environment has been minimised. An environmental art plan has been drawn up for the Ring Rail Line. Art will bring the stations to life. 10

Ring Rail Line, construction progress ½ In 2012 the Ring Rail Line project progressed at full speed The project as a whole crossed the halfway mark Some of the milestones Breakthrough of the Ring Rail Line tunnel Completion of the spectacular railway bridge in Koivukylä Completion of the MRU1 excavation contract (the railway section between Ring Road III and main road 3, Hämeenlinna motorway) The largest contract of the Ring Rail Line started The largest separate contract, the interior design of the train station at the airport, was started at the end of October 2012 11

Ring Rail Line, construction progress 2/2 Earthwork contracts MRU1 (From Vantaankoski to Ring Road III) is completed MRU2 (Kivistö Lapinkylä) underway MRU3 contract enquiry in spring 2013 MRU4 (Leinelä area) underway The contract of joining the Ring Rail Line to the main railway line will be completed this summer Building of stations Changes at Vantaankoski are completed Building of stations in Kivistö and Leinelä are underway Interior contracts of Aviapolis and the Airport station as well as Ruskeasanta (reservation) and Viinikkala (reservation) are underway The building of station in Vehkala will commence this year The building of Tikkurila office and retail centre started in February 2013 12

Critical points for time shedule 13

Approval process 14

Glycol area 15

Cross-section of the profile 16

17

18

19

20

21

22

23

24

Thank you! Project Manager Juha Kansonen phone +358 (0)20 637 3633 Project Engineer Jari Jaakkola phone +358 (0)40 520 5171 forename.surname@fta.fi Ring Rail Line communications keharata@pohjoisranta.fi 25