Alan Buchanan Chief Engineer - rail The Timken Company

Similar documents
Bearing Failure: Causes and Cures

Specification for Rotary Drill Stem Elements

Bearing investigation. Extract from the Railway technical handbook, volume 1, chapter 6, page 122 to 135

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Rebuild Instructions for and Transmission

ENGLISH FORK GUIDE 2013

Classic Bearing Damage Modes Ryan D. Evans, Ph.D. Manager Bearing Fundamentals & Tribology The Timken Company

Round Housing with Side Ports

BEARINGS, TYPES & SERVICEABILITY LIMITS, FAILURE MODES

ROLLING BEARING FAILURES

AP Bearing Installation and Maintenance Instructions. Diesel Locomotive, Passenger Car and Freight Car Applications

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

Spicer Axles & Brakes ABIB-0302

Industrial Bearing Maintenance Manual

PRE INSTALLATION MANUAL

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

BRAKE DRUM AND ROTOR SERVICE INFORMATION

EEC 94/20/EC APPROVED KINGPINS

INTRODUCTION KINGPIN REPLACEMENT

I BEAM TRACK INSTALLATION

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

MANUAL TRANSMISSION CONTENTS ...

1.8 CRANKSHAFT OIL SEALS

Step-by-step instructions:

Repair of Hyd-ro-ac Actuators

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

MOPAR 8.75 REAR DIFFERENTIAL INFORMATION

Technical Data. 7. Bearing Fits. 7.1 Interference. 7.2 Calculation of interference F B LLLLLLLLL( A-54

Geometry and dimensional tolerances of engine bearings

6-Speed Synchromesh Transmission Service Manual. (FS-6406 Series)

DO NOT attempt to repair hub and wheel bearing assembly.

DRIVE AND DRIVEN PULLEY

ARMSTRONG MOLD GRAPHITE DIE CASTING DIVISION

Drive shaft, servicing

THRUST NEEDLE ROLLER AND CAGE ASSEMBLIES Assembly Dimensions, Load Ratings, Thrust Washer and Piloting Dimensions

*Specify Oversize When Ordering

EMERGENCY EGRESS LIGHTING POWER SUPPLY PART NO COMPONENT MAINTENANCE MANUAL WITH ILLUSTRATED PARTS LIST

TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE Part #: HT-1

Product information 401. Bearing failures and their causes

SHIMS STAMPINGS MACHINED COMPONENTS

Trouble shooting guide

Checking Wheel Brakes Wear

NORSOK Compact Flange Installation and Assembly Procedure

Part and tooling design. Eastman Tritan copolyester

HYDRAULIC LIFT TABLE CART 2200-LB.

Resharpening Companion

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

DMS 680. Universal length measuring system gauge inspection for»iso 9000«requirements

Self-aligning ball bearings

Drawn Cup Needle Roller Bearings

Diesel Fuel Systems. Injection Nozzles

Quality Management System Manual Revision L

Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:

QUALITY CONTROL MANUAL

Piston Diagnosis A rough Guide

Information on the product

Lenntech psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

PRODUCT MANUAL - M090

ARTICLE BEGINNING APPLICATION IDENTIFICATION DESCRIPTION LUBRICATION & ADJUSTMENT TROUBLE SHOOTING. MANUAL TRANSMISSIONS Saab 5-Speed Transaxle

In-Ground Basketball System Owners Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Timken Bearing Damage Analysis with Lubrication Reference Guide

FAG Hydraulic nuts. Technical Product Information

Self-Audit Checklist

DODGE USAF 200/300 Direct Mount Pillow Block Bearings

TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE Part #: HT-2

Bogue Machine Company, Inc. Business Instruction

SERIES NG 1800 STRUCTURAL STEELWORK

. Failure. Analysis... Report...

Lathe Milling Attachment

Layered Audit Process

Meritor Rear Axle Seals

H EAD TUBE BASICS. Figure 1 - Head tube, front fork and hardware

Stainless Linear Motion Rolling Guide series

Performance Cylindrical OD Bearings (ER) Felt Seal & Flinger. Grade 10 Steel Balls. Lubrication Groove. Zone Hardened. Black Oxided.

CHAPTER 13 LOAD HOOKS

TECHNICAL SERVICE MANUAL

STEEL fabrication quality SySTEmS guideline

UNCONTROLLED COPY FOR REFERENCE ONLY

The Bonelle Tool and Cutter Grinder

S-Cam Air Brakes. Braking Systems - Air. Operation

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

DL-9000 Ticket Eater with AP-100 Logic Board

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Railway Freight Car Inspection and Safety Rules

Auditing Contract Manufacturing Processes

ARVINMERITOR UNITIZED FRONT WHEEL HUB INSPECTION AND MAINTENANCE

SEWING MAINTENANCE CHECKLIST

All replacement hub units are not created equal. What you don t know can cost you time, money, and customers.

Installation instruction

ARGUS GR RFHQ\ VWDQX WHFKQLF]QHJR

Supplier Requirements Manual M M 0 3

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

10 TON HYDRAULIC PRESS

YUASA MILLING MACHINE ACCESSORIES & TOOLS

Webinar Series. Committee. Disc Brake Wheels Off Inspection and Reline. Presents

TIRE & TUBE SECTION DEFINITIONS: OVERALL WIDTH SECTION HEIGHT (D) OVERALL DIAMETER (A) SECTION WIDTH (B) NOMINAL RIM DIAMETER (C)

Transcription:

Transportation Technology Center, Inc., a subsidiary of the Association of American Railroads Alan Buchanan Chief Engineer - rail The Timken Company Bearing Shop Basics 12:30 1:00 PM Day 2 27th Annual 2015 Quality Auditors and Industry Conference TTCI/AAR, 1/10/2012. filename, p1

Scope of presentation Incoming Inspection Training In Process Inspection Inspection and testing Identification and Traceability Preservation and Packaging Quality records AAR rules for bearing reconditioning & remanufacture Manual H-II Defines re-conditioning Defines re-manufacture Defines interchange parts C TTCI/AAR, 1/11/2012, Filename p2

AP-2 type bearing nomenclature C TTCI/AAR, 1/11/2012, Filename p3

C TTCI/AAR, 1/11/2012, Filename p4

Roller Bearing Manual - Section H Bearings in spec. M-934 Seals in spec. M-959 5 Lists all applicable manufacturing requirements for: Grease in spec. M-942 List of approved roller bearing grease & seal combinations in spec. M-942 Appendix E C Spacers (M-934A) Seal Wear Rings (M- 934B) End Caps (M-934C) Backing Rings (M-934D) Cap Screws (S-702) Locking Plate (S-701) TTCI/AAR, 1/11/2012, Filename p5

Typical product receipt C TTCI/AAR, 1/11/2012, Filename p6

Typical high volume bearing washer C TTCI/AAR, 1/11/2012, Filename p7

Typical inspection line with electronic data collection C TTCI/AAR, 1/11/2012, Filename p8

Training and standard work It is critical to quality to ensure each and every worker has been trained and tested in proficiency Works instructions should be available for every operation. As accurate measurement is essential there should be calibration schedules for gauging, and traceability to calibration and national standards. C TTCI/AAR, 1/11/2012, Filename p9

Cup Initial visual inspect Gross defect Verify brand is present Outside diameter measured Counterbore diameter & roundness measured Visual inspection of raceway Stain or heat discoloration Cracks or broken areas Spalls repair, polish & mark AAR Spec None bigger than 3/8 x 3/8 x 1/8 Max of 6 on either raceway Max of 2 in 2 circumferential section Min bridge between 2 is 3/16 Brinells width, length & number Mating cones always removed from process Water etching, corrosion & rust Electrical fluting, pitting or burns Smearing, peeling, nicks, indentations Scribe inspection date & shop code Apply appropriate labels Enter inspection results into data collection Nonconforming that can t be repaired Scrap or Sent to OEM to be remanufactured reground Inspection & Repair Timken Confidential TTCI/AAR, 1/11/2012, Filename p10

Cone Back face wear inspection Inspect for cleanliness Inspect for Brenco recall Actual depth inspected at 3 points AAR spec up to.005 Scrap & salvage rollers Remanufacture Regrind face - up to.010 Laser mark cone repair history Assembly Inspection Inner raceway inspection Visual inspect on backlit fixture Corrosion, rust, pitting Spalls - unrepaired Water Etching Brinell or flat spots Electrical arcing Fracture Secondary inspect with feeler probe Hidden spalls Nonconforming cones Scrapped if unable to be repaired Sent to OEM remanufacturing Timken Confidential TTCI/AAR, 1/11/2012, Filename p11

Cone Assembly Inspection Roller inspection Complete circumference (360 )of each rotating roller Visual inspection utilizing magnified inspection light Etching, corrosion, pitting & rust Fatigue Cracks, Fracture Fatigue spalling or Flaking Smearing, peeling Electrical burns, fluting Brinelling, flat spots, indentations Stain or heat discoloration Scoring, nicks, threading Nonconforming roller(s) Sent to OEM reman Timken Confidential TTCI/AAR, 1/11/2012, Filename p12

Cone Assembly Inspection Bore (ID) measurement Measure bores using digital two point gauge or gauge plate Thermal compensation Indicator lighting defines conformance Red oversize, out of round Yellow AAR service limit Green - OEM Oversize sent to chrome Spacer Inspection Visual inspect for nicks, cracks Go/NoGo gauge for acceptable face width & length Check to surface finish standard Parallelism < or =.0010 Spacers are sized and placed on racks Data collection Cup & cone data tied to each order Cone data Class, date manufactured, type of defect, number of times reconditioned Timken Confidential TTCI/AAR, 1/11/2012, Filename p13

Lateral setting is key to bearing performance Powered lateral process Pressure applied on each cone ensuring rollers are seated Bench End Play set based on spacer length Production lateral master to calibrate machine Bearing loaded into machine Data loaded - cup serial #, month & year Lateral measured with base spacer Conforming lateral Spacer size and lateral value data entered Verification of cup serial # with second entry Print, apply and scan bar code label Release assembly Nonconforming lateral Repeat lateral measurement Fault in this process requires key to unlock Supervisor or QC intervention TTCI/AAR, 1/11/2012, Filename p14

Grease & Seal Installation are safety critical Machine/data acquisition integrated w/lateral Lateral bar code scanned Error proofing conforming lateral verified Input scale tares incoming components Error proofing detects incorrect cone Measures and logs ungreased bearing weight Grease & seal installation Grease seal insert flip-grease seal insert Grease fill tolerance +/- 1 ounce Seal insertion & ability to rotate the seal is checked 100% Grease fill fixtures must be designed to ensure grease distribution per AAR service limit charts Seal clearance charted SWR orientation verified 100% Backing ring is applied using press Output scale tares greased -sealed assembly Error proofing PLC computer locks machine if grease weight nonconforming Exit gate won t open if grease weight nonconforming Fault in this process requires key to unlock Supervisor or QC intervention TTCI/AAR, 1/11/2012, Filename p15

Remanufacturing vs. Reconditioning AAR approved scope of work matrix: Reconditioner Independent Remanufacturer Authorized Representative OE Bearing Manufacturer Cone bore stress relief Cone bore chrome plating X X X X X X Cone face turning X X X Cone de-caging X X Cone race repair X X Cone Race/rib regrind Cup regrind X X TTCI/AAR, 1/11/2012, Filename p16

Cone Remanufacturing Roller Buffing and Polishing Remove stains and other visual discoloration Roller Visual Inspection 360 degrees, nonconforming rollers marked De-caging Visual of cone race for gross defect Roller sets kept together by class Nonconforming rollers removed (4 or less) Roller gauging Required to replace nonconforming rollers Master made to class XXX tolerance Gauge indicator resolution to 0.000010 Same gauging used at roller producing plant Must use consistent roller end marking TTCI/AAR, 1/11/2012, Filename p17

Cone Remanufacturing Race repair Visual inspect of naked race Spall repairs per AAR spec Majority of nonconforming >6 spalls/race Notches added indicate repaired spall locations Nonconforming sent to race regrind, face grind, or scrap Conforming sent to chrome for bore gauging Face wear grind AAR allowed once per cone Grinder up to 0.010 removal Within 0.001 on parallel Surface finish held to <125 RMS History of cone repair must be maintained Laser marker used to add shop code & history Cone assembly Complete roller sets loaded by class only OEM can do this Cage close-in press used for assembly Error-proofing - missing roller detector 100% cage clearance measurement on steel cages TTCI/AAR, 1/11/2012, Filename p18

Cone Reclamation Stress relief of cone bore 100% of cones to be chromed Parts normalized 24 hours Buffed and prepped to be gauged Bores are gauged Conforming parts sent to cone assembly Nonconforming sizes are sorted through gauge gate system Nonconforming out of round/taper is scrapped Sorted parts are staged/grouped by size Chrome Plating Electrochemical hard chrome process Cycle time varies by plating depth and AMPs Buffed & polished Post plating stress relief Bore gauged to verify final conforming size TTCI/AAR, 1/11/2012, Filename p19

Cup/Cone Regrind REMANUFACTURE Cup Regrind AAR allowed once per cup OD Track grind ID cup grind one race per pass 100% gauged for ID size & taper, OD and Counterbores Raceway visually inspected & repaired Shop code, date & operator mark applied Cone Regrind Rib grind Ribs 100% checked for race relief & size Cone OD grind Checked 100% for size & taper Raceways are visually inspected & repaired R circled to indicate conforming Remanufacturing TTCI/AAR, 1/11/2012, Filename p20

TTCI/AAR, 1/11/2012, Filename p21

CEPM ensures full traceability of bearing assemblies TTCI/AAR, 1/11/2012, Filename p22

27th Annual 2015 Quality Auditors and Industry Conference Thank you for your attention.. TTCI/AAR, 1/11/2012, Filename p23