Steel Door Frame Installation in Masonry Construction

Similar documents
Steel Door Frame Installation in Steel Stud Construction

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

DE Frame with C Series Sidelight

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

INSTALLATION INSTRUCTIONS

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

Installation S D I TECHNICAL DATA SERIES. and Troubleshooting Guide. for Standard Steel Doors and Frames STEEL DOOR INSTITUTE

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

Ceiling Mounted Folding Attic Ladders Installation Instructions

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Guidelines for Earthquake Bracing Residential Water Heaters

Installation Guide. Bath and Wall Surrounds SERIES B

Guidelines for Earthquake Bracing of Residential Water Heaters

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

Clad Direct Glaze Window Installation Instructions

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

Packaged Terminal Air Conditioner Wall Sleeve Installation

PART 1 GENERAL 1.1 SECTION INCLUDES

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Laying the First Course. 1. Excavate the site and construct the footing.

PANELIZED HOME INSTALLATION GUIDELINE

2. This is a close up of a typical area where the rocker is rusted out leaving holes under where the rocker moulding would be..

R O A D M A S T E R, I N C.

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Installation Instructions and Ordering Information

KAWAI VERTICAL PIANO REGULATION MANUAL

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

R O A D M A S T E R, I N C.

March 14, Installation of Bay, Bow and Garden Windows

Awning Instructions. Standard Manual 1.5m to 4.5m

LAYING BLOCK AND BRICK

SHOP NOTES METAL SHAPER FOR YOUR SHOP

INSTRUCTIONS: LocknCharge Laptop Carts

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

Tundra Series Windows January 2016

Practical Alignment Tools and Techniques

Speed-Mat Rectangle Cutter

6.0 Implementation: Retrofitting Gable End Walls with L-Bent Straps

SECTION 6. Glass Storefront Doors:

R O A D M A S T E R, I N C.

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Make sure all tubes are installed to your satisfaction BEFORE finish welding!!

Can you design a frameless shower enclosure that doesn't leak?

INSTALLATION OF A BAY WINDOW

92-00 Civic/ Integra/ Del Sol/ CRX Rear Kit Part No

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

EQUIPMENT SET UP RECURVE BOW

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

If stepping is required, step at 180mm as seen in this picture.

R O A D M A S T E R, I N C.

Models A spe n, Econoline C o l o n i al. and Savoy. Installation Instructions. Contractors Wardrobe

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Lathe Milling Attachment

HORIZONTAL INSTALLATION

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

SUPER SHED. Indoor shelter for your outdoor tools.

AMF112 Instruction Manual

MEDIUM FLAT PANEL DISPLAY STATIC MOUNT MSR Series

Important Information for Installer & Homeowner

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

Cooktop Low-Profile Ventilation Hoods

2.9 WINDOW & DOOR BUCKS

Rating when used as a weight carrying hitch without spring bars:

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

How to secure your property after a disaster

WINDOW REPAIR MANUAL & REFERENCE GUIDE

Composite Stone Veneer

Mark Cramer Inspection Services, Inc.

MGB Chrome Bumper Conversion

How to Install GoBoard:

Generator Transfer Switch Model # HTS15-AUTO

Sun Windows General Information Sun New Construction Window Installation Instructions

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

DISTRIBUTOR TECH DATA

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

ROLLING CURTAIN DOOR INSTALLATION, MAINTENANCE & PARTS MANUAL WINDLOCK MODEL 955WL

Panel Track Installation Guide

R O A D M A S T E R, I N C.

ANSI A250.4 Test Procedure and Acceptance Criteria for Physical Endurance for Steel Doors, Frames and Frame Anchors

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Pole Lathe and Shave Horse Design

JANUS INTERNATIONAL CORPORATION INSTALLATION INSTRUCTIONS Pantheon Mini Operator

Owner's Manual & Assembly Instructions

Stainless Steel Continuous Hinges

Basic Spring Motor Roller Shades

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

SPIRAL STAIR KIT INSTALLATION MANUAL

Balance Shoe and Balance Replacement

PRS Y-axis EChain Installation

Transcription:

Steel Door Frame Installation in Masonry Construction Steel Door Frame Installation in Masonry Construction For use with the Steel Door Institute (SDI) video How to Install a Steel Door Frames in Masonry Construction This manual gives you step-by-step instructions for the installation of a steel door frame in Masonry Construction. It is a companion piece to the SDI video How to Install a Steel Door Frames in Masonry Construction. This manual and the video are designed to work in tandem. Please watch the video for a visual demonstration of all steps in this process or to clarify what a specific step may look like. To access the video, scan the QR code below or visit the SDI website steeldoor.org/videos.php. Link to video. Version 2014 1130

Steel Door Institute Frame Installation: Masonry Construction Regardless of the type of building project, secure openings require proper frame installation. This manual will walk you through the three steps of the installation process for a steel door frame in masonry construction. Prepare: Install: Verify: Select the right materials and tools for this project. Set the frame plumb, level & square; complete frame installation. At least a 2-day process with masonry construction. Test the door to ensure that it is functioning properly. Step 1: Preparation 1. Locate the frame at the door opening location. Verify that the frame numbers match those of the opening location. 2. Compare the handing and size of the frame to the drawing. 3. Check the hardware schedule. Contract your distributor if information does not match. 4. Verify that the proper hardware reinforcements are installed on the frame. Also verify the hinge size, strike type and closer mounting. 5. The floor finish will affect the way the door should be installed. Determine if the floor finish will be: Concrete Carpet Wood Tile As shown in the image below, we are using a 4-1/2 hinge, an ASA strike and both regular arm and parallel arm closer reinforcements. Wire anchors work in a variety of masonry applications and will be used in this installation as well. NOTE: Some wood and tile finishes, such as quarry, are up to 3/4 thick. Steel Door Frame Installation in Masonry Construction

Steel Door Frame Installation in Masonry Construction Before setting the frame, always verify that the floor conditions match the drawing that you are using. Circumstances may call for mounting the frame directly to the concrete. You may be installing the door frame prior to floor installation. It s critical that you know the specifications of the floor that will be laid, so that the door will not drag or have too large of a gap when the installation is complete. 6. Adjust the frame to match the floor finish thickness. Frames are provided with adjustable base anchors that allow you to adapt to floors that are up to 1-3/8 thick. CAUTION: Not all floor anchors are adjustable. We recommend that you contact your job supervisor and verify the floor anchor requirements of the finish flooring. SDI manufacturers may provide either adjustable or fixed anchors. Pre-welded frame 7. The frame may be shipped already welded or it may ship KD (knockdown). 8. Install base anchors to the frame using the screws provided. Pre-welded frames are transported to the job site using a shipping bar to prevent the frame from twisting in transit. This bar is not to be used as a spreader bar to set the frame. Spreader bar Some assembly is required with KD frames, but it is minimal. Note that each slot has an associated tab. The most important tab connection is at the rabbeted part of the frame; those tabs should be bent in an outward postion. 9. Stand the frame up in the wall line at the proposed location. Stand the frame up in the wall line The shipping bar comes welded from the factory. It is important that it is properly removed by grinding off. Do not bend or twist off. 10. Place the spreader that has been precisely cut to the door opening specification between the hinges and strike jambs at the floor. Version 2014 1130

Steel Door Institute CAUTION: Check the spreader to ensure that it has been cut squarely and accurately. This will help align the jambs as they are anchored to the floor, which is critical to proper installation. Place spreader between hinges and strike jambs. Step 2: Setting the Frame Plumb, Level & Square 11. Attach the base anchors to the floor on each jamb, using a concrete screw or drive pin anchor. 12. Check to ensure the frame has not moved away from the layout lines. 13. Verify that the head of the frame is level. Attach base anchors to floor. 14. You may need to adjust the base anchors to achieve a level head and Throughout any frame installation, it is important that the frame is continually checked to be plumb, level and square. proper floor clearance. 15. Shim the bottom of the jamb with a flat washer or a fender washer if needed. 16. Recheck for level accuracy after you make every adjustment. With the frame in place, the jamb should be temporarily braced. 17. If your installation requires electrical components, now is the time to install conduits or flex cable for low voltage wiring. 18. Install a piece of tie wire around the frame 48 from the finished floor. Twist the wire tight. This creates inward tension to hold the spreader in place. Steel Door Frame Installation in Masonry Construction

Steel Door Frame Installation in Masonry Construction 19. Place another spreader in between the hinge and strike jambs. This mid-frame spreader is important for keeping the frame straight and in alignment. 20. Check the frame for plumb, level and square accuracy. Bend the anchor ear around the stud to hold the anchor in place. 21. As the mason begins to lay the block, the courses should be brought up evenly on both sides of the doorframe. CAUTION: Be sure not to push the frame out of plumb with the block. Bring the courses up evenly. Lay a wire anchor at the third course. 22. Fill the jambs with mortar evenly up both sides. Lightly tap the frame to settle the mortar. 23. At the third course, or approximately 24 from the floor, lie in a wire anchor on the hinge and strike jambs. Then check the frame again to be sure it is still plumb, level and square in all directions. Make any necessary adjustments. 24. Continue laying the block, filling the jambs with mortar evenly up both sides and lightly tapping the frame to settle the mortar as you go. 25. At the sixth course, or approximately 48 from the floor, lay in another anchor on the hinge and strike jambs. Then check the frame again to be sure it is still plumb, level and square. Make any necessary adjustments. 26. Continue laying the block, filling the jambs with mortar evenly up both sides and lightly tapping the frame to settle the mortar as you go. 27. After laying 8 or 9 courses, the masonry should be allowed to set overnight. Leave the spreaders and temporary back bracing in place overnight. Before leaving the site for the day, clean any mortar out of the hinge pockets and strike reinforcements. Also clear any mortar droppings away from the base of the frame. Leave the spreaders in place overnight. Step 3: Completing the Installation (Day Two) 28. Begin day two of your installation by removing the back braces. Be very careful not to damage the doorframe. The spreader should remain in place if at all possible. When using wood stud anchors, bend the ears tightly against the stud. 29. Evenly fill the jambs with mortar on both sides and lightly tap the frame to settle the mortar. Version 2014 1130

Steel Door Institute 30. At the next course, or approximately 72 from the floor, lay in another anchor on the hinge and strike jambs. Again, check the frame to be sure it is plumb, level and square. Make any necessary adjustments. Anytime you fill a head more than 42 in length with mortar, you will need to insert a vertical brace to prevent sagging. The brace stretches from the bottom of the head down to the floor. Shim the vertical brace as needed to maintain a level head on the frame. 31. Continue laying the block and filling the jambs with mortar evenly up both sides. Lightly tap the frame to settle the mortar and continue up to the top of the frame. The head will now need to be filled with mortar. 32. Lay the lentil over the frame. Tap the frames to settle the mortar. Step 4: Verification 33. Check that the frame head is still level and that no sagging has taken place. If it is level, your frame installation is complete. 34. The frame installation is now complete and ready for the next stage of construction. The procedures described in this document are only guidelines. Please follow all applicable building codes, standards and accepted practices specific to your geographic location. For more information, visit http://www.steeldoor.org. Steel Door Frame Installation in Masonry Construction