7.11a: Quality in Project Management: PRINCE2 and ISO 9000

Similar documents
Superseded by T MU AM PL v2.0

An Introduction to PRINCE2

PRINCE2:2009 Glossary of Terms (English)

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

Purpose: Content: Definition: Benefits: outputs outcomes benefits Business Case dis-benefit Key Responsibilities: Approach: Executive Developed

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

Maturity Model. March Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

WHAT IS PRINCE2? Benefits There are many benefits of using PRINCE2 but primarily it:

Prince 2 Health Check

QUALITY MANAGEMENT POLICY & PROCEDURES

ISO :2005 Requirements Summary

TfNSW Standard Requirements TSR T Technical Management

Association for Project Management Business Management System

Contract Management Guideline

BUY ONLINE AT:

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac

Network Rail Infrastructure Projects Joint Relationship Management Plan

LESSONS LEARNED REPORT

Procurement guidance Managing and monitoring suppliers performance

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

The Department for Business, Innovation and Skills IMA Action Plan PRIORITY RECOMMENDATIONS

ISO 9001:2000 Gap Analysis Checklist

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

Vigilant Security Services UK Ltd Quality Manual

<name of project> Software Project Management Plan

Quality Management Subcontractor QM Guide-Section Two

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

PROJECT MANAGEMENT FRAMEWORK

A COMPARISON OF PRINCE2 AGAINST PMBOK

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001:2015 Overview of the Revised International Standard

Quality Management Manual

SCHEDULE OO CE NETWORK TRANSITION

Quality & Safety Manual

Portland. Reducing Software Costs While Increasing Cost Predictability and Control. Abstract. Mikko Marttinen

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Camber Quality Assurance (QA) Approach

Reaching CMM Levels 2 and 3 with the Rational Unified Process

ISO 9001:2000 AUDIT CHECKLIST

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

Guideline on good pharmacovigilance practices (GVP)

Spillemyndigheden s change management programme. Version of 1 July 2012

PRINCE2 Introduction PRINCE2 Introduction

John A Manzoni Chief Executive of the Civil Service. chief.executive@cabinetoffice.gov.uk

Update on Programme Management Controls & Risks

ISO 9001:2008 Quality Management System Requirements (Third Revision)

Appendices to Practice Guide to Project Management for IT Projects under an Outsourced Environment

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

Crosswalk Between Current and New PMP Task Classifications

Quality Manual ISO 9001:2015 Quality Management System

Improving Project Governance

Operations. Group Standard. Business Operations process forms the core of all our business activities

Benefits. MIRACLE Benefits. I have no idea! What is going on in here? Konferencja "Bezpieczny Projekt" WARSZAWA 11 maja 2010 r.

ISO/IEC Registration Guidance Document

DNV GL Assessment Checklist ISO 9001:2015

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

Client information note Assessment process Management systems service outline

QUESTION: 1 In PRINCE2 what product is used to define the information that justifies the setting up, continuation or termination of the project?

ISO/TS 16949:2002 Guidance Document

Project Governance A N T I C I P A T I N G A N A U D I T

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.

AEO Guide to Engineering Management

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL

Job Description. Barnet Band & scale range. No. of staff responsible for 0 Budget responsibility ( ) Purpose of Job

Programme Governance and Management Plan Version 2

QUALITY MANUAL ISO 9001:2015

Human Performance & the Role of Human Resources

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Project Charter and Scope Statement

Tendering Policies and Procedures

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

ESKISP Direct security architecture development

The Foundation Examination

Quality Management Standard BS EN ISO 9001:

DPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010

B.2.2. Project Management Principles

Aerospace Guidance Document

South Norfolk Council Business Continuity Policy

Consultancy Services Proposal

Capital Projects. Providing assurance over effective delivery of projects

Information Commissioner's Office

ITIL Introducing service transition

TÜV UK Ltd Guidance & Self Evaluation Checklist

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

The Gateway Review Process

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM

ISO-9001:2000 Quality Management Systems

Central Agency for Information Technology

QSS 0: Products and Services without Bespoke Contracts.

Business Intelligence Analyst. Business Intelligence Manager (BIM) 1028 Heslerton Road, Dunsandel, Canterbury

Bristol CIPD event - Change Management practical aspects of business driven changes including examples of restructures, redundancies, TUPEs

Risk Management Policy

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

Transcription:

7.11a: Quality in Project Management: PRINCE2 and ISO 9000 An overview of the PRINCE2 Method (PRINCE2 is a Trade Mark of the Office of Government Commerce) by Peter Whitelaw, Rational Management Pty Ltd, Melbourne PRINCE2 is a structured project management methodology. It consists of a series of processes that a project manager, and other members of a project team, can follow to effectively undertake a project. PRINCE was developed in the United Kingdom in 1975 and underwent several enhancements after acquisition by the UK government in 1979. A consortium of 150 European organisations contributed to the revision and PRINCE2 was released in 1996. It is now a de facto world standard in use in over 40 countries and many thousands of organisations. The method is a complete and logical set of processes that ensures that all aspects of a project are addressed. It is based upon common sense. PRINCE2 encompasses: Starting up a project Initiating a project Planning Controlling a stage Managing product delivery Managing stage boundaries Directing a project Closing a project The method has components to guide project participants through the development of the Business Case, Project Organisation, Plans, Controls, Management of Risk, Quality in a Project Environment, Configuration Management and Change Control. It also offers techniques for Product Based Planning, Change Control and Quality Reviews. It can be tailored to suit any type of project and is scaleable to align with any size of project. Adoption of PRINCE2 offers the following to organisations who manage projects: Eliminating the need to re-invent a management method for each new project Delivering a standard, but flexible, project management framework for the organisation Ensuring stakeholders are represented and share in project ownership Ensuring clarity and congruence of project objectives Agreement between stakeholders of quality and performance expectations Investing in sufficient planning prior to commencing a project Establishment of quality controls, configuration management and control of changes Anticipating current and potential problems and risks and planning to meet these Co-ordination of project resources Decision making milestones incorporated within the plan A mechanism for early warning and dealing with deviations from plan Communications, both within and external to the project Control and progress reporting of project status, specifically achievement of the Business case page 1

Quality in a Project Environment Project Quality is the ability of the solution delivered by a project to meet the needs and expectations of those who sought the solution. It therefore encompasses product features, fitness for purpose and compliance with stated requirements. PRINCE2 recognises the importance of quality in project management and provides the project team with several processes to ensure that quality solutions are delivered by the project. The method also recommends that the implications of quality in a project should be addressed whether the organisation has embraced a quality standard (such as ISO 9000) or not. If the organisation has implemented ISO quality standards then the method is intended to be compatible with those standards. Quality in a project environment is achieved by: Defining the project to recognise agreed quality expectations Planning the project to incorporate products and activities required to ensure quality Monitoring and assuring the quality of the project's products (and the overall solution) during the conduct of the project and on project closure. Reasons for Quality in a Project Environment Organisations often commit significant investment and resources to projects in the expectation that they will deliver new and improved products and services and ways of operating. The benefits to be derived from projects are most often traceable back to the organisation's vision, mission and strategic plans. The stakeholders in projects may have diverse views of the performance and quality requirements of the solution to be delivered by a project. If the project under-achieves these expectations in the view of some stakeholders then the project may be deemed a failure. If the project over-achieves in the opinion of other stakeholders then it may be viewed as a waste of money and resources. Therefore, one of the keys to success in projects is to negotiate an agreed set of performance and quality criteria between the stakeholders and then deliver a solution that meets these criteria. A project management method such as PRINCE2 must provide the tools to define and achieve the agreed quality criteria of the project solution. How PRINCE2 achieves Quality in a Project Environment PRINCE2 recommends the development of several project documents that are designed to ensure quality at various times in the project and at various levels of detail. They include: Customer's Quality Expectations (and Acceptance Criteria) The process of Starting Up a Project requires a Project Brief to be created that provides a preview of the project ahead. Within the Project Brief are stated the agreed Customer Quality Expectations. These are likely to have been determined through consultation with the customer (and users) and discussion with those who are likely to be engaged in providing the solution. If there are divergences in expectations it may be necessary to conduct some negotiation (possibly with senior management arbitration) to come to an agreed set of criteria. page 2

Acceptance Criteria may include: Accuracy Appearance Availability Capacity Development cost Ease of use Major functions Performance levels Personnel level Reliability Running costs Security Target dates Timings Quality expectations are also likely to be influenced by the Project Approach (also documented in Starting Up a Project) where, if possible, the type of solution is defined. There may be marked differences in the quality expectations between an off-the-shelf solution versus an internally developed solution versus an outsourced development. Project Quality Plan When the project has been approved to proceed into detailed planning (PRINCE2 calls this Authorising Initiation) it will be necessary to define how the Customer's Quality Expectations can be achieved. The Project Quality Plan includes: Customer's Quality Expectations (and Acceptance Criteria) Quality responsibilities (identifying who has responsibility) Standards applicable to this project Quality control and audit procedures Change control procedures Configuration Management Plan Quality tools and techniques required Stage or Team Quality Plans PRINCE2 recommends that the quality products and activities necessary to assure quality of the specialist or technical products to be delivered by the project should be integrated into the Stage and Team plans. The quality products and activities could include: Interim quality checks or inspections Final quality checks or inspections Formal Quality Reviews Pilots or trials User Acceptance Testing Product Descriptions As an essential part of planning, PRINCE2 utilises a technique called "Product Based Planning" which is similar to the Work Breakdown approach, but focused upon deliverables (products). Product Descriptions are the documents that define each of the individual products that in aggregate will provide the project solution. Product Descriptions include: Purpose of the product Composition (its main parts or components) Derivation (source) Format and presentation Allocated to (who is responsible) Quality criteria (for this product may refer to a detailed specification) page 3

Quality tolerances Quality method (test, inspection, review required) Quality responsibility (who will conduct the check) Issue Log PRINCE2 utilises an Issue Log to capture (amongst other issues) any quality problems including Off- Specifications detected during quality checks and the actions required to remedy the problem. Some Off-Specifications may be able to be corrected without adversely affecting the project manager's budget and schedule for the stage, others will require escalation to the Project Board. In some situations the product may be accepted containing an error (called a concession) because it s impact may not be significant and the cost and time involved in correcting the error may be substantial. Quality Log This log, created during Initiating a Project, tracks all of the products of the project, their planned quality checks and the outcomes of these. It also logs the number of errors detected, action items required and the final outcome of any remediation. The Quality Log is therefore a useful monitoring tool to assess the progress of the project. Responsibility for Quality in a Project Environment The responsibilities for quality in a project environment may include: Quality Assurance (Organisation-wide and external to the project) Setting and monitoring or the organisation's quality standards. Participating where required in Project Assurance. Project Board members Approval and monitoring of the Project Quality Plan. Approval of Product Descriptions. Overall responsibility for the project meeting the Acceptance Criteria. Project Assurance Independent monitoring of quality within the project from their specialist perspectives. Ensuring adherence to quality assurance standards. Project Manager Preparation of the Project Quality Plan and Product Descriptions. Incorporation of quality products and activities into plans. Management and monitoring of all quality aspects of the project. Maintain the Quality Log. Project Support Administer Quality Reviews if required. May also be required to administer Configuration Management, Change Control, and the Issue Log. Teams, Contractors, Suppliers Plan, manage and monitor quality in relation to their contribution to the project. Ensure all quality checks on products and work packages are conducted as required. Update the Quality Log. Quality Review Technique A Quality Review is an optional procedure that offers a more formal approach to quality checking of the products of a project. It requires the appointment of a panel of reviewers who are engaged to assess the product for conformance against its Quality Criteria defined in its Product Description. page 4

Because the procedure usually involves the commitment of time and effort of several people it is generally only applied to key products in the project. Attempting to conduct a formal Quality Review on all products of a project is likely to be unproductive. It may be appropriate to conduct a Quality Review over a period that covers assessment early in the creation of the product, during development and then prior to delivery of the product. In this way defects can be detected early and remedied. Reasons for using the Quality Review Technique Early detection of defects has obvious benefits to the ability of the project to achieve quality outcomes and minimise threats to budget and schedule. The formal nature of a Quality Review should ensure that all key stakeholders have the opportunity to assess the conformance of the product and contribute to the quality outcomes. This has the effect of enhancing ownership of the final products, particularly where the user community has been actively engaged. Conduct of the Quality Review Technique During Planning it is appropriate for the project manager, possibly with guidance from the Project Board or Project Assurance, to identify the key products and the timing of Quality Reviews. These will be incorporated into the Stage Plans and the individuals appointed to conduct the review are notified. These are the likely appointments to a Quality Review and their responsibilities: Review Chairperson (may not necessarily be any member of the project organisation) Checks that the product is ready and that arrangements for the review are in place. Collects questions and publishes the review agenda. Chairs the formal meeting. Agrees the result of the meeting and signs off on the product if appropriate. Advises the project manager of the outcome or any problems. Producer (of the product) Provides the reviewers with the product and the Product Description prior to the meeting. Assesses questions from the reviewers and assists with the agenda. Responds to questions during the meeting. Agrees to any remedial actions or changes. Obtains sign-off on the final approved product. Reviewers (may be specialists, may include Project Assurance) Review the product against the quality criteria in the Product Description. Document their questions and identified defects for the Producer prior to the meeting. Resolve agreement on remedial actions or changes during the meeting. Scribe Assist in administering the review. Document the assessment and outcomes. Steps for conducting a Quality Review The three steps in conducting a Quality Review are: Preparation Confirmation that the product is ready. Distribution of the product with its Product Description to the Reviewers. Assessment of the product against the quality criteria and submission of questions and identified defects. Arrangements and agenda for the meeting. Review Meeting Discussion, clarification and agreement on points raised. page 5

Agreement of remedial actions or changes. Agreement on outcome of the review. Follow-up Advice to the project manager of the outcome or any problems. Plan for remedial actions or changes. Final sign-off of the product. The outcome of a Quality review may be one of the following: The product is free of defects and is approved, signed off and baselined. The product has defects that have been agreed to be remedied and when these are completed and checked the product will be approved, signed off and baselined. Note that any Off-Specification will be logged as Project Issue and managed accordingly by the Project Manager. The product requires major rework or changes that probably require changes to be agreed to the Product Description before work proceeds. Note that any Request for Change will be logged as Project Issue and managed accordingly by the Project Manager. PRINCE2 and ISO 9000:2000 PRINCE2 is a project management method that incorporates a number of quality processes and techniques that are provided to ensure quality of the project's products. These processes and techniques are designed to be ISO 9000 compliant however in all organisations where ISO 9000 has been adopted as the basis of a Quality Management System (QMS), the standard takes precedence. The following are the areas where PRINCE2 exhibits compliance with ISO 9000: Quality Management System The PRINCE2 quality processes and techniques may form part of an organisation's QMS. Where necessary the quality aspects of PRINCE2 can usually be tailored to align with any form of corporate QMS. Management Commitment The PRINCE2 processes for appointing project board members include the requirement to document and agree to roles and responsibilities that encompass quality. Customer Focus PRINCE2 assigns responsibility for monitoring customer satisfaction to the senior user representative on the project board. Through the processes of Starting Up a Project, Initiating a Project the customer's quality expectations are identified and incorporated within plans. Quality Policy The organisation's published Quality Policy is a reference document in developing the Project Quality Plan. Project Board members approve and monitor the implementation of the Project Quality Plan. Planning PRINCE2 requires the identification of the customer's quality expectations and these form the basis of the Project Quality Plan and the quality aspects of Product Descriptions and Work Packages within the Project and Stage Plans. Responsibility, Authority and Communication PRINCE2 requires the project roles and responsibilities that encompass quality be documented and agreed. Project reporting processes are defined and the Communications Plan extends to internal and external participants. Management Review PRINCE2 requires that a Lessons Learned Log be maintained throughout a project and a Lessons Learned Report be published. These provide inputs to the review process for the QMS. Resource Management Within the scope of the project, PRINCE2 requires that quality products and activities be defined and planned, including the allocation of resources, both human and other, for quality management purposes. Individuals and groups are assigned quality responsibilities ranging from overall Project Assurance to page 6

detailed product quality assurance. PRINCE2 does not cover the organisation's personnel, training, facilities and infrastructure aspects except where these that may be within the scope of a specific project. Product Realisation The PRINCE2 Product Descriptions and Work Packages include quality criteria, quality method and quality responsibilities applicable to each product of the project. The Project Quality Plan defines Change Control procedures, the Configuration Management Plan and quality tools and techniques required. Design and Development PRINCE2 allows the project planning process to define stages that may encompass design and development. It provides for appropriate quality reporting during these stages and ensures adequate record keeping through Configuration Management and Project Document Management. The conduct of quality checks, including formal Quality Reviews and the maintenance of the Quality Log satisfy the quality verification and review requirements. The PRINCE2 Change Control processes further enhance this requirement. Purchasing PRINCE2 does not separately identify purchasing as it may or may not be part of a project. If purchasing is within the scope then the products of purchasing including specifications, tenders, contracts and the purchased products themselves would be quality managed in the same manner as all other products within the project. Production and Service Provision PRINCE2 does not separately identify production and service provision as they may or may not be part of a project. If they are within scope then the products required would be quality managed in the same manner as all other products within the project. Specific methods and tools such as monitoring and measuring devices would be defined in the Project Quality Plan and individual Product Descriptions. Measurement, Analysis and Improvement Conformity is recorded in the Quality Log. Customer satisfaction is assessed during the project through customer involvement in the quality checking processes and by review of achievement of the Customer Quality Expectations by the Project Assurance roles. Specific customer satisfaction is evaluated in Closing a Project. Non-conformance is managed through the Issue Log and Change Control procedures. The assessment of the organisation's QMS and the function of continual improvement are not usually within the scope of a project however the PRINCE2 Lessons Learned may be an input to this process. page 7